Parks & Recreation Commission · 2014
Parks & Recreation Commission
· recording 2 hr 46 min
Agenda
Agenda items for this meeting haven't been extracted yet. Read the agenda on the Town's site ↗
Transcript
359 passages · machine transcriptAutomatically transcribed from the Town's recording with speech-to-text. Names and numbers can be wrong; the recording is the record. Open the Town's video ↗
0:02 No, I hadn't moved to Mammoth yet, hadn't moved to this planet yet. I'll call this meeting of the Mammoth Lakes Recreation Commission for December 9, 2014 to order. Jamie, roll call please. Commissioner Mendel? Here. Commissioner Souser? Yes. Commissioner Turner? Hello. Vice Chair Stroud? Yes. Chair Tora? Here.
0:40 And I'll now open for public comments. This is the time when anyone wishing to speak on any item not appearing on today's agenda may come forward. Hi. Do you guys have an item prior to – well, we have an actual – I think we're going to have you guys do a little presentation under our first agenda item, so no problem.
1:26 Thanks. Hi, so my name is Mike Ramirez, and I know most of you have spoken to a lot of you about the Shane's Inspiration Playground, getting that inclusive playground built. And I can't stick around for today's meeting, and I have an important meeting with this school and my daughter, so I've got to run. But just wanted to let you guys know that we still have volunteers ready to go, ready to fight for this project. We still have volunteers ready and willing to fundraise for it.
1:56 I have a group of friends that have volunteered man hours for when it comes to putting the playground together and setting it up. So I just wanted to let you guys know that we're still here, still ready and willing to do all the work that's necessary to help move this project along and moving forward. Thanks, guys. Sounds great. Thanks. Thanks for having a night. Any further public comments? Then I will close public comments and move to the consent agenda.
2:29 The only item on the consent agenda is the meetings from our last, is the minutes from our last regular meeting. Do I have a motion to approve or anything anyone wishes to pull? I'll make a motion to approve consent. I'll second. I have a motion and a second. Any further discussion? All in favor? Aye. Motion passes 5-0. All right, we'll move on to our ice rink presentation and discussion. Stu, would you like to start us off? Thank you, Chair. Thank you, Chair.
3:07 So I'm just passing around just some latest statistics updates and a little fancy graph that you can look at. That's our most recent, as of yesterday, statistics at the rink. So what we'd like to do here is a brief just update on the ice rink itself, just what's happened over the holidays. Grady will talk about what's happening with the roof. And then we have Lynn and Jeff from our kind of fundraising working ice rink team.
3:32 He'll kind of give us an update at the end of this presentation on their efforts and how we can kind of work together to get this project done. So just really briefly, I won't kind of read everything, but I kind of hopefully gave you a brief update in the written report. But thanks to Dennis and his crew and our staff with Dan, you know, we were able to open ahead of schedule on Thanksgiving Day. It was kind of a little bonus, a little kind of soft opening. As you know, the weather was a little warm.
4:02 So we tried to open as early as we could, but typically on those days on the holidays, it was around about 4 o'clock, just from the integrity of the ice, and I know Betsy was the first on the ice. Well done. Thank you. So here is just a quick comparison between this year and last year. You can see we actually did quite well, considering we only opened for probably half of those days.
4:27 But I think what was most surprising was you can see the revenue per skater was up. So even though we're doing less people, we're able to make a little bit more revenue on those skaters during those holiday times. So that was good. We also recently, as you know, if you saw the website and a lot of information, I announced that at council last week that we had to close the rink on Thursday, Friday.
4:52 Because we pushed so hard to get that open in less than desirable conditions, the integrity of the ice really suffered and we had a lot of dirt in the ice. So Dennis' crew cut that down, reflowed it, got it back again. So it's in, I think, premium shape now for the holidays. So that's great. We also had a service technician from train come down to look at the chiller. So we replaced that panel.
5:18 We're dealing with a few other issues that Dennis can talk about if he wants to, but I think we're getting on top of that. It's working well. So overall, the facility's great, working as expected. We have hired our final employee, which is our basically lesson instructor. So we have another Stephanie in the office. It's simple.
5:45 So Stephanie has a great background. She's worked with a lot of rinks in actually setting up, running lesson programs, figure skating programs. She has a great US figure skating background. She's certified with that organization, so she's going to bring a lot of experience and knowledge to that program. So we're really, really excited about having a professional join us with our staff to advance those programs. You know, we've just been dipping our toe in the water, but now we can actually schedule lessons. We've got the Learn to Skate Program, figure skating program. We can do lessons.
6:12 Private Lessons, and hopefully we can expand that program. So we're very excited. You can see we've just listed all our staff, which I think if you've been over there and met them, very approachable, very professional. I smile a lot, so I guess that's all right. Unless Curtis is out there making ice at night. Youth hockey is underway. Jeff made me talk about the adult program, but Patrick and his crew are obviously on the ice, going really well.
6:38 I'm very happy about that. Moving forward, next event is our Skate with Santa event on December 18th, and then the annual New Year's Eve party, obviously December 31st. And then from Saturday, December 20, we'll transition into our holiday skate hours, seven days a week. So that schedule is basically the schedule for the two-week period, really kind of looking at our holidays.
7:01 Also in the holidays we're still working with some tournament groups. We've scheduled some ice time for them. They've kind of scheduled two four-day tournaments during holiday periods. So we're kind of opening up the rink at 8, going to run them through to 12, and then they'll come back and play again kind of mid-evening, early afternoon type of thing. So we're giving them five hours of ice time each day for four days. So we think that would give us some great exposure. Hopefully the weather helps.
7:30 We'll just have to see how that goes. But that's exciting. We're booking some birthday parties as well. We've got all the VIP passes going out, all the school passes. So we're ramping up, hopefully for a good holiday period. And the last thing too, we just have that early skate sharpening promotion right now. And then there's also, if you've been over there, Ashley's opened up a business that she rent electric bikes in.
7:57 Over Summer, it's over in the, kind of that, Chart House Mall, can't remember the name of the store, is it? Pedigo? Pedigo? Yeah, Pedigo. So she's actually renting skates over there, she'll have a skate shop, and I said, we've been in contact with her. So there's good opportunities if, you know, people need additional skates, we have them, they can get them, you know, so forth. So, kind of working together on that, so, that's exciting.
8:23 So that's all I had from an operational point of view. And again, I just handed you the latest statistics from yesterday. And that's what we track each day. We also track a little bit more in depth and we drill down and we can actually go in and piece in each of those visits. So is it an adult? Is it a child? Is it, you know, you fucky? You know, what is it? So we have all that detail if you ever want to see that detail. But again, we're off and running and here's to a great season. Any questions on that portion of it?
8:53 I'm just curious with the dust. I feel like that happens like once a year, kind of early in the season before the snow blankets, the dust that's out there. Is that the case? Yes. Well, we usually get a big wind event. You know, this time of year a storm comes in and it's a dry storm. You get a big wind event and pine needles, dust, debris, yeah.
9:17 But it's only at the beginning of the year usually, right? Typically, once we get the snow cover, then we just get snow drifts. Yeah. Yeah, and snow drifts aren't a problem. Okay. And we've got some wind coming in with this next storm again, as you know, Wednesday. Yeah. Well, ground's moist now. See how we do, yeah. The crew's out there blowing the dirt off the... Yeah, shave it all. It's really hard on everything. It's hard on our groomer because that dulls a knife on it. Uh-huh. So...
9:49 We cut it all down. It's hard on the skates, so we have to cut it all out. We repainted over the whole thing and then reflood it. Okay. We were planning on doing another inch of flooding or half an inch of water on top, but this forced us to do it a little sooner than we wanted. Sounds good. Great. Any other questions about current operations? And then, Grady, you can give an update and then we'll... Yeah. Thank you. Great. Thank you. Thank you. Great.
10:18 The subject of the ice rink roof went to Town Council, as most of you know, last Wednesday night. There was some very good debate, I thought, and very good discussion. One of the subjects was whether to look at a fabric type of structure or a sprung structure versus a metal, and it was clearly the consensus, I thought, from Council that if we were going to move forward with this, they wanted to look at a metal roof.
10:39 Discussions about possibly closing it in at some other date in the future if it were to happen. And also they wanted to leave the door open should solar become a possibility on the roof. So the indication is metal if it does move forward. The two real issues and the direction from council, if you will, I think they, again, the clear consensus when they supported the concept. We are much closer on the dollars. Town Manager Holler was able to identify
11:05 About almost $600,000 in funds that could be used for this roof. So the shortfall is in the $350,000 range. The two items were, one is the school district because it is on school district property. There were some issues with the lease and when the lease was going to run out. Currently, if we do nothing, it could run out as soon as 2017. So the idea was we didn't want to make the recommended town that we...
11:30 to a $900,000 investment in a project that could last two years. We don't think that's the case, of course. But they directed town manager to meet with the superintendents of the school and start that discussion. Any action would have to go to the board itself sometime in January. They also, however, directed staff to continue, I guess, exploring the idea, which means before we knew if town council was going to support it or not, we basically, we got some preliminary
12:00 ideas and estimates from various possible suppliers. We didn't formally bid the project. It wasn't out on the street. We just kind of went through some what-ifs so we could come up with a budget. We actually got three of those so far. What they've directed us to now is sort of fine-tune those. So we'll be talking to those same suppliers and others about the cost of doing the foundation, the timing, all those things, so that when we do meet with the school district, we'll be ready. And if they do direct us to go ahead and go out for an RFP on these things, we'll be ready to go.
12:29 I could see it being in really sort of three packages. First would be an RFP on a performance spec for the roof structure itself, which would identify the width and the length and the height and the type of material, lighting, things like that. But it would be a performance spec because every manufacturer does it differently. You know, all of them are different. That's sort of their sales point. The second would be a bid package.
12:52 Almost certainly be publicly bid, which would handle the foundations, a little bit of electrical work, some site clearing and demolition. And what we have yet to weave into that is how the community will be involved. And we appreciate...
13:06 Certainly cash donations are the easiest for Public Works Department because we don't have to coordinate everybody else. But we also recognize that there's some great skills out in the community. We want to make the best use of those. So as we move forward in the next few weeks, we'll be talking with Jeff and others in the community to express an interest and see how we can weave that together to make the best use of all those resources. Again, we expected to come back to council after they begin meeting with the school districts in January. Anything you need to add to it?
13:36 Got it. Thank you. Thank you. If you have any questions, I'd be happy to try to answer them. My only question is one on a financial basis. I don't have notes here with me, and my mind isn't as clear as it once was, perhaps. When we dealt with this in the Measure R process, somehow in the recesses of my brain, we talked about giving them enough money, and I thought we had to put in the stuff for the posts for a...
14:05 Roof, we did not do that? The only thing we did was for design, I think. Yeah, I think we did design because we... Well, because we decided to go with the slab. We gave them the money for the slab. And I thought we decided at that point... Well, when the slab was poured? Yes, that that slab would be... That was not something we did, actually. ...would be structured to hold the load of a roof on top of it. And that the foundation, therefore, was already in place for a roof. Well...
14:33 Two comments. I think the roof that we're looking at actually spans outside the ice so there's room for pedestrian activity inside that and actually the stands on the western side would be covered as well. But I'd be interested to hear if there was an idea of putting it right on the concrete. I don't think so because the wall is around the edge of the concrete. There was, however, $12,500 in Measure R Fund set aside for design and that's still, in fact, that's still on the table. Yeah, the slab was not something that actually
15:00 The Rec Commission said to take forward. The council moved that forward on their own. And anyhow, so I don't know that we had any involvement in what that looked like. Yeah, the only thing that I know out there is just that design that we had funded, which I think was $25,000, something like that.
15:29 The slope that we poured can accommodate the footings, you know, so we're not putting the concrete where the footings would go. I think it's kind of what the discussion was. Yeah. Yeah, and I would say if we're going to do this, I would say it'd be a metal roof, and I thought we had already actually ruled out the sprung structure because to get it as wide as we needed, we needed to go too tall.
15:49 So that's... I think this was like a sprung, this was like the skin but not the full sprung. Oh, okay. Yeah, there's a difference between the sprung structure and the fabric roof. The sprung structure is more enclosed like the, well, Eagle. Okay, so we weren't talking sprung, we were just talking about the shade. Okay, all right. But there was an issue with the height with that, certainly, because it did have to be a little higher with the pitch, and I think the last shot we have through was 41 feet, and we had asked them for cost to lower it to 35, which wouldn't require any kind of variance, so.
16:19 There's still a subject, but again, I thought the clear consensus was Melville. Okay. Yeah, that's what I heard. I wasn't here. I watched them. Yeah, I was here. That sounded like it was definitely the consensus, so. And then, so yesterday, Stuart attended a meeting of the
16:37 Hockey group that you guys have been organizing to try to do a grassroots effort to move this project forward. So I've actually asked you guys to come today and give us just a brief overview of kind of where you are and what you're trying to do. Hi, I'm Lynn Altieri-Need and this is Jeff Posey and it's more than just the two of us that have been meeting. We're a passionate group of community members that have been meeting weekly for about seven weeks.
17:08 Just researching, gathering, and formulating all types of materials towards a roof over the rink. My children have learned to skate on that rink. They're now 9 and 12. Became very passionate about hockey last year when they attended a drop-in session, and now they're hooked. And as a result of them getting involved in the program, I became very passionate about seeing a roof going over, especially when we hear of reports such as debris on the ice and unseasonable temperatures, closing them.
17:37 The rink, and we are a winter resort, so I'd really like to see this be an amenity that is an attraction for the community as well as for tourists. But what we discovered when we started to research was that there's a huge potential to take a current asset, which I would refer to as quite underperforming, two and a half to three months out of the year, the ice rink is in full operation. First ice.
18:03 What's that? For ice. For ice in the winter. Yes, that's correct. But it's actually a year-round facility, just not year-round ice. Yes, for ice. That's correct. And then in the summertime, it's very limited in its usage. And so in looking at how could you potentially increase this as an asset, the roof can also provide that. We discovered that the current size of the rink, which I don't know if you know this, but it's an NHL regulation size rink. And Jeff, would you like to?
18:30 200 by 85. 200 by 85, and Jeff has researched and believes that we may be one of the highest NHL regulation ranks in the country here in Mammoth Lakes, which I think is quite a kudos and something for us to really be considering an additional asset.
18:46 But as a result of the research, what we discovered is that this particular venue with a roof on it could hold 200-plus persons, and that's another asset that the town does not currently possess with a roof over it that would offer shelter. So in doing a concert seat assessment type thing, we estimate about 900 persons could occupy that space in the summertime.
19:08 Events such as Farmer's Market could be offered as well as summertime music festivals, art festivals. We researched Crested Butte, population 1,500. They had an open-air ice rink that they also pursued in covering and they have now since covered it. And they are holding multiple festivals in the summertime, including Budweiser funded a Whatever USA.
19:37 and gave $500,000 to the town. They used that facility as a base for that particular event.
19:45 So I really think that in meeting that we see the potential in not just being utilized more heavily for hockey, but also for year-round events. Like you were saying, Betsy, yes, it's available now, but how much is it being used in the summertime? And I don't know if you've played any street hockey on there, but it's blinding. It's really, really, the cement is really hot and the deflection and such, it's quite damaging.
20:12 So what we discovered though is just the amount of activities would really expand as a result of having a roof over the rink. I mentioned farmer's market. There could be movie nights. I know maybe an Oktoberfest. I know that we've discussed that there might be a special use permit that may be required in order to pursue that for special use events, but that is something to be considered.
20:39 Jeff, I don't know if there's anything you wanted to add to this.
20:42 Your phone is going. So yes, very passionate, and we've been networking with lots of liaisons through the LA Kings, and we've actually been getting feedback. An alumni just recently ran into one of us locals and said, hey, I hear you're getting a roof over your rink. So there's a lot of communication going on, and we'd really like the Rec Commission to support us, or for us to support you however we can in working in alliance.
21:10 But, you know, as a result of the research that we did, we really felt that, you know, the rink's mission is really to become a multi-use, world-class recreation and event center and, you know, seeing how long it's been without a roof and kind of a substandard performing ice rink.
21:28 Would love to see a roof go over that and would highly encourage that. So we are available. We have a lot of fundraising ideas. We've discussed those with Stu Brown. We'd like to see the Rec Commission to join us in our meetings and in our venture to raise the funds, raise the roof, as we kind of come up with, or as Jeff said, put a lid on it. But we're hoping to really make this happen with some strong momentum right now.
21:55 Did you have anything you wanted to add to that? Yeah. Well, everyone knows me from years past of coming in here and planning and crying about our rink, and I just want to thank you guys for what you've done in the past. When I came up last time I spoke to Sean about the glass, and you're like, oh, we have glass, and that went up the next year, Dennis, and Grady, awesome job with the extra supports. I don't think we've had any issues with it blowing down yet, so. No.
22:24 I think we're good together with that. And that has changed everything as far as how hockey is being played out there. Because the netting before was absolutely dangerous. Now you guys have killed it. Ice has been great after the one incident, the wind and the dirt, which if we had a roof, that wouldn't happen. But I also want to talk about hockey. With our youth hockey program, we've grown from, I'd say, three years ago with my kid.
22:53 And like three of his friends going out there and playing. Now we have, I believe, 34 sign-ups with more every day. Like last night we had, I think five kids show up and have never shown up before. They're all interested. And we're not necessarily stealing from other programs, but other programs are now being more interested in hockey as opposed to just playing football or opposed to playing basketball. So they're coming out and they're doing everything now. And I think within a couple years, there's a strong possibility that we could have a high school team.
23:21 We have an elementary school team which can travel to either Tahoe, Sacramento area, like all of our teams travel. But Bishop also, roller hockey, I spoke to Cronus Dillard, who he brings up a high school team to play. They go down and play in Anaheim every year for a couple tournaments, and he has 700 kids in that program. So if there's a way where we can link roller hockey, roller grade and ice hockey, when you're looking at it,
23:50 Quite a bit of money which could help sustain the rink for a long time. And the tournament that Stu was mentioning is coming up. Three of the coaches that are coming up are former NHL hockey players. One guaranteed Hall of Famer, Saku Koivu, I don't know if you guys follow hockey, but he's an amazing hockey player. He's coming up with his kids. Kyle Holder's coming up with his kids. He played for the Kings, Blackhawks, Flyers.
24:17 I believe a team over in Europe winning the lockout. Well, either way. And Jeff Friesen, who's played for the Sharks and the Ducks, is coming up. So, with those guys coming up, and they see what we have, it's basically a win-win. If it snows in or snowed out, oh dang, I wish we had a roof. You know, if they come up and play as, you know, Blue Bergen, they get to play outside and see how our rink works and how we're lacking lines. There's no blue line, there's no red line, there's no goal line, there's no...
24:45 Crease for the goalies to know where you are. When you're playing goalie out there, you've got to reach back and just take a feel of that and see where you're at because there's no, you can't paint lines because of the sun. It'll melt a great hot instantly. When it used to be down at the RV park, we had that big power cable going across. Remember the hump? I think towards the end of the year, somebody would pass the puck and hit the hump and boom, hit your chest. So the sun is a factor on that rink.
25:10 And with the roof, obviously, it'll change everything. The bids that we have, and I know my own is going on in public or whatever, but my friend's father, that's what he does for a living, is a RecSeal Buildings. And he's basically giving us the building and cost, and we just have to pay his foreman and whoever else does the trade work or whatever. They're going to come out and put it up, and volunteer labor force will hopefully cover all of the rest.
25:37 I have a friend who's involved in commercial lighting. He's going to try and get us all the lights for free or at cost, which is a huge savings. There's a lot of work going into this and a lot of, you know, kind of not under the table work, but cashing in favors. So I think we need to do the right thing, put a steel building on it, and then eventually that will leave it in the solar, which will be self-sustaining pump money back into the grid. I think our rink will be one of the few in the country that actually makes money.
26:07 Once all this happens. And I think that's all I got. Thanks. Appreciate it. Well, thank you. I really appreciate your grassroots efforts, but don't go anywhere yet because I want to just give the commissioners a chance to ask any questions or make any comments.
26:20 Yeah, when do you meet? You mentioned, Lynn, that you guys meet? Yeah, we've been meeting weekly, and it varies. This week we met Monday morning, 8 a.m. Black Velvet is where you'll find us. Okay. But it really varies. If you'd like to come, Sean, we'd love to have you. Okay. Yeah, any of the Rec Commission members, please do. Like I said, we really formulated not to operate separately from the town, but at the same time to say, okay, what can we do?
26:48 to really, you know, access information. And we've done a ton of networking. We really have. I saw them with the school superintendent, her administrative assistance about solar efforts that they've made. So we have a source of who we can contact that can do grant writing.
27:03 For, you know, solar panels, we've already resourced two local companies and what that solar, those solar costs would be. Potentially, you know, it would reduce, they looked at the electricity bills, but it would reduce based on a roof being put in place. So we have a lot of information that we have gathered. This is kind of, it's all in here. A lot of it's in here. So that answers your question. Bill? I have no questions for them. I have questions before we're done for staff. Okay.
27:34 Clayton, do you have any comments or questions for Gray? No, I don't necessarily have any questions. Thank you guys for everything that you've done. The efforts that you have started looks like maybe it'll come to fruition. So anyways, I mean, without your efforts, it probably wouldn't be where it is right now. Well, thank you. We're huge proponents of momentum right now. So we're, you know, as much as we can do to perpetuate this momentum would be.
28:02 would be excellent. Yeah. And I don't know, maybe Stu can shoot us, because I'm assuming you're letting Stu know when you meet, and he can shoot an email out, and if any of us can make it, then maybe we can do that. Yeah, I'd be happy to go.
28:21 Yeah, and kind of, you know, act as a liaison with them. So, Stu, can you maybe kind of outline sort of, well, I guess we've already talked about the next steps that the council is looking for in terms of, you know, firming things up with the school district. But I know, Stu, you're also kind of working on starting, you know, a business plan to just show what the differences would be in our operation with a roof in place.
28:40 Yeah, so we're working with the group, which is great on a number of things. So we're looking at, you know, fundraising efforts, campaign letters, material, you know, those type of efforts. But I think what we really want to focus on is kind of a broad operating plan that would really identify, so if we get a roof, what it would be. So on a 12-month window and a calendar, how long are we going to operate the rink for? What would summer look like? What else can we put in there? You know, try and put some specific dates, events.
29:07 Maybe some numbers down, put some revenue, expenses, how it would look, a little pro form in regards to the facility. I think that's really something that Commission would probably want to see. I know Council would probably want to see it, right? So we've got a number of plans we're working with, so we're going to work through that. So we'd like to probably keep engaging the Commission through this each month as best we can and keep you updated. We'll try and have that document done probably in a month. It might be a little...
29:34 Christmas Project, we'll kind of keep working on, but there's a lot of plans out there, so you're not creating something from scratch, right, this is not, nothing new, it's really just what would be specific for area, so I think with this group we'll come up with a great overview, good outline, and then love to have the, you know, commission support, so if the chair can join us for those meetings, probably only two of us will probably attend, right, because? Yeah, so we don't have a quorum. Be an issue, so yeah, Commissioner Turner and the chair.
30:02 I know everybody's busy, but I just do want to let you know that staff's absolutely collaborating with this group, and this is how we get things done in our community, working with the community. So, you know, we're very excited, so, you know, we'll work as collaboratively as we can, and working with our commission and staff, and trying to turn this into reality.
30:27 If anything, I was asking when you're meeting is just because in this public forum to let the public know so that they can attend. But it doesn't sound like you've got a regular meeting? It's been weekly, but it really comes down to a few core of us and our schedules. That's really what we've based it on. So, no, we don't have anything set to date. But, no, I would invite, and as a matter of fact, we're going to need to expand, especially with our fundraising efforts. Right now we've discussed about a 30-day plan of just finalizing marketing materials. With Stu's approval, Colin Fernie as well has been.
30:57 Giving us approval along the way. So any approval we need to seek, we're not moving forward without the support of the town behind us. And ultimately, too, we thought with fundraising efforts that those funds would be funneled through the town. So we're not operating as a separate entity by any means. So we've created, just to share with you, we've created a donor-centered letter. We've targeted, we have a mailing list. We've targeted 1,000 particular
31:25 Hi, household. Yeah, thank you. And we've also, we have two 12-year-old daughters that have interviewed several individuals within the community, including Lois Klein has just accepted to be interviewed, just with a few brief questions, just showing support for the roof without getting political, of course. And just really trying to move forward with them creating a little bit of a fundraising video showing that there's
31:55 Puddles on the rink, and that we need a roof. So that's also in place. Reaching out to Bauer and Eastern, who are equipment companies, LA Kings. Brian from Crumby's now works for Los Angeles Kings. So it's, we've got a group for Jim Kings. We just have to have a proposal that understands that if they sponsor rinks.
32:21 Down south to like $250,000 to $500,000 per year. Wow. Super. So we've seen it one time. Wow. Put a roof on the feet and whatever else they can help with it. Great. There's been a lot of communication and so they're waiting for materials basically. And so we just need to get those ready and finalized. So ready for the new year. Question. When the bids that you're talking about and the amounts where you said you're roughly $300,000 short, is that including lighting or would lighting be on top of that?
32:50 The rough preliminary estimate is about $919,000. It does include lighting in that as well. We have a rough estimate for the foundation of around $80,000. It could easily be more than that, but that's what we're trying to find. So that would be in addition to? Right. And I did want to mention that depending on the types of uses, of course, right now if it's just for sports, it doesn't have to be sprinkled necessarily. If we move into something where you're going to put 200 or 900 people in, you either sprinkle it or you have...
33:18 Three fire trucks sitting there the whole time. We'll work that through with the fire district and see what we need to do. Because we would certainly, if we're going to do this, we'd like to be year-round and be able to host that. But that is an issue, the fire sprinklers, because they're not cheap either. But again, looking at all of them. Okay. And I did go online and look at Crested Butte. And it has a great picture of the Rink and what it started. It has a little slideshow there. And it's like, wow, it's like a little puddle that they started with. So anyways, it was...
33:46 It was pretty good. And they actually do have a hockey group that kind of, you know, works with, I think, the community is what it looks like and is ongoing because that's on the website and their programs and everything else. So it was a good thing to actually go and look at the Crested Butte because I heard that at the council meeting. So anyhow, if anybody else wants to go look, it was actually. Yeah, it's pretty cool.
34:11 Good to take a peek. And they don't have a chiller. That's how cold it is there. Which actually leads me to my question, and Dennis, you'd probably be the one that remembered this. It seems that when Greg was sitting up here as our chair, and we did this originally, that when we bought this equipment, which came from the East Coast, we were told that we would either need to have a roof or significantly add to the compressor power.
34:38 And that with our high temperatures here, we may need to add more tonnage of compressors to keep the ice cold enough. Have we looked at the cost effectiveness of going that route and keeping it cold enough to maintain ice even in the warmer temperatures? I mean, let's face it, they have ice outside in Los Angeles in the summertime for special events. So we know that it's possible. You don't have to have a shade. That doesn't affect our lost days to snow.
35:07 And we would all love to see a roof on it. I think really with our environment, the intensity of our sun, I don't care how cold you get that slab, you're going to get melt on that edge. We're pumping out 200 tons on our chiller. It's at capacity. Center ice is froze solid. You get to the other side, the west side of that rink, it's as hard as could be.
35:36 It's just that four foot section. Now when everybody talks about Southern California and Vegas having ice, what you don't see, they cover that thing every day. That's the only way you're going to do it. So we could put a cover out there and put five, six guys out there and cover it every morning, uncover it every evening. That's a possibility. But then, you know, we've got to store this big cover and you've got 90 mile an hour winds and snowstorms and you have to deal with that.
36:07 I think it would be a big gamble to think that two chillers is going to do what you want it to do. I really don't have an answer because we're unique in our area compared to anywhere else. I just remember that conversation before it ever arrived that we may well need to add to our chiller capacity at that point. Yeah, and, you know, actually our chiller has held up and our ice has held up quite well other than
36:38 You know, we get into the 50s and 60s and we start losing ice. And you look at the chiller and what it's putting out temperature-wise, like right now it's putting out, it's going out at 11 degrees. It's coming out of that thing at 14 degrees and we have a little bit of water on it. You can't get it any colder. I mean, our chiller, to bring it any colder than that, you start having chiller issues because they really aren't, you can't get it down to zero.
37:09 It's just the chill, it's the machine itself. You start having issues with the thickness of the glycol and freezing issues with the fluids and there's a lot of calculations and formulas that I don't quite understand but I do know it causes us grief. We ran the machine at six degrees the beginning of the year this year hoping to help us with those issues. Well, I had a low oil alarm that went off and I called
37:39 Train Technician and said, you know, what's going on? He goes, he was afraid of that. He goes, it's just too cold. Your oil is not moving in your compressor because the temperatures are too cold. Raise your temperature to 10 degrees. So I raised it to 10 degrees and I had a couple other alarms go off. He goes, well, you probably need to go back up a couple. So I'm at 12 degrees right now. We're maintaining at 12 really well and it runs at 12.
38:08 You know, we probably have to, in order to maintain ice on that slab, have to be at zero all the time, you know, on warm days. That's why I asked. I don't know if a chiller, I'm probably not the guy that I can talk to our chiller guys when they come back up and ask him that question. We've always had that ability to set up for two chillers if we ever had to, or in an emergency, if it went down, that we could bring a standby in and tie into it.
38:37 Okay. Your utilities also skyrocket when you add another. Yeah, I can imagine. Yeah, just double it. One more thing with the two chiller thing with Vegas and all that. They're also running an aluminum plate underneath the ice. So it's not concrete. The aluminum retains the coal or whatever it does because they have aluminum under there. So it's a lot easier to keep the ice at a lower altitude. And our issue isn't with the chiller, it's shaming.
39:04 I skated on Patrick's right on Dorrance and Lupin in March last year, a full month after our ring closed, because he's reminds, because he can't, you know how there's no smaller time here, you know, 85 degrees in town, you're hot, you just go in the shade of a tree, it's shade, it's shade, and I think he runs six months a year, easy. Thank you. Sounds great, thank you guys. Thanks Jeff, appreciate it. Do you guys have any more questions for staff?
39:35 Any public comments on this item? Okay, then I think we're actually going to move down to do our little discussion of CIP. Are you seating down here? You know, we're going to sit in a circle cross-legged. We're going to have our kumbaya moment.
40:22 Thank you.
40:46 Let me go test this for this.
41:17 Thank you.
42:14 Ready? We, uh,
42:45 We met several times and grappled about how best to work through this process. And you folks, most of you at least, have been through the Planning Park stuff and everything else. And what that ended with was, okay, let's come up with some priorities. You did come up with a list of some seven or eight projects that were, I guess, somebody called it low-hanging fruit and things. But even at that point, the Rec Commission didn't actually prioritize the Planning Park ones. So what we thought we'd do with all the different moving parts was,
43:15 We put together the spreadsheets that you see before you. Basically, we went from one facility to the other, listed everything that was one in Planyu Parks and also everything that you'd looked at in various reports over the years, sat down with Dennis and said, okay, the reports are nice. What's really happening on the ground? Let's figure out what really needs to be done. And we came up with a list of projects, if you will, some major maintenance, some...
43:40 Strictly Capital Improvement that would allow the facilities to continue as they are and in some cases enhance them. What we thought we'd suggest is that we go one facility at a time and prioritize the things that are on the list here. As an example, we have the trail system. There are five things listed, three of them, in our opinion, and please, we want everybody's input, but between Dennis and I and Stu, we thought these three
44:07 Need to be done or the facilities just, I mean, it's not even going to be open if we don't do those. So we listed them as a work program and priorities number one because in our opinion, if we don't at least do those, just, you know, there's not going to happen, you're not going to have anything. So then what we do is go back on the other two that aren't those and seriously just talk about those two. Dennis is probably the best to describe what's in those two projects and the other three and then just give us some input which one of those two, frankly, are more important based on the
44:37 The timing that I've suggested, and believe me, these years 1 through 5 and then 6 through 10 on your right, again, I have been around town for many, many, many years, but I've been here for 6 months, so if you have any input, tell us what you think, please do so. And we could go facility to facility. A couple things I want to mention, none of this includes
45:01 The regular parks maintenance budget of about $600,000. There's two or three things, I have to admit, that are on here that are also in there, but predominantly, they're not there, so this is almost 100% not funded. So when it says work program, that doesn't mean that it's in the budget? Right, not necessarily. It just means that we really think it should be in the work program, and when we get to the individual ones, Dennis will let you know which ones.
45:23 Are in the budget. There's only two or three, I think, out of all those, but we'll get to those. The other thing I want to mention is the town fiscal year that's based on year one is the town fiscal year. That ends June 30th. That's why if you look at the bottom line for year one, it's only $93,000. We only have May and June of next year to do something. So if you look like year one is really small, that's because it's really only two and a half months long. It's, you know, it's ten weeks.
45:51 That's why that number is, I guess I'd call it artificially low if you would. The other thing I'll mention is on the first one, the trail system. This does not include everything that we're looking at with the trail system because we're talking to the Forest Service. We didn't include the Sarbanes Grant million dollars to get the Lake George Road and Lake Mary.
46:12 Road Path put in, things like that. We're talking just signage with the Forest Service as well. MLR has a MLTS subcommittee. So rather than frankly belabor this with a list of 50 improvements we need to do on the trails, we could be here all day just on trails. Believe me, I was that way with engineering staff just a few years ago. We just listed the ones we thought were most urgent related to maintenance that Dennis brought up.
46:37 That's really sort of the preamble. If you'd like, we can just jump into the first one unless you have any questions about the process. Yeah, we'll jump right in. What I would say is that when we're done, and the reason we wanted to focus facility by facility, because if you start crossing over, maybe we could be here for a long time, as you guys have already been over these a lot.
47:03 If we go facility by facility, at the end, depending on what time it is, we can start into it today. But at the end, I would then like to suggest that if the commission so chooses to form an ad hoc committee that could sit down with the three of us or four of us and say, okay, now we have one, two, and three items for each facility. Now we need to blend them together because there's only X amount of dollars and is the...
47:28 Ceiling of this tennis court more important than the community garden down here. How do they work together? And I would suggest that that ad hoc committee could meet with us, have something put together, and then come back, of course, to the full commission in January. But again, we chop it up into little pieces, do the best we can, put it back together, and see where we are. Because I sat on an ad hoc committee for this, and that's exactly what we did. We put that together, but then the problem is it never came back, and it never went.
47:54 And so, well, I don't know. I'm not sure that that, I guess this is going to take a while. I'm not sure that that I thought wouldn't be better to go through these and then come back again. But I don't know. There we go. Along the same lines. This is a long.
48:12 And one thing that I'd added, because as I was working through the spreadsheet,
48:39 I realize exactly the same thing, and that's why I split it into year one and two. If you look at the blue, that's year one and two. Maybe if we focus on that, we'll make a lot more progress because that is the most urgent one. You know, we need funding. We need to do it the first two years, and that significantly shortens the list if we hit those items first. We could do that if you're in need something for, you know, budget discussions so that we can move those forward to. Exactly. Again, they're the most urgent ones that have to happen. So with that,
49:09 A, Trail System. Dennis, why don't you run through those? And again, in the interest of brevity, I think everybody's pretty familiar with all these things. Be as brief as you need to be, and if anybody has any questions. Please. When it says update signs, are we talking about just our in-town mups? No, I'll go through it with you and give you a brief description. He's going to hit each one. Every item. A1. Yep, he's going to hit every one of them.
49:35 With Grady having said all that, most of these items I've gone with you guys through, we've done field trips, we've looked at these, we've talked about them. I want to get it on your radar just so you know what it is. I'll give you a quick description and a reason why. So update trail signs, 18 by 18 inch. Lakes Basin trails, we've got people that go way too fast on bikes. Put the bigger signs up there, hopefully that slows them down. That's it in a nutshell.
50:07 If there's no money in the blue in year one or two, does that mean that no one's been allocated? No, there's no money allocated for any of this. And some of them, and we'll get to this example, B2, it's out in year four. So there's nothing in one or two because we don't think it needs to happen in one or two, but we welcome your input either way. So we're looking at year two to start that. Trail maps. A lot of our trail maps are
50:35 Not actually correct. When all these trail maps went in, we need to make some changes and update those maps. They're very expensive and they're not going to come out of my operating plan. These are the ones that are on the maps. Yes, they're all over. Yes. We're not talking about the OSD map. No, no, no. This is the bike trail maps. This is our map. Yes. I mean, it doesn't show the links to Mammoth Creek Park.
51:05 That's different. That's their winter and summer map. We just updated the winter and we're moving on to summer. We start here. We think, you know, this is, again, this is community recreation. Absolutely. And that's why it's a pretty short list because we will want to meet with the MLTS subcommittee. That's why I mentioned that. That's another reason that list is short. It's like we need to do these.
51:29 Regardless. Go ahead. Slurry Seal Trails. We do that now every year. We want to continue to do that, and we want to carry it. So we have 20,000 every year to do one to two miles of trail every year. And that is? This is in your work program? That is in our work program, yes. It is funded. Currently, we've gone up and down with it over the years. We want to hold on to that. We need you guys to support. We need to keep that going.
51:55 An asphalt repair patching, it's the same thing. It's in our budget. We try to do as much as we can. It's slated to go out $5,000 every year. Repair center post. Our center post, we started out with a wood post. We're moving to the recycled lumber post. It seemed to hold up. You don't stain them. You don't paint them. The leg spacing trail has a new style, which has the logo and the reflectors in it. They are very expensive.
52:22 I thought there was a volunteer group through Mammoth CPA and the trails that went through and replaced them. They changed logos. Yeah, they all went off and put that new logo. Yeah, that benefited our program. Yeah, that was Sean's program. That's important. So other than that, everything on the trail system is covered under our normal maintenance. Okay.
52:50 Community Center. No, no. We have three items that we're already doing and three you said are funded now. Of the two, we all started with a short one just because I wanted to work through it once. We have two items, update the trail signs and update the trail maps. If you only have money for one, which one would you suggest we do? I mean, I'm just trying to focus on the process. For me, if you're asking, it would be easy to go with signs. A1.
53:21 Let me explain why I went down that road first. Our maps are in terrible need of being upgraded to the point where they are reusable so that they go and we don't until we redo the maps. I can't get on my little special phone here and see real time where I am, where I can in a lot of other communities and stuff. So before we go through the maps, I'd like to see if, or maybe I'm wrong. I agree. Yeah, so before we do the maps, I'll go with the signs while we're
53:51 Redoing our maps to a point where they can be brought up electronically. Because this is what everybody's using now. I thought you could bring them up with the QR codes that were on the science. You can't. You can't. Yeah. You can bring up, with the QR codes, you can bring up on the bigger map that is on our Mammoth Trails site, which doesn't give you the closer level that you need.
54:20 For things like walking and mountain biking and things like that because it covers too much territory. And there are those who are a lot better with electronics than me. I'm still having trouble. Mr. Wentworth went through it and showed me how wonderful it all works. I'm still having trouble getting in to do some of those things. So I think there's an upgrade needed on our mat which made the signs natural for me.
54:45 We'll look at that, but in addition, especially the summer maps that we'll be working on, that's one reason we're going to wait a whole year probably before we, yeah, not yet, probably next spring before we update those. We want to make sure we're in concert.
55:14 I asked the Forest Service that specifically if they're meeting the bishop, but they said at this point in time they don't see any major changes in any of our OHV, OSV, or hiking, or biking maps, so that's not the level they're getting into in this version of the land management. But this is more reflecting the water for example closure in that one, even the Mammoth Creek little piece off the end of...
55:42 My street. Meadow Lane. Meadow. It isn't even on there, and that was built two years ago. Well, we've added trails. Things are changing constantly. Okay. And they're going to change. We're going to have additional trails that are going to be added. So maybe what we need to do is, yeah, I would say probably the signs. Then let's look at what the updates are and when we're updating these other trails and see if we can incorporate some of that. And again, all we're looking for today is kind of a consensus.
56:09 Signs, then map, they could both happen the first year if they outweigh some of the other stuff, though. I don't think that the speed-related issues out there are an issue of people seeing that they're supposed to be going slow. I think they're just boring.
56:28 and big signs not going to direct that. She would suggest that we move snow off speed bumps. Remember those little things? I've seen them on the overpasses, and when you come down the other side, you have to almost get off your bike and walk it around. What we've noticed is a lot of accidents.
56:55 A lot of hospital visits, a lot of ambulance rides, almost weekly. And frankly, and again, this is why we could be here. But just to finish that, when we looked at it, it was more people from out of town, untrained, letting their kids ride ahead of them at 40 miles an hour. That's where the accidents came from. You're right, they won't care about the signs. Just out of curiosity, where are the biggest trouble spots you guys have? Lake Mary.
57:22 Everything up in the base and coming down. It's just, you know, 3% grade, 40 miles an hour, the whole thing. All the way. All the way to Whiskey Creek. It's pretty scary. Whiskey Creek? Yeah. The wars are transitioning onto. I had to. Hey. It's ingrained. And it's hard to see those guys sometimes. Okay. So, okay, so I have to agree. It probably isn't good.
57:51 Will the 18 by 18 sign actually kind of be a hazard? What's it going to take to update the trail maps? I mean, what budget is here and what are you calling for? What's the difference between the two? Well, some of it we'll do in-house, but I put $2,000 in year one because that's some of the design work to actually get it updated and then $15,000 probably to print it. Well, I guess what I'm asking though is, you know, yeah, we would do consensus on this.
58:19 But you're saying that the maps are not ready to be updated? I think they are, but we're just, we're constantly changing. We need to make sure that some of these maps in the lower areas where we know we're good, but when you have the whole trail system on that map, we want to make sure that we have everything on it. And when we do this new trail next year... I guess that's what I was thinking, is that, you know, once we...
58:45 You know, look at the trails. Could we put a future trail on there and just put trail coming, you know, in a year or something like that? Yeah, we'd like to do that. And that way you're not having to then, you know, replace the sign again in another year. We had a lot of problems with the original maps. So that's where this came up. You are here. Oh, really, we're not there. But we think we could do this next summer and have them printed.
59:15 You know, in July. All right, so do we have a consensus? Are we pretty neutral? I mean, this is probably just... That's fine. We can, and this is not... Equal is fine. We have an indication that they're both important, and that's what I want to hear. I did too. Are these 18 by 18 sites really going to make a difference? Are all of those signs, signs?
59:46 The speed limit, there's some that are showing that you've got a grade ahead. Some of them are stop signs at the intersections. There are all type of regulatory signs that we have on the trail system. But they're already there. They're already there, but we have the small 8x8s and 10x10s and 4x4s. We have a lot of signs out there.
1:00:14 Yeah. And I don't feel strongly either way. If we can use the money to update the maps and make them more user-friendly, then I have a problem with that. I'm really more true for maps, you know, just for that, for the same reason I'm Clayton, but I also obviously want to make sure the information is kind of good about maps.
1:00:42 Well, you know, I just want to make sure that we're timely. I don't want to do that too soon that, you know, when you're going to say something else comes out from the Forest Service that we've just done something that's already outdated. We'll be okay. I mean, it's going to be changing all the time. Every year we'll make our best estimate. I guess I'm leaning just a little bit toward maps just because we have closed some major gaps in the last couple of years and those aren't reflected now. So someone is just looking at it.
1:01:11 Okay. Dennis, Community Center and Park. Community Center and Park. Refurbished landscape. Really isn't any landscape there, so we need to come up with a plan. Why don't we do this? Why don't we focus on the ones in the blue? Okay. Which means you can jump down to...
1:01:33 The parking lot rehab. Because the others are out in years three through five, unless somebody has a strong opinion to bring some of them back closer. You're right, we need to narrow the scope. Thank you. Parking lot rehabilitation. Parking lot's in very sad shape. The community center would like to repave it. ADA compliancy, which would go in with that about the same time. We'd have to stripe it, make sure that we have a proper angle on that.
1:02:04 Slope, I should say. Forest thinning. We have done some forest thinning over there. We need to do some additional thinning around the restroom area where we have some very large trees that are lifting the cords and causing damage in there and actually give us a little bit more light in there. It would be nice and keep the pine needles off the cords. Install Wi-Fi for the community center and the park.
1:02:37 New technology. Paint the interior of the building. We're going to try and do some of that work this year. It's just time for maintenance there. Install shelving in the storage room. That's Stu. Stu has that in his budget. We're going to try and perform that operation this winter. Just clean it up, organize all our rec supplies and their special event stuff that they have with recreation.
1:03:06 Repair the steps and ramp. The steps and the ADA access ramp on the side of that building are just in very poor shape. And I think all that can be performed in-house without a problem. Paint the exterior of the building. The building's due for paint. That's it for community center. Of those last five, which ones are already in your budget? Community center, paint.
1:03:43 The back room and storage for Stu there. We're going to try and achieve that. Stu has some money in his budget. I think between ourselves and Public Works Maintenance, we can get a few guys over there to accomplish that task. Okay. Is that interior or exterior? Interior. Yeah, well, that way, weather won't affect us on that. So you said interior, shelving, and ramp.
1:04:12 The ramp will try and perform that work next year, which is not very partway. So you're using $1,000 for exterior paint? If we buy just paint. That doesn't include the labor. But we'll do it in-house. So we'll do it with our own. So the three to discuss would probably be numbers four, five, and eight under that?
1:04:39 The two issues in the parking lot, and then the four sitting, which was, of course, part of the planning your parks process. Again, trying to focus it on those three. Now, the parking lot ADA compliance, I know when we were talking about this, there was one that was flattening out of the area by the separate parking lot of tennis courts, and then there was one that was just changing. That's a separate, that's going to be on your next item, tennis courts. Oh, okay. So we're talking about strictly community center.
1:05:12 And that was, wasn't that more just changing the flow of traffic and moving things around? We wanted to, well, first of all, pave it, take care of that, and then a new striping plan that made the ADA access, which will come into play at the same time. So we have a, we're compliant. We need to be compliant with the law. We're currently out of compliance. We're currently out of compliance.
1:05:43 I think, and again, I think as to the existing parking lot, it may have to change later because we don't know what the master plan holds, but that's why on the rehab one, on number four,
1:06:09 The full repaving in the parking lot is out at year four because that gives us a chance to look at the master plan and decide what we're doing. This is just what really needs to be done now just to rehab the surface. Okay, so this is not a whole repaving. This is just like... Patching and taking care of the major bad areas. You see in year four there's $160,000. That would be the repaving project. Okay, you guys don't have any of this in the budget? No.
1:06:43 Well, for me, I would like to say that I've been the parking lot rehab and the ADA compliance is the same issue. It is the same issue. We just joined together. Mm-hmm. Well, I think we need to bring the in-depth compliance and the time we need to do the ADA. I asked a question at our last meeting of Dan. It's like, what does this community center cost us?
1:07:17 Every single month. There's a lot of stuff that needs to happen at that community center. I don't know what that cost is. Is there a facility that's in town that we could actually rent and close down that until we build a new one? I don't know. To me, there's just between the roof, the maintenance that you need to do inside, everything else fits. You know, is there a facility that would...
1:07:45 Accommodate the height for our gymnastics. Is that, you know, I don't know. I know that's not the most popular because it's a facility that's there and you don't necessarily want to close it down. But it's a facility that we've got issues with. It's not sufficient for what we want it to do. I don't know. I just set it up a lot in public. I asked Dan about it. It wasn't something that he had to answer for me. But it's really, I don't know that, you know, is that something that we would look at?
1:08:16 That's probably something we need to consider before we get into these larger ticket items. But I think in terms of the parking lot, I mean, that's going to be town property regardless. Regardless, you need to do the ADA. I think that's something that you would have to do. Well, and frankly, closing the facility down doesn't solve any of the issues. I don't know that any of you drive up there and look at it on a regular basis, but it is used as a parking lot for the mountain. And it is full anytime we have any kind of occupancy in Mammoth.
1:08:47 That being the case, that parking lot is full when we're at 20% high. What I've done is I've given you a list of everything that I've seen over the years. Good, bad, negative. If it needs to be fixed, I'm going to give you that. I didn't look at it because I've asked that question.
1:09:17 Are we going to keep the community center? No. Are we going to keep the community center? Yes. Are we going to do something with the community center? No. Are we going to do something with the community center? Yes. I don't have those answers, so what I'm giving you is a list of everything that is deficient within our facilities. I can't answer any of those questions if we're going to keep it, how we're going to program it, or what's going to happen with it in the future, but these are the items that I've found.
1:09:47 It's hard to throw good money after that, so that's the only thing I'm looking at. And again, understanding that we'll, this isn't the roof process, we'll hopefully have a paddock community to go through, but what I'd suggest is the two parking lot going to properly, both two, because they do need to go together, the forest state is close, you know, close behind that, but one of the things we'll do, and as you'll see, I'm sure, we'll go through this process, we'll get to the end, and then we have to go figure out how much money we'll find where.
1:10:16 And that will help come back and reset the priorities. It is a bigger process. My goal is to keep it moving because, again, you don't want to go through this and have nothing happen. For me, four or five are the same thing. And short term, we need to do the pavement repair.
1:10:37 And like we found when closing that parking lot to use, and that would just be shooting ourselves in the foot. So, yeah, so to me, that's the top priority up there, yeah. I would agree with you. Great, so maybe in the Avalon Committee, when we get it to some of these further out, you know, maybe that's, like, you can't start with any of those alternatives.
1:10:59 Well, this is the same list we looked at three years ago, so unfortunately it is. It is? Yeah. So I appreciate you coming forward again. Again, but why, and I'll be, as students, I'm always, you know, the pain is, I'll just keep pushing because if somebody says you want to do it, it'll be okay. Yes. If somebody's told to stop COVID, I'm going to keep putting it out there and say, okay, if you want to do this, then great, let's go get the money. Where does that come from? I can't do that. Your money disappears all the time.
1:11:29 This list isn't going to go away. It's not going to go away by itself. So I've had this list for years. It just keeps getting bigger. I've got a new guy. I'm going to give it to him. So I think our role is really to set these priorities, and then as we go out and advocate, we get the money so we're not sitting here another year having to put us on the same competition. Yeah, no, that's fine. All right, so we have some consensus. Consensus on working out would be one.
1:12:00 So, first item, rebuild, replace tennis court storage. What we're talking about is the small wooden structure out there. We're just going to go buy next year a small wooden building, prefab, done. So, is that what you've already got in your budget? No. But that's what we're planning on doing. Right.
1:12:29 Parking lot ADA Compliance, now this is the tennis court parking lot, it is a disaster. Run power to the facility, the restrooms, there is no electrical power to the tennis court, it's a problem. Those bathrooms don't have electricity, there's no place to plug a ball machine in, a light bulb in, nothing. Restroom fixings, it says fittings and paint, we need to spend a little bit of money on those restrooms, they're very old.
1:13:02 Fence Repairs, that's, the chain link fence is starting to show some damage, most of that we can take care of in house, not a huge part. Crack and seal and paint annually, that's something that we want to keep doing as long as we can. That is on our work.
1:13:36 What I'm envisioning is just basically getting a pedestal at least out there to the center of the tennis court area so we can run a ball machine or run a light or different things like that.
1:14:00 We don't even have a, we have a quarter generator up there, we need to do what we need. But we run power extension cords, and when the contractor comes to do the 10 square repair, we run an extension cord outside the old library building, all the way up the hill. So, I think it would be a very simple process of crunching and conduit, not just put a small pedestal out there, buy us time until we figure out what's going to happen to that facility in general.
1:14:31 I would think that this falls under the same thing, but two and three are together, and to bring that up to code and compliance has to be number one. Yeah, I mean, just looking at this, you guys have $7,000 a year in practice going into the exports. That's an ongoing annual, unfunded, frankly. Yeah, that is funded. That is okay.
1:15:02 It's not funded. We can pull it out of that. We can make it funded, but something else will suck. We pulled it out of our contractual service. And, you know, rebuild or replace the tennis storage facility. I still think that that, you know, I almost think that could be a community project.
1:15:35 We're just looking at buying a simple tough shed, you know, wherever, Home Depot, something like that. Or maybe we look at going through the high school woodshop program that's coming around, they've talked about doing something, you know, we buy the materials. That $5,000 is just a number, I don't know, $7,000, $10,000.
1:16:06 3,000. And 5,000 was the number that I pulled off by. So that's the best estimation that I could give you. You can't collapse with the snowfall, right? So it's not just a regular garden shed. Yeah, we want something that's fairly weak because we don't go back there and show up. Unfortunately. I agree with charity. The Contractors Association, we'd probably get enough good old boys to donate the labor. We'd probably get a voluntary cost, or at least a contractor's cost. What does that do to bring up? One thing that was on the next round?
1:16:35 Each one that identifies the highest priorities will work to function in the estimates as well. So it's not as much. It's really come back. We might say it's going to be, you know, $65,000 or $35,000. There's so many we can value it to everyone. No, it's hard for us to see that as a higher priority than the clients. No, you kind of need to. We need to get the parking and maybe any.
1:17:02 How is our parking lot out of the EA?
1:17:28 The striping needs for, well, it's, there, yeah, there's a couple issues. Striping, the encroachment going to the walkway, the big holes in the parking lot and the tree roots that have lifted the parking lot and there's a batch of working. I think, particularly, you know, with the Women Warrior Center and our communities throughout our communities as, you know, being an accessible and welcoming place, I think, you know, that also just adds to them.
1:17:58 I think that really ties into our tennis program, too. Ryan, we've got a tennis pro, we need to support that program. We've got a great community there, so I just think that's embarrassing that that building's still out there, honestly.
1:18:32 Pull it down and get rid of it. And I don't want to say that, well, I don't know, restrooms are powered. I would say for the facility, power, but the restrooms. The restrooms work. They work okay, and I'd say the power basically enhances the facility because it allows you to get more blessing, it allows you to do more things. And public safety, too. I mean, you really need a light. And that's funny. We didn't talk about the forced thing.
1:19:00 As you guys have heard from this several times already, Parking last Monday all because of the tree roots pushing up the pavement, because I think of my driveway. The attendance courts are cracking because of the roots pushing up the courts. So if we could identify some of those trees and take out the big ones that are causing those issues while leaving the small ones so that we don't lose our in the forest feel. That was number two on the first one, though. Yeah.
1:19:27 Is that good? So it was number two on the B, on the B, it wasn't identified on the C. Okay, and that's fun, we don't have to try, we don't have to talk about it next time. Okay. West, okay. As you know, the fence in the front, wood fences, most of it's laying on the grain.
1:19:55 I can give you a comment because I wrote it on the other note. So rather than, the greatest comment is rather than put another fence up, how about I'm going to put some more shrubs in there and just kind of barricade it off. I want to buy it all the time. I want to buy it all the time. I want to buy it all the time. I want to buy it all the time. A little bit and you're done. It looks better. You don't have to repair it all the time. Because I want to buy it three times a day. I just don't, I just don't, my personal. I'm just like I said.
1:20:24 Number three, which is number four, is a community garden.
1:20:55 Last but not least, paint the restrooms each year, extra year. We're going to do that as part of our work plan this year. How can you merge numbers three and four? They look pretty different to me. Oh, no, no, no, no. I just said the third item, which is line four. Sorry, but we didn't mention item three because there's no dollar amount associated with that. Again, I would like you to consider that because that is the oldest program. We just don't know what it is.
1:21:25 What was the status of the community garden? Depends on the extent of what the project is. So it's just sealed, you know, essentially, you know, whatever they are, garden boxes, you know.
1:21:46 It really depends on the design and what they're proposing for. So if it's sealed, it has a liner, then there's nothing that's going to seep outside of that. If there is a liner, then it could seep outside. So it's really the scope of that project, right, exactly.
1:22:04 So, would you guys have funding to do shrubs out there? Probably. You know, I think we might need a little more money to...
1:22:30 Why larger shrubs? Or if we had people, maybe there could be a shrub donation. Shrub debt. That fence that was put in originally was more aesthetic than anything else. So why do we even need extra shrubs? It seems to me we can take those debt fence and go, oh, if you guys want to pull the fence down, tell me to pull the fence down. Well, with the park, did we really have to have some type of a block? No, not really, no.
1:23:00 No, it's kind of cosmetic, isn't it? For my money, just haul that sucker off. There's been money on shrubs. The safety of bitter brush there don't work well anyway.
1:23:19 Would you be able to do that in your workplace?
1:23:39 Sure. Like I said, I'll go talk to Public Works, and maybe tomorrow they'll rip that fence out. Parking lot rehab. One thing we do know here is that we did for $20,000 in year two, but there's another $140,000 out in year five. And the reason is, by the way, we don't figure out what we're going to do with the parking lot.
1:24:07 The major reason for rehabilitation. We wouldn't consider rebuilding it today. Are you guys going to be doing any more grinding and new roads where you can put some more? It's not bad if it was actually if it was now dirt. It doesn't work on existing pages. If it's already there, you've got to grind it out. So that's 140 on it. It's a batch. It's a batch. Where's the playground?
1:24:40 Does that come to MLR? No, it hasn't. So I actually made a note that we need to, because it was supposed to be a discussion item with MLR, to get that together and bring that back forward and bring that discovery group together. Is there information there? Yeah, absolutely. So we'll bring that to MLR. Can I just raise an issue about that?
1:25:05 So we still are all intact. The same group that started this one in a year ago, and we're ready to move forward to try to obtain funds to do it. We'd like to see ground broken in the spring as soon as the ground is soft enough to start digging. I've been doctoring this town for more than seven years. I know the kids, and I know we need this, not just for our local kids, but for our kids that come up. We have a lot of kids with disabilities, you know, and a lot of kids that come up. This is something we really need.
1:25:35 He really wants, and he's ready to help and fundraise or do whatever it is again. He's going this spring, in 2015. You don't want to wait until a year or two or whatever. You might break down here. We just, yeah. It's too long that discovery group needs to be put together, so we're going to have a meeting for MLR on the 15th. Okay. And I'll talk to...
1:26:01 Anna, so we don't have enough committees right now. So we'll put another committee together and... We just have one committee. Yeah, at foot, my iceberg is melting. When you see a problem, you form a committee without a meeting. There's a solution to everything.
1:26:23 But, you know, that was something that was discussed earlier, and I know, actually, there's a priority loop in doing priorities and strategies, and it is in that whole discussion, but I think this is one that should move forward to at least do that discovery, where are we going, where are we going to be, and how, you know, and so I think that would be good, and I'll shoot an email out to Dana, and see if we can put that on our...
1:26:50 Okay, is anybody allowed to attend that? So I'm here on the 15th. Okay. You know what, we've been either meeting at the library or the fire district, so I, you know, I go to Mammoth Lakes Recreation Network and you'd be able to see what the meetings are going to be because I'm not sure later.
1:27:07 Because there's so many committees. Yeah. Well, I think that's something, too, because I was going to ask the panel to agendize. We didn't really need to get, you know, Sean and I, you know, said we'd be in part of that liaison group. So I think, you know, we really need MLR to designate a couple people, and that might be a good, you know, there might be some props to work. It's great. As we work through this, how do we make these? Yeah, how do we merge the two together? Absolutely. Right. But they're not just falling off tables and, you know, it's a collaborative effort. Right, because that's really, yeah, good. Great.
1:27:35 Yeah. So the only ones to really discuss the thing that there are three items here. Hence, we're going to look at this room in a minute. Take it out. At nowhere, a little possible for the staff time. Well, we'll have a little bit of a dump piece. Or we'll cut it up and burn it. No, no, no. Thank you. Yeah. Yeah. Yeah. Yeah.
1:28:02 I think that needs to be a grassroots effort for the community is to bring that forward.
1:28:27 And so I would say the parking lot has to be my personal view. Yeah, in terms of the town's obligation. Until we're ready to pay Mr. Searles to move a motor home down to the community garden and sit with it. And I don't mean to be negative. I think it's a great idea. One of the veins of my insistence is that I can't grow things in Mammoth, but I've been trying for it.
1:28:57 Thank you. Thank you. Thank you. That's going to go into our program this year. I have it on my list right here. Then we have replaced the bridge on the east side, which is the part of the diamond bridge.
1:29:30 We do have a couple of bridges that went more than possibly one of those may work for that. Great music. How about the bridges that we originally had to go out to? Yeah. There is more now. We think we can size that one. No, we're talking about just taking out the bridge that's here and doing the replacement of it. Yeah. Yeah. There was a dollar amount attached. Originally we talked about adding the second bridge just east of the museum side as well.
1:29:59 That was a talk. Yeah, you and I talked about it. I don't know. I'm up in any order. It should be plural. Well, that was right. Bridges. Yeah. Yeah. Yeah. Okay. Well, yeah. So, if the rest of the things also have already happened to us, and the old one on there is a bridge. Except, except item number one, we didn't put a dollar amount on that.
1:30:27 Because that's, again, that was a planning process. Well, I think that's part of the discussion. How do we bring this and incorporate that into the whole part of these strategies that's going on? I don't know. I've attended one of those days, but I've seen a lot of these things, and I know Planner Parks was on their whole big list.
1:30:53 I think that makes it 10.
1:31:16 If it works, you can hand this list to that group, because you have it identified as, you know, for the NLR. Correct. And that's the idea of refinance, we can separate it, and that's how it works. The bridges we're looking at for the replacement bridge there, those are significantly wider than those currently, aren't they? No, I wouldn't say significantly. They're probably 10 foot wide. I think we're looking at the air, it's only about 3 feet wide.
1:31:46 The ones at a foreign, yeah. The Barbara Diamond, right? Yours? Yeah. The existing one? Yeah. No. The wider one? Oh, yeah. I know it's not very darn a lot. It's about eight. Yeah. Okay. The wider one's really on the knee, please? Whatever. The east side? Yeah. Oh, they do more than that. That's my name. But, in five years. In their forest service, it's a forest service loose like shade grass.
1:32:16 The demand, I think, when you plan your parts and you determine that that's going to be something more than it is, then you talk about that facility. But I think at this point in time, what I'm looking at, they need some paint. They need a little bit of attention. I don't think it warrants a huge investment until you decide what you're going to do in the future. I'd love to have a new one at the hangout. New restroom?
1:32:47 Because they're using a blue box now. And if I have another question when it comes to bridges, who maintains the bridge, the furthest bridge down on the creek? Is it by Indian Cave Parking? I don't know. It's not in our park. Well, I know it's not in our park, but it's on our trail. Right. We don't. That would be four citizens? It would be four citizens. Honestly, I've never walked down and looked at it, Bill, in all these years. Yeah.
1:33:15 Well, I've ridden across it, and people's snowmobile across it. I'd love to see it replaced with one of these wider bridges, because in my silly little mind, a cross-country ski trail that goes along the creek through the trees and back up the other side, where we actually have snow makes good sense. And if it's snowmobile across the environment. That would be something we'd have to look into to see if it falls within our creek service. If one of those two bridges would work, then...
1:33:45 So there's probably a possibility to do something. H-C. Shade Dress Park, ADA doors in the old restrooms, which is near the playground. We've been replacing one of those or something. We redid the interior, which is ADA compliant. We have not done anything with doors on that building. They're a cinder block building.
1:34:23 May have to do some cutting to put new door jams in and change those. They still have the old steel doors on there that have been there for 100 years. The problem with them to make them compliant, they need to be wired. Yeah, that's it. Yeah, cutting. Playground servicing, I'd like to really love to see us improve that servicing and go to the wood chip service. Picnic tables over the course of the future.
1:34:53 Every year, let's purchase a couple of tables, move them around, and keep up with those, and so a couple of thousand dollars every year. Are any of these moving in your program line? No. Snack bar siding, and we've talked about doing some work to the plumbing, so we can extend that building's season. First freeze, I shut that baby down, because that building freezes pretty easy.
1:35:23 This is the community project we really want to focus on. So this is really our priority in regards to getting that done. I think we look at both of those and say, you know, a few different community groups. Lines are interested. Yeah, we think that's very feasible. But we still need to come up with that money, purchasing materials.
1:35:53 Restrike the parking lot. That needs to be done every few years. And that's going to be within the workplace. Then skate park maintenance. We've got that scheduled to happen this year. We're going to go in there and reseal the asphalt area and patch some of the concrete transitional areas at that little skate park there. And then reseal the trails in the park. To me, I would consider it part of our trail system.
1:36:31 It really isn't. It's in the park, but I would just like to include it into our trail system and have that done at the same time. And it's a budget item in our trails budget. So are you looking to pull from the trails budget then? Every four or five years are as needed on that. What I'd like to do is one to two miles of trail every year, and then we go to the worst sections.
1:37:01 At that point, you can just pick one out. We've included that trail, that path going through the park as part of the trail system in the past. I would like to keep doing that. It's not that much trail compared to taking a mile a bike trail. Because it is kind of part of the path. The path pulls right in through there and goes right through the park.
1:37:31 It's just the path, it's not the parking lot. Bleachers. We need to update the bleachers with either back rails on them now, new laws and new codes, because we need to be safe. So I'll probably start looking at purchasing new bleachers every year for the next one, two, three, four, five, six, seven acres. We've got four acres. Yeah, they're a little dangerous.
1:38:04 People lean off the back and, you know, don't come back. So it is, yeah, it's a safety hazard. We used to allow drinking. Now we don't allow drinking and people are falling off. We don't allow drinking, Bill. Yes, I know. Okay, Bill. Bill. Bill. Certain things you just don't discuss, Bill. Yeah. Yeah, well.
1:38:33 What about the volleyball court? We talked about that previously. I think we talked about that before. That's the curving and the new sand and everything. So we've done that one. Relocate AYSO, Little League trailers and thin the trees. So we're going to include that into our normal budget. So what that means is Little League is purchasing a trailer. Little League wants to purchase a storage container same size as AYSO's.
1:39:02 I want to get both of them moved and get it organized and straightened out so it's just a little more aesthetically pleasing. You're talking about thinning the trees. Thinning some of the trees. The food facility and the... Yes, just that little area. Correct. Yeah, the rest of it now. And we'll bring those closer to the building. Yeah. Yeah, so we'll get close. There's actually a good one. Is that the little shed there right now? Little shed? Yeah. They built it, yes. If I wanted to move that, it would probably fall down. That's a concrete slab.
1:39:31 Okay. So on this one we actually have six items to look at. I think once again we have the two ADAs up top, one and two.
1:40:02 I mean, you guys can determine which one would be more important if you're going to, but I think ADA must be your first priority. We can come back to you on item number four of the snack bar, but they can't, because we could reduce the cost on that.
1:40:31 I think four and five you could even take to the community along with the tennis shaft and then take four and five and then see if the community can help out of them. I would say the same with three. On three, have we looked at the possibility we have a program where we let people use benches for...
1:40:58 If I want to put them on that pot, though, I don't want to leave them in a pot. We are now suggesting that every time somebody wants a person, how about a picnic table and put it in the park? We'll give them the wires, you know, and if we get enough that we can get some momentum with this. We've also been working on a donation catalog.
1:41:24 That if we can get that momentum back, we get it. And this is going to go from everything from putting a bench or a picnic table into building a lid on an ice rink. We will throw all those items in that catalog. We'll just have a tough time getting the whole thing together. Getting a few of us together and focus on that. It's pretty close. It's like 90% done. I think we were pretty close on time.
1:41:49 Just want to get photos and costs with it and things like that. But it's part of that program, absolutely. When we get calls, you want to buy a bench. How about a pavilion? How about some papers? Bleachers. Bleachers. We'll start with bleachers. Anyway. Is that what you're doing on bleachers? Is that it, Ed? It's still cool to train the train on the park for the bleachers tonight. We're getting the size of our safety for the bleachers tonight.
1:42:17 Well, it sounds like seal code you're going to include in your regular maintenance. I would like to. I just want to reply to you guys, let you know this is what we're doing and why we're doing it. I think it's great. I think that sounds great. Yeah. Because when we get a contract to do the seal code, it's like, what's the price? Can we get two miles? Can we get three miles? Is this how much money I got? Is this going to work? I mean, frankly, I consider that more part of our trail system when the trailer goes between Cal and Joaquin.
1:42:47 There you go. I spent time over there this year. Yeah. And those bleachers would be a good addition because it's a busy park. We need to really cycle those old ones out. Number one is the ADA, number two is the bleachers? Or is it one, two, and three? I thought it was one and two was together. I thought one and two together. Okay. One and two and then bleachers. Bleachers.
1:43:16 Yeah, the bleacher thing, which... And obviously the snack bar, I mean, that's right there, right? Well, I think the snack bar is definitely high on that list. It's a community project, right? Right, absolutely. So what we're looking for is really commission support saying, great, go get it done. I think that we need to put these items down and go out to the community and if you need our support to do that, then we'll figure that out and go out and do that.
1:43:40 Well, a lot of this, too, is that when we go to council and say, hey, we want to throw another $100,000, $150,000, another $600,000 in the parks budget, you guys are going, yeah, this is why. Well, I can't imagine, you know, I'm sorry, these 80 IOs have been here for a long time. They've been deferred and deferred and deferred. It's crazy. It's the first thing that really goes on all budgets.
1:44:08 Yes, they existed prior to the financial downturn. Yes, they did, absolutely. And it's the highest number they've ever been. It's not out of these funds. Right. Trails End Park. Are we there? We didn't get. We didn't put any estimates on Trails End Park. It's a simple fact that the one, as I mentioned before, the Longtown Council, the common was for MLR and their commission to get together to talk about Trails End Park. So I'll give you a $10 on that, I think.
1:44:35 My suggestion is what that process happens. The other thing with Trail Sand is I did meet with Jane out there not long ago. She wants to finish everything that she had actually envisioned with that park. She has money. She's going to have more money. Did you say she has money? She has money. So we went through a lot of these items and talked about them.
1:45:05 She just wants to see that whole thing done so she can stop her fundraising side of it. They'll do some of their programs in the future to give us the money for maintenance for that facility. So at some point she's going to come to either Parks and Rec Commission or MLR or Council, I don't know which. Does she have what she's looking to?
1:45:33 Finish? Or is that just what I'm seeing here? Basically what we have on here. Yeah. That's part she wants to finish is the landscaping part of it. Yeah. Paving or where we at? Trails Inn. Yeah, so it's G4. All that stuff on Trails Inn. Landscape, do a little bit of hydrosy, finish the pathway around the back of the skate park and tie it in towards the playground there.
1:46:00 And then, of course, to paint the restrooms, we're going to do that, and that's on my list. That's in my collection. That's part of my normal maintenance. Well, I think, too, in terms of the state park, probably needs to come here, right? Because, you know, it's a town facility. Starts here, absolutely. No, she's, we met with her, and she just talked about it. She said she has the money she wants to go through and come back and talk to everybody.
1:46:28 Maybe she can come talk to whatever that ad hoc group is, and then it can come here, and then when we have that conversation with MLR, then it can be... I haven't seen her since. We can reach out to Jane and see. But you know, Jane, she'll just front council and that'll be all right.
1:46:47 I would just say, yeah, she, you know, whatever she wants to do, come forward, because it should be part of that whole master design. And it's part of that plan that we have originally, because she's talked about.
1:47:18 I think today, okay, it's not official, but I think today we finished the settlement with FieldTurf about the turf itself and there was an issue with it in three different counties or three different locations in California, including the moderate-rate, I think we understand this from the here, we could be loving the locations, and they actually
1:47:47 They couldn't prove to CalRecycle that the recycle tires were from California. So CalRecycle has witnessed an official letter saying, well, the probability of about 36% of the revenue they were going to give us for that stuff. So we held, and we've held for a long time, a bunch of field chairs, money on that. We've reached a settlement agreement on that. The only thing I can report for sure is that part of that includes them.
1:48:11 Coming up twice a year and performing maintenance on the material, on the material, which includes, you know, kind of vacuuming it, fluffing it, and putting it back down, basically. So within a few days, again, it's not 100% official yet, but within minutes, probably, you know, signing that, we'll have that. What that means is we don't have to do the maintenance ourselves.
1:48:35 And they do it, they'll do it for the first eight years, but out in year 10, we'll probably add an item for buying a piece of equipment that costs like 15, 10, 15 grand or so. And having to build a little building or something out there to store it. But that's just kind of a report. Maybe by then we'll get permission to put lights and shade in and we'll have one of those fields. I just wanted to report that. Is there a financial cost on it?
1:49:04 The front side as far as monies that we have to give back to anybody or anything like that? We're going to be, we're likely have to give money back to Calvary Cycle on the grant, but overall we came out of what we came out of here. Okay, so that needs to go to the... We still have to reconcile that. It's been two years.
1:49:32 That was one of the items that the track was part of our reconciliation with Stuart Brown, and I think this is one of the reasons I went to their office, their secretary was out of town, so we had to come back and sign it, that's where we are at that place. They are scheduled tentatively to be here Friday.
1:49:55 We're going to clean the field. To shovel the snow? No, I'm sure we have timing. Because they're coming from Grass Valley, but I might look at the track in the field today and say it's clear. Yeah, come down. If they're coming Friday from Grass Valley, probably we will not see. That's right. Probably not, but you know what? We're going to hope. That would be interstate 80. In fact, you know, I have interstate 80.
1:50:18 As of today, it's clear. I said, sure. Go now. We're ready. That was a progress. Okay. So, Whitmore. We've talked about this one before. H1. We're all ready. We've done H1 before, right? That was kind of a measure of our application before, wasn't it?
1:50:50 Build restroom, H1, winterized the restroom, talked about that, try to do that. That was a play in your parks. That was a play in your parks, no. Yeah, for five, replace ball, field, backstop, dugout. Field one, trying to get the pearls, softball, high school to move to that field, now that we have the whole park fenced off and keep the traffic down.
1:51:21 Increase that use on that field. It's a lot more user-friendly, a lot more fan-friendly. And it's caved in, I don't know, five, six years ago during heavy snowstorm and now that back's awesome. So one is field one and one is field two. One says field two.
1:51:56 H5 is 2. Same thing on Field 2. Paint Backstops Field 3. High school's willing to work with us on that one, so I think that's going to be achieved in-house. They don't like their burgundy colors they put on their backstops themselves.
1:52:25 We're going to go back to the good old baseball green, make it look the way it's supposed to look, and I said, I'll help you guys, I'll buy the paint, you guys are paying, so I think we're going to accomplish that in-house. In-field mix on field, backstop, and that's to get us by temporarily, I think that's going to be accomplished in-house. In-field mix on field one, I'm working with the high school on that, I think we're going to be able to split the cost if that works.
1:52:59 I will sort it out of our regular operating budget just so we can make that happen instead of waiting for funds to come up. They're raising money right now. They've got a good portion of that money and it may be just our labor to go out there and get that brick dust. And can we pay for any of that as well? We will get reimbursed if we pull it out of our regular budget, yes. Yeah, and I think that's how we dealt with the pool last time. So if we identify items that are...
1:53:30 Kind of applicable to the county. We'll notify them in advance, get their permission, we'll go and spend that money and get reimbursed. So, we'll talk about that. It won't happen the rest of this winter, but that'll be a early spring project. We had Wi-Fi? Picnic pavilion. I think we were about 50% on that still. Yeah, we're just waiting for the ALP, right? And then the little something on the bottom end of the airport runway there? Yeah, and I think...
1:54:08 That's really what we tried. We couldn't get to the green turf, so there's going to be a structure. It could be as simple as a post put on the bottom of the runway. It'll bounce down there and over to Whitmore, so that's this spring. I think you have the funding for that. Correct. That's funded. ADA updates, restaurants, walkways, gigs, a lot of dirt out there. Less now. Not as much. We have good access to...
1:54:45 The new track and field. The gates going to the ball field in the park. We're going to have to talk about that. Once again, counting to probably kick in, put that into our budget and make that request to them. Drinking fountains, we have two drinking fountains to replace down there. I just haven't had the staff until later.
1:55:22 Get everybody together. This is what the missile needs, plumbing supplies. We have two brand new fountains sitting upstairs that just need to be installed. A little bit of plumbing and material will be the way to that. Picnic tables, again, Whitmore's very limited picnic tables. We'd like to start purchasing those or getting donations, but afterwards we can start getting some tables out there. Lighting upgrade on field one.
1:56:01 We're going to do that with our work plan. We have the lights. We may need to buy another light or two. We won't know until we get up there. We're going to borrow the fire departments. Big ladder truck can get up there. They're 60 feet in the air. It's the only access we have to get to that height. So if any volunteers...
1:56:23 The duty rating on the top of that. It's okay. It's not windy down there much.
1:57:05 How serious is this? Is it close now or is it just doesn't work at all? We're close. We can get to the restrooms. We probably need to do some updates to those restrooms. We've talked about being able to make those restrooms winterized so they have some heat in. I think that's in here, but it's shot up for another year or two.
1:57:38 But I think that should all be accomplished at the same time. If we're going to put some heat in the floor, and I don't know what the best way to take those old restrooms and put heat in them. You know, the question I always have on those restrooms and put heat in them is, are we going to somehow come up with money for the either concession room or locker room? If we're going to build a locker room, why wouldn't we put...
1:58:04 Tag the restrooms on the end of that instead of rebuilding easily. Exactly. So before I want to spend money there, I want to do a lot of planning and decide in what order we need and can't get these things done. The subject system in the leach field that's out there right now is designed to handle that larger facility. So whatever happens with that facility in the future, the old one will probably go away. Yeah.
1:58:35 Which is what I'm saying. I don't know. We want to spend this kind of money rehabbing the old restrooms. We're going to bulldoze. Yeah. Because for that to be successful as a high-altitude training center, we're going to need some kind of a locker room facility down there. All the slopes on the concrete going down to those restrooms are compliant. A couple of the two fixtures in there need to be raised and lowered.
1:59:07 Proper heights. And H-22, that's one that we see pretty important if you're down there a lot and there's really no shade. Again, though, my thought was the same, sorry. Damn it. Still, I might catch it again. But, you know, it's been so long, man, you probably used to be doing that too good. My question there was between that and the pavilion we're talking about, what is the timing for which and could a shaded pavilion serve?
1:59:37 First, instead of the shade, in terms of prioritizing it. Yeah, so I think, yeah, just to answer that, I'll cut you off again. So we see them as two projects, right? I think the pavilion is at the picnic area. We see the shade as having basically those candy leave, the big posts that reside just over that bleacher area. I just don't think you can put a pavilion over the bleachers. So I think there's two projects. Right there. So from a priority point of view,
2:00:05 I don't know, I think they almost go together, but shade is critical. If you're down there at all in summer, it is hot. There's no shade. To me, the pavilion aspect, just like it's shady here, where you're going to have kids and parents seeking shelter there off of the field, to me is probably a little higher priority than actually putting shade over the, I would put that ahead of the shade over the winchers. I'd be that way.
2:00:35 I think regardless of how you're looking, you do need some shade down there. Oh yeah, because there is, unless you want to go back on the trees behind the ball field there, high down there, but yeah, the park itself. Yeah, you said when you're playing game. Yeah, so.
2:01:07 So I think for spectators, that's only the reason why we were kind of looking at the shade, probably more than pavilion, yeah, just because of track meets, soccer meets, football meets. Yeah. We could go either way, but just from what we've seen, yeah. Okay. Where did we leave off with that? That's a big work program down at Whitmore, and I think, Betsy, it's part of that, I think that whole, I know Terry just left the room, but it's...
2:01:33 Again, it's probably that advisory liaison meeting with MLR regarding that facility and how we can, you know, certainly develop that further. I know we have the plans for Phase 2 and Phase 3, and they've just kind of sat out there, we've talked about it in Plan Your Parks, but we really need to kind of get that on that work program again. How about other EDA ethics besides the rest of the walkway to the gates? H14? Well, and that's the thing with that park, we really don't know what. Yeah.
2:02:01 You know, what's happening? Are we going to put more walkways in? So how much of a concern is that right now? It doesn't sound like it's as big an issue as sort of our understanding. The bathrooms, we should probably do a few things good, one way or the other. Just, yeah, we suggest that we take another look at that and see what we can do with the structure to get rid of the severe problems. Sorry, I was going to say, well, I was just going to follow up on that is the bathrooms are still inside.
2:02:33 High School Soccer won't go until they're down there now. So, my facility's closed.
2:03:05 Do you want to take a look at that instead of focusing on it? Yeah. Yeah, let's see. So if you have number one and number 14 or number one, is that kind of what we've done? Well, let's see what we can do. We'll come back. We'll change that number a little bit.
2:03:29 We'll look at that. Because the biggest issue today is we need access. We need the access, thresholds, those kind of things. We've taken care of the parking lot. We've got the ADA parking spots. We're getting closer. And then the rest of the week is I've committed to talk about the overall planning for each other. There's a lot to plan down. And that's plenty of information to get. This is actually being very helpful.
2:03:58 Okay. Pool. Pool. One more pool. Parking. Consistent theme, isn't it, really? Yeah, because that's the big numbers that would just, yeah. Parking lots of world shape. I don't want to say any more about that. It is abysmal. Pump room updates. You know, we've been whittling away on that pump room over the last five years. It's not bad. I still have concerns. We still have the old pump in there.
2:04:27 It's going to be more than $5,000 if we do put a new pump in there, but we can get a backup pump. I think I can still get parts for that old existing brass pump. But it might be something that we put in stock in inventory for that day that that thing goes down. I spent some time last year looking for the impellers and the parts for that pump. And I had a tough time finding them.
2:04:58 Update lights outside. I don't know if we necessarily need this, but I threw it in there because we have old halogen lights out there. We're not using that pool of light.
2:05:27 I look at those lights and go, we either get rid of them, or, I don't know, we don't, we're not using that facility at night on a screw, I don't know what, you know. The lights even on and it's not being used? No, we don't, we don't have them. They're on that building and they're just kind of funky, sitting up there, but probably shouldn't do something. We don't need to stay up until 8 o'clock at night and then add away by 8.30 in the middle of the summer. We might have turned them on.
2:05:58 The decking on the pool, we should spend a little bit of money every year on that thing.
2:06:27 The concrete's really starting to fail around the coping edge. It doesn't really have coping on that pool. It's just a canopy or over the edge of the pool. So you guys don't have maintenance funds to do that type of thing? No, not $5,000 to $10,000 worth when we're looking at year three. I think it is $40,000 worth of concrete or putting new surface on that. One thing before I forget is I'm kind of a hearing from a lot of users.
2:06:56 And in all seriousness, I'm not for a second going to talk about public work revenue again, because I've gotten to my life very quickly. There is a serious need to look at the overall approximate budget. If it's $600,000, maybe it needs to be $7,500 or $8,000, or where the money comes from. I'm just saying...
2:07:13 When we were with tourism, there was a lot of money that came to us.
2:07:33 Don't know where it came from. Probably not. Yes, we are. Thank you very much. So. That's what you point out. I remember constantly having big discussions about potholes, which came out that potholes aren't in and not the pros are in a huge issue, but these are equally huge issues.
2:07:59 And our budget took a huge hit over the last few years, and it has to rebound. That's why I'm bringing it to you again, so you can fight with the council on it. And having said that, I'll just also wish I agree and support the idea of the extra government where the fund is coming from. There's $150,000 in general fund money. That's one of the two other courts.
2:08:25 And it's not there now, because it's going to go towards that if that project gets approved. So the balance is very important. That's not for me to see where it goes, but I just want to make sure everybody understands and we keep hearing what should we be doing. And I reckon, if anybody's not there, don't be wrong, I don't know where it comes from, but something should be discussed. And just, Dennis almost got to it there, I-7, a lot of facility identification signs, if you've seen a lot of them, signs for any of our facilities, they're really non-existent. This one's...
2:08:54 You know, practically falling down on that Benton Crossing Road. We also identified actually two on Whitmore Track, so one actually at the track, and then almost one, if we can get it, with Caltrans on Benton Crossing Road into Green Church. So, you know, I think there's a lot of work there, and also you'll see multi-use ice rink as well identification signs, you know, so I think there's that similar theme that we're just not doing a really good job of telling people that we have these facilities.
2:09:18 We don't have signs that are updated. Community Center. Right. Community Center is full. Yeah. And once again, the pool. Yep. County pays for part of this. 50%. Yeah. If there's a maintenance. But when we go to the county, the county financially is no worse than us. So if we go in and make the request to the county. Maybe say there are any. Sure, you can do whatever you want.
2:09:43 We're not going to reimburse you for any more. I mean, you know. They need to be aware and they need to know what the dollar figures are and so that they can start looking at them too. I mean, because if you just bring something on them, then I could see where you'd be shot down. But, you know, if we say, if we get a plan for those areas and say, look, this is what we need to do, this is the plan, one, two, three, you need budget for it. And they have other areas they can pull from that we don't.
2:10:11 Service Area 1, which was set up originally just for television, with the help of R. John, is now helping pay for sports fields and things in crowded. Is there a better use for some of that money, perhaps, than the Whitmore fields? They just built a huge snack shack down there, the ball fields in crowded. No, just so it's one field.
2:10:37 Yeah, so, I mean, I think John has done a great job getting the county to open that pocketbook up a little bit for recreation, because the county's been nothing on recreation. Maybe we need to be talking to them about perhaps some of that money. I think you really need to get a handle on all of this, that there is a partnership with so we can get that to them.
2:10:59 They can start budgeting that. Yep. And, you know, we're not, like I say, we're not swinging it all over the chair. It needs to be on their radar. If we end up being not paying for it, they need to know that, hey, you know, we need to take care of this. Yeah. Anyway, I just thought I'd have to bring out the signage issue. Thank you. Paul.
2:11:20 All their signs. And we talked about doing a signage policy and what our signs look like so that all our signs are consistent and that we have to move forward with that either. So that could help us to open up.
2:11:36 Well, actually, you know, I think it's a park's master plan, and in... The truss system, the signage and wayfine. The signage and wayfine is there. So we're following that guideline. Yeah, as long as we follow that guideline, we do have... But if the parks are just for trails. We should be using it on everything, I think. What's the one we put, the shady rest of? We took that rock out and we put that... There are all those big rock signs and we have the big metal signs. That one. We have the rock signs.
2:12:04 I don't know if those are in that plan or not. They have the big metal signs. You're talking about the metal ones there, the new. With the big icebergs in them. They're actually a very nice looking sign. I still think the rock ones are better. So do I, but the rock is a piece of art. Yeah. Where the signs there specifically, it's visible all the time.
2:12:33 That's what we were planning on. I thought that would be brilliant. I don't know. Couldn't comment.
2:12:57 Okay. Yep, I would say that one, two, and five would probably be the ones that can be included. I don't know, how about the eight? We'll do it.
2:13:26 Huge momentary $1,000. Well, it may not be $1,000. Do you want us to prioritize one, two, and five? Yes, please. Okay. We want that parking lot shut. It's hard. It's bad that that pump fails and we're closed. Yeah, but you know. You can get a pump here pretty quickly, though. Well, we can get a pump here quickly.
2:14:02 Like I said, it's going to be a substantial cost. I think they're in a $7,500 range. And I think we would have no trouble in an emergency getting the council to allocate that money. We're getting them to allocate it for maintenance is a whole other issue. Do that, then we'll... That's why I think that the parking lot redact, to me, goes ahead of the pump.
2:14:27 I think you guys can convince Council that we need to do it right away. The pump? The pump. Yeah. If we got in that situation. Oh, yeah. For an emergency? Yeah. In an emergency situation, I think we can say this is what needs to happen. Absolutely.
2:14:57 Remember, part of the ADA thing is the parking lot. And I would love to agree with you.
2:15:18 You know, when I come through and wasn't there, it wasn't paved at all. It was a lot like that picture. It's going to be a giant bottle pretty quick. I mean, it's safe. It's safe to use recreation dollars when returns. It's our facility. We should do something with it. It's not safe. It's not, it's... This is the worst one of all of our places. I just want to make sure that we're taking all of these items for these facilities and we're putting dollar numbers to it and what these issues are and that it's going to the county as well.
2:15:48 And that we're going to do that program. So really, if the county were supportive of it, then we would be supportive of it, but if they're not willing to pitch in the $60,000, right? Okay, all of these things are. Because it's $120,000 just for Whitmore. You can just spread something like that on them. No, well, we're not. I don't think that was the intent. I think, yeah, we're just identifying here. So if we put this all together, and have that in a work program as well, and we can have a consolidated work program.
2:16:15 Between the two, hopefully we can break some of these forward. Well, and does the county have the ability to lay papers if we don't? Can we have them bring their equipment now to do some of this work for us? No, we have to. We have to. Yeah, but we'll definitely. So should we stick with one, two, and five? Is that what I heard?
2:16:40 I would still say the parking lot is one, because it is really bad. You know, I don't know, you tell me which one is, you know, can we put the full surface off, deck off? Otherwise, I would say that's number two. And then the pump would be number three. And the pump has kind of, kind of, agreed with Bill.
2:17:05 So I would say the deck would be number two. We'll all stand. What's the deck we're looking at? $55,000. $55,005, then $10,000, then $4,200.
2:17:25 I'm not saying that we want to go ahead and redo the pool deck service. I think whatever we need to do to maintain it, to make it safe for the moment.
2:17:50 Is that what we need to do? Yeah. And I'd really say the same thing. Maybe we need to clarify that. You brought up the grinding side. I would have no problem going out there with a ripper and tearing up that pavement, hauling it out, putting down grinding, rolling it out. Due to the success of the grinding program this year, we'll look at every chance we get, we'll look at public sources, but next year we don't have a lot of grinding. We're doing a path and middle school project, but not.
2:18:18 We'll definitely keep that. Well, we could almost rip that pavement to pack the dirt, and it would be better than that. That's true. Yes. We will definitely look at that. We talked about that when we were in the dark right down the road. I think we can go down and look at the vacuum up pool, because you really have to look at that. Yeah. So we can talk about alternatives for ed. Like I said,
2:18:45 This is the same thing. We're going to move. We're going to do this. We're going to do that. Well, 10 years later, I'm looking at these same cracks in the deck. Let's look at all three of these items. We're going to make the exterior of the buildings.
2:19:12 We're going to do that in the house. Really, I'd add number six or something that's in the program you have to do. We brought us. I left it out here specifically so you see that it's either above the number five is two or three years out and we need to refurbish the shelters and the same thing again three years later. So that's a $10 amount with a tri-project for it. We might need some help there. The two to really talk about then are really just number three and four.
2:19:44 Yep, and you know that top cap is that used to be red, now it's that pink.
2:20:08 Kind of cover around the circumference of the offspring, the top row, yeah, deteriorate in it, yeah, it's a safety issue. It's pink, you might like pink. So really we're kind of on a holding pattern to figure out what we're doing. I think so, yeah. We're going to paint buildings, the exterior buildings, this.
2:20:36 I'd like to do it this spring. So you can't just paint that cap? It has to be... It's all plastic. You know, there was a brief discussion about that, and it's like, oh, you guys should have ordered the white top rail. Too late. Do you need to? I'll finish this, and then I'll have a... And then bell-shaped parcel. My comment on the bell-shaped parcel, I can read it in the planning parts of this day.
2:21:06 We had a proposal a couple months ago. Somebody wanted to do a wedding out there. My comment was, that's great, but we don't even know what we have. We don't know what we have or what we're doing. We don't know what we have in terms to be able to tell them how they need to do that. So from a planning perspective, I think this is really important because you can meet it between recognition and MLR. You can talk about all you want, but unless you have your opportunity constraints, let's show what you have.
2:21:36 I'll tell you my concerns about right off the bat. We don't have money to spend on anything. On something that may never become anything, go right to the bottom of my list. I wouldn't suggest spending any money on the bell shape at this point.
2:21:55 Until we get the rest of our thoughts in a row. Don't you guys already have like an old delineation and we feel that maybe there's less wetlands than we originally thought? So you could actually have a wetting out there using what you have currently? I've heard that in my experience. Oh, okay. A lot of wetlands things is it could be terrible. I mean, you really don't have any idea. I should go out and do it up to anyone now. Because they're based on older maps and aerial photos and things. And it may be right.
2:22:22 But it may be completely wrong. Well, Sam, wetlands doesn't delineate where you can and can't use. You can have a wet in the wetlands without bringing in rules or regulations. You can't build in the wetlands. You don't have to have foot paths or bridges or whatever. When it's dry, it's dry. Okay.
2:22:40 Yes, when it's muddy, but when it's muddy, they wouldn't have a wet there. It's very convoluted. I think this is also just a discussion of MLR.
2:23:09 And then all that's going to go through a prioritization, you know, with conversations back and forth, and hopefully we're going to have a, hopefully, a plan. But I think this is something that they need to know at some point. The best case for people with money is 5% of what we just decided to do. Why would I want to spend money on a facility that's 10 years down the road is best?
2:23:37 And as far as having a wedding there, if you walked in there, I don't know if you did walk in there, if you did last year, where would we have a wedding out there anyway? I think the museum is not fair. Put your chairs between the state front and that front. We'll take a shot at that, digesting everything you've heard. And not just in terms of prioritization, but also this probably needs to be stressed within a lot of this school district, this is the county.
2:24:05 Thank you for keeping us on track. I absolutely appreciate that because trust me, we spent a lot of time on this and it didn't move anywhere. So I really appreciate the fact that it appears that... You just got to get it out there. Yeah. You need to start finding for my...
2:24:35 Interest in serving on an ad hoc to tighten this up. We can do an ad hoc. We can do a chair and place chair. I am willing to serve if necessary. I don't have a problem. I've kind of gone through all of this.
2:24:58 I was just placed on the strategy with some people. I was just thinking of you because I know you've gone through in the past several times now. I think this is going to fit it very well. But I know you have full plates as well. So those of us whose plates maybe aren't quite so full these days, if necessary, I would be willing to sit. Make sense? It's going to be pretty short term. A couple meetings maybe. I don't want to see divorces because
2:25:28 You know, maybe, maybe it works better that you and Bill sit on this because I'm sitting on the strategy part and then it'll come to me anyway necessary to come forward. Maybe that would be, maybe that would be better anyways. And I can take this and I actually can speak well enough probably to MLR.
2:25:56 I have all that actually. I've got that package here. Yes. It's something that we
2:26:25 We didn't quite cover, but we'll present to the health committee. So this is just out of the Parks and Rec master plan. And this basically gives you kind of level of service indication over 5, 10, 15, 20 years. So we kind of pulled a lot of the numbers basically into this. But that's, again, that's our adopted master plan. So we want to make sure we're referencing that document. It tells you picnic tables, shelters, you know, those type of things. Check.
2:26:49 We haven't adjourned yet.
2:27:06 No, no, no, no. I moved that Bill and Betsy. I don't think we need one. Okay. I will take the consensus. All right. Let's see. All right. Let's see.
2:27:35 We are working on the allocation process right now. I'm on the allocation committee. We're looking at, I think I said this the last time, we're looking at a one-page process for an interim, actually for a regular, but right now just for the interim.
2:28:04 One page for a larger project may go to a full application, but what we're doing is it's a funding request. It's not an application we're doing, a funding request that has basically all the general information that we might need for a project moving forward. So if something meets the fast-track criteria, then it may not have to go through a full application. If something is coming forward that needs a feasibility study, it needs.
2:28:31 More information than that, that it would have to go through a full application process. And so we're bringing, we just tweaked that form once more and it's coming back to the Mammoth Lakes Recreation meeting on the 15th, hopefully to go to council on the 17th to be approved. There's an interim funding cycle that we have been asked to, it's in our contract to move forward in February.
2:29:00 I think it was February 15th. We're looking to either regulate the council on the 2nd or the 18th of February for funding recommendations. But it will be a very limited focus and limited amount of money coming forward on this first round. Because as we know, the funding actually is still frozen at this point in time. So anyhow, but there has been the first...
2:29:24 Go around. If you went to the Mammoth Lakes Recreation site, and once again, I encourage you guys, go on that site, put your names on there so you can get, you know, you'll have all the information that will come forward in every meeting and everything that's coming out will be sent to you via email. And the first go around is on the allocations committee's minutes, because we posted that, but we will, the next one, we just had a meeting today. I've been in meetings in State 30 this morning.
2:29:54 So anyways, I think that we're not taking Measure R and you separately. They're going to come forward with the same application, same funding request, and then the same process moving forward. So anyway. I got a couple questions from the events collection. Okay. So with regard to the R and L being combined, R and U being combined,
2:30:21 Is there a specific area that you, I mean, are they, is there going to be any money allocated, strategized for events? There will be some trailers that are going to be coming, suggested to be brought forward that kind of go towards events as to what might be funded, what might not be funded, and that's coming forward.
2:30:54 to the Mammoth Lakes Recreation meeting on the 15th, and then that would come to council as well. They're in, you know, this is an interim funding process, and in the interim funding process, most likely there would be the ability to, they can apply, so they can certainly apply for funding.
2:31:20 We'll finalize that. We'll finalize that on 15th, yeah. And certainly, but, you know, moving forward, what we're looking to do is the same thing that, you know, Rec Commission, MLR, there needs to be that prioritized list, and that priority list is really going to drive future funding. So will that include, you know, that part I can't. So interim, right now.
2:31:48 It was kind of discussed that, you know, you ripped the bandaid off. It's possibly ripped off a little slower, but anyhow. So there, you know, it has not been said, no, they cannot be funding. There will be items that were funded previously that we will be suggesting that no, we will not be funding. So anyhow, but that's coming to the MLR board on Monday. And so then it is up to each person to determine, you know, what they feel like within their event that they can fund.
2:32:20 So, you know, plus ESTA is a very appropriate funding source. So anything of that will still be out there. And so anyways, but that's all going to be come to the Monday, the 15th meeting because all of that's going to be discussed. And a lot of this, some of this is coming from the reconciliation. The reconciliation committee has gone through all of the performance reports. Very adequate.
2:32:49 from the reconciliation point of view. So there's going to be some changes on all of these forms to moving forward and other things that we're going to be asking for requirements for people to have to move on.
2:33:21 So, yeah, and we haven't ever told anybody to dump their shop or anything, but anyhow. But then that's going to be completely at the council. Yeah. Because everything is still frozen right now. So that will be completely at the council is what they determined is, you know, we'll make some suggestions and that's all we do is recommend. So, that hasn't changed. Thank you, guys. I'm sorry I'm taking off. No, enjoy the desert, please, for me. I got it. Okay.
2:33:50 We've rented our conduct. We've got to go get put together. All right, so let's bring it back to the diets to do our programming. Thanks, everybody. I fully intended to stay the whole time, but I've got to go. Thank you.
2:34:21 Great, so this is just a brief update for summer programming, Stu, do we really have much?
2:34:52 So not since the last meeting we really kind of took off this item just because we had this larger workshop agenda. So we're still finalising the work programs. So we're going to put it in a calendar. We're also going to put it in a kind of a budgeting document so we can start allocating future funds to these programs. That'll also give us an idea of...
2:35:15 The cost and the fee schedule for those programs as well. So we have a little bit of work to do then. Hopefully we'll get you an update back in January for that item. Are we still looking at April for maybe that open house? Yeah, I had another discussion with the county on that as well and just from their health department. They're very eager to kind of participate as well. So everyone's kind of going earlier and earlier.
2:35:40 Yeah. So we might actually be doing it next month. I don't know. Maybe not next month. Yeah. Thank you very much for coming. Thanks, Maria. Thank you. All right. So then we'll move on to the manager's report. So what we've got in here, apart from what I can present verbally, we have approximately about four of the eight teams penciled in for the indoor soccer league.
2:36:16 That's the minimum we need, right? Yeah, so we need minimum, and we think we can easily get to eight, so that's exciting. We've purchased new, actually, regulation foosball goals for that. We've used just kind of smaller non-regulation goals, so we think that'll really enhance that program, so that's exciting. We really think that'll probably max out as a good support for that program. Steph's working on Skate with Santa and then New Year's Eve Party, bigger and better at the rink.
2:36:43 We've got some, as we said, instructors identified for the gymnastics program, so we're working on that, and John's working on his hotshot program, which is about 25 or 30 kids right now, so that's going really well. Just on the event side, we've got three right now, and I think there's another one coming in. We'll see. Okay, we'll see. So we're working with the event applicants for the Gimme Shelter Carnival for next year, so essentially what we're doing there, we have a neighbourhood meeting.
2:37:10 Scheduled either for Thursday or Monday. We're just waiting to hear back from that group. So we're really kind of presenting the revised site plan and operating plan, getting them involved early in this process so see if we can kind of collaborate and come together with a well-presented event. Everybody's happy. Night of Lights, that's obviously scheduled. Moving forward, that's December 20th. We're just waiting on some permits from the fire department. And then New Year's Eve fireworks in the village again.
2:37:40 Fireworks just being kind of slightly addressed and modified not to impact the crowd so much just because they're getting so many people there. So the fire department have been involved in that process to help produce a safe event. Is that going to be on the 31st? Yes, 31st again in the village. So that's our three events right now we're working on. That should kind of wrap up this year's events. So that's about 36 permitted events that we permit through our department. So it's quite big.
2:38:08 And I think that's it. I've talked about the rink, talked about all the facilities. So technically, you know, as most of our facilities and parks are closed from November 1 through April 30, the only use agreements we have outstanding right now are with the school for Whitmore Field, for their soccer teams to use that field based on weather and availability, those type of things. But that's about it.
2:38:30 I think that's all I have. The other item is getting traction with the Youth Advisory Committee. So I know we brought this up previously as a work plan item with the Commission. Again, we're going to partner with the county with their health department. So they have a need to create kind of a task force. We have a need to kind of seek some ideas, interests, and feedback from
2:38:57 Particularly probably 12 to 18 year olds, so kind of the youth team. So we've structured a youth advisory committee. It'll be jointly staffed by the town and the county. It'll be involved in recreation health related program development, evaluation, event planning, policy recommendations. We'd have them working with the commission, with the county, probably introduce them to the council. But I would see them coming towards working with this commission every quarter, probably. You know, we'd meet with them once a month and we'd be able to kind of present some programming.
2:39:25 Issues, how these youth in our community can make it a better place for themselves. So we're really interested to work with that group. So we're really going to start through the school. So we've produced kind of a template document. We're going to start with the school, get their feedback, see how we do, and launch that next year. So get that rolling. So again, my question to the commission, I know I've advised the chair on this as well, if it's something the commission would like to see this before we roll the whole program out.
2:39:55 Just give me some feedback. I can send it in an email. We can bring it back for a discussion item. Just thoughts? Yes, I'd like to see it, but do we need to do it in a meeting? I mean, it might be best in an email and then have a meeting. I don't know. We meet again on January 6th, so ideally we're probably not going to launch it before then, so what I'd recommend is I'd just put it on that January 6th item. We can put it in a discussion item.
2:40:21 At that point, we would have met with the school, met with some, you know, councillors and representatives just to get a little bit of a plan on it, bring it back to you, and then we can launch it. So, because I really think the commission, this is going to be a great program for these kids, you know, so I really want to make sure the commission's involved. I think this really follows on some of the comments that Dan brought to our last meeting about, you know, expanding our, you know, reach.
2:40:44 Youth Advisory Board is critical. We should have had one since 84. I can tell you the county used to have one back in the 60s and 70s. So yes, I want to be involved. I want to see what you're planning to put together. I think the commission needs to weigh in on the direction that they feel it needs to take and the powers and stuff that it needs to have. I'd love to see it on the 6th and bring it on. So can we agendize that? Maybe say Sandra can come too?
2:41:12 Yeah, absolutely. It's great. And I think that's all I have. Thank you. Stuart, could you give us a report on the tree lighting? Yeah, that was pretty entertaining this year. Well, we actually launched the community food toy and clothing drive. So first year of Andrea kind of came forward. We kind of pulled that together in a couple of weeks.
2:41:41 We're trying to get a number from a marker who were the recipients of the food and the clothing, but anecdotally it's probably five, you know, minivans full of food, went out, clothing, was great, toys, phenomenal amount of toys. Yeah, I actually talked to Camille Miller yesterday, she said, from the Mammoth Fun Shop, she said she could not believe, just, you know, the generosity and just the huge amount that people bought and donated, so. So that's really exciting, so hopefully this could be an annual event.
2:42:09 with that community. So, great support. It was great to see the chamber involved with Craig's. Brilliant. I mean, it's really working well with us moving forward. So, I thought that event was great. That went for six hours, and then we switched to the tree lighting at 5.30 for 7. Not as cold as years before, so everyone kind of hung around a little bit longer. Didn't need as many fire pits, but I thought it worked great. Stephanie and the crew did a great job. We had some UMCs, which I thought were quite entertaining and had a lot of...
2:42:38 Got a new energy to the event. You know, we're talking about next year again, but also we'd really like to see the Chamber, you know, take a larger role in this event next year so we can see if we can kind of hand a little bit more of the responsibility off to that organisation. But I think it was a very popular event. It's probably the largest we've had there for a while, Bill, in regards to crowd. So there was really very little parking available at Footloose, which is always a good sign. And Andrea called me this morning, really happy with it, thought it was great, had good comments.
2:43:06 Yeah, another great event. Good way to kick off the season. The first one I've missed. Thanks to that stuff, and I didn't quite see you there. Yeah, and I apologize for that. Me too. I try to make it to that, and life sometimes gets in the way. Yeah, I think that. It was cozy. Betsy was there. Yeah. Clayton was there. I was there. Alex. Yeah, I saw the crew. It's fun. Thank you. Yeah, we had a great time. Good time. Yeah, so there you go. All right. Thank you. Thank you.
2:43:35 All right. Commissioner reports. Clayton, you want to start? I have nothing to report. Okay. No, any biathlon? Lots of biathlon stuff. Nothing to report. Nothing to report yet. Okay. I will just as soon as yet. We'll look forward to a full report. As scheduled. It's all moving forward, though. It is all very much moving forward. Great. I'm speaking. All right. Sean?
2:43:56 Nothing really. I will say that I attended the Events Coalition meeting today. But again, they know that they're going before MLR specifically. I did have some questions that I'm researching for them. But, you know, it's good to be part of that group. And frankly, I think it's one of the more organized. It's one of the best years, I think, going forward, at least for today was a good attendance.
2:44:18 I apologize that I missed the MLR meeting on Monday. All my diligence in putting it into my calendar didn't pay off because I guess I didn't get to save or something. But I will be there on the 15th. How does that sound familiar? Well, please just let us know if something comes up. My only comment was that I wanted to apologize to staff for not showing up for that event. I like that event and I always try to show my support.
2:44:50 And I failed this year and felt very badly about that. So that was my commissioning report, my failure. It's okay. I think you've probably attended more than the rest of us put together. So it's probably fine.
2:45:04 All right. Well, that was really just going to be my commissioning report was just to really commend staff not only, you know, for the tree lighting, which I thought went really well. I think everyone had a great time. I think, you know, everyone really liked the new MCs, the format, but also just for, you know, being out there to collect donations, you know. I think, you know, that really meant a lot, I think, to people in the community, and hopefully that's something that we can continue and build on. So, thank you. Welcome. All right.
2:45:31 Any other requests for agenda items for January? I think we've got. We've got three items here. We've got three items, so. If no one has anything else, I would entertain a motion to adjourn. I'll make the motion to adjourn this time. I'll second it. I have a motion and a second for any further discussion. Thank you. All in favor? Aye. Aye. Thank you. Thanks, Amy. Thanks, Amy. Thanks, Amy.