Measure U Committee
· recording 1 hr 28 min
Agenda
Agenda items for this meeting haven't been extracted yet. Read the agenda on the Town's site ↗
Transcript
183 passages · machine transcriptAutomatically transcribed from the Town's recording with speech-to-text. Names and numbers can be wrong; the recording is the record. Open the Town's video ↗
0:00 Meeting so intensely there for a while. I think that, yeah. I felt the same way, yeah. It was kind of like, huh? Okay. Well, good morning. Let's go ahead and get started with our Measure U application regular meeting today, Tuesday, March 4th. Right on. Stu. Rope call. How about that? Sounds good. Chair Perry. Here. Vice Chair Turner. He's not here. I just left her a message. Committee member Bill Souser. Yeah.
2:39 Committee Member Sandy Hogan. Here. And Mr. Don Zeleny. Yes, sir. Great. Great. And with that, I'd like to open up to public comments for anything that's not on our agenda or discussion items for today. I'm just here purely. Excellent. Well, thank you for joining us. It's nice to have one face in the audience. Exactly. Exactly. Then let's go ahead for the consent agenda item number one to approve the regular meeting minutes of January 7th and January 14th, 2014. I move to approve.
3:13 Okay, that was Sandy and Don. Okay. And you want to approve both meeting minutes, is that correct? Mm-hmm. That's the motion to approve. Approved January 7 and January 14. Okay. All in favor? Aye. Great. Aye. A little slow there. A little slow there. As long as I didn't say no, it was just a serious. Excellent.
3:52 Let's move then into discussion item number two, the Mammoth Lakes Recreation MLR update and town council action regarding Measure U. Okay. Record that. Record again. Great. Moving along. Stu, would you like to give a quick background summary for us, please?
4:39 So in the analysis you can kind of see I just went back and looked at that application.
5:08 And as you can see, I've kind of identified that one, it really provides oversight, well firstly, sorry, provides the funding recommendations for any awards that are set. And as you can see, the action took by council is essentially they're suspending the
5:35 The award process, if you would. So the second item that we're going to talk about, which is the opportunity award, you know, is still, I think, realistic to talk about. I think all they've really done here is just to spend the formal process, which is that formal process. So I kind of see it as, one, that A, the committee is still very well positioned to meet on a regular basis, certainly regular enough to conduct any, you know,
6:04 And then secondly, you know, we're still going through the reconciliation. So that's really the oversight, which was the second purpose of the year. So what we're doing now is Susan Cash has kind of taken over that process of alignment finished. From a measure art perspective, she's converting everything to QuickBooks. We're going back to the Recreation Commission in April with kind of essentially a P&L from a QuickBooks perspective so you can see every project.
6:32 So that's really kind of the oversight that I see as the committee still performing. So really this discussion here is one, providing any direction to staff on that in regards to regular meetings. We'll talk about the opportunity reward next. And then just providing any direction to staff. I'm happy to keep scheduling the meetings.
7:02 If there's no other, you know, our, say, for instance, items to discuss that we can maybe miss a month here and there, but, you know, I anticipate coming back at least if not April, May, you know, with that reconciliation and those recommendations going forward. So, you know, certainly for the short term, I would think we'd have some functions to perform as a committee. And as the MLR group moves forward, I mean, they're not really looking at forming.
7:30 So I think that's a good discussion for the committee if you want to briefly discuss that and then all I did here was just put the next steps in.
7:58 For the transition committee, so the transition committee has met twice. Those meetings, we'll be back in suite Z, they've just met twice in Maniflex Tourism. They'll meet again, I believe, on the 17th, Monday. They meet basically Monday afternoon. We'll be back in meeting again, and they've essentially selected Danner as the chair, John Armstrong as the vice chair of that formation committee, and then we fire it.
8:27 Which actually worked out well. So we went through interviews for our Recreation Department Office Assistant. We had some terrific candidates. We were able to use the pool that applied for the office assistant position for the town. We found a terrific young lady called Melissa. She's called Missy. So she started supporting that transition committee. And then she'll start with us at the Recreation Department in April.
8:55 She has extensive experience online selling homes, reservations. She worked with Mammoth Vacations, you know, certainly with Call Sound. She worked with YMCA. So I think she'll be a great fit for us. Good support for the transition. Hopefully she'll be able to kind of get involved and help us out here at some point as well. Anyway, so that's the kind of MLR structure. The pages are still updated. The page that I have on the Recreation Department. We post the agendas. We post the minutes.
9:25 We still close to meetings down here. It's still a Brown Act meeting. So we still need to keep it very well noticed. Are they going to be on Granicus? It will be on Granicus. For whatever reason, it met with the tourism office bill. I'm not too sure why. It will be back here for every successive meeting because it really needs to be publicly noticed, webcast and broadcast.
9:54 And record it. So I think that's really important. The meeting follows that. Will agendas be online? Agendas from online. Committee, commissions and all. And the meeting minutes are online. The first meeting minutes are up. We'll get the meeting minutes from today. From yesterday. From yesterday. We can close those. Okay.
10:12 Feel free to contact me and I can get you any information. Will those be on the page where all the other commissions and all are and just be added there? I'll create a separate section for the Transition Committee. Stu, I would suggest that you automatically send those to us because there is an impact, I would say, to us, to the Trails Committee and to the Recreation Commission because it's going to be an ongoing process. It appears that it's going to happen. But the fact is, you're right, there's going to be a long, long period of they have to recruit.
10:42 You know how long all those things take. And in the meantime, we are going to function. I think the Trails Committee will function. The Rec Commission is going to function. We're trying to do business as usual, right? Yeah, yeah. So I would suggest that you automatically send it. That would be great. Thank you, Stuart. I'd love that as well. Yeah, because to me, you know, having, you probably too, in the Forest Service, having gone through some amazing transitions,
11:08 What you do is you carry on as normal, and then you slowly but surely start plugging in the new parts. And I think probably for us, I would suggest that we have a continuing discussion about how to transition if it happens, and if it doesn't, how to continue, you know. You know, my concerns on all of this you're going to hear probably in item three. So in terms of the MLR update, since we're only taking it as an update, I will hold my comments until the next agenda item.
11:39 I will go ahead with both my two and three then versus giving you my one and two. Anyway, first, we're not going to be going on as usual because they've suspended the formal award process. So the fact is now they've set up a method by which we can
12:08 By which anybody with the power to bring forward an application can cherry pick. So we're no longer hearing the applications as a whole and being able to pick the best. We're going to hear applications one is one, which was never the intention of the opportunity process individually, and we're going to say, my, that's a great presentation, that's a great application, without being to weigh it against the other competing interests. So far from normal are we going through.
12:38 If it's going to be a year before this is done, I would have just assumed that they either suspend it completely and put that money in the bank or continue on with the formal process. That's my concern in this transition. We are giving the town, most importantly, the opportunity from staff-driven projects to cherry-pick the system. Those of us that sat on both the R and U committees worked our tails off to see to it that that did not happen.
13:06 So that's my main concern with the R and the U process. By suspending the formal fall award process, they have suspended competition. It's this council that made that motion. There'll be a new council in June. Yeah. We don't know. That could be undone. I think if we and the other commissions and committees give input, you know, one thing that bothers me is on this transition committee, there is not one
13:38 Person with Measure U experience on that committee. They have no knowledge of all the work that went into the steering committee, which Measure U is very complex because it's got three parts. And so to not have anybody there with either steering committee or application committee experience really is, I think, very worrisome. It just, you know, I mean, I don't think a lot of thought went into this, this selection.
14:06 And it's just kind of like we keep going down this road without, and I'm hoping actually I did read the minutes from the first meeting, which I don't know that was noticed necessarily. It just happened, but we found out after the fact. But actually the minutes were very professionally done. It looks like there's going to be a real intent because my comments were the, you know, basically there are legal concerns using Measure U and Measure R, but if they're going to work with the attorney to resolve this,
14:35 You know, they'll work with the attorney to resolve it. I don't think they're going to want to leave the town in a risky position. The public process part is one that's bothered me all along because the fact that they haven't even asked for input from any of us, you know, formal input, I mean, that bothers me, especially because we've been trying to work this out. Bill knows. We've been going through this for a couple of years, chewing out questions, whatever, having a special task force to work on events. We've responded.
15:01 By, you know, by funding events, recognizing that all of us want to see the capital facilities, but we also understood the importance of funding events and getting those summers because of our economy. So as I say, I originally, and I think Bill knows, I was not a big fan of events, and yet as I saw the impact that it had on our economy and how good it was, I won't apologize anymore. So I worry about it, but I do think
15:30 That we should plan to continue as normal no matter what. We should also be prepared to do a fall award process in case that happens because there may be pressure from the public to do it rather than just sit on the money and allow exactly people to come in and cherry pick. I would agree with you. That is not the intent of this. They have to work out the legal ballots. We have to hear what the attorney is going to say. So, you know, we have to go on two tracks.
15:59 One is be prepared to change, but offer good advice how to change it without disrupting the system. Because some sort of public process is still required. It's recreation commission or such other body as appointed by the town council. Now that's us right now. But it should be a public process. And I think, you know, I think the public is going to keep saying that. We want to know. So it isn't just...
16:27 You know, but you had two committees met, one for R and one for U as they were in the past, and it was decided that it needed to be an application process for a reason. To suspend the application process does more than change who's going to be making the decisions. I don't mind. I trust the people that are on that transition committee. The two from the recreation commission, I trust both of them. I just don't know why we would suspend until they come up with a better process.
16:56 That is publicly vetted. Exactly. I don't know why we would suspend the current process. And I think we're saying the same thing. Yeah. Exactly. Exactly. And I think we need to keep giving that input back. It's sort of my understanding that they suspended it in order to move forward with an absolutely new body. But that doesn't mean that it couldn't be put back in. I guess I feel like it's now our responsibility to ensure...
17:20 That it continues as an application process and all this hard work that has been done over the last few years by us, by you and steering committees, that it continues to be a part of the future. So I feel like, I don't know, I guess I felt like it sort of had, maybe it didn't have to be done, but in order for it to sort of move forward as a new body. You just pointed to a new body at the point that you have one.
17:49 Yeah. And you've decided what their goals and what their principles are. Exactly. They've come up with their mission statement and their vision statement so that we know it's in align with what R and you were aligned with. At that point, you simply transition from one to the other. You give them the calendar and you say, here's the calendar. We're going to start hearing from the applications have to be in by ear. Here's where we're going to start hearing from them. Here's your job. It's laid out. They don't have to create a new...
18:15 Process. The process has worked and it's worked well. Well, so has it, was it then dissolved basically because this commission is? Well, I hate to take things personal, but it would almost appear that it's been dissolved so that there can be a segue in where the monies are pointed. You know, I haven't been to the meetings. Yeah.
18:41 And I've promised both the people, and like I said, I trust both the representatives from the rec commission completely, that not being there, I can't speak to the process. I just have a real concern over what this means in the future for how those dollars get allocated. The legal concerns of them being allocated by a group that requires them for their own, which can be handled in many different ways. You can have an elected board which can then disperse.
19:09 Tax money. There are ways to do it. I just, it's a pit that, you know, those Corvettes in Florida, it's kind of a sinkhole. Kentucky, I think. Worried about it, yeah. I don't know how to better verbalize it. When I look at, I glance back through the minutes of what we had approved this award cycle.
19:40 I'm at the point, certainly, I believe MLR is going to happen. There's questions on award. If I read the paragraph on page three that says, you know, we're going to continue some things, and I look at what's currently been approved. We have lots of events. Those will happen. We're going to get some performance reports. Now, if that comes to us, so what? Perhaps they get sent over to MLR, but if it doesn't affect another award cycle, no.
20:11 What's the point? There's a document of what happened by the events, but what happens with them? Do they factor into future event applications if there is such? I look at things like special event trolley funding, things that are a little closer to stew, roller rink operations, is that under MLR? Perhaps that could just as well be under the still existing rec commission.
20:41 But I look through these various things and think about the timing and that this fall people will be thinking about the next year and putting events together and whether MLR can stand up. I guess the intent is it will. The other thing that's I think a little unclear, I'm not too sure. I know that my term ends in June. And bills may or may not have some status there too, so there are other changes.
21:13 Well, it depends on, I think he pulled papers for something. Yes, he did, yes. What that means, I'm not sure. Ask the voters what it means. I feel fairly sure that this group, after the 1st of July, is probably going to go away. And I have no problem with that. One less meeting for me to go to, okay. My fear is more,
21:43 How those monies are going to be directed. The previous three town managers have all been uncomfortable with R&U because they are dealt with in a way that is non-traditional in the bureaucratic sense. In the town's bureaucratic sense. Not the county, not the federal system. So they've all tried to roll this more into the general fund budget and make appropriations out of it where they're allowed for recreation, which would then, we would have lost general fund support.
22:09 Most of recreation would be being funded out of this. You know we've fought that tooth and nail. Is this being used right now as another vehicle to come to that end? So this ends up as a pot of money allocated by staff and approved by commissions. Bobby had dolls, which is what we were when I first started on this commission. So that we get back into a normal government routine. And that's what I don't want to see. These weren't done in a normal fashion.
22:39 This was out-of-the-box thinking by the people of Mammoth, and the process worked. I guess I'd like to comment a little bit about government and the idea that we're going to go away in June. You know, the role of government is to provide for continuity and history and policy and reasons why things go on, and they change through policy decisions, public policy decisions, things like that.
23:07 This was a vote of the Council, whether it was a well thought out one or not. I know that Matthew Lehman had a lot of questions that needed to be answered, and his intent is to really vote yes or no in June. I believe some of the other ones too. If the proposal comes forward, and it is not well thought out, as it is not right now, but I know they're working on it, it may or may not go forward. But the key to me is, assuming that it's going to go forward,
23:36 Our job is to make sure that continuity is preserved and that what we have worked and spent taxpayer dollars on developing policies and task force, steering committee, this one, whatever, that this goes on and, you know, one of the outcomes that would make a lot of sense to me, if MLR even happens, is that MLR sits in that seat and takes the notes maybe and this committee goes on because it's a public forum that the public expects.
24:03 And we know what the procedures are. Nobody on this committee does. That's my problem. And it's like I have heard members of that committee say, well, we'll just wipe everything out and start from scratch. You don't do that in government. You do not do that. And I guess what I'm saying is as long as I'm a member of the public, I will continue to say that because you want, if you've put time and money and effort in things, yes, it takes time to turn the battleship, but you can turn it. But you just don't.
24:33 Blow it up. That's not smart. You know, so I guess that's my little speech, but I will work to make it, if it happens, I will work to make it successful, but working to make it successful means that we transfer as much knowledge as we can if they want somebody else to do it, or in the interim, the logical thing in any of them is to keep your committees going because it's going to take several months to find
25:00 At least several months to recruit. If they're going to talk on a national level, like they did with John Urdi, somebody respectable, I don't know if it's a professional recreation manager, is a professional fundraiser, or is it a professional NGO person, but to recruit takes a long time. Then somebody of that caliber takes several months because they have to give notice on their other job, they have to move, whatever. Things are going to go on with us, and performance reports we're not going to get until October, November, and somebody needs to hear them.
25:30 Not that board. They don't know a thing about it. You know, so this is the kind of thing to me that we plan. We plan to continue. My suggestion to them would be, if you're formed, keep this committee going until knowledge is transferred, you've got somebody in place, and you feel like you can do a public process. But, you know, don't just say, June worth, we're done. I don't believe in that. That's a waste of taxpayers' dollar in all the work that's going on. And you have been on both committees.
26:00 You know? You know, Sandy and Bill, I agree with both of you. I feel like we have a responsibility. You have been here for several years. Don and I here a shorter amount of time, but I feel like it is now our opportunity and our responsibility to provide good recommendations and to ensure that things happen, that we have worked very hard to make sure it is not a government
26:30 Town government decision on where the funding happens, but that there is, whether it's another committee that is formed, whether it's a joint R and U committee, commission, you know, I guess I have faith that this is going to happen and that the two individuals that are on the committee, the MLR committee, the transition committee, who are, you know, Terry and Betsy, who are both on the recreation commission, although it's
27:00 Not you. Because they do have an understanding. And I know in our joint meeting with them today, we certainly can take a few minutes to discuss that. And I know both of them are, you know, very open to the process and, you know, want things to move forward so that you and R can be more than they have been. You know, we have accomplished a lot, but maybe we can accomplish.
27:27 Any other comments? Well, we know for sure we're going to keep moving forward because we have not been disbanded. Yes. Yes. We'll continue to have meetings. Yes. They may become coffee clutches. I think it's still important, just to clarify, I'm just kind of summarizing. So I think it's still important to provide that kind of management oversight of the current process. We still have awards ongoing. We still have applications out there. We still have contracting. We still have to complete the reconciliation. I think it's important. We still have to identify the obligations that measure you have in the future. So I think in the short term,
27:57 You know, I think that's what staff recommends. I think that's sound, and I think it'll lead into our next discussion on this opportunity award about how we structure this together. So that's not what I'm reporting here. I would add review of performance reports also in there, because that is a close-up part of the current year process always. Yeah, which I think is without limiting, yeah, completion of current funding awards. And performance, you know, review of performance reports, because those are things that we're supposed to be doing. And I think we...
28:27 I mean, I think what we'll try and do as well is kind of crack that language and put it in the recommendation because we, on the next item, there'll be a recommendation from the committee, that's what we're discussing at 1 o'clock from the Recreation Commission about this opportunity award and I think we, as this committee, I think it's very relevant and very pertinent that we put that recommendation here into council for April 2nd basically stating that this is what we, you as a committee, believe is the best cause of action at this time because of the recent census.
28:56 Have them debated, and if they provide us direction, that's great. If not, then maybe they have done what we've recommended and carry on and get to a point where they're going on. Yeah. One thing that came up yesterday at the Trails Committee meeting was an interesting idea because our question was how do we get this feedback to the MLR group? And Steve's suggestion was that we invite them to come and hear our comments, or at least a representative or two.
29:24 So that, you know, there is some formal way of us getting to that committee. So perhaps at our next meeting we invite a member, a representative, so that we can, you know, yeah, from MLR, so that our comments that we've, today and any others we think about in the next month are conveyed to them, you know, so that
29:54 We are going to work with them to be successful. To me, I think we can make those comments as far as our transition plan or whatever and the things that need to be done. And I'm sure they'll have realized at that point the timing issue of filling a position, getting somebody up and running, hiring whatever assistance they're going to have and starting to understand the program, that just doesn't happen overnight.
30:24 This is a request on the agenda for the March 17 meeting. Okay. To say, you know, the recommendations for the U Application Committee is for representatives from MLR to sit and we can actually make a staff report from an item. I think that would be good. The ins and outs and transitions or whatever it is.
30:43 And you might talk to Steve Spidell because I think that we talked about that also having that on our trails agenda so that they understand. Wasn't it, I don't know if it was going to be the next time, but he was going to do that, I think. We were talking about it and maybe in terms of time we'd be better off if we asked them to give an actual presentation with all three groups so that they don't waste staff time and regular time three times over.
31:10 Could you speak with a workshop, right? A workshop would be great. A discussion. It's not actually going to come out of it. It's really just like you said. Give them feedback. Information. Right. Feedback, yeah. Yeah. That'd be great. But if we time it with the other meetings so that we're, you know. It's not a burden. Yeah. Or a minimal burden. But I just really think they need the input, especially since they don't have any you. I mean, my fears are.
31:36 You know, I'm a supporter of recreation, but the arts and culture part. Yeah, absolutely. And even mobility. You know, those theoretically I represent mobility, but the key is I just don't want to see the other ones get lost because basically, you know, they're recreation. Yeah, you know, I agree that that's their focus, but I do think that the others do think highly of the arts as well, so. Okay, yeah.
32:15 Actions speak. Actions speak to me. Actions speak. I don't listen to words anymore. I know the events I attend and who I see there. Yeah, yeah, yeah. Okay. Stu, when is the next MLR meeting? 17th. March 17th. Two weeks. All right. Anything else to add for our discussion of item number two?
32:51 Just continuing. Please put it on the agenda. I would say as a continuing item. Because I'm sure we'll think more about it as it evolves and how to... Okay. You can do an hourglass at the end of it showing it's... There. All right. With that then, let's move on to discussion item number three for the 2014 Measure R Opportunity Award process as...
33:20 Mentioned earlier, we are going to have a joint workshop with... One. I'm sorry, at one o'clock today, with Measure R and Measure U to discuss that. Sorry, and it doesn't say Measure R and U. Yeah. So this is the same staff report that the Recreation Commission will be reviewing as well. It's the same timeline. You can see I provided, you know, a good little background. I mean, there's no spring award currently for Measure U.
33:50 The Recreation Commission at their last meeting, you know, decided not to move forward with a regularly scheduled spring session for their opportunity award that dual characterises it as. So this option here is staff put together, and I think, you know, listening to comments today and certainly previously, if you go to page four, you know, what I've tried to put together is really the nuts and bolts, hopefully the conversation.
34:18 Today at 1 o'clock and with the Reparation Commission as well. So on March 4th today, you know, we have all the committees meeting to talk, you know, about this item. And I've basically put together a timeline that could work. And what we've tried to do is consolidate it, synchronise it, and combine it that we're not having that one-off review. Everything will still come in at once. You know, there's going to be a date that you can see that we identify that any applicant...
34:45 As being previously funded, or if there's a project out there that is just so compelling that it really needs to be considered for funding, that they all come forward at that one time. So I would see, and we'd have to talk about how this gets together, but I would see both the committees, both advisory bodies, be in the same room at the same time. You'd have the opportunity to come forward and present their case.
35:10 The committees would then make a recommendation to say, okay, that's a Measure R application, that's a Measure U application. That applicant then goes off for that next month, completes the application, brings it back to that respective group, that respective group reviews it, goes through the scoring process, and then makes a recommendation, you know, once, and then it's funneled back to the council again at the same meeting, right, at the same time that these are the joint Measure R, Measure U, but they've still gone through their separate processes, awards. So the council can still see it in in its entirety,
35:39 So they're not piecemealing like we did last time. They can deal with Measure R first, they can deal with Measure U, they can have that discussion. We can set up that joint workshop. What we'd recommend here is it's kind of that July 2nd time. You know, it's the time after the meeting, you know, with the changeover of council. I talked to Dan about this, and it's the same for the planning and the parks process. We're going to move that back into July as well.
36:08 June is just too hectic right now with the budget and the changeover of the council. Unless you deem otherwise, but that's kind of our plan. So that's really what this process here lays out. So it's a pretty simple process. It'll just sit with each of our regular meetings. We're not really adding any meetings. I think it's just going to consolidate those advisory bodies together. So that's really it. The other information that I provided here was a little bit on the
36:37 Funding priorities. You know, the funding priorities we've always established before and they've always carried over in the spring. So that's something that if the committee feels like they're still very relevant, we can still make that determination and say yes, I think if we go forward with this opportunity award, these funding priorities are still relevant. And then finally, you know, really what we're looking for is making a recommendation to council as its formalised body and then we can kind of present that recommendation at the workshop with the commission.
37:06 Just attached to the packet, I know you've probably seen it, but it is that Measure U process recommendation document that was awarded and adopted in February 12th, I believe. February 2012. I also attached the ordinance as well. You can see it for Measure U, so you can kind of see it into that detail. But that was essentially staff's intent, you know, talking with the town manager. Seems quite realistic. So I really think it's an understanding, and I really think it's a...
37:35 It's the committee's purpose, I think, to articulate to council why there's a compelling need to still put together an opportunity award and why it would be important for the community. There's no formal, you know, formal process for R&U, then who can really apply, right, has to be, I think, a pretty defined criteria that I think you want to establish. It's not an open award process by any means, again, right, but I really just think it's that opportunity award that...
38:05 Previously, what the Recreation Commission have discussed is really just either you've been previously funded or it's a hugely compelling reason to come forward. If we can define that criteria, then when those applications come forward, not even application, but really the idea, that's when this committee can really just say, you know, based on the criteria, we don't recommend you moving forward with application, or yes, we recommend you go and complete the application and bring it back.
38:32 We've still got to have some pretty defined criteria. I think it's really important. And communicate to the public that this is the opportunity award for this purpose and this purpose. That's what the staff would recommend. If I may, I'll run this first. I have a problem with the timeline in doing it the way we did the measure R. If we look at how that has functioned, and that's what I like to do, is see how something has actually worked.
39:02 I was viewing this in terms of if we continue with the actual fall process.
39:32 Not having that, you know, upsets my teacup, if you will. We need a way to fund things that are emergency outside of the regular process without going through a regular process. No timeline. You have to be in by April to be out by July. But if something happens during construction and we have an overage, that needs to be brought to us and we need to be able to right then have a meeting or a special meeting and say, yes, by golly, we have a problem. We want to spend this much money on it.
40:03 And then that needs to move to council. So today that was going to be my recommendation in both groups. With the criteria, as you said, very, very heavy, you had to already have received an application, and you needed more money in order to bring that to fruition that was unanticipated. Or it's a project that cannot possibly wait in no way, shape, or form. And we've seen them come forward before in oops-r-tunity and get money.
40:31 And they still haven't started spending that money. So we've got to get a much better handle on what is a crisis. And then that would be the opportunity award for both R and U. And that was going to be my suggestion. So if the turf at Trails End Park came in so far over budget that we needed more money to finish it, they would be able to bring that to the next available U or R meeting, depending on what application process it was involved in.
41:01 For us to consider funding of it at that point in time. Truly an emergency only process. If we've done away with the fall process, we don't need to worry about anybody coming back for the emergency process because there won't be any other funded projects other than what we've already done. But that would still be, if we're going to continue on as if nothing has changed, that would still be my recommendation. Not a timeline process. They would need to fill out the standard application so we can view the merits.
41:31 of the program, but we wouldn't be judging it with other projects. We would have already made a determination on funding for that project, stand alone in the regular process. If I might, we've had a lot of discussion of a sprung structure, and we provided $25,000 to do something that Evan's doing. The objective was to have a facility available summer after next. So to do that, you've got to build something.
42:02 You probably got to pour concrete this fall by the way he has things laid out. And in order to let a contract to build something, Evan has to have the commitment of the current community college district. He was down in Bakersfield yesterday discussing things. For them to commit, if you read the grand jury's report, they need an O&M commitment.
42:33 That says an O&M commitment before a contract's lit. That O&M commitment is honest just nearly. And to let that contract, he has to have approved plans. The last time I spoke with him, his intent was there's a new Title 24 coming on 1 July. That's very paper and review intensive.
43:02 So the objective is for Woodward and Walker to have the construction plans done by the end of June to have them into town. Now for them to do that, we back all the way up to what we saw in their original application, which says as soon as they finish this current refined floor plan budget, he needs another something like $80,000.
43:32 Which is only a month or so away from us probably. So all of this stacks up and how it all fits together with the change in council, with I think we're certainly at risk. The chances of truly having something summer after next I think is questionable. But we'll just have to see how all this stuff fits together. Is this the it's not like the turf?
44:04 It's something we knew was coming at us because it's just been going on and on and everything from the grand jury report. We know it's there, but how do we deal with these things is part of things we have to resolve. In my comments, we're actually going to have to do that because, you know, Bill, before I've always said, oh, I didn't think we needed to do an up-oops-o-tunity for Measure U, but in this case, because we did know this is coming and we planned for it, we awarded 25
44:32 With the contingency that they come back in, knowing that we have to do that, to me, I was going to say yes. I think actually this whole idea of merging the R and U, emergency one, whatever, this time makes a lot of sense to me, having the two committees, because we know this one is there. I don't know if other ones are out there. I look at Stu's timeline, it's all very critical when we know that Evan's going to need this other chunk of money, not in June.
45:02 He's got to have construction drawings into the town at the end of June, and you don't do those in a month. So this has to be done. Yeah, so in other words, this part of it has to come forward a lot faster than this timeline, I think is what you're saying. And I know I'm saying we have it. Let's have that special meeting. Maybe it's our next time. Have him present because also I'm assuming that that other is going to be completed.
45:30 And ready to present to us, you know. But it's a tight timeline, and if we want to make it, and maybe that's what the special meeting is about. You know, that would make sense to me, because we have said over and over and over again, we want this to happen. You look at all of the, you know, the... He's trying to make it happen. Yeah, and you look at all the election materials and that commitment to the performing arts and the operating...
45:55 Operating. That's why it's there. That's why it's there. And if he's actually getting all of these commitments, and I think the council would go with that, understand that, because they did leave the opening to not interfere with things that are ongoing, and that's definitely an ongoing. You know, that last time was step one in this two-step. I think you've made my argument why I don't want a timeline. And we need an emergency process. Yep.
46:23 To see case by case without stacking up a whole bunch of cases. This falls right into it. It has to be done by June. Didn't have the opportunity to know at the last award cycle what the dollars were going to be or what we were talking about. It fits an emergency plan. This is where the Upsertunity award process and the timeline fails us. I think that the timeline is there so if we get a bunch of awards, give staff the time to prepare it all for us.
46:52 And bring it forward in a concise way for our consideration. I think that we don't need that much lead time if we're dealing with one at a time. I would agree. And if we draw the parameters of who can and can't tight enough, then we will not have that rush of, you know, it's running season, we have to have two more lanes at the track. So it keeps that sort of thing from happening. We leave them in the regular process, which is in the cloud.
47:22 I still don't understand the cloud. Someone will have to explain that to me. But I think that's the way we have to go. Yeah, I agree. We can't do a timeline process. If something comes forward that's an emergency and needs almost immediate funding, we need to be able to be nimble enough to get that done. Well, you know, taking this approach actually resolves one of the concerns that I didn't express.
47:46 That if we, you know, instituted this oopsitunity for Measure U, I could just see, then you get some projects that really aren't thought out, and then they come in for part two, you know, and that always kind of worries me, whereas this one, if we just limit our next meeting and just say, this is what it's going to be, we're looking at this one, and I hope that Evan can meet that, you know, I mean, I hope he'll bring us all the information, you know, because I do believe the council gave us that authority to continue with things that are going.
48:17 And this is one of them. It behooves us to come up with our version of what those sidelines are going to be before our 1 o'clock meeting with me. I wait. You're going to talk to yourself. Well, no, I'd like to see some conversation on that. And we're due to take those notes so that he can make a presentation on all our behalves at the rec commission meeting. I mean, I think the top one is previous application.
48:45 Previous approved application for either because I think that the opportunity award and I believe we need to get rid of the opportunity award. It hasn't worked in the way that I originally envisioned and I believe just because you've done something.
49:00 If it doesn't work, you need to get rid of it. You don't just continue doing it the same way. Evan's proposal does have in it the fact that he'll need the other $80,000 or something. We've all known about it. We've all agreed this is what we want to do. And our next meeting is Tuesday, April 15th, so that would hopefully encourage...
49:25 Be able to move forward. I hope he's ready. And they could go to council. And the next one is in May. I mean, you know, Stu, as you were saying, I think we should continue to have our regularly scheduled meetings if there is...
49:38 Nothing on the agenda or no one has submitted an application, you know, at that point we can decide not to have the meeting, but I feel like we should definitely have those meetings. You have the first bullet point being a previously approved application. Yep, in progress. I think going back, I think what I'm just going to summarize here is, you know, the question really was, which I wrote down here, does the committee want a structured board process or process whereby the applicant comes in at any time?
50:01 And I think what I'm hearing is really an opportunity where they come in at any time. Any time. Any time. Coming in at a regularly scheduled measuring meeting. Yes. Right. Yes. With a very tightly structured application. If something comes in that can't wait. We're having our meeting today. If something showed up tomorrow that was absolutely an emergency between staff and the chair making a decision that, yes, this is worth.
50:26 Convening a special meeting, we need to be able to be nimble enough to have a special meeting as well. That's why we have a chairperson, that's why we have staff, so that we can think beyond the normal confines of a meeting. I'm going to say the consensus is to recommend any time process. Only for emergency. There needs to be a regular process. From my opinion, I think we have consensus. There needs to be some sort of formal, regular process for the average.
50:54 Application to come through to be daylighted with other applications so that we aren't cherry picking. Is it an emergency when we've known about this all along? An emergency? About this problem? No, this one does not because this is one that's in progress. Okay. I mean, it was based upon, we would not have allowed. I keep hearing emergency. No, no, no, we would not have given the 25,000. Okay.
51:17 Yes. If we didn't want to see it progress, and that was a necessary step. But there are emergencies. Yeah, absolutely. If all of a sudden a great comes through to complete a section of trail, or if Faith Hill says for $10,000 she'll come to Mammoth and do a concert, which is arts, you know. Sure. It's a lot to say no.
51:39 The Broadway company of cats wants to come and play on in Mammoth, but that's going to require some funding, and the funding has to be decided before a certain day. That would fall into an emergency and needs to be brought forward. Absolutely. And then we can determine if we want cats here or not. But, you know, whatever the situation, there are true emergencies that come up that are so time-sensitive that they need to be heard outside of the process.
52:04 And our first order of business then would be to determine that they are indeed that time sensitive and that there's something we want to move forward. But that's the emergency process. And it wasn't just a lack of planning on their part. That's exactly right. Yeah. I mean, because there are created emergencies that I, you know, sometimes the process. But we have to make that decision. Yeah. Yeah. It just makes us a lot more nimble than we have been. Okay. So I like the idea of if something does come up, staff and chair talk.
52:34 Call a special meeting and Ann. That works. You know, but you guys screen it very carefully. Okay. Yeah. We won't bring you garbage standing. So what I've got the criteria, so what I've said is the consensus is to recommend that an applicant present a project based on the identified criteria below, and that criteria includes a previous menu funding recipient, is a compelling project, the project is experienced at funding process in this time section.
53:03 You might want to add for ongoing something that has been in progress. In other words, I look at the spring structure as one that's one step of many steps. Well, for instance, the town's looking at bringing the board of the trial in front of the recreation commission. The what? The board of the trial segment.
53:25 Waterford Trail project? Waterford Trail. Waterford Gap. Waterford Gap. Waterford Gap. Yes, I did. I had the same problem understanding Peter, so it wasn't access. Okay. Okay. You say Waterford, Sandy thinks you're crystal. Yeah. Very good. Okay. And then the recommendation was to carry over the funding priorities from the fall award, so it's... We're not, we're not.
53:50 Here establishing new parties just as what we're saying. Exactly. And I'll present that to the commission that I want to talk if you'd like. I can present that. I mean, really it's just a meeting between the two committees. Scott doesn't want to get too involved. I have a process question. Since the Measure U process was adopted by the town,
54:22 In February of 2012, was it, or whatever? Does it have to be unadopted? Or is this just a process that, in other words, if MLR goes forward, does the process...
54:38 Continue until it's changed? Or what is the... Probably superseded, I think is the word. So I think they'd be looking at having to adopt some type of process in the future. Okay, so in other words, as a part of the MLR process, they would have to figure out how to supersede some of these processes. You know, they might look at, I think there's, you know, probably 89% of it should still be current. Hopefully so, yeah. I mean, ideally, ideally, yeah.
55:06 Okay. Those are just process questions. Maybe, you know, actually more to carry forward to that committee. Yeah. Okay. And, Stu, I'd be happy to present this this afternoon. Yeah. If you don't mind if I could have a copy of the notes. Yeah. That would be wonderful. Especially stress the ongoing nation idea of the, you know, the spring structure. In other words, the performing arts center. But that is something that, yeah. Because the other is the emergency part.
55:35 Which I think they're probably familiar with. But I think this one, they may not be familiar with. That's right. Let's see. Bill's made it in the room. Perfect time, by the way. I sent the bill. It's probably about 930. The committee's going to be good. Not bad. Pretty good. Thank you. I've often said something similar.
56:00 And with that, let's move along to discussion item number four for the HVS Consulting Special Event Venue Feasibility Study. So, come on. Before we start on that, I just wanted to briefly comment on the last item. I was on the Yes on Measure U Committee and also on the original steering committee for Measure U. And I like what I heard generally because both measures U and R should be strategic funds.
56:31 Not just kind of ad hoc opportunity funds. They are our chance to actually look to the future, decide what our priorities are, and then work towards them. And what I heard today sounds like it's going to do a better job in the current process of keeping the decision-making process in that strategic realm. And ultimately supporting those strategic priorities. So I think that's good, and I'm looking forward to seeing the changes.
57:01 Okay, with regard to the study, the first thing I guess I will say is that the study that you have and I hope committee member Hogan that you got a copy. Thank you, Bill. Thank you. I was in the middle of a MLH board meeting when I got your second. So I guess the first thing is to understand that that was rewritten and redrafted in response to community comments.
57:29 I'm wondering if you had any particular questions about the study or its contents before we go into next steps. I didn't get a chance to read it totally and completely. I got to it this morning. But I didn't see a huge amount of change in there other than the recognition that some of the sites really weren't. The main changes were
57:58 Waiting priorities in some of the text in response to comments. They didn't shift. There was no sea change. That's what I thought. Okay. Yeah. I couldn't. Nothing jumped out at me. Okay. Well, I'll move on. And if you have any questions and something pops up, just ask. This doesn't need to be lengthy. This study really is here. It's here for you, for the rec commission, the council, and the public to use as background information.
58:27 In making decisions about investing in event facilities. Since, in some ways, this study has already achieved its primary purpose, even though the final draft hasn't been accepted by the town at this point, because it has spurred action at the foundation site and discussion regarding the wood site or other site for event facility.
58:54 And that really was the purpose originally behind doing the study was to say, okay, let's cull through the 14 or 15 different potential sites and narrow our focus on anywhere from three to five sites. It's actually really gotten down to two to three. And say, okay, do we want to invest in them? And if so, how? And how do we want to move forward? And the community has jumped in. And Mammoth Lakes Foundation has said, we have a program.
59:23 It appears from the study that A, well, from both the events study, HBS study, and from the feasibility study that was done by the foundation three years ago, that there is sufficient demand for some kind of facility, and that we have the ability to program it, but that it probably will need some at least initial and short-term subsidy, if not a long-term ongoing subsidy.
59:53 to actually break even. So I really think that the use, the primary use of this study will be when you get proposals like the proposal from the Mammoth Lakes Foundation or potentially some future proposal from either the new MLR if that actually comes into being or from some other entity. This will give you and them background information to look at their proposal and say,
1:00:22 Yeah, it's reasonable. No, it's not. This is not a plan. It's not the thing that will actually drive action. It's a resource. And so there's really not much you need to do with it except to recognize that, look at the proposals that are coming before you in light of the information contained in this study. Anything else, Stu? I haven't seen the most recent version, but certainly in the earlier version, the thing I thought was
1:00:52 of value, and it fits in with what you were saying, is that there was a set of considerations of criteria that anything we consider investing in, that's a good basis for trying to think it through, and there's value there. And I think that by essentially evaluating some of the sites that were perhaps more fringe sites and being able to say, okay, let's not talk about those anymore. They really, they fell to the bottom of the list.
1:01:24 There's no pressing need. And it doesn't mean that other events won't happen on other sites. It just means that's not where the town's likely to invest significant amounts of money. Stu, Bill, when I look at what you would like from us, it talks about moving forward with further evaluation, yes, no. What does that mean? What does move forward with further evaluation of what?
1:01:52 I'll rephrase that. Yeah, that's a good point. The further evaluation was further evaluation of sites. And given that the process is kind of advanced to where we actually have proposals and discussions coming in, I think that's the further evaluation. Here's a proposal. Here are the criteria. Is it reasonable? Is it something that would be applied to the sprung structure, for example? Could be applied to the sprung structure. Could be applied to the sprung structure. Could be applied to...
1:02:21 Potentially the Sam's Wood site could be applied to any other site where somebody comes forward. I think you heard the schedule that Evan's sort of marching to. When would you see any of that done? Well, actually, I would say you should be doing that now. Really, in some ways, as I said, this study has already achieved one of its primary purposes was would have helped proponents.
1:02:50 To look at their own sites and say, okay, this looks feasible, let's go. And it certainly is the case with Mammoth Lakes Foundation. Yeah, to me, actually you've got two good examples there. One, the Mammoth Lakes Foundation has really created a business. I mean, it's very detailed. The steps are laid out. There's a business plan. There are joint, you know, partnership agreements going on. I mean, it's the example of ready to go.
1:03:18 And then you have a concept of Sam's Wood Site, which, you know, I think is a great outdoor venue. And I've said, I think it would be great for the town to acquire it. It's available, whatever. But in fact, we don't even have a map.
1:03:34 You know, because there are two parcels there. We don't know the cost of each parcel. We don't know the value of acquiring one parcel versus the other. I look at one of them and I don't see any mention of any kind of the main parcel is actually pretty, could be used for some sledding, for little kids, for some winter play. There's some winter recreation opportunities that haven't even been looked at. They're not in here either. So, you know, to me those are two good examples of
1:04:02 One, what has been done, ready to go, and what could be looked at, you know, and further developed in really kind of a business, whether it's a business plan. It needs a business plan. Yeah, business plan I guess is the proper word. I don't use that that much, but, you know, that's the kind of thing I think for Sam's Wood site so that people know what we're talking about. We're not talking about all of it, I don't think, or maybe we are, but the price I've heard doesn't cover all of it. So we need to know what we're talking about. And those are the questions that should be asked.
1:04:31 Yes. And the first question is, of course, as I commented related to the earlier items, the strategic direction. Yeah. Is this consistent with the adopted directions of the town? Yes. Royal Parks are, to me, absolutely. If we check that one, well, we check that one off. Okay, now, what's the program? Right. Does the program fit and does it make economic sense? Right. Yes. And only then you get to the, okay, let's fund it. And as I said, basically,
1:05:00 You've already started down that road to a certain extent with this growing structure. I don't think you will find anything in the report that would tell you that was a bad idea. No, no. In fact, I think, again, Mammoth Lakes Foundation waited until they saw the draft report and were involved in it to say, okay, this looks like the direction we should be going. And they have the ability to leverage funds. Right. And see, to me, the Sam's Wood site one, I wouldn't even put in the economic because I look at that as a park. It's an open space park.
1:05:29 You know, yes, that will be part of it. You'll need to know how much do we subsidize. That's what you're talking about. How much do we subsidize? And economic analysis is can we afford it? Sure. How much is it going to cost us to buy? How much is it going to cost us to maintain? The sprung structure will not turn a profit in the immediate future. It's not about turning a profit. It's about understanding the cost. Right. It's fulfilling needs. But it's stated they need O&M.
1:05:56 Yeah. There has to be a commitment, whether that's from the town or some outside company, who knows. I did have a question. This was the HVS contract. There were options. Right now, we've probably spent half the money, so whatever's left will get split back between R and U. So we recapture. You're accepting the reporter. At this time, you're closing out that study. Okay.
1:06:20 The remaining five options are no sense. When you guys consider these sites on Sam's website, and it probably says somewhere here and I've missed it, did you take into consideration both parcels or one parcel? How was that created? It was actually evaluated on both parcels. On both parcels. That doesn't, and you'd have to go back. I think the only thing that would be impacted by only looking at the Walker parcel is the capacity.
1:06:48 Because in the last year, Bluza Bluza expanded up into the other property to get some additional capacity. So you go back and we have the spreadsheet in Excel format. So if we need to go back and change numbers or if somebody sees new evaluation criteria, we can go and plug those in and change the weightings, whatever. So the capacity you're talking about with both parcels was based on current layout.
1:07:18 Correct. And since it wasn't in your purview, I don't imagine you guys looked at different ways to lay it out to have a more efficient stage and emergency access and egress. That's correct. There was no site design. Right. Right. Because I've walked it personally. I think that it could all be done on one site with some modicum of changes. However, there are those on the...
1:07:42 On the entertainment side would disagree. So at some point it seems to me it would behoove us to take some of this money and hire somebody to determine the capacity of that site. What I think we have seen out of Evan, we saw a conceptual floor plan that he's now refining. That's a $25,000. We also saw a business plan and they're going to refine that. They're going to get better numbers out of what they're doing now. We need those two things for a wood site. We need a site plan.
1:08:10 This is conceptually how it would work so people can see it. And we need a business plan. We know we're going to be putting money into it forever, but what does that mean? What does the bonding mean? And I think you really need to, and this is a decision for the town, but you need to decide whether you are going to be the lead on this, or as with Mammoth Lakes Foundation, you will let somebody, people who are actually going to be potentially running the site and doing the programs.
1:08:40 Take the initiative to do the planning. Is there a proposal on the table for that second option? Not that I know of. It's a well-defined thing with the Mammoth Lakes Foundation. If nothing else, they're putting up the land, basically, or depending on how it works out for it becoming town property. No, there are options, but I haven't even heard of an organization willing to take on the wood site.
1:09:08 Maybe the champion. That's part of the business. It's a concept. And it doesn't necessarily have to be an organization that's running it, but there should be a champion out there who's creating the program. A responsible champion. Yeah. And they may come to the town and say to the council, look, we want you guys to hire staff to do this or whatever. But right now there needs to be a proponent. Yes. Unless, and it could be one or all of you if you choose to take that on, but there needs to be somebody who says, this is my program.
1:09:38 We can't just kind of throw money out there and hope that it'll fertilize the soil and turn into an arts center. Actually, I think Bill had a suggestion that perhaps we look at using part of this to better develop a site plan based on perhaps the one parcel or the two parcels. But how would you do that? I don't know that. In other words, perhaps we put out an RFP. So then you would take that on as a town function.
1:10:07 Rather than waiting, saying to the public, hey, if there's a proponent out there, you know, put together a plan, come ask. You know, they're proponents, but are they real proponents? Are they just people speaking with ideas, you know? I view it as a town function. As Sandy has said, I'm trying to agree with Sandy on something. I know it's campaign season. Sandy has said, I view this as a park.
1:10:36 Right off, I think that the wood site is important for us to get in the next couple of years. I don't think it's the long-term solution 20 years from now, but I think it's the only solution we have for our current needs and we need to get going on it. So you guys want to be the champions? Whether it's MLR or the Measure U Committee or the Rec Department means nothing to me. If we were going into a regular fall process,
1:11:00 I would ask the town staff to come up with a proposal RFP to float the idea that we would get a landscape architect to come in and somebody who knows sound and all of the rest of that to come in and show us what the possibilities are on either one or both sites so that we would know what we need. But without the normal process, this isn't something that's an emergency. It doesn't fly in what we just talked about.
1:11:30 In a normal season, I would be asking staff to come forward with this for our consideration now. I don't know whether I go to my town council friends and say, hey, look, you need to bring this forward now. It needs to be done. Yeah. But it's critical. The time is now. Dennis and Sam aren't going to hang on to that piece of property forever.
1:11:54 And if we're going to have an event site for the next 10 or 15 years, we've got to get on with it. Maybe we've got to schedule this as an agenda item for our next, actually a little more in-depth discussion of this for our next meeting, you know, at the same time to talk about so that we can send this forward. Not as a decision, but as, you know, a solid... You know, we have had Dan Holler stand up at several meetings and say, we can do three things. Yep. So, okay, town.
1:12:24 How do we go ahead and start some of this stuff happening? That's what it's about. Because in the meantime, it just circulates as ideas. Somebody's going to step forward. A site plan and a business plan. We could provide some leadership, yeah. No, this isn't the place for another non-profit to come along or for somebody in the event business to come along and say, we want to take this on. This is a time for... It's a park. It's a park. It is a town park. And our general plan says acquire farms. Right.
1:12:53 Yes. That's fulfilling our general plan. Yes. So, acquire more parks. And, Stu, I'd be interested to know what's left over after this out of the money originally allocated and the thoughts on whether or not we could treat this as an extension of that process. Well, I think the first step is, you know, I'll just make this recommendation. I think the second step is really, from the start, I want to view the direction of the council. The council's actually really moving forward with the purchase of this land. I'd hate to see us out there swinging wheels on this.
1:13:22 Business plan, operations plan, the capital improvements, if they're not. I mean, you know, time's pretty important for us. We just don't have a lot of capacity. So, again, I'm just, I think what we can put for us, and the committee recommends the acceptance of the plan, you know, we can move forward with whatever we're saying here. You can almost put a recommendation in that you see a purchase of the event venue with a great opportunity, and you'd recommend that... Do some groundwork. ...but before we do, you don't have to get direction from...
1:13:52 Absolutely. Now, that is the direction from council to say that's really a viable use of stuff behind. Well, maybe we need to agendize it a little more. Yeah. I mean, the committee could say that they think the required next steps are, you know, preliminary site plan, preliminary business plan. But that doesn't mean it would happen right now. It just puts it on the radar as like, yes, should the council choose to go forward, they'll know that that's where they need to go next. These are steps we see that are necessary. Right. Exactly. Not just have them run forward.
1:14:21 Do it, which is what a lot of times happens. You know, we're just saying there's a process here that's important. And we've got a good example with the foundation site. The wood site is clearly, you know, we all are in support of it. We see it as a park as well as an entertainment venue.
1:14:39 But we don't have exact dollar amounts yet, which means it really hard. Sure. I mean, we've been talking about a lot of other things about dollar amounts. It needs to be put down on paper. Someone thinks it through and puts the numbers. Exactly. Some lines on paper for drawings. To be realistic, I can see the town affording one parcel. I don't see the town affording both parcels. I don't either. Without sacrificing growth in other areas for years to come. That's why, to me, the...
1:15:08 The landscape architect piece and sound engineer's piece on the one that is willing to sell now and carry paper and do the whole nine yards is incredibly important. And I don't know, I know we can't plan before we own, but we don't want to buy until we can plan and know there's a scale here that's not in balance at this point. We need to bring in balance so that it can continue to move forward properly. Yep.
1:15:36 Well, you said you can't plan. I mean, if you're talking about rezoning and doing all that and going through full architectural, yeah, that's difficult. But if you're talking about simply doing your due diligence so you can decide whether or not it's a reasonable purchase, that you can do. Yeah, well, that's, Evan had an 11 by 17 drawing of his first conceptual sprung structure layout. That's getting refined. He's, and you, years ago, did a lot of the groundwork for
1:16:05 Capacity for use and all under the original report that was put out. So a lot of work was done, but we haven't seen those kinds of things at any level really on the wood side. It's needed. So can we put it for a future agenda discussion? Absolutely. I think for next time. So Stu, let's go ahead and put this on the agenda then for Tuesday, April 15th.
1:16:34 Yeah, it just depends on, again, what I'm putting down here, just let me know, next steps for Sam's Woodside include, recommend using balanced funds from feasibility study for completion of following tasks, site plan, required capital and better fit infrastructure, business plan, O&M requirements. Again, I just don't want you to get too much ahead of it in regards to resources. I think what you have down there fits.
1:17:00 My perspective, I don't think this is going to... You know, but we're a forum for public input, too. And we might have folks come stepping forward and saying, oh, no, no, no, no. Stu, I think what we're doing now, I don't expect any of this to move forward in a month. No. But we have to start the discussion saying these things are needed. Yes. Is what it's about. Start getting...
1:17:26 The comfort level up that we need to do some things on this. Some of that planning kind of stuff. I suppose at this point we have segued off of our number four and need to get back on that. Who are we? What's the recommendation? Yeah, yeah. Yeah, and we still accept it. Accept and approve it, but yeah. I think we all like the idea of further discussion in a way that makes us feel better. Yeah. That we will discuss it further. Yeah.
1:17:55 And we can then go on with a motion to accept the HVF's consulting special event venue feasibility study. Okay? Do we have a second? And do you have the consensus direction on next steps?
1:18:21 Well, we're going to discuss it first. Well, no, I mean, I'm not putting that in the menu. Oh, okay. I'm just saying accept this. Is there a second? I'll second. All in favor? Aye. Aye. Okay. So with that, we are recommending that the measure your application rate, we are accepting the HVS Consulting Special Event Venue Feasibility Study. If I could make one comment, Stu, I understand
1:18:52 You know, staff's reluctance to maybe feel like you're taking on extra duties because we have, you know, we want to talk about this further, but, and you feel like, well, if it comes from council, then you know you have to do it. But frankly, that was my reluctance with MLR. It came as a directive from council. It did not come up through the ranks. And I think we are a public forum. We should, you know, start these discussions.
1:19:22 We should invite the public in and get the feedback. I mean, there may be lots of negatives. We need to hear it before the council, you know, gets it. I don't want to see council always, okay, these are the priorities, and, you know, we've never even given any feedback. I think that's what commissions and committees exist for. We're a public forum. Just my comments. And we will try not to create extra work for staff. I promise that.
1:19:57 Thank you, Bill. Thank you. Excellent. Thank you for your time. Shall we move along then to a manager's report if that's necessary? Yes, a manager's report was the planning box. Yes. Okay. It's been moving forward with the recreation commission. It's part of the Poxian Recreation Master Plan to the completion of...
1:20:26 Master plans for those four parts that we've identified there. We've got funding from Measure R. We've contracted with Verdi Design from Brett Long, who was down here before. We also did some design work for the community centre task force and so forth. So we've scheduled these two community workshops. The first one is March 20th. That's really to reaffirm the community priorities for our parks and facilities.
1:20:53 Really trying to get broad community engagement input again on those four parks. The April 17th workshop is where the conceptual master plans will be presented to the committee members and to the participants to review the layout, the design for each of those four parks. Again, the purpose is to look at potentially starting recreation centre and aquatic centre. Again, you can look at event venues, expansion, tennis courts.
1:21:21 A lot of people were talking about a lot of great needs. The needs were identified in the Parks and Recreation Arts and Plan needs assessment already. So we had a lot of body of work, community input. But again, it's just getting the community engaged. So we've got a pretty aggressive promotional schedule here. We've got these posters rolling out. We're making postcards. We've got some radio. We've got some good emails going out. We're reaching out to a lot of the youth groups. So again, what I'd like to do is send you...
1:21:50 A little outline of the program, I can attach this PDF to it. And again, just start virally getting out to your groups. Thank you. That would be very helpful. So again, it's viral. We've got some Spanish. It's going to be the Spanish version of this information on the website as well. So people can go to that website, mammothrecaration.com, read everything in Spanish just as English. So we are trying to keep it forward. Stu, I noticed the bell-shaped parcel mentioned here. Is it on the list too?
1:22:18 Yes. That was a recommendation from the commission. It's zoned right now that it's applicable for recreation uses. So all the town would have to do is just pursue whatever planning and zoning requirement would be, but it was a zoning out for mid-state. So that's a viable option. But it's a great property that just hasn't been utilised. It's a great town asset to work while planning. It's just sitting there.
1:22:46 It's the right thing to do. It's also east and west, like Mammoth Creek Park, east and west, so we also have that land that we leased from the Forest Service. It's really unused right now. That came up as an event venue before. What could that be used for? We've talked about putting, you know, recreation centers and ice rinks on the other side of Mammoth Creek Park. And then again, we have this big discussion about Whitmore. You know, we have a great synthetic sock field down there. We have the track. We have baseball fields. We have a pool.
1:23:11 Should that be it? What should that be? You know, we've got phase two and phase three of Whitmore tracks still out there, you know, so what other investments are required down there for that facility? So, a lot of questions. And I'm sorry, could you repeat that on east and west? Yeah, so we, so east, I believe, on this side is the land that we own. I believe that the west is what we lease, I believe, from... Vice versa. Vice versa.
1:23:38 You have five acres on the west side and you have 15 acres. Five acres on the west side and 10 acres in the east, approximately. So we lease that land from the Forest Service now. The Forest Service is in Canada. If we want to do something more than what we're currently doing, we either purchase that land or look at some different kind of mechanism for use. We don't have to lease it. We hold it under a special use. Yes, exactly. There's a big difference there. Yep. So there's some big questions there. But, you know, that park, the existing park is,
1:24:08 There's a lot of valuable land in there. Yes, there is. Plus, I believe there's still a draft document which covers that whole five acres when it was proposed for the ice rink. We've seen that. We've looked at that. We light it out there. Yeah. Yeah, there's a lot of work that's been done there already. There are actually at least three different documents dating back to the county's days. I'll bet.
1:24:33 So you'll send this to us? Yeah, I think I'll send it to you. Ready, Sandy? I think I sent you the latest links. Oh, the links, yes, but if you'd send this, because I've already sent, we forwarded to our Homeowners Association all of the information, but if you send this, this will get them going. Yeah, that would be helpful for us. Yeah. And I'll have a couple thousand postcards you can grab as well. Good. Oh, good. It's already been in schools. Okay.
1:24:57 Buy a copy to put it in there as well. And this will be at the community center, right? Yeah. Excellent. We're looking at a big deal, but I think we're going to run out of space. And I think that because it's a venue that we're looking at, I think that's actually a great site. Oh, that's a good spot. Yeah. A great idea to plan one of our parks in one of our parks. Yeah. That makes perfect sense to me. Yeah. Exactly. Big initiative. So we really want to make sure that that's what we're seeing. And we'll bring that back to council, essentially, the committees.
1:25:25 By, you know, May, June. So that's an actual July. We'll get them to accept that plan. So we're trying to, you know, get this thing done and move on and build something. That's all I have. All right. Well, thank you, Stu. Are there any reports from committee members? Anything else from the public? All right. With that, I will adjourn today's meeting to the regular meeting of the Measure U Application Committee meeting on Tuesday, April 15th.
1:26:01 Uh, 2014 at 8.30 here in Sweet Z. You're good. Thank you. An hour and a half. Thank you. Yeah, so I would, I would love this as a PDF and if there is a blur, yeah, like you said, so I can just send it out to all my contacts and, uh, take some postcards to elementary school tomorrow. Yeah. Postcards aren't ready yet, but, uh. Okay. Whenever you have them. Yeah.
1:26:32 Because they're not printed at any of the expense as well, right? So we can get them on their property and get them out of the bathroom. Wonderful. Okay. And then this, was this part of something? That's from yesterday. That's the interpretive panels, yeah. Those are I's. MLTSCC. Okay. Those are great.
1:27:00 So those are all going to go up in the... Those are all going to go up in a lot of different areas in the trail system, yes. Those are really nice. Very nice. Thanks, Greg. Yeah, yeah. Good seeing you in one. Yeah, seeing the flowers. Oh, yes. Thanks for coming. See, you probably don't need one. Yeah, that was interesting. Yeah, well, nice to have a face to look at this as well. Thank you so much for providing that.
1:27:27 And thanks for the late night the other night too. Yeah, yeah, did you guys have fun? Yeah.
1:27:48 Affiliation, but it was a couple of days ago. Of course. I agree with that. When cars were going up their stairs. Stu, have you turned off Granicus and the lights and everything?