Parks & Recreation Commission · 2012
Parks & Recreation Commission
· recording 1 hr 53 min
Agenda
Agenda items for this meeting haven't been extracted yet. Read the agenda on the Town's site ↗
Transcript
226 passages · machine transcriptAutomatically transcribed from the Town's recording with speech-to-text. Names and numbers can be wrong; the recording is the record. Open the Town's video ↗
3:00 Thank you, Stu. Welcome, buddy. Yeah, thank you for your comments. I read them. Didn't have a chance to reply. The first one here. No. Yeah, I can do it right now. Yeah, these let me go. Good. Hey, Sean, how are you? Just fine. Everything he said is all the way out. And look for tech college producers. Yeah, yeah.
4:17 Are you guys still busy? I know I'm great. Yeah, there's... Good church.
4:48 Okay.
5:14 So, yeah. So, yeah. So, yeah. So, yeah. So, yeah.
5:33 It's Terry, Bill, and myself there up for reappointment. Tomorrow we have interviews. Yeah, but you're leaving us. Is that right? Right. Okay. So it's a total of five people applying for four spots, correct? Yeah, I know. I know. Yeah, I did hear myself too, but you know what? I want that one back. That's still a little slow.
6:04 Is that right? Okay, good. Thank you. That's on Sunday. It's two weeks, two hours. Yeah, two weeks, two days, two hours. I'm counting down. Thursday.
6:48 Hold a second. Yeah, we're doing a Thursday night gig. Okay, I will call this regular meeting of the Mammoth Lakes Recreation Commission to order a roll call. Commissioner Agnich? Commissioner Stehlik? Yes. Commissioner Turner? Present. Vice Chair Colisardo? Here. Chair Salzer? Half. I'll note that. I'm half here. She's putting that down. Public comments, this is the time for any member of the public wishing to speak on anything that doesn't otherwise appear on the agenda. Chair Salzer, Commissioners, Peter Bernstein, Public Works.
7:31 Just wanted to give you an update on our projects this summer. The Whitmore Track is underway. Mass grading is pretty much done. We did run into some debris under the field area, so that's being removed, hauled off to the dump. Debris? A couple dozen cars. A few things like that. Lots of beer cans. It's not a dump. It's just debris. Okay.
7:59 So the project's moving along. Looks like paving should still be done by the end of August. We have to allow the polyurethane to go down in the first couple weeks of September. And then the field turf, synthetic turf, would actually be installed in October. So we'll switch some things around to keep the schedule to be done this full season. For the wayfinding project, we've got the TML wayfinding project. The foundations are going in.
8:31 One of them's in front of Shell Mart. There's another type two at the chosen park. And then there's several around on town property. The foundations are also being poured right now. That project should be done first week of August as far as all the signage. The R project also now they've got a contractor working on foundations. And Forest Service just gave them another couple weeks extension due to their subcontracting issues.
9:00 And underway, some of the posts are down at the yard right now, waiting to be installed. The interpreted part of that project, the signs have been installed up at Lakes Basin, so if you're up at Horseshoe, you'll be able to see a couple of signs up there. Let's see, the ARA, Lake Mary Completion Project, basically the construction's done, we're just finishing up some house builds, final documents for Forest Service, and then that project, totally done.
9:33 Trails End Park, we should be advertising in a week, and so the construction would start first week of September and be done the second week of October. So that would be moving along. I thought when we gave up the money for Measure R last year for Trails End Park that the bid was going to happen in the spring, and we would have been under construction by August. Was that just staff timing?
9:58 Staff timing and, you know, we're working with a landscape architect and sometimes twisting arms don't exactly work exactly what we would like. They're a small, smaller firm, he had some issues with family and he's been traveling a lot back and forth to see his parents. Okay, because I thought we actually had the design was complete. No, I wasn't ready. And then we were ready to go out to bid. Yeah, it wasn't quite nearly complete. It will be in about a week.
10:25 That's pretty disappointing, unfortunately, because I kept telling people, oh yeah, it's going to be ready for the summer because that's what we were told. So construction will actually start just after the skate event. Yeah, so it's going to be available once winter hits. I'm sorry, I'm very discouraged and disappointed in that. A couple other projects, Safe Routes to School and Tavern basically is done. We're ready for streetlights and the pad buttons. Sierra Park sidewalk.
10:57 Project will be started next week or later this week and the voodoo shoot project will start later this week. That project will close the voodoo shoot for several months. And then Bruce Woodward's been on vacation for a bit so we'll get him started on the ice rink cover study so that we have information for you at the next meeting. Until again. Any other questions?
11:26 On the safe routes to school, that's the one putting in the sidewalks, right? On, what is it, Sierra Nevada Road, the last one before Main Street off of Old Mammoth? Correct. On the end of that down there, the sidewalk that was put in has a sidewalk piece that makes the full turn to an area where there's never going to be a sidewalk. Why did we do it that way and why didn't we just connect it in with a handicap ramp? Because we sort of just...
11:53 It kind of looks funky, and you're dumping everybody on the ground. Yeah, so, you know, this is all state and federal funding, and we're required to strictly comply with the accessibility laws. And even though there's not a sidewalk there, and we do plan on doing some improvements along the west side of Sierra Park, down at McDonald's, kind of making that more compliant, that little three-foot piece of sidewalk.
12:21 We have to put what they call areas of refuge at the intersection so that the person can get out of the street and let traffic go by. So one of the things you'll see next summer when we construct the street improvements on Canyon Boulevard, we'll have the same thing. The sidewalk will be on the north side, but at all the intersections, we'll have to have a curb ramp and in returns on the south side. And the curb ramp has to be with it curved? Yeah.
12:49 To make it an area of reference. People are on to some of the landscaping, which probably isn't desirable for them. Yeah, there's no trees. We've kind of looked at that in detail once Caltrans told us that they're going to require that. Okay. Is there a reason why we put this on the north side? Yeah. The north side is the south. The north side actually gets better sun. The south facing side? Oh, okay. Yeah, north side will get better sun exposure. Thank you. There's also less impact on any parking in front of condominium projects. Okay, thank you.
13:20 I have a question. Peter, about the signage, the trail signage. Were those the 90 signs from last year? That's correct. And so what is the timeline now? Their current contract completion date is August 17th. And, you know, they've got a contractor now that's getting after the work, and I would anticipate them meeting that date. The actual signs are here at our town yard for that project.
13:50 So they were given a small extension and then they were given another one just recently because of their contracting problems with the local subcontractor. Are they being prioritized in any way so that the more populated areas would have signage place out first? Well, the interpretive signs are done. Those are the ones in Lakes Basin. There's a couple at the Overlook and then at Horseshoe there's a couple more.
14:20 The others, they're essentially working in zones so they can, when they get a truckload of concrete, they can use the whole truck without going too far. So they'll be pouring the foundations along Salmo Cutoff Road, Shady West Park, Welcome Center Thursday and Friday, and they're working on foundations out on the loop currently.
14:48 So they're basically doing the ones in town, which is kind of what we're talking about, but not exactly. They're basically trying to do it by its own. We're just happy to see them finally working. It's been a struggle getting their final documents and moving along. Struggle for us enforcers. Before the summer, too. Yeah. Any other questions? Any other questions for people? No, thank you very much. Okay. Thank you. Any other public comments?
15:22 Do me a favor, Sean, take one and pass him down. Okay, thank you. Thank you, sir. You should put him down there anywhere. Thank you, sir. Good afternoon, Mr. Chair, commish, staff, and members of the community, Rich Bashi, Superintendent of Schools. Been here two years now. Got a great Eastern philosopher, Yogi Berra. He says, you learn a lot by watching. I've learned a lot the last couple of years. I still ask myself the essential question, what are we going to be when we grow up?
15:59 What are we going to look like? What are we going to taste like? I started with the Measure U Committee. Jumped into that. I liked the conversation. Crafted the applications. We talked about big projects. Top tier. Maybe even putting 50 cents of that money, 50 percent of that money away for big projects down the road. And I started watching some videos the other day. I think it was the March 2010 Town Council meeting. Long hair John Wentworth was talking. Talked about air subsidy.
16:27 And I got on the July 4th meeting, watching the Town Council meetings the last couple of nights. So I'm challenged in terms of who we are. So I want to put an idea on the table. I just want to throw something out and see where it goes. I figured I'd start with the Rec Commission. I looked at the Rec Commission plan. It talks about the vision, gateway for boundless adventure in the eastern Sierra that inspires, challenges, and renews. I know your mission statement, the strategies. There are five of them. I know they all talk about recreation, which is great stuff.
16:56 Then I said to myself, you know, we're bigger than that. We've got a great community like this. What do we do to get ourselves on the map in a positive way? So I've had some experience working with the Olympic Committee in the past. I was fairly competitive. I was a national men's program chair for a number of years working out of Colorado Springs, LA in 84, helped manage the Olympic Games and gymnastics competition. So I wanted to start with the Rec Commission. I think this is where this fits.
17:26 In your little packet, we have the U.S. Olympic and Paralympic training sites. It would appear to me, based on some of the conversations, the work, the athletes we have, that we should find somehow to build an action plan to apply to the Olympic Training Center to become an Olympic training site. You know, the designation itself, you've got the track, you've got the mountain building, that training complex right now.
17:52 High altitude training. You look at the RecStrats plan. It talks about a field house. You know, what can we do to move something forward? So there's a little fact sheet that I'm not going to walk you through. It talks about where the Olympic training sites are in the country at this point in time. And it goes through and talks about a training site designation plan. Elite athlete training in world-class competition facilities. I believe, maybe it's just me with a crazy idea that's gone sideways, but I believe that if we could...
18:20 You know, get ourselves together, find somebody to facilitate the conversation. You know, my charge, my challenge to this group, and maybe I'm in the wrong place, would be to get a task force together that would call together the stakeholders in the community. You've got the hospital, the schools, the town, you know, the chamber, private, the mountain, and sit down and talk about what are we going to be when we grow up? Is this an avenue we want to move in? I might feel like, with all the respect, I've only been here two years.
18:49 You know, but I hear the same conversations. And from talking to people, it sounds like we've had the same conversations. So I guess my challenge, my challenge to this group is I would like to request at a future date, since this is just public comment at this point, that we put together a task force that investigates the opportunity of us seeking training site designation, which I think as we begin to look out, you know, five, ten years down the road, what does that mean as we gather all the stakeholders together?
19:19 What does it look like in terms of facilities? What would it look like in terms of facilities bond as we get through these challenging financial times? But I think this could be a way for us to, you know, pull ourselves together as a community and say, this is who Mammoth is. This is where we're going. This is what it looks like. So let's roll. Let's rebuild Mammoth. And I think this is a good place to start. So my two cents on a Monday afternoon. I appreciate the opportunity to share that. And I seek your counsel, direction.
19:48 or next steps in this process. Thank you. Any questions for Rachel on this presentation? No. Thank you. Thank you very much. Although I'm hoping it is Tuesday because that's what I'm sitting here. Sounds like a Monday to me. Yeah. Okay, so am I in the right place with this? Would there be a next step on this concept or am I just talking to the wind? No, I think that this is something we probably will want to agendize at some point in the future.
20:17 and have the conversation with the proponents, that would be yourself, and the commission to see if it's possible how we would move it forward. So yes, this is the right place. Thank you. In my fuzzy mind. So would we put it on the next agenda? I would say put it on the next agenda. Put it on the next agenda? I have no problem with that, depending on how big the next agenda is, yes. I think we should just try to define a timeline. Maybe it doesn't have to be next month, but in the future is kind of broad. Well, for the moment, let's add it to the next agenda, Stu, and see where we end up.
20:48 Thank you. Sounds good. Thank you, Rich. Good afternoon. My name is John Wentworth with MLTPA. Just a couple quick notes of the trail system, things that are happening. Peter spoke eloquently about the signage, things that are going on the ground. It's a great relief, I think, for all of us to see that actually starting to happen. The interpretive panels are great. I encourage you all to get on the Lake's Basin Path to take a look at that. They're magnets to people and visitors. They see those things, they just go right to them. It's pretty exciting. Summer Stewardship Event, the last one was this last Saturday.
21:21 27 volunteers, 28 logs cut, 15 feet of trail restores, 60 pounds of trash removed, four steps constructed on the Mammoth Pass Trail. The next event is coming up July 28th. Really encourage you guys to come out. It's a lot of fun. A lot of very important work getting down on the ground. A lot of trees fell down in places we didn't even know about. There's a bunch of trees on the Dragon's Back Trail that we have to get dealt with. So that's all going well.
21:46 The 12 of the Measure R projects we've been reporting to you guys over the last year have been accepted by the town. It's kind of by default. We delivered 12 projects. We didn't hear anything from them in the 30-day review period, so we're going to consider those projects accepted without comment. So that's the first big bunch of those. It'll be more coming in the coming weeks. The last Mammoth Trails meeting is going to happen this Thursday under our current contract. We don't have a contract going forward for future Mammoth Trails meetings, so the last one will be Thursday if you want to come.
22:14 And we'll be talking with Mammoth Trails members about what the next steps forward look like with that. We're working hard with the town staff to get the Measure R award that happened this year in the spring to get that contracted so we can get those website enhancements moving, doing some back and forth with the town staff about getting scopes of works and things like that figured out. Dave's going to speak about MLTSDC progress. I'm not going to speak about the website at any length, but the town and the Forest Service are working to finalize the MOU before we can launch the site.
22:42 The Forest Service had some concerns about wilderness representations. We met with them a couple times. I think we've got a lot of stuff figured out. David can speak about that in more detail. MLTPA has been designated to be managing the website. We're going to be working with the town staff to try to get that contract figured out. Obviously, we don't want to turn the site on until there's someone there to answer the phone when it's live. So we're working on that in the Forest Service. David can speak this in a bit more detail. He's very excited about doing a big roll-up for the Mammoth Lakes Trail System probably towards the end of August.
23:11 The R celebrations, Peter talked about the signage and all this trail work that's happened. It's a mandatory part of the federal legislation. You've got to have a celebration when you complete an R project, but also the hard rollout of the website and the hard rollout of the Mammoth Lakes Trail System, the definition of what the Mammoth Lakes Trail System is, as documented in MOU between the Forest Service and the town. So a bunch of exciting things are coming forward, and I won't speak anymore because I'm sure Dave's got a lot of great things to say about it.
23:38 Soft rollout of the website. Are you sure we're going to do a soft rollout or are we going to? We're ready to go. We're waiting for the town and the Forest Service to get their MOU finalized, the Forest Service, if they don't want it happening without that. We have, we've met with the Forest Service twice on representations of wilderness stuff. We think we've got that figured out. We're waiting for some response to them of the re-working, some descriptions we've provided them. We haven't heard from those yet, but we're ready within the next week or two to do it.
24:05 You'll send us all an email if there's an opportunity for us to look at something live. Oh, of course. And we're hoping to have a Survey Monkey thing built into the sites, people give responses on things that they like or don't like or whatever. And the hard launch, the hard launch is asking the Mammoth Lakes Tourism, the marketing that Mammoth Lakes Tourism is willing to do. All that stuff will kick in at the same that time, probably be later in August. Thank you. No question.
24:30 John, maybe this isn't for you, maybe it's more for Dave. How was it determined that MLTPA would be managing the website? Dave can speak to that. Any more public comments? If not, I will close public comments and look for a motion or something else on the consent agenda. Somebody absolutely on consent that we'll talk about? I did have a question on the summer camps.
25:06 I was just wondering if for each camp we have a number that a number of participants to say that we're at least breaking even. Is there a break even number of participants that we do? I don't know if it's a specific number. It's really the availability of the staff and the cost of the camp, length of the camp, things like that. I'm just looking at the numbers. Are you looking at a specific camp?
25:35 No, I'm just looking at if we have, let's take the little sluggers, if we have 28 people participating in that, is that paying our expenses for that, or how many people do we need to sign up for that camp to actually at least cover our costs? Right, yeah. We can pull that information for you. I remember it was in that big spreadsheet we did last year that had each camp. I haven't got it on the top of my head what that number is. I think it was in there.
26:01 We had how many people were there and what the cost of it was. But it would just be nice to know going into each camp, this is the goal number. This is what we're shooting to strive for. So this is the number where we at least break women. Beyond that is, you know, gravy. We have a little bit to enhance the program or something else. Yeah, they're very heavily subsidized programs, as you know. Well, do you determine at a certain point, like the, is it the skate camp?
26:31 Six participants. I mean, at some point you decide, you know, six is too few. We scale it down so if it's, it depends on, yeah, I mean, based on the numbers. So we don't really want to cancel camps. I mean, that just doesn't, you know, it's not really the right image we're trying to portray. So we'll try and run camps as the best we can. Say, for instance, the Basketball Academy, I mean, we only had three sign-ups, so, you know, we've had to cancel that. It's a contracted camp, though. If it was our camp, we would have probably reconfigured the camp.
27:01 You know, to turn it into a different kind of program and get some people going. But that's a contract camp. With the Guarmania Escape Camp, we can run that camp with one, you know, person, one camp counselor, right? So instead of being two, we run it for one. So, I mean, you can run the numbers on that camp. It's a $100 camp, $105 camp, six people, $600. We can work out, you know, staff time and so forth. So that's probably about the number to break even on the camps, I'm thinking.
27:29 It was probably about a four to six, depending on the cost. And the intense life wilderness camps, a little bit more intensive. They've got overnights, they've got more food. So it's really kind of a camp by camp number. I don't know if that was a discussion with the group that met as to what they cost. I thought we did talk a little bit about it. I know that we have had to cancel camps in the past for very low attendance. I'm aware that they are subsidized and it's not a good image.
27:58 But at the same time, we may want to look at just exactly what the, you know, what point, how heavily are we subsidizing these, especially in light of our financial situation. Yeah, I think important to look at, go ahead. And I actually want to ask a question with regard to the roller rink. I don't have those numbers from your projections from our last meeting, but where is that, how is that measuring up? You know, we've got barely $1,200 in revenue and so far $15,000 in expenses.
28:27 How is that lining up with what our projections were? Well, the expenses, as you know, is all the capital that we purchased. So it was actually payroll expenses. It's probably about where the same revenue is. I think payroll expenses. Probably a couple thousand, yeah, two, three thousand. So it's not very high on payroll expenses. As with any new business, I think, as you know, it takes a lot to get that awareness. You know, we've just hired our recreation coordinator.
28:54 You can see we've got Michelle's kind of helping us out as well. So we're running it pretty tight. We had a great, you know, free skate day. So it's really only been open just on a month. So I think we'll get there. It just depends how much we really want to spend to get people there, you know, what's the most cost-effective way. So really what we're finding now is the staff are really getting out into the community and trying to, you know, encourage visitation with some promotions and things like that.
29:24 And then Whitmore Pool, I noticed enrollment is down quite a bit. Is that because it's a shorter season or...? Yeah, we started three weeks later. Remember the swim team? We kind of bumped their time so they're going to run later in the season. So you can see why those numbers are down because they're predominantly all the swim team visits in those first three weeks. So, yeah. We've actually got the YMCA high Sierra camp at the pool today. There's 96 people at that pool today. They'll be there on Thursday. So, you know, some...
29:52 Pretty large numbers coming into those facilities. So we're seeing, and I don't know if you're looking at the camps, but all the camps that we've been running to date are all exceeding our numbers that we've been looked at and certainly what we ran last year. So what we're seeing is a pretty strong summer, I think, as you can see across visitation throughout town as well. So we're trending certainly higher than we were before. And did we start the pool later so that we could have lap swim later in the fall?
30:21 So we start a swim team later? Yeah, actually. Because I thought that's why our numbers are off. Yeah, that's right, Commissioner. Yeah, the swim team actually came to us and said, you know, we'd really probably prefer it later in the season just with their competitive schedule. So there we go. So we just, yeah, didn't open it three weeks later. And then we're able to, with their swim team, work in those afternoon lap swim times, which have been actually really good.
30:45 And everyone seems to be pretty content and happy that it does mean on Saturday morning the swim team's there at the pool, which they haven't been before, so a little different change in schedules. My last question would be about the top doc, kind of the same thing, and maybe we need to talk about this during our Measure R, is maybe we need some timelines, because if the top doc is on order, to me it should be here at this point, so it should have been ordered as soon as those funds were verified and awarded.
31:16 And so that at the beginning of our swim season and before we do lessons and that we have that top doc so that we can actually advertise and get people to use it. We actually have one there. So we do have a top doc. This one that we're looking at was just a larger one, you know, to take more people. Still same concern, though. If we award something, then it needs to be dealt with because that's why we're awarding it at that point so that it's available in the summertime.
31:44 On that note, the covers, I think, have been making a big difference, and certainly that vacuum, that vacuum's been amazing. Once that thing comes out of the water, see how much it collects, you know, so I think staff have been amazed, you know, how cleaner that pool is, so, and it's a lot more efficient with that pool cover, so, and certainly the weather's been helping, right, it's a lot warmer. So, I know Dennis was trying to make it today to give you an update on the parks and facilities, but his punch list just gets bigger and bigger, unfortunately.
32:14 And I just have one last question on the swimming pool. Is the lap swim, we had a PM, it says it was in red, but I'm assuming that's the lower number that passed this last year. That's only in May. Did we not do a PM lap swim class for the rest of the season? Last year or? No, this year. This year. Yeah, we're running lap swim. No, I'm not. Not to show you the question. It says PM lap swim right here in red. So you have like six slash one. So I'm kind of assuming that.
32:45 I don't have it in red, so I'm assuming that the latter number is the evening lap swim or late afternoon, whatever time it is, but I don't see the numbers separated in June, so I don't know if we May 2012, lap swim, PM lap swim, lap in red. So anyway, the numbers just aren't that big. I guess I'm just looking at, you know, is the PM lap swim actually
33:17 Justifying itself, if that's what this is. That's why I'm asking, and it's not split out in June, and so maybe it's just something, we'll evaluate the whole program at the end of the season, I guess, and see what's working, what's not working. Yeah, as with anything, I think we offered lap swim in the afternoons way back when, probably when everyone was still on commission here. We haven't had it for quite some time, so again, with a new program, it's taken a little while to keep going.
33:44 I think we want to pursue that, because I think it's actually an extremely convenient time for all those folks up to work to get down there. But yeah, this is great data that we get from the pool, and as we said, we'll be back in September, October with a wrap-up. Sounds good. Good. Any other questions for me? Why don't you make a motion to have some minutes? Accept the consent agenda. Oh, and that's it. I'll make a motion to accept the consent agenda.
34:19 I'll second. You had a question, Beth? No, about the minutes. So that now it's all included. So I have a first and a second. Any further comments? Because you didn't mention minutes. Okay. I just had a question about the minutes being, have we heard from the TRAC program whether they receive that $50,000, $55,000? I think they have. Yes, Stuart. I'm sorry, before you...
34:48 Improve the consent. The quarterly presentation from MLTPA will now be in September. So we're going to move that back to September. Just to make you aware of that change, it'll be updated on the next commission packet. And why is that? Signage, I believe. I think the applicant can speak to it, but that was our request. Several of the outstanding projects we have in our contract have to do with the signage program. The RS signage and the Phase 3 signage, and all that's been pushed back.
35:17 By about a month. So we'll still be working on that stuff through August. And because the budget we have left is probably enough for one more final presentation, we want to make sure we're presenting the whole thing. And if we did at the beginning of August, we still wouldn't be complete with our products. I'm going to miss the September meetings. Okay. And just the way I should have done this today, when the consent agenda is there, it's a motion to approve everything within the consent. So when Terry had questions on the summer camps,
35:50 She should have pulled that from consent, then we should have voted on the rest of consent and gone on to that. So with questions on the minutes, then we should pull that from consent and then go on with it. So the consent, we will hang on as a, you know, as a one piece. Well, actually, the minutes, it just kind of sparked my memory about that item, not that questionnaire, the minutes. Okay. I have a first and a second on accepting the consent items. Any other discussion?
36:21 All those in favor? Aye. Any opposed? We need to change our motion since we changed the one date. They made our motion. We already voted on it. Okay. I'll make notes. Okay. Jamie's on it. Update from Town Manager David Wilbreck regarding the Mammoth Lakes Trail System Coordinating Committee. Good day, sir. Good afternoon, Recreation Commission.
36:53 So I'm just going to kind of walk through a few things and then take some questions if you have them and try to answer them. If I can't, I've got other commissioners and members of the committee here to help me. So as you recall, the Mammoth Lakes Trails System Coordinating Committee was formed, approved by the council. A membership includes two commissioners, Commissioner Sauser and Turner. There's three others as well, which are Bill Taylor, Bill Smith,
37:21 Sandy. Sandy? Okay. Thank you. Sorry. I'm kind of the de facto chair. I'm not sure if I'm doing a good job with it, but I've been trying to give it off to Sean. He's very busy. I'm trying to give it to other people or everybody wants it. I'd like to note that you know how that feels. But anyway, actually it's kind of fun to get back into Parks Recreation. I enjoy that field. I did it for many years before. I think the, just to kind of give a quick review, you know a lot about it.
37:52 You were an integral part of improving our bucket list process that we went through and that was ultimately afforded to the council. The primary focus in the springtime was once the council allocated $300,000 of measuring our dollars, we wanted to come back to the council for the budget process to kind of queue up with that annual calendar. So the process was to try to move forward quickly.
38:17 with a prioritization process based upon something that people could look at and follow the thinking and logic about. So we used this bucket concept, which is a very simple way to view a very long list of projects. I think that went well. I think there's some things we learned, at least I learned about it going forward.
38:37 And one of the things we didn't really have a chance to do, which I think we need to do this year in preparation for next year, is have more public process. The list was defined when we got it based upon kind of how we were moving forward, so I think we need to take some time to expand that and get some feedback from commission members, from community council, so we could revisit that list. The list was approved. We're working on the list now. On the short term, we have a couple of projects.
39:05 One of that John just mentioned a few minutes ago was summer of stewardship. We have a partnership with MLTPA as well as the Friends of the Inyo to run those programs. I think that's going to be a successful summer program. We also have a couple of other on-the-ground projects with some alignments and various things. Going into the fall and winter, we'll go back to the rest of the bucket lists of projects.
39:31 And I think the most important thing we can do, and you can get some feedback from other people on the committee, is really just looking at specific deliverables. One of the things I think happened in this process is we move very quickly, and when you move quickly, you sometimes compromise specifics of what you want to accomplish and things like cost that are maybe not as defined as well as you could do.
39:58 So the problem with that, of course, is it appears to be slowing this side down, slowing things down a bit. So I'm okay with that, slowing it down, just so we can get the information correct, revisit that list. And so we're working through that process, I think, now as we go forward. We're going to be looking at each one of the projects, define what the deliverables are, how that fits into what we want to accomplish. And then as the project gets defined, we'll go forward and allocate resources. And the question will be then,
40:28 Who's going to do the project? There has been a shift and change. John had mentioned his contracts are expiring or have expired projects or are getting done. I think, frankly, that's somewhat intentional. I think, at least from my perspective, the committee wants to be able to make decisions on how the work is going to get accomplished and trying to find the best resource to do that. It could be MLTPA, it could be a consultant, it could be some other entity, or it could be done in-house.
40:58 It could be through a partnership. All of that is yet to be somewhat, I think, looked at. And that's a change on how we've done some business in the past. But the feedback I'm getting, unless it changes, is that's the direction the committee would like to follow or like me to take them to. So over the next several weeks, we're going to be continuing to do that. At the same time, there are some very specific projects that we want to get done this winter. So next year, kind of following.
41:24 Terry's comment that we need to get things done and be prepared to get them done when the time is right to do them and not be in the middle of the wrong time of the season to start things. So we're working toward that goal. Of course, next year will be another list of projects. Some of these that we're working on today will be more progressed along the path to move to the next steps. So I think generally it's going in the direction the committee wants to go. There wasn't really a format for us.
41:52 to use other than maybe my old recreation, Parks and Recreation background was is you have a group to work with, you have a project process, you move it forward step by step, piece by piece, and implement as you go. So that's been kind of our method. We've had good attendance, I think. People who are able to come have come. When they've come, they've been engaged. We try to keep our meetings to a couple hours every time we do it. We've gotten good public comment. There's some folks that regularly attend the meeting.
42:20 You know, engaged in it and other people that have come and had a chance to sit and listen to what we're trying to accomplish. And I think there's a sense of inclusion. I don't think anyone feels they're left out in it. And my sense is that as we go forward, that committee will probably be coming back to your commission and probably asking for some guidance and some recommendations, get some feedback on what we're doing so that we're on track and ultimately goes back to the town council for approval on various.
42:50 projects. So other commissioners have comments? I'd love to hear what your thoughts are. I'm sorry, what did you say about the MOU? Where are we with the status between the town and the Forest Service? So we've had meetings with the Forest Service recently. My understanding is that we just need to finalize it. You know, my energy, frankly, has been a little bit directed in some other areas, so I haven't finished that, but I think, according to the Forest Service, I think we just need to finalize it and get it done.
43:18 Okay. Yeah, and I know that you had stepped out while John said that, but it seemed that that was the most important thing coming from the forest. I would agree on that. Okay. We're still very much on board. There's nothing that's changed for that. As far as the MLTSCC, the only comments I would have to make is that we're working through the process. There's a lot of work left to be done. We crammed a year's worth of work in a really very short period of time, and I think we will expand on that over the next year.
43:49 One of the questions I was asked by the Forest Service representative was how come, for instance, two trailheads that are going to be built that will be part of the Mammoth Lakes Trail System, even though they aren't paid by the town, were in the projects that we had listed. So we have to work out how do you add a project, what types of project, where does it go? So there's still a lot of discussion and coordination to be done to pull the whole thing together, but it's exciting.
44:17 Working outside of the box. It's not the way business is normally done in the town. I think it's more creative. I think that it's going to create a great product for us as a town. Is the Forest Service in attendance at these meetings? They have been at the majority of them, not at all of them. They can't vote or anything else. I understand that, but at least the information. I think the feedback I'm getting, and you guys can tell me you're feeling it different, is that they're glad it's happening and glad for the partnerships.
44:44 As all of our pots of money get smaller, partnerships make more and more sense. And pulling in the coalition, as the Mammoth Trails has attempted to do, not completely successfully yet, but we're getting there, is really an important thing. And that's what this all represents. So I'm excited to keep moving forward on this.
45:06 Well, it was nice having John, because Merrick's there fairly regularly, because he can give us some guidance like the fact that you guys need to get the MOU done. And we knew that, but just to kind of have that reinforced, oh yeah, we've got to get that done. Are you guys meeting on a regular basis, or is it just as things come up? No, we're meeting on a fairly regular basis. It's been an aggressive schedule. We're working to a drawer.
45:37 I think we met every two weeks for the first three months to get it to the council level, and I think that schedule's now dropped back at least once a month and not more often depend upon what we're trying to accomplish, but it was a very aggressive schedule. Now, is the idea that MLTSCC is going to take the place of Mammoth Trails and that we bring those folks in from Mammoth Trails and kind of invite them to be part of this process?
46:05 I think that's to be determined. I don't have an answer for you. Yeah, and if I gave you an answer, it would just be my opinion, of which I certainly have one. We'd love to get your input, though. I mean, I think that that would be great input from the Commission on what your thoughts and ideas are. So I think that maybe now is the time to give us some ideas about it. We certainly can bring it back as an agendized item to you if you'd like. You know, there's been such a large amount of work that MLTPA has done. We certainly don't want to lose any of that.
46:34 and inertia, but the accordion community is a little bit different in its mission is more focused on the deliverable side and hasn't been really taking on some of that public process side of things that MLTPA has been so good at doing. And I guess, I'm sorry, I was just going to say I guess at some point because I know I've attended some of the Mammoth Lakes Trail System meetings and there's some great people that are in there with some great ideas to bring back to that.
47:01 You know, committee would be nice to have, see if we can reach out and try to do that. And that's what I was saying. What is that conduit we haven't created yet to get those public ideas funneled into the trails committee? But the committee is really the nuts and bolts of all things trails, from my standpoint, all things trails that concern the town of Mammoth Lakes. Regardless what the recreation is, whether it's equestrian or walking or bikes or whatever,
47:32 Our living is provided by those folks, whether it's in the town limits or not. So it behooves us to have a Mammoth Lakes Trail System that goes outside of the town and a committee that can deal with those in the town. So Bill, are you suggesting a separate committee or including these other members in this? No, I think that we need to find the conduit so that each one of those organizations has a way to find their ideas.
47:58 to the committee. I wouldn't want the committee to be any larger because we wouldn't get any work done. I'm not saying that they're part of the committee. I mean, they're not part of the Mammoth Lakes Trail System. This is just a matter of that they meet and they, you know, accept ideas and information, but they're being invited. And so I'm not saying that your committee needs to be any larger. You're still the main committee. You're just inviting those public folks that are, you know.
48:25 Well, and Trev was saying earlier, as we get more control and go to a monthly meeting, it will be a more open format to get that input from all. You know, I think there's a couple of ways to look at it. Certainly, there's an operational side of it. There's the development side of it. There's the advocacy side of it. So all these pieces have been, you know, working through the years. You know, under, you know, different circumstances, the Parks and Recreation Commission often would do all of that.
48:55 And Mammoth Lakes does things a little differently. And so I think part of what's happened is that we've been so focused on getting our current workload accomplished. I haven't spent a lot of time certainly on that subject, but it's a very important one, no doubt about that. And the Recreation Commission certainly needs to be engaged in this thing. In whatever fashion and form you'd like for that to be, I'm certainly willing to...
49:24 Work with you and figure out how to do that, whether it's a reporting kind of a thing regularly, or there's workshops, or however you think you might feel better that we'd serve that need that you have, because you kind of have the overarching interest in recreation programs. Just as a curiosity and a question to me, the park side of the parks and recreation has been left off. Is that just by renaming it?
49:49 Because you're still at Parks, right? We used to at Parks, absolutely. Okay, I just wanted to clarify that. I just felt Recreation kind of covered all of it, so. Okay, that's fine. I just often wondered why that change had occurred, so it's really just more of a name change. Getting back to the input, I think it's a good start to maybe include members of that other committee. I've attended, I think, maybe two other meetings, but then maybe reaching out, like you said, Bill, to a request for in.
50:17 Organizations or other groups that are not represented, at least to have them be aware of this committee and give feedback, I guess. Yeah, perhaps eventually we could even do a twice a year workshop situation to gather that winter versus the summer to gather that information in.
50:42 to help with the scope of work for the committee for the next year to find out what the public is thinking and what direction they'd like to see us headed in. Yeah. We call them summits. That's the word I was looking for. Originally, we did summits. And maybe that's what we need to do here is, you know, one or two summits a year to focus on trails. We'll work it out. All right. All right. So, Dave, I have a question for you then. Could you explain the process then on who's determining who?
51:13 is going to handle some of the implementation of your projects. So is it the town making that decision or is it the committee voting and deciding who's going to handle things? I guess specifically the website because in my mind that would be the easiest thing to go out to bid on to see who is the best person, business, profit in the community.
51:42 That's a good example. We had a long conversation with that subject, and I think it was decided at least on a short-term basis because MLTPA's been so heavily involved in the development of it, it made sense for us to maintain that relationship with them for the management oversight, at least for some shorter period of time, maybe up to a year or some period, until we're confident about where it's going to be located, who's going to be managed, who's going to...
52:09 Updated, those kinds of things. There's a lot of uncertainty about that. So since they were the ones that did a lot of the work on it on the front end, they had the relationship with the developer, we would maintain the continuity of that. I think to answer the question longer term, I think there's still that question about who would be the best to do that. And I think the commission, as I mentioned earlier, the commission is looking at that question really for all parts of the system. The fact is that the town staff has gotten so thin.
52:39 I tell people don't promise anything anymore because you don't know what's going to come in the door as soon as you make a promise, which is going to dip the car upside down, you're not going to deliver something. So we're very reluctant to allocate resources that we may not be able to commit to completion. So that leaves our other resources, which could be MLTPA, it could be consulting within the town itself.
53:05 It could be individuals, but I think it's going to be a case-by-case basis. As each one of these comes up, the committee's going to have to take a look at it and decide, you know, how best can we deliver this service? And some, you know, some of it's going to be because MLTPA, for example, has capacities and energy and time that they've devoted to certain areas. Some of it may wind up going to an RFP. At a recent meeting I attended, I guess I'm bringing it up, is you mentioned Mammoth Lake Tourism and everything should be going through them. And I think...
53:35 MLTPA, Mammoth Lakes Tourism, and Friends of the Inyo. Were they going to get together and kind of figure some things out? So I guess if everything streams through Mammoth Lakes Tourism, then it seems like they have the capability to handle it. Is that just adding an extra layer that maybe doesn't need to be? Yeah. My recollection of that conversation was specifically about technology because we had three people. We had Christy from the tourism. Oh, that's right. Nate. We had Nate, and then we had MLTPA.
54:04 So we had, you know, talent at the table that could help us sort out the best way to kind of work forward with the question. But I think until we do this a couple of times, we're not going to know for sure. But I would say that's where we're headed. The task of the committee right now is to go back and delve into those things because a lot of the numbers we used weren't hard for firm numbers either. But to firm up those numbers and decide how best to proceed and who best to deal with those things is probably going to be the scope of the next.
54:36 A couple of meetings, I think, would be my assumption. Yeah. Okay. Any questions? Sam, do you have any thoughts? Yeah, just a quick comment on, I think, the website, a discussion that we had the other day was that we've got a subcommittee to meet some report back, and I think the decision was, in the short term, to meet the subcommittee report back. A written report, I know that I was asking before, I think a couple of other folks.
55:04 So that we really kind of understand, because most of us, at least I'm not, so I need something, you know, that I can actually simplify and talk about it. But in the short term, in other words, it is to continue the present situation until we can make that informed decision. Is that right? Any other questions or comments? No, thank you very much for your time on the committee. You're an important member, so we understand there are other things going on.
55:32 Yeah, no problem. Just as a comment to go back to the original comment or conversation earlier, I think the ordinance actually says in terms of recovery, because you asked us a question about programs and classes and camps, what the recovery is. My recollection from many years ago is that we have a 90% or 10% recovery for children's programs and a 40% recovery for adult programs. And I'll guarantee you that we don't achieve any of that. But there is a standard based upon the ordinance.
56:05 When was that put together? Years and years ago. It might be interesting to look at it. It was a place that I came back in 2000. Yeah. Yeah. So it might be interesting to look at what's... I think you guys did what's comparable in other areas as to what the... You know, for public disclosure purposes, I think it's a great thing to know what it is that you're doing. Yeah. And you can still do the same things, and if the recovery's 5%, but you think it's a valuable program for whatever, great.
56:35 But I think it's good to know, and those are good questions to ask, because it really makes a decision, it helps you make your decisions about how you fund things and what the priorities of the community. I can tell you, for example, swimming is generally a very, very expensive proposition, but it's a very popular and important thing for teaching safety and swimming and those kind of things. Thanks. Did you say 10% for kids and 40% for adults? Okay.
57:05 All right, thanks. Okay, moving on. Review the 2012 R Fall Award Process Timeline Application Evaluation. One of our commissioners had a screw loose. Sorry about mine. Probably me. The way the last couple of weeks have gone, there's no question. Okay, Chair, so I'll lead off with a staff report, if I may? Yes, please.
57:43 So this is the July 17 meeting. As you can see in this packet, there is a timeline. So this is the first review of the Measure R4 material. You will then review it once again at the next commission meeting on August 7th where you'll review and approve. So the purpose of this item is to really schedule the fall award process to review all the evaluation, application material.
58:08 And then to direct staff to implement that timeline and that process. So what we might do is just go through each item as it appears on the staff report here as it relates to the timeline itself. So what we'd look at is page one of the staff report and then attachment A. Maybe we can go through it that way. We can kind of at least get an overview of how it's looking and how it's scheduled this fall.
58:37 So as you can see, the first item that you want to look at there is the funding priorities and principles for the full cycle, which is also that subsequent spring cycle as well. And then based off feedback from the town council, who indicated that they'd like to be involved in a discussion with the commission, we've scheduled that first workshop on August 15th, which is that second meeting in August. And that's really to discuss. It's not establishing. It's really just to discuss.
59:04 The Annual Funding Principles and Priorities. The Commission then would, on September 4, establish those funding priorities and then would also review the full Measure R applications that the Town would be considering at that time. The application form... Could you look at that, Stuart? Oh, sorry. Would it be applications submitted by the Town? So...
59:34 Yeah, so remember how we've done it before, so yeah, it would be specific town projects that would be considered for Measure R funding. So the commission would, one, either vet, you know, yes, no, and then secondly, you can prioritize or at least indicate based on, you know, any priorities that have been established by town previously, prioritize those applications. The application period,
1:00:04 is scheduled to open September 24. Typically it's open for a month, those 30 days, so you can see it's going to close on October 24. Running through the November 6 commission meeting is when you would first review the application and establish the order of applicant presentations. We've scheduled two hearings, as we've done in the past, November 13, skipping the Thanksgiving week, and then bringing it back on November 27 for the follow-up and
1:00:35 As we've found, I think, in previous funding cycles, I think those two weeks are quite advantageous, because I know the commission gets questions back to those applicants, they then have time to prepare those answers and then come back to the commission. So that kind of fits there well. December 4 is when you'd actually make your funding recommendations. We did have that December 5th workshop in there, as we've done in the past.
1:01:03 Again, just direction from Commission on whether that's something we want to schedule right now or wait. And then it's due to be awarded on December 19th. Again, you'd have a special workshop with Town Council on the 19th and then the award that evening. Also in this packet, and we can come back to that too, Chair, if you wish, is the application form. We have the project filter and checklist.
1:01:33 I also included the project filter and checklist from Measure U, if that's helpful. There's also that performance report that we produce. I've indicated that the measure our maintenance costs for projects that have previously been awarded will be presented at a subsequent meeting. And then we talked about the proposed town measure our application. So I'll kind of direct it back to the chair and see how you'd like to proceed at this time. We also, as you know, received comments
1:02:05 Which I've made available to you up at the dais there from Commissioner Agnich on a lot of the application form and the filter and the performance report. So that's what we have at this time. Okay, well first let's ask if anyone has any questions or problems with the... Does that put us in the right place, time-wise? Yeah, it seems a little late, but I think that the amounts of times in there are appropriate, so...
1:02:41 Yeah. I was just wondering if the month was needed for people to submit applications or do they all wait until the last minute? Yeah. Yeah, because it gives them a time when they pick up the application and they meet with staff and they give direction if they're new to the process. It gives them the time to educate themselves to the process and get the application filled out at that point because we ask a lot of things.
1:03:08 You know, the performance and everything else we didn't ask for before. And some of them may need to go out and actually get professional help to help them fill the thing out. And if you remember last year, Commissioner, the award was in February. Remember how we ran into delays? So we've kind of put it back on the traditional timeline that it's at. And if we do get bumped, I mean, now we're in the beginning of January. So again, the goal of this is to really get your funding secured for that summer construction spring cycle.
1:03:38 Yeah. Yeah. Do you have a question from the multiple people in the audience? I don't know if you have a public question opportunity to have a question. My name is John Wentworth, so I'm speaking a little bit as a member of the Measure R Steering Committee and all the work we did putting the application process together, the timeline, all the rest of it. And I think it's important for you guys to consider that a significant change has occurred.
1:04:09 which has to do with the awarding and the contracting of these applications lining up with the town's fiscal year. What this means is that even if an applicant goes through this process and they've got a project they want to get done next summer, I've heard from two of the commissioners today about their frustration about projects going through the fall process, they're ready to go, an expectation that as soon as we can it'll be there by June or July.
1:04:35 Lighting up the awarding of funds and contracting with the town's fiscal year, June 30th, means that you're going to be lucky if you get a contract for something by the end of July, which means you're going to be lucky to get a summer project done in that summer. And I would really encourage you to speak with the council and or the town manager about this problem, because I think you're going to create an expectation of the mind of applicants, while I'm applying for this money in September or October,
1:05:02 Surely there's plenty of time to go through this process. It's going to be awarded in January or February only to get into a situation where the applicant, if successful, cannot even start having a discussion with town staff to get something to contract until the first of July. And I think that that's really problematic. And actually, John, I think I've had this conversation with at least one councilman because the town does an annual review of its budget to look at...
1:05:29 Tax Trends and where their budget falls into line with what their estimates were, that there is the perfect time at the beginning of January at this point, until they change your fiscal year, which they're looking at doing, to add anything we award into that year's budget. They alter that year's budget in January of every year, so I can't see any further problem.
1:05:49 With adding what we award that needs to go out in the current fiscal year, into that current fiscal year. That would be a perfect solution. Because you guys go through all this work and you try to hit deadlines and the council approves a package. By moving this back to December, which we have done, it will give the council the option to add the funds we award into that second half of that fiscal year budget. That would be a great solution.
1:06:15 That would be great because I guess my concern with that is that we've been asked to add administrative costs to anything that's happening. So if we're putting the administrative costs and the project in the measure of our application, there should be no reason why it has to wait until the next fiscal year to actually function and happen. And the buckets are all already there. How much work is it to add or subtract a number to that bucket line?
1:06:43 I don't see it as a daunting task. As I understand, the town is looking at changing its fiscal year to a calendar year, which would put us in perfect as we are. So, okay, moving on. Any other questions? No. Shall we go over the application and Commissioner Eganich's comments? A lot of my comments are just grammatical.
1:07:19 A few things that need to be changed. I think what I was kind of focusing more on is that with some of the requests that we asked for for money, that would just be more itemized or detailed in some ways, so it's not a lump sum of $200,000 that we're trying to figure out how to do this. Right. So your question number three, itemized budget is hugely important. I think we asked for that, but perhaps not in the right way.
1:07:50 Because that is something I think we have all looked for, is that itemized budget that shows the full breakdown of where it goes and how it is spent. 11B, why is this one? Have any public funds been previously committed? You know, I still think that's an important question. You know, is this just being funded by public monies? Is there any other monies that are coming into the project? If you're coming back and asking for more money, why?
1:08:23 So I think on the one page that I saw, it just said measure. It didn't say measure R. It didn't say measure U. The initial got left off. So I agree with you. And then another concern, I mean, I've just been assuming in the past, like maintenance and operation, that whoever the entity is that's going to handle that has been approached and approval has been received.
1:08:53 But is that indeed the case? And that's why I thought maybe if we spelled it out somehow. Right, which is a question that we can ask in our, part of the reason for having the applicants here is to, if it's not the applicant themselves that's going to be doing it, which previously all the applications that have come in, it was going to be either the applicant or the town doing those things. And that's why we specifically ask, who is it that's going to be taking care of that, and maintenance and operations.
1:09:23 I think that's still an important one to be in there. Does it need to be worked differently? Was it confusing? Well, I guess saying who's responsible means that there's been dialogue and there's been agreement. So you don't just say the town's going to do it without talking to the town first. So maybe we need an agreement if that's kind of like we do if you're using somebody else's property. Do you have an agreement for that? Are you asking for an agreement?
1:09:59 I don't agree with that. I just, you know, that there's been some conversation. I think number three, who is and will be responsible for maintenance. Here, in your, what you added, has this entity agreed to provide these services almost as if they've been, their bid has been accepted and awarded, and so I'm not sure if that fits in the board. No, I mean the entity, like the town, like if somebody's saying, well, the town's going to handle this, do we know that the town has agreed to that?
1:10:29 At least verbally. Right. No, I understand what you're asking. I mean, not a bid process or anything like that. I just want to know that the conversation's happening. Yeah. Yeah. Look, it sort of worried me about the farmer's market request that it is soon that the town is going to continue to contribute those monies, but...
1:10:51 We could, I mean, were they? We could just put, have all parties agreed. I don't know. Okay, that's it. Yes or no? I don't know. I don't expect an agreement. That makes sense, because I mean, at least, you know, the conversations have been had with the town. They know that they've got added responsibilities if the group isn't going to do it. I think it's quick, it's easy to say the town's going to do it. So do you want to make a change there, or are we comfortable with how it is? I like what you suggested.
1:11:19 Have all parties agreed yes or no. I have no problem doing that. Have all parties agreed yes or no. Simple yes or no. So Stu, you got that one? Mm-hmm. It's question three, right? Mm-hmm. Of section two. So number four, you're just looking at adding the word detailed. That's kind of what I'm getting on that one. High the nice cost. High the nice cost. Well, even going all the way down to number eight. Mm-hmm.
1:12:11 So instead of just saying it's going to cost $20,000, what does that entail? It would be nice to even know how much is going towards... That that would be in the budget, if they had a budget, as to what it's being, you know, administration, programming, maintenance should be in their budget. One thing that we don't really ask for, though, is we're asking for...
1:12:38 Construction funding, maintenance costs, operational. What about administrative costs? That would be operational. Is it? Well, not really. I would think so. Yeah. It's part of it. Do you want to make it clear? Operational slash administration? Or maybe it's on question, I think. Actually, each one of these could have some administration to it. So, you know, you're going to need to have maybe at the beginning.
1:13:10 For questions 4 through 4 through 12, 4 through 14, please describe in detail, itemize, you know, put a header on it or something instead of having it within each one. Does that work? So, please describe in detail.
1:13:49 Oh, well, you don't ask them to describe. At 14, we asked them to describe your plan already. Detail itemized costs. And I think we asked for a detailed budget, so I think it's already going to be in there. Yeah, I don't know if you want to just leave it. It's just one more time here. Let's leave it blank just because I think Bill's right that it does. Yeah. I don't want this form to become too cumbersome. I've heard that call. It's pretty cumbersome already. I'm sure you guys. It is. I think it's spelled out enough.
1:14:18 Do you want to consolidate any of these items? I mean, I know recently it was expanded, but it is kind of overwhelming. I'd love to see it condensed in some way. The problem is that when they come before us, then we ask them a lot of questions that they're not necessarily prepared to answer. I think it just prepares them. I like it being itemized because we were just getting too kind of brief, lump sum.
1:14:44 Answers, and this makes them look at their whole project and break it out into each individual item. So I kind of like it. Yes, it's a little redundant, but I think that it makes them think about each item. Well, I don't think it's so much redundant as much as it's just being clear on asking about each possible area. What I would actually like to suggest, or, you know, in kind of looking through this, is make sure that we really try and avoid any duplicity of questions.
1:15:13 that seem to be answered or asked in one section and then again in another. So I'm not necessarily seeing some of these right now. Sometimes it can be interpreted as such. But again, my goal would be to try and streamline it and at the same time ask all the important questions. I would say we leave them separate. And I think the only place that you possibly...
1:15:38 Repeat Yourself is in the feasibility portion of it, but it's asking, in the feasibility, it's actually asking you to delve in and get a little bit more detail. Were there any areas that you thought specifically? No, not necessarily, because in reading this, I was thinking, do I have to ask that? But at the same time, yeah, I kind of want to know how that fits into the big picture. So, no, Pat, I don't.
1:16:03 My word of advice to anyone filling this out is read the entire packet before you start filling out question one because you may try and elaborate on question one more than you need to because it's going to ask you that on question number five. So it almost, Stu, if you could give any advice to any of the applicants when they come forward is read the entire packet first before you start filling out question one. Yeah, intense. And then fill it out. Yeah. Okay.
1:16:43 Are we comfortable with our first page then? We can move on to the second. I'm already on page five. I was going to say, are we... No, I was looking at just your question sheet. I thought we were going by section. Well, no wonder I'm getting confused. I'm looking at one set of... I don't know if you're working on another. Okay. Section four. I was just going down... Question one. The list. Her list, yeah. And most of it's just...
1:17:18 Cleaning up with them. I agree with every one of them as I look through it. I'm glad you caught them because I never would have seen the difference between fist and first. It actually fits within the marketplace. Okay. And I basically, this is, I just stripped this out of the application form because the application form was formatted as with...
1:17:44 As we've worked with the applicants, they prefer probably that stripped out Word document, and then there's not these preset tables with characters and limits and those type of things, so that's kind of how we're going to move forward, just kind of a basic Word document that's, I think, far easy for everyone to work with. Right, so they can add everything they need to in between. Exactly. And I would agree with that. And not add pages and pages after, which makes it hard for. So where's everybody at? No, why do you want to delete A, the subsection A? Because there's no B.
1:18:17 Got it. Okay. Didn't even catch that. I'm like, all right. I was thinking she wanted to get rid of the verbiage, but okay. It took me a while, too, but. Okay, thanks. Usually when there's an A, there's a B. Yeah. Okay. So, got it. So we're all going to cost analysis. We got cost analysis. Okay. I don't know, I think it's kind of fun when we're asking the same question on four different topics.
1:18:54 I don't think the applicants share your enthusiasm. Analysis. Am I missing a question, too? I'm just wondering if cost analysis should be in front where you ask for a detailed budget so that they know what we're looking for. Just moving forward. Just moving forward. Those are what you need to answer. That's what you need to put into a budget. Or just see cost analysis in the budget.
1:19:42 Feasibility. Oh, no, that's not even in the feasibility. Oh, yeah, it is. Project feasibility. Because I think it's important for it to be in the feasibility. So you could put C, feasibility section, cost analysis. Just, you know, I'm sure everything you're doing up there makes sense. I'm speaking as a member of the Measure U Committee. And one of the directions we thought was very important was that the Measure R and the Measure U applications
1:20:16 If there are common questions, that they'd be similar, that they'd be the same. So the applicants are going through applications and where the, you know, if the same sentence can be used in both applications, it is in fact used in both applications. So you're not trying to, you're divine from the tea leaves what the differences are. So I just encourage you, whatever.
1:20:35 Tweaks or changes you make. I mean, Stuart, you were part of that Measure U process. You know that whatever those things are, they should go into the Measure U applications as well so that both documents get stronger as things go forward. And I've got some things to do. So thank you very much. Thank you, John. Thank you, John. Can we do that? Because I just would rather not leave it and take it out of the feasibility part of it because I think that's key to be in the feasibility. So just see.
1:21:02 Cost analysis within... You know, I think it comes down to the same thing. Staff telling them when they pick up their packet, before you make out your budget, please read through the entire packet because there are things you're going to want to include in your budget from the cost analysis and feasibility analysis. Well, if you just wrote it in there, you know, I don't know, maybe it gives people a heads up, you know, I don't know.
1:21:24 But I hate to start pulling the feasibility stuff out and start moving it around because that is kind of a whole package. Well, then under cost analysis, gee, should we say operational slash administrative costs like we've done in the previous section? Or even give it, you know, its own letter here. At the very least, I think it should be operational slash administration, Pat. But maybe even give it its own letter.
1:22:00 Because there's definitely things that are operational and things that are administrative. Just include administrative costs within each category. I don't like to know what they are. I mean, maybe some organizations are approaching us that have no administrative costs. Okay, so just add a... And then maybe some have quite a bit. Add J, B, administrative, and then K, other. Is that what you're looking for? Sure.
1:22:31 Oh, nothing. The only other thing I was thinking about was with regard to land acquisition costs. A lot of groups are not necessarily acquiring land. I know this is a one-time annual cost, but I'm worried if it should say land or building acquisition or leasing costs. It could be acquisition or lease, yeah. I suppose acquisition. Acquisition could be lease, yeah. All right, let's just leave it. Again, I don't want to get too cumbersome. I don't want to get too wordy.
1:22:58 God knows I've been accused of that before, so. Well, I have another question then. Equipment acquisition, how does that differ then from operational costs or construction costs? I guess because if you're buying equipment like a sound system. Okay. Purchase equipment. Swing set. Thank you. We'll cover.
1:23:45 I have no problem with her grammatical corrections here, so I don't know if we need to just say that's okay. I have no problem with them either. I thank her very much for taking the time to find them. So next we're moving on to the primary filter. I remember the last time we were going through this, and I'm sure other commissioners are thinking the same thing I need to do, is that when we're getting requests for studies, some of these questions just don't apply.
1:24:18 with regard to what's the replacement costs. Do you remember last time when we were trying to score? Absolutely. And, you know, I thought that exact same thing at the time, and you heard me say so. But then as I read on, there are other questions where construction projects aren't going to get a high score, but the planning is. So I think the balance is there, and we just have to try not to give it a score where it shouldn't have one.
1:24:47 I would just average them out. So if you have one that's a study and only three things are applicable to that, then you average that. And if you have another one that's five, average that. So you're still putting them all in the same categories. It's just, you know, because I hate to start having 15 different checklists. Does that make sense that, you know, if there's three, then you average out those three.
1:25:15 And if there's five, then you average out the five, and then you have one number. There's still going to be an apple to apple because you've averaged them within each study or within each project. In the long run, I think the application is well enough thought out that it averages itself out, even if you do an average of the whole thing. And we talked it through. My biggest concern was more for the applicants. How can they...
1:25:43 You come to a question when they're asking for money for a study that says, what was a good example of that, what's the replacement costs or NA, yeah, you know, and they're just going to have to be instructed to write NA because it's an application for a study. Do we want to make that clear to applicants or is that something that town staff can advise them when they're
1:26:10 Initially applying? I don't think that the people that were applying had as much problems as we did when we were scoring. And I think it was the scoring process that we were questioning is that some of these apply and some of them don't. So, you know, I guess if I go back to the averaging, that if you're, you know, if you do it that way, then you're still coming out with, you would, instead of us sitting here trying to give it a number, we could say NA as well.
1:26:37 And then you can average everything out and you're still giving the proper score. I mean, when all is said and done, this is just a talking point. Because there are going to be times and have been times where something that scored higher may not receive funding as something that scored lower. I mean, I know it's supposed to be a justification, but sometimes things rise in importance based on the time frame and everything else that we can't possibly include all here.
1:27:07 I totally agree with you, and it's frustrating sometimes when we go through our scoring that we're not, the audience is not well attended by even the applicants, because they need to understand that frankly, our checklist and filter is pretty darn open. You know, we discuss absolutely everything here, the numbers are all very clear, we're able to ask questions and that kind of thing. It's just more, I guess, the reason why I even want to state it is just more for
1:27:33 Explaining the process up front, I think that we would have less confusion and better satisfaction with seeing the openness of our scoring as long as we can just try and define what our scoring parameters will be as much as up front without being cumbersome. So I know I said a lot there and then fished it without being cumbersome, but at the same time, I don't know how to best explain it.
1:28:00 And I guess when we had the workshop with the council, that was brought up as well. So what happens if something scores higher, but that's not the highest priority. Something that's scored lower is actually the higher priority. And that's perfectly okay that if that needs to rise to the top just because it's scored higher doesn't mean it. But the council has, you know, final say on what we suggest anyway. But that came from the council because they, you know.
1:28:25 We'd like to weigh in on that. But I still go back to, you know, answer an NA instead of us trying to give it a score. Answer an NA, average it out, and we're going to come up with the same scores. And maybe people need to know that it's a guideline. Because when you say a score, you almost think, okay, whatever score is the highest is going to receive the funding. Yeah, which isn't the case. So maybe it's guidelines. You know, these are guidelines that we're working with. So you can just put a guideline up here. I mean, this is a form that we're using, so.
1:28:54 Nobody sees this, right? No, maybe we need to explain it to the applicants or staff. You know, and I think that that was one of the concerns that I heard from Sandra Di D'Amizio about the farmer's market was that apparently she was told, and I'm not entirely sure by who, that Measure R was the place to go, but as soon as she got here, Measure U applicants had already closed. We told her, well, you should have gone through Measure U.
1:29:21 So I think that the best thing we can do is perhaps give guidance to staff to give to the applicants. And I know you counsel them fairly in-depth, don't you? Kind of say this is what will happen in the process and that kind of thing. So I don't know. Maybe we're already doing the best that we can. And I feel like we're pretty darn open. No, I don't think anyone can argue with that. When were those?
1:29:48 Did it coincide with us pretty close? No, it was like two weeks before us. Yeah, it was close. It was moved up. The council wanted to get that money out. It was going to run concurrently, Commissioner, and then the council moved it up a month. Will this, I'm sorry if you already answered this, but measure the fall applicants, will it kind of mirror, parallel the Measure U applicant? So the Measure U application committee meets next Tuesday.
1:30:18 Actually to discuss that full funding cycle or the annual, spring, whatever funding cycles and they haven't been determined. Okay. So. So are we agreeing to correct the grammatical? Yes. And leave the rest of it as is except for the one addition that we made. I have one more grammatical on seven on the performance report. It just says where.
1:30:48 All measure order awarded funds extended should just be awarded. It's grammatical as well. Are we seeing the checklist though? Sure. Because going back to I think what Teri mentioned during the last meeting with G and H. Remember? So A through F.
1:31:23 Or, you know, the higher the score, the better. But G and H, the lower the score, the better. So do we want to reword G and H somehow? Well, no, because if there's no long-term impact, I give it a high score. So it works out. And that's what I was saying, because sometimes a study gets shafted in the upper in some areas where something we're building doesn't, but at the bottom it scores really high.
1:31:54 They average out to make for a correct score. Do you want to say one is low or bad and five is high or good? I mean, I think that's what you're, that's the way you just phrased it. Right, that's what we do. It says right on the thing, low is one and high is five. Okay. With a little arrow going between them. Yes, but you just used the words, you know, that it's more a good impact or a bad impact. I don't know if that's the right wording. I'm kind of joking on that. But I think that we just maybe need to have a discussion that,
1:32:24 Just as you just did, Bill, explaining. Yeah, if it scores high, that's favorable. If it scores low, it's negative. So long-term impact, if there is no long-term impact, that's favorable. I'd give it a high. If it's $10,000 a year, I may score it lower. Would that work for you? I don't know. I'm just responding to what was mentioned at the last meeting. Right, because when you look at it,
1:32:55 Limited or available to year-round use, well, a study is limited, so it's going to score low there. But it's going to score high where, you know, a playground that's open all year is going to score low. So I think that it averages itself out and becomes really very fair. But, you know, even some of the Measure U meetings that I participated in, sat in with Bill,
1:33:22 There were, there's a lot of discussion about, like, participation. I mean, you could have, I think we used the Mommy and Me or, you know, POP program that might only have, the camp, the skate camp might only have six kids, but is that, how do you weigh that versus, you know, a huge event, a huge event that has thousands of people, you know, so.
1:33:47 We need to think about that. Well, you do, but it comes down to the same thing as the... So more numbers are better? Yeah, more numbers are better, because if they both cost the same, and one has a thousand participants and one has ten, then you're getting a bunch of... But they're not going to cost the same, because if it's a class with ten kids, it's going to be, you know, a thousand dollars versus a huge special event or something, or a huge event that's going to cost...
1:34:16 Thousands and thousands. And I think that's where you weigh that. I mean, if something costs a whole bunch and it's, you know, taking care of 2,000 people, then what is that cost ratio? If you have something that costs $10 and it's taking care of six people, what's that cost ratio? And I think that's what, you know, what you're looking at. But I guess you could look at quality of life and, you know, Dave even brought up the Whitmore Pool, safety.
1:34:43 Maybe safety is a huge factor to consider as opposed to a dollar amount. You have measurable community benefits, so I think that you can look at that in that manner. Can I jump us forward to the evaluation guidelines for Measure U Project Filter if you go one page further? I'm sure you like that language just because, again, it's very clear that a low score is because of these things and a high score is because of those things. We don't have this attached to our Measure R application, do we still? No. I'd love to adopt that.
1:35:13 And we talk about using the same language as what Measure U is using. That's a pretty good little matrix there. And we could probably just adopt that straight in. It would deal with the questions that Pat and Bill were just talking about with what's a high score, what's a low score. But then the last time we were rating, like if somebody gave something a three, well, why a three?
1:35:38 One out of four or two. You know what I mean? It's always going to be subjective. I think we could do this. Ours is not exactly the same, and I looked to see if we wanted to change it, and I actually said no. In my mind, we didn't want to change some of our things that we have here, like long-term impact on measure our life cycle. That's not in the measure U.
1:36:07 I would like to keep it in here. I think it's important. So if we wanted to take this guideline and add it and match it to ours and clarify it and bring it back, I think that that would be fine. And I think it could be helpful. But I was looking to see, did we want to have them exactly the same? And in my mind, I said no. There were some questions that were on ours that I felt were important.
1:36:33 But we could create our own guidelines. Yeah, we could basically use theirs and add the extra couple of points that we have there that you have to do and add the verbiage. I guess since we're going through this still, I did have a couple things. On number three, does the project service meet the priorities established by the Recreation Commission? Do we want to add and accept it by council so that they know this has been vetted through or is that just kind of common knowledge? Yeah. We need to add on number four, we need to add rec strats.
1:37:01 So it has Parks and Recreation, Master Plan, Trail System, Master Plan, we should add RecStrats. Yeah, maybe that should just say, is the project service identified in any park and recreation plan? In any, yeah. Park, recreation, or trail plan. In any town accepted plan. Our town accepted, we can do that. It's filled in the application, so.
1:37:20 Yeah. Yeah. I just, I guess if we're already putting those two in there, so, so that's, I guess number four, if we wanted to adopt that, that's how it's spelled out in Measure U, is the project or program identified in the town's adopted plans. So you could, you could change that to that, that would be fine. And I'm not even sure it, it. And then five, to match Measure U, I think we could also add the economic analysis. It says conceptual plan and economic analysis, just add that. And I think we should keep.
1:37:53 Number 6, which measure you don't have, but anyhow, because if there's anything that falls outside in measure you, they say no. But we haven't done that. What has happened? I mean, has that come up? Yes, there have been things that fall outside, but, well, we say yes, and then you give it a low score. So, anyhow, I think that was when there were maintenance issues that came up, you know.
1:38:21 Maybe an airport subsidy? I'm sorry, I didn't mean to. There you go. I would agree to those changes. Yeah, yeah. Are you guys good with those changes? These are on, right? Okay, good. They are on. They are on. That's why I said it. I didn't say it. Okay. Are we good? I'm good, yeah. That's good. Any other questions? Under the filter, can we add socioeconomic benefit, D, which is...
1:38:53 Like Measure U has. So just economic, it was socio-economic. Right, socio-economic. I have no problem with that as long as... Because I think that got back to the overall benefit of the community, not just the financial benefit. Although I think that the socio-economic measurable community benefits, number one, I think it already carries that. Yeah. I think we put number one there on purpose to carry that with it, so that the economic was separated from the social. Measure U has that as well.
1:39:29 You can put economic slash socioeconomic. That's okay. This is an internal form. Yeah. So Stuart, you're going to redo this and bring it forward on the next meeting? Yep. So you get to review one more time and approve it. And just, I did want to comment on the guidelines. That's kind of why I included them in the packet. I thought it was a good step for the commission to consider. And then...
1:39:54 The Measure U, Steering Committee, I know a lot of the members are here, you know, it didn't indicate a score of value, you know, because of that reason. That's why it says low score or high score. I mean, I think the discussion with that committee started out as, well, what's a one, what's a two, what's a three, just got a little bit too specific, too defined, so they kind of just went with that broad range, and I think that's a good recommendation. Yeah, I think that's fine. We just need to add our extra columns. Yeah. And put a definition in there. Okay.
1:40:28 Any other things to review? Any other questions? Moving on. Manager's report. I'm sorry. Did we want to have some kind of timeline? You know, put in here, you know, we asked. I don't know that there's a timeline that says when is this project going to take place. I don't know. We asked that question. We verbally asked that question. Yeah. I don't know that it's in here. I don't think it is.
1:41:02 But we base funding sometimes on that verbal ask. So you want to add to the construction section, what's your construction timeline? But they aren't going to have a timeline if they don't know if they've got funding or not. What is your anticipated timeline? Something like that. What's your anticipated start date? I don't know. Completion date. Completion date. And if these funds are awarded, when does...
1:41:34 Because nobody's going to be able to give you an exact, and you can't hold them to an exact any time you're doing something like that. But it would be nice to say, and so somebody knows that this is, you know, I'm a big procrastinator, so, you know, it's nice to have. I'd probably put it in Project Summary right on the first page there. Yeah, on the first page, it would go in there. That's what I was looking at. I have no problem with that. Anyone else? Good. Okay, sorry. Are we done? Are we done? Mm-hmm. Manager is important.
1:42:05 Okay, I just had a few items, and the chair and staff are going to meet with Crowley Lake Fish Camp, but I just did get some preliminary numbers. They estimated around 650 cars for July 4 and 150 walk-ins. Looking at some historicals, 2007 was the last time it was on Wednesday, and that was 538 cars. Saturday in 2009 was 682.
1:42:34 Sunday 7.72 and a Monday 5.20. So actually for a Wednesday I think that was pretty good. Real good. It's a good number. So the next steps now is to, as I said, the Chair and staff are going to meet with the Crowley Lake Fish Camp folks and just kind of work through the expenses and so forth. I do want to say though I did run the numbers today and what the expenses were and gives us some indication but we saved just over $8,000 so far. We're still waiting on a few expenses but I think we're pretty close from the previous year.
1:43:03 So I think that was considerable. We saved just under $2,000 on the Pops in the Park contract. So hopefully I think that was still a great event, right? So I think that was very productive. We received $5,150 from sponsorship. Again, that was primarily Mr. Rick Elkus. It was $5,000 and Fendons actually gave us a check for $150 for sponsoring.
1:43:28 And then the last number of that revenue is the revenue from Crowley Lake Fish Camp. So we can work that out. But I think from the goal where we started months ago about trying to save some funds, we're looking at a savings of net expense to the town from $36,000 last year to $25,000 this year. Kind of a net expense. That's great. That's awesome. Thanks, Bill.
1:43:56 Fish Camp was great to work with, a little bit that I did, Stu worked with them a lot more. I'm anxious to have them wrap up with them to see how they felt. Beings that I do spend the fort down there, my disappointments were, never before have I seen the car lights light up along the Whitmore Road where people were watching them for free like they were this year. Crowley Lake Drive was again absolutely wall-to-wall packed with people watching them for free this year.
1:44:23 The hills on the backside of Crowley, where normally people camp, there was a traffic jam leaping on the dirt roads to go back over to the dam. There has got to be some way that we either get county participation, because those are primarily county residents. The tourists don't know how to get to the back of that lake. There were no fewer that I personally knew of than eight parties at Crowley Lake Homes.
1:44:53 to avoid paying the fees for the fireworks. If we could somehow get any of those people to pitch in, or the county to pitch in, this could be almost a no-subsidy deal. Couldn't the county post no parking signs in certain areas like they do on the highway? Couldn't they do it on South Landing?
1:45:16 Probably need a revised ordinance, I would say, from the county to do that. Yeah, they would have to pass an ordinance to do it, and then they would have to come up with the funds to pay the sheriffs. I would almost rather that they took the money that it would cost them to do that enforcement and pass it along to us. To encourage. And then as the economy gets better and we can all put more money back in.
1:45:40 I don't, did he, did any of you see the, I don't know, Terry saw them. Did anybody else see the firework line? Not this year. From my porch. From your porch? No, did you pay for it? Did you call in your $30? They truly were spectacular. I was disappointed that there was no...
1:45:59 Broadcast this year. Kobe, that gentleman had left town, so we weren't able to secure that alternative in that time that was available, so. Yeah, well, hopefully we can work on that, too. You and I can be noticed as one of my passions with fireworks down there. It would be great to try and get. But other than that, for Crown of the Lake, it was a spectacular fireworks show. I enjoyed the heck out of it. I did, too. I have to say that I'm surprised that we had the numbers that we did, because I thought it was.
1:46:25 Pretty light down there. In fact, when I left, I have to tell you, I drove straight from the lake, straight up and through. No waiting anywhere, period. Well, from out on the boat, just before sunset, you could see that the hill behind us was packed. Oh, Crowley Lake Drive was horrible. I wouldn't want to be in that line. But it was a great event, and I hope that we can find a way to continue doing this.
1:46:53 of whoever's support we need to enlist because it was, it truly is a spectacular thing out over that way. What was supposed for a vehicle to go? $25. $25 was that at? We hadn't changed it. $5 goes to, um, um, um, DWP. And DWP helped us there because in the past, when you got charged for camping, you didn't get charged for the fireworks.
1:47:17 This year they added the $25 onto the camping fee specifically so that it would contribute to the fireworks. So they have stepped up, cost me more, but they have stepped up as well to try and make this thing a success. And I think that moving forward we probably need to maybe have a meeting with ourselves, Crowley Lake Fish Camp, maybe Chamber comes in, we enlist businesses.
1:47:42 You know, so that we can have further donations because that's going to be key moving forward. And the county. And the county, yeah. Pat doesn't live in Mammoth. She enjoyed the fireworks. The comment from the county was that the county doesn't put any money other than in-kind services into the Bridgeport one. Other than in-kind services? What are the value of those in-kind services? Those in-kind services because they're not putting that in here. I've had those conversations with the county before. Maybe dig a little deeper there.
1:48:08 I know we've got to get. I'll just finish my manager's report. I'll just finish. I'm actually on vacation July 30 through August 20. So I'm going south. Not Mexico. So Mark's going to be chairing your August 7th meeting. I'll produce all the staff reports and whatnot. So the question on the Olympic training site and that kind of group, if you wanted to put it on August, that's fine. I did mention to Rich that
1:48:37 You know, if we wanted to do a little bit of research and come back in September when I'm back here again, it's up to you, but I thought that might be a good suggestion. You know, let's do like we've done with a lot of things, put things on both agendas, and then work it as we can because there are things that need to go there. And I'm sure there's other thousands of things we're working on, but that's it.
1:49:04 I have a question on that. No. You can use it as my commissioner's report, whatever. There are, we have a facilities committee that's been, you know, in place. This meeting, kind of to what Rich is talking about, was it specifically for an Olympics training center? No. But that meeting was supposed to have taken place, so I would really like to see how we can gather these bodies together, the folks that are on the Rec Commission subcommittee.
1:49:32 All the players that have properties and needs for facilities, you know, is that facility an Olympic Training Center? And, you know, I really would like to get that group together because that's kind of key in moving forward, especially looking at our fall applications. I think that that needs to happen sooner than later. And, you know, we talked about having the school, the college, the county, the town, you know, all of those players.
1:50:00 Sitting at a table so that we can have that conversation. So I would really like to see if we can make that happen. And then I also want to find out, and it can be brought back or maybe have an answer, track operations and marketing. Is there a business plan? What are we doing? We're building this. How are we going to make it function and profitable?
1:50:24 I'd like to see that come back and that's probably a conversation I'm assuming, well I don't know, what is that conversation when? I would assume it would be with Mammoth Lakes Tourism and the track and the commission. I'd like to see that happen. Yeah, we're doing, I'll answer two of those. So Mark's chairing the August 7th, so I did recommend to Mark to see if he can kind of put that on the agenda and work towards that workshop and that goal. And then we are conducting research right now on the track.
1:50:50 We have severely resource restricted right now, so I'm just thinking that's probably a good fall, you know, early winter project for that track. It would just be really burdening our staff right now with what we're trying to do to get that up. So that would be my recommendation. But yeah, I think they're good suggestions. Then let's move on to Commissioner Reports. Pat, you like the fireworks from your... Good job. That was just... I just had a couple of questions, so...
1:51:21 Yeah, I'm just going to talk about Bluza Pluza real quick just because this is the last meeting before Bluza Pluza starts in two weeks, two days, and two hours and ten minutes. A couple new things this year is that we're having Thursday, which could be fun. It's a free event. So the public is welcome from six to nine. It's really an opportunity for our bars to kind of have a soft opening, test the lighting, that kind of thing. Shane Dwight there, and that's going to be on Thursday night. And who knows?
1:51:49 Four years ago Sunday didn't exist as a third day for Belusa Belusa, so we are officially making it a fourth day. We are offering early ticket fulfillment, and this is something that we've talked about with the Lodging Association, which is new this year, is in the Whiskey Creek parking lot. You can come get your wristband affixed and take your tasting glass home on Friday, because we've had a lot of complaints in the past, or I shouldn't say complaints, but
1:52:14 Again, every year we try and make it better, but this way people don't have to carry their tasting glass around all night on Friday night if they come to the early ticket fulfillment on Friday, which is all day on Friday. Other than that, tickets are well ahead of previous years. I've said this to my entire staff, is that I do want this Bluza Bluza event to be absolutely the best possible event that can be put on in this town, and that is in our mission statement and our goal for Bluza Bluza.
1:52:44 Like I said, it's barely over two weeks. So those are my comments about Palooza Palooza. The only other thing I want to say is, Stu, my seven-year-old absolutely loves the UK soccer camp. Can't stop talking about it. So just so you know from one perspective, it's a winner. Thank you. I'm good. I'm good. Fourth of July fireworks were spectacular. It was a great event down there. I'll take a motion. I just have a request. As I mentioned, I won't be at the September.
1:53:14 meeting, so if we could once again ask for the quarterly report to be included in the packet, that would be great, so at least. Okay. So moved. I got a move. Second. I got a second. All those in favor? All right. I suppose I forgot to ask for any other comments. Wait, just in the nick of time, Jamie. Thank you. Yeah, I think it was sweet. What's next? Smith's a light agenda. Smith's a light agenda.