0:00 All right, so I'll call the, uh, what are we at? We have the, uh, Rick Commission meeting to order at 420. Do we have a roll call? Commissioner Colasardo? Here. Commissioner Feibiger? Here. Commissioner Richardson? Commissioner Souser? Commissioner Stalick? Here. Commissioner Svinson? Here. Commissioner Turner? All right. Okay.

0:29 Okay, public comments. Okay, at this time, if there's anyone in the audience that would like to talk about anything that does not appear on the agenda, now is your time to step up. Okay, got that covered. Approval of minutes. Approval of minutes. Okay. Any discussion? All in favor? Aye.

1:03 Okay. Items for discussion, 2010 follow and measure our full presentations and applicants. Okay. So... My understanding is today is actually our question and answer, or our question and answer, so we can give the applicants any questions that you might have. Okay. You know, I was thinking about looking at the audience. Maybe it would be easier to go to...

1:36 The winter biathlon and a few items like that? You can probably go on both of the biathlon issues so that we can cover that. Okay, so we'll start with that. Any questions?

2:02 So, Vice Chair, I just distributed,

2:35 The material I received from Michael Grossblatt regarding the insurance, the liability, the check-in, check-out procedure, the recommendations from California JPIA, which is identified here. And these are the procedures that we'll have to follow with those rifles. And then secondly, I got an email from Chief Watson who stated that they will not require any maintenance from MLPD.

3:06 Just cleaning. And he doesn't believe we need to budget anything in our measure administration line item, which is good. Which they'll do, but they just don't believe they'll be charging us.

3:42 When these rivals are used in the wintertime, biathlon, right? Let's say somebody drops a gun in the snow. Yes. That would be, that would come under, yeah, it would be a maintenance thing. The way we work the biathlon is we have,

4:10 The shooting range with, we hope we're going to have 20 different targets. Each lane has a range or a lane master, let's call him. We have a range master and he's the guy who says ready on the left, ready on the right, commence firing or stop firing. He's the one responsible for the overall safety of the range.

4:39 But then at each shooting site we have a, I'll call him a lane master. And that person is responsible for that lane. So one of the things that guy does, for instance, is if you've got someone who's shooting and he shoots and he hits one and all of a sudden he says, hey! You know, he turns around or something or tries to turn around. That lane master is there to keep that sort of thing from happening.

5:07 The other thing the lane master does is to take care of a jam when a gun doesn't fire, when this fire or a jam, and those happen. These guys are all very knowledgeable about the rifles and know how to handle that sort of stuff, and so the same thing would happen if someone were to drop a rifle into the ground.

5:37 Probably would take that rifle out of action for today. Do those folks have to be certified in any manner? They are certified by U.S. Biathlon Association, and I'm not knowledgeable enough to tell you if there are different levels of certification, but they certainly have a U.S. Biathlon some level of certification.

6:03 Stu, just kind of, you're saying there's not going to be a cost, but if you read number three, it says cost of maintenance and cleaning should be passed on to the sponsoring agency that it relates to. Which is this group. Yeah, and if they're, I haven't seen the cost, not the duty, so. Yeah, I haven't seen the, what you're reading from there. The, I think, I can't speak for the police department, but I will. I think

6:31 Both the police department and we, meaning Eastern Sierra Nordic Ski Association, would probably prefer that we, ESNSA, do the shooting if there's a way to, not shooting, but cleaning, if there's a way to do that, because we do that routinely, and if somehow that can... I would think that we can put something together for you.

7:00 Yes, NSA does have one.

7:29 And we would, our first try would be to pay for it ourselves. What is the life expectancy of the guns and the pads and the targets? Okay, three different questions. Life expectancy of the guns is...

7:55 Not something that anyone in this room has to worry about if they're properly cleaned and cared for and stored. The guns will last a long, long time. The targets are, I'm tempted to say bulletproof, and I guess I will. The targets, the biggest vulnerability of the targets is in transportation or something, but the targets are

8:26 Are very robustly made, and we haven't had any problems with those, and I've seen targets at biathlon ranges that have been there for 20 or 30 years. They're very hefty, hefty things. The mats are somewhat of an unknown. Certainly, I would expect in the last 5, 10, 15, well, 10 years. I think so, yeah.

8:55 So then we'll have to put aside some replacement value over time in order to replace them as if we purchase them now. So the last five years, a thousand bucks a year is part of your sort of depreciation. Yeah, that's probably a reasonable estimate. So five to ten years and then we've replaced them as if we put aside an additional thousand dollars for maintaining them. You know, I think something we should think about is that

9:24 Replacement costs, you know, as we go through Measure R over the next few years, we're going to be buying things and building things and then starting to replace things. So I think, you know, whether it's during this application period or not, maybe we should allocate a little bit of money for funding maintenance and breakage or whatever the case may be.

9:47 Whether it's necessary, this program, or whether it's on spring district, putting some money aside, I think it would be good to have that so that

9:55 And maybe it falls into view of security in the spring. I think it might look in spring because the audit is going forward right now. So I think we have, once we have that audit, we can get the detailed list and then we can start probably looking. So are you suggesting something like $1,000 a year or something like that for the next couple of years or something like that? I would say, you know, maybe, you know, there's $600,000 being allocated at least.

10:22 5% of that. Because as we get through this process now, we're going to have maybe projects out there that are worth a couple hundred thousand dollars. We should just have that reserve fund started in the beginning as well.

10:42 Okay. You know, I think $1,000 a year. You're talking about everything. I was referring to $1,000 a year just for the maximum. So, I mean, but to Tony's point, I mean, he's speaking more broadly about everything that we're funding now. And that's a pretty standard CapEx sort of reserve fund is 5%. So that's probably a good amount to consider in that 5% to 10% range. Okay. Not that we have to discuss it today, but that's something that's very considered.

11:07 I've got a question with regard to something like this. I would think that athletes who do biathlon on a regular basis, and maybe this doesn't apply in biathlon, but that they would have their own gun. They'd want to be training on their own rifle or perhaps have their own mat. Do you have anyone who shows up with their own gun?

11:36 Let me address the mats. Let me address the mats first. It's not like yoga, where most people who do yoga bring their own yoga mats. The mats are athletes do not have their own mats. Rifles, yes. The people who get serious, the elite athletes, they'll all have their own rifles.

12:03 What we have is or what we want to have and have are rifles for the non-elite who want to come out and do biathlon but aren't prepared to spend two or three thousand dollars to buy a rifle to use to compete. So the rifles that we have, what we call the community rifles, are left at the shooting range.

12:33 The elite biathletes, they ski with their rifles. That's the way it's done at the World Cup level and the Olympic levels. They ski with their rifles. And they become very friendly with their rifles. They know the idiosyncrasies and stuff like that. For the people like me, like Mike Karch, he's got his own rifle. I don't have one. The people who are citizen athletes.

13:02 They don't have rifles, although some of them do, a few of them do, but most citizen athletes do not have their own rifles, and so we've built racks, we have racks right at the shooting range, and they come in, and actually the rifles are kept, we have a rifle in each of the shooting positions, so they come in, go to a shooting position, shoot, the lane master will hand them the rifle, they'll shoot,

13:32 And they'll hand the rifle back to the lane master and go shoot their penalty laps if they've missed some shots and go ski their course. I'm sure there are more or less powerful rifles, right? Is it up to the lane master to check it out if that confirms to the competition? The, uh, yeah, no. Yes, so, yeah.

13:58 Jaunt 9. Jaunt 9. Okay. At the elite level, the rifles are checked just like you might see during the Tour de France when they check in, they look at their bikes and make sure they can form weight and so forth. Same thing for the rifles. The rifles must be certain weights. They have a gauge and they check the trigger.

14:25 The pull on the trigger, it's got to be within a certain number of ounces and things like that. Those are checked very carefully and rigorously at the elite level. And we haven't gotten to that because we haven't had elite level races here yet. But for the citizen rifles, the...

14:48 To get back to the other part of your questions, for each lane, we have, for instance, we'll have some lanes designated for juniors, and those lanes will have the lighter weight, easier to handle rifles that wouldn't fully meet a biathlon, the elite level standard, because they're a little lighter and easier for a hundred pound kid to shoot.

15:16 And so what happens is in the citizen's race, the racers come in, we have someone at the entry to the range who will direct the racer to a lane that's appropriate for him. I'm comfortable with the government. Do you guys have any other questions? Just real quickly, so the citizen's right was in will help encourage visitation. I mean, is that the concept? More people will participate, more people from the outside will be.

15:48 We'll know that we have citizen rifles. If you don't have your own $3,000 rifle, you can still come and participate, hang your entry fee, participate in this, stay in food nights, generate TOT. So one of the great concepts of the citizen rifles is that. And then the other quick question that I had is,

16:08 How does this project meet the priorities established by the parking brake commission? I mean, you said that you're finishing a project. So by doing these things, effectively, do you believe this will be the last time that your group will have to come to us and request something very specific, like mats and rifle storage and targets? Well, for five years. Someone asked that same question of Karch last time. They said if...

16:37 One of you all said, if we grant you this, your request, will you be back next time? And Mike said, of course. I will go out on a limb and say, at the moment, I don't foresee any additional things that we're going to need.

17:02 If we can get the target, get the match, we have everything we need to have a full-up 20-point World Cup quality biathlon. So at the moment, I don't see anything more.

17:28 Or 20 targets which you need. Is that kind of like a space allotment as well? So that the event would maybe be three days long or four days long? Right. What we would do is we'll have to elongate the event. And, you know, our hope is when we can get a permanent range in that we can

17:52 You know, you mentioned a 300 number, and hopefully we'll get that this year. Sure. But our hope is that we can get to the point where if we don't have to set up the range just to do the event like we do now, if we can have a range to set up year-round, then we can have additional events all through the winter and have a point series and things like that.

18:20 So more than just one event. Right. In the course of the year, they can be an ongoing generation of potential TOT and taxation revenue. Right. And the 20 lanes, though, from what I read, is standard. It's standard. It's not like you're going to get increased those number of lanes to do something else. I think in the Olympics they may have 50 points.

18:47 If we get to the point of putting in an Olympic bid for Mammoth, we'll address that then. But since we're too high, that's never going to happen for cross-country. Have you ever seen these targets inside? When you get the permit to put in, is it going to be laid out such so that training can occur on a regular basis, on a daily basis? So if biathletes want to come to Mammoth to train, we can capture that market as well? Absolutely. Yes.

19:15 Tell it to the mound when they've got no problem with people shooting up there on a daily basis once that permanent rain is established. Because, I mean, if people want a high altitude training for running in the summer, I'm assuming that there's a need for high altitude training for cross country and this sort of thing as well. That will tie into what these summer track folks are trying to look at. Yes. Both, actually, biathletes will want to train both winter and summer. They do running and then shooting in the summer.

19:44 We have had discussions and talked with Tamarack and the Mountain about having the range open. It would probably not be every day of the week for shooting, but we would designate certain days of the week that the range could be open. And to do that, to shoot, then you need to have infrastructure around like a range master.

20:14 And safety personnel and things like that. So that's all been discussed with Tamarack and with the Mountain. And that's our vision to make that sort of thing happen. Now, having said that, the other way, it turns out that biathletes train with the rifle probably 60 or 70 percent of the time without shooting bullets.

20:44 They carried a rifle, they come into the shooting range, they go through the whole procedure of getting in position, and they shoot, but there are no bullets. They pull the trigger, everything is the same except they don't fire. And 60% of the time they train, they are dry shooting.

21:06 When I said, you know, maybe we'll shoot two or three days a week, the other days the range is still available for dry fire. Sure. So what's the, how do ranges deal with moist pollution and the fact that you have gunfire? Because I know a lot of ski ranges deal with that and neighbors that are upset because of the ongoing gunfire that occurs in a ski range. I used to live near a ski range and every Saturday morning I always remember you get woke up by rifle fire.

21:34 So my question is, is that going to be an issue with this particular measure? It may be an issue. We have had no complaints yet. We've been kind of happy to have no complaints yet. At least during the winter, well, first of all, I think .22s are not as noisy as skeet shotguns. Sure.

22:04 During the winter, the noise from the guns is attenuated quite a bit by the smell. And what about the lead pollution? We have procedures for dealing with that. We have taken, for the last two years that we've had the biathlon up at the pack station, we've taken...

22:32 You know, that's in the watershed for the town. And so we've taken soil samples up there. The Forest Service has been very concerned about the lead. We have boards, 4x8 plywood that are up behind the targets, going up 8 feet, not 4 feet, all along behind the targets. We have tarps that are in front of the targets.

23:02 And so the lead either ends up in the boards, which is pretty unusual. Most people at least, they may not drop the target, but they at least hit the target itself, which is about that big. And then the lead that hits will often splatter back, but it's all on top of these tarps. And then after the event, we...

23:29 We sweep all that up and collect it. Are there such a thing as silencers? There are silencers, but they're not used on biathlon rifles. I wasn't sure they had biathlon silencers for the rifles. No, not that I'm aware of. Now, the other thing I'll mention, and we're not there yet, but it probably is coming, is that

23:59 Disabled Sports, as part, Kathy Copeland, as part of their Wounded Warrior Program, have gotten a grant and have purchased two laser rifles, which we're going to use them and work with those guys. You know, that may be something that that's the way Biathlon's done in another 20 years. I don't know.

24:30 How is it in the summer? Of course, the pack station, as it says in here, is going to be for animals. Well, the permanent range will not be at the pack station. You should have the rules? No.

24:57 And we used the same procedure in the summer to collect the lead. So moving on to... I think we answered the rifle storage too. I think so. We're going to have to fill out...

25:29 And present with each application. I'll go home and eat dinner. Thank you all. Thank you. Thank you. Do you want to do that as a crew after we hear everybody and go back to each one?

25:45 I was going to say we could go through, ask questions, make notes if you have any questions and then come back to discuss those questions amongst ourselves.

26:12 Thank you.

26:34 Good afternoon. Hello. How are you today? I am very well today. How are you? Good. I would like to make a follow- I'm late. I apologize to you all for being late.

26:59 We heard you got locked out of your car. I would like to follow up with letting you know that we do have a signed letter of intent for the commitment, the funding commitment I mentioned last week. So that is in place.

27:29 Okay, and what was the total amount? $600,000. So you have $710,000 to be asking one party? The NGC wants to remain anonymous, so at this time... And that $600,000 would finish the track? The $600,000 is part of the funding for the $1.7,000, $1.8,000, $1.8 million for the track, so it's a component of it. I'm working right now on...

27:56 Finalizing the in-kind services with the mountain to see what areas those will take care of, what services those will take care of. And then I also have two other bigger foundation grant applications out, one for the use of recycled tires in the project.

28:25 And that's going to go out this fall. Well, it's October, November, going to go out. And then I have another one going to a soccer foundation for support. So those are other sources of funding that we're trying to secure. So we're going to continue, and I will have a better idea of the gap that we have. I know it's in here, but since I didn't copy it all out, I don't want to look for it.

28:55 Outside of the infield, would you ask them for more money for it? What is the total cost of track? It would, it would, to get it up on operational. It's about, it, so the total for phase one that we're talking about is a little under 1.8. So I'm asking for the 600,000 plus from you all. Which leaves 1.2. Which leaves about 1.2.

29:18 And any kind of services that you're looking at from the mountain is to help with the construction or possibly grading or something like that? Yes, it's grading, a lot of hauling. Right. Yeah, no, that all is focused on the construction. Grading, hauling, demolition. They have the big equipment and they have human resources to help with the project. Is that part of the 1.7 cost?

29:45 Yeah, that's pictured in as a value, and that's why I'm going back to look at what they're going to do, and then I will take out the appropriate amount of dollars associated with the in-kind services that they're providing. For the whole project, we calculated it to be $370,000, and now we're going back to look at, you know, this phase and what that'll be. Any idea what those grants might be?

30:14 One, the rubber tire one is up to $100,000. And from what I've seen, the architect we're working with and then also the field turf company that we're working that we've gotten to know and have looked at, they've also been very successful at getting about $100,000.

30:39 So that's under 200,000 potentially. The other one is 200,000. So there's one for 100,000, one for 200,000. And then the rubber material would be used actually physically in the track surface. Yeah, we don't, yeah. It uses a spongy effect or makes it more of a. Yeah, they use it in the track, the polyurethane that's poured, and they also use it in making the synthetic material of the turf. So it's actually used in two places. Okay.

31:11 I'm trying to get a handle on this whole thing. You guys have used the Tahoe track kind of as something that you're looking at to see how it was used, how it was made, how it was built, and that type of thing. How do they program? How many people use that track? How is it programmed?

31:32 Any information on that? It's on the school site, so the school is responsible for programming. I was just looking back at my notes on that, and they are busy all of the time. All of the time that they can schedule either for the soccer field or the track, they have things happening there. It's really been, they weren't mentioning, you know, it's been overwhelming, the response. And they even have

32:00 Groups coming for soccer from the East Coast, they mentioned to me. So they schedule it through that. So is that something we looked at at our high school? As far as... Is that something we looked at at our high school? As far as... Is that something we looked at at our high school? As far as...

32:15 Did we look at, okay, putting a track up at the school? Yes, instead of at Wimmer. We did consider that way back when we were starting this, so that's about two or three years ago. The issue with putting it on the school site is that it's restricted in terms of the hours that it's available for use.

32:34 So that we wouldn't be able to use it at all from 7.30 to 3.30 or 4.30 Monday through Friday. So that was a big restriction on how we knew that we would be using it in terms of having any clubs or elite athletes come to train on it. We wouldn't be able to accommodate that, et cetera, et cetera. So it limited the hours of operation.

33:03 So the track in Tahoe is not really made for elite athletes? Oh, no, they can train on it. It wasn't, I don't know that they had that purpose there to do, to work with elite athletes, but they certainly have the use of it by those outside of the area coming to play on it, to run on it and play on the field. The Tahoe track was originally...

33:32 Done long ago, and then they resurfaced it. Yeah, okay, so it's recently been resurfaced, because I think it was originally built for the 68 Olympics, but they didn't continue to train there. Yeah, yeah, it's been, yeah, it's the one that was there for the Olympics, right, and they even have old pictures of it with trees growing up in the middle, but now it's been resurfaced, and then the infield has been turned. Okay. And is this the first time it's been resurfaced in 68? I can't tell you that. I don't know. I was there about five to ten years ago, and it hadn't been surfaced yet, so it's going to be recently.

34:01 It's recently done resurface, but I don't know in the interim if there was any resurfacing done on it. So the turf and the track from what I'm seeing is one is five years before it has to be replaced and the other is 10 to 12? Yes. And it's the turf that's five years? Yeah, I believe so. I'd have to, yeah. Because it's a huge expense every day. It's a...

34:29 I put it in there. The truck, I thought, was guaranteed for it. There's $10,000 in five years that you're in that truck. How do you spend it for? I have to. The truck surface has to be re-poured every 10 to 12 years, although the most recent things I was reading was 12 years, so it's up a little. And then,

34:57 Because we'll be covered in snow, unless we choose to remove the snow, we'll get a life extension on that most likely because the UV rays are what actually does more damage to the polyurethane than the snow. The snow doesn't harm it at all. Actually, it says it's 400,000 dollars to replace the test. So it's about 600,000 every time.

35:35 Repain, yeah, repainting. And the field is every 10 to 12 years at $400,000. You're better at that 5% zoning. Wow. Our life's goal with the Sierra Striders is to raise money for support of this track, and we'll be doing it until we keel over. The application was very, very comprehensive and did a very good job on it. Thank you. One question I do have, though, is

36:06 On the maintenance, and referred to Dennis, and you wouldn't know what it might cost to maintain an annual basis until you had it gone through the first year. How did you have a thought on that? Well, it was an estimate. It was an estimate of $25,000 a year, so the staff hours dedicated to that. Dennis did do an estimate on the annual maintenance, and my comment was,

36:35 That he was being very generous, I thought, in terms of the most it would be needed. And he was very conservative. Very conservative, yes. And I, right. So I think, you know, he's allotted a lot of time to taking care of it. And we'll find out if that's required or if it, my feeling is I think I'm talking to the folks.

36:59 The architect and all. It might be a little less, but his is very, I think, a conservative estimate. It's pretty quiet up there. We talked to the maintenance manager and truck, and I used his numbers. That's how we face it. It just depends on the usage in our environment. Right, and we'll have to see how dusty it does get, and that's the concern here. Up at Tahoe, they have pine needles.

37:29 That get on the track that they have to watch. So, and we're, I think, you know, through the planning process and looking at how we can keep the dirt around it planted so that we minimize the, with native scrub, minimize the dust that will fall on the track. And then the other question I have is, you know, we've talked about bonding and you've talked about financing and that.

37:58 Is there any, just with the numbers you gave us, if you got all the grants and the work done, whether or not it was $370,000, it would be a $1.82 million project. And we've allocated, we put aside $140,000, and you're asking for another $510,000. Is there a possibility, is there any other financing that you know of?

38:28 We can commit to the 510 we paid over the next couple of years until we know where Measure U is and, you know. You know where the town is a homeless. You know where the town is a homeless. You know where the town is a homeless. You want to bring up a lawsuit. Yes. Yes. There are things out there that may change the way we all operate a little bit of this. Right. I can't, I, there are, there isn't anything that right now I could point to to say if you, if

38:58 What my understanding is what you're saying is we'll commit to the 510, but we won't give you the cash right now. We will give you the cash in allotments over a period of years so that if we still wanted to go forward with the project and would there be a way to make up that cash we weren't getting?

39:21 In the first year, this summer. Is there a way to look at that? I guess there's always a possibility of that, but there is nothing that I know of today that I can say, yes, there is somebody waiting in the wings to fill that. So honestly, knowing how difficult it is to get all of these pieces of funding in line, to add

39:51 The responsibility for also financing that portion of it is difficult, is a challenge, is daunting. If we don't get all of the money from the town, that full $510,000, could that be a delay, cause the project to be delayed even though it had the rest of the funding, even though it had all the permits? Yes, it could delay the project. So would we try to accommodate that?

40:21 Of course we would do that. Would we be successful in doing that? You know, I don't have an optimistic answer for you on that. I guess because, you know, we've allocated $140,000, the total cost of the appeal was $650,000, so we'd be looking at maybe financing $300,000 or somewhere around, or maybe less than or more, I don't know.

40:49 But it would be the full 5-10. Right. I understand. There's financing out there and cost of financing may be allocated to them. I don't know. Well, you know, if we could sit down and talk about adding interest that we would get that would be incorporated in the full amount and then have the high Sierra Striders go out and look for a loan.

41:16 Is that a possibility? Perhaps. How successful would it be? Would it be at a cost that you all would agree to? Again, I don't know. Take off the rose-colored glasses and look at this from an absolute realistic timeline. Looking at how your capital fundraising campaign was on this point. Realistically, what are we looking at at the start?

41:47 So we have the permitting process that goes along with the fundraising process. The permitting process is, and we've talked a little bit about this, we anticipate to have everything between June and July. We have to start the project by July 1st in order to complete it during the summer. So we're on track there.

42:13 The fundraising, we're a few hundred thousand dollars short. We're looking at some grants and foundations and continuing with our corporations and individuals and the fundraising effort that's gone on along and continues to go on. So we have a gap of a few hundred thousand dollars and that's going to

42:41 We're pressing that hard. We're going to continue it. I'm feeling more optimistic every day. We were working hard on this $600,000 grant commitment that we just got. And if we were to get the town's commitment, that creates a lot of energy in having others be more comfortable in committing.

43:10 So that when we talk to the individuals, it's much greater likelihood that we can get those individuals to jump in too because they see how close we really are and the commitment of others and the town. We have a potential economic impact, let's say hypothetically finish the summer instead of finishing it two, three years. What's the impact economically? Increased visitation, room nights, taxation revenue, sales tax revenue?

43:38 It's going to be generated in that two-year period versus waiting, which we might offset some of the cost of paying now. So that's another way of potentially looking at it is what is the short-term revenue growth by having this in place versus, you know, waiting two to three years to fund it down the road. I mean, it's another way of potentially looking at this. Is there a way to quantify that? We could certainly take a stab at quantifying that.

44:07 There would be a lot of assumptions with respect to that. We've tried to collect some data with respect to visitation now and expected increases in the number of events we want to have, all of those kinds of things. So it's possible to do it. So I think that...

44:29 It's not, it'll be an educated guess at it and everybody would have to be comfortable with the assumptions we're making, but certainly we plan to and have already started talking about the programming for the site because that's why we're building it. So all of those things we would, we're already now planning how to use it once it's built. I guess that was my question.

44:59 How are you looking at this big program and what are the opportunities of anything that might be based so there's some income from the track itself and then you have the TOT visitation. Well, we've been talking, you know, with the Mammoth Track Club, want to talk with John Urdi about

45:26 Promotion of this. But we're thinking, as I mentioned in this document, thinking about running camps, thinking about the fantasy camps that adults have so they can run up here where the elites run. We're thinking of having

45:44 And had already sort of planned, tended to plan to do it last summer, working with the college to get students here during the summer and so they can be training on the track. Talked about having soccer tournaments, talked, you know, yesterday with Tom Cage and to have a talk with Stu about soccer tournaments and that whole avenue of getting folks up here. The same lines of...

46:07 Perhaps doing the turnips, but also looking at soccer camps. There's a multitude of things that we're talking about programming to bring new events there. We, you know, even some of, we have three events in the summer, but we could also have one that's around the track and combines with cycling or anything else down there. So there's lots of different ways that we can go about programming. You see like a high school high altitude kickoff race or marathon or some kind of race.

46:37 To start the cross-country season off in California. Absolutely. With colleges. Colleges already come here. We can have, you know, an invitational kind of meet. We can have the high schools, of course, are the big ones that come here. And we're thinking of just talking about it last night, identifying when those colleges come so that we can target those dates and then invite others to join them that we haven't had here.

47:10 What you actually have is the $625,000 donations currently, right? We've got in-kind services and donations. We have potential donations. $900,000, right? Right, we're working on, well, yeah, we have the $600,000 of that, and then there's the other two in grants applications that are in the works. Okay. How about the...

47:39 The DMO funds I actually left it for, have you done anything with that respect? No, we haven't asked. The marketing. Right, we haven't asked for any money from the DMOs. Have you had another question yet? No, I haven't asked for any money from the DMO, and we're going to look to how we can collaborate, and I know that they're going to be.

47:59 They're focusing on promoting the events that we're doing. So we're looking at putting on the events and then understanding the extent to which that they can promote it so that we get an increase.

48:24 Good estimates from there with the maintenance costs. Yeah, he's handled it and has talked to them, so he feels confident in his numbers. So it'll be about $25,000. You know what? I've never heard anything about their tracks and field competitions. We start off with elite people here.

48:56 I think so. Oh yes, absolutely. I agree with you. I mean, we have the opportunity, and this is really one of the things that we need to start working on, is looking at

49:20 Marketing the High Altitude Training Center and looking at defining, if you will, the brand. Is it, you know, the mammoth effect and you come to train here because of altitude and because of the opportunities. I mean, for running, we have the trails and the track and everything that you might need, including the...

49:41 The ancillary services, you know, the hospital here and the services and the physicians that are oriented towards sports medicine and can help either the elite athlete or those of us that want to pretend we're an elite athlete and come here to train where the elites do. So all of those services are, you know, a step ahead a lot of the other altitude training centers that are at other places.

50:10 So we have a whole, and so we just need to, we need to package that and brand it, and that's one of the things I want to talk with John about, is how do we, you know, what's the best way to do that? Now when we voted in here about 10 years ago, running USA, that was stationed in Colorado then, right? Are we making progress to have all this advertisement in Maryland?

50:39 That's what John would be... Once we... Yeah. Once we get up and down here, right? Yeah. Once we get up and down. Now, there's also another question that was mentioned, San Diego, where the doctors and, you know, the physical aspect was, is that still in San Diego? They have a training type in San Diego. Okay. But we, you know, and we have the ability... She goes to New Maryland from Colorado, right? Yeah.

51:09 Yeah. But we have the ability to do a lot of that testing here too with the VO2 max and lactate testing. So it's a very comprehensive services that our hospital is actually offering for the elites and then even non-elites if they want to find out. Another plus box, right? Mm-hmm. Thank you. I'm going to get back to my previous question about best case scenario. Okay. When we're going to start. Right. If we were to...

51:39 Support the project and say this is the most wonderful thing in the world. Right. And give you the money we're asking for to be able to log on home because there's nothing left else to hand out. Right. I don't think that's going to happen. Right. So are we, is it real likely in your position that it's going to take next July or is it more likely that it's going to begin the spring after that if we get all our ducks in a row?

52:10 Because I don't want to start, excuse me, I don't want to put money into it until we know we have all the money necessary to finish it, because the town certainly isn't going to have the money to finish it. So I understand it's easier for you to get money with a commitment, but does that commitment need to be for the $500,000, $10,000, or could that just as easily be split between this fall, next spring, and next fall, and then there's the next spring cycle after that?

52:43 Before you would actually get into that next year's construction phase. I'm just trying to be realistic. I'm trying to be realistic as well. One of the things that, and let me split up the request into two parts with respect to the commitment for the full amount, regardless of the timing. One of the things that is going to be most...

53:14 Critical for us in all of our fundraising efforts for the remainder of the amount plus the future is the commitment that the town will make to that $510,000 plus the $140,000. So that's number one for us in terms of making that commitment to the funding. The other issue is when it might come, whether you decide to give.

53:44 None now and all of it in a year or parts in this fall, spring or another fall cycle. That's another issue that we can deal with. So for the project and the fundraising effort, the commitment of the full amount is critical for fundraising. If you were to make that commitment and fund it all this cycle, can I guarantee that

54:11 July 1, we'd be starting the track because I had all of the permits and approvals I needed and I had all the money I needed. No. I can't make that today because I don't have it. Am I very close to getting it? Absolutely. But I don't. I don't. Today I don't have in my pocket all of that money. You have some of it. I'm working on some of it through grants and applications.

54:41 I've gotten the letter of intent for part of it. But the commission has requested that we bring projects forward that I'm not requesting 100% financing from you. We're going out and we're leveraging dollars. We're bringing in more money than we're asking for. And I think that really needs to carry some weight here.

55:12 You know, not all the applications are bringing what we're bringing with us. And that's got to count for something. Can I give you an absolute guarantee? No, I can't because I don't have it today. I'm sorry, you know, did you ask if you had all the money today, would you be able to complete the project, get all the permits are in and have gone through this? If you had the 1.8, could you complete that project in one year? Absolutely. Could you have it by next fall?

55:39 It would be done July. I'd start July 1 and it'd be done about October 1 with all the permits and all the funding. Because I'm just wondering with the commitment of the $600,000 plus you got the grants and this and that, if we committed to that money through two or three cycles, if not four maybe, that the completion date would be spring 2012 when you get the last $100,000.

56:09 See what I'm getting at? You're committed to 140 already, we're committed to 170 now, committed something in the spring, the 600 and the other grants, you'd be working through that whole process, and what you'd be sure is maybe 200,000 in the fall somewhere, and whether that would have to be completed at that time, or whether it could be completed through the fall and the next spring, and give you the 1.8 and a complete project by the spring.

56:37 And you're talking about the parts of the construction being sort of delayed? Materials, whatever it might be, they come a little later. Completion data, and we know how all that goes. To be completed, to be started July 1, completed by fall to 2011, right? Okay, so you're asking. So I guess what I'm asking is if you're short a couple hundred thousand. Yes. And you're committed to that and you got it by the following spring allocation.

57:06 You would have a complete project by spring? It's very difficult for me to say whether or not we would, knowing that we were shy within this 1.8 target. There's a few, probably, there's a certain amount, but a very small amount, I'd say less than 100,000, that we could wait to do until another time.

57:35 Whenever that is, that wouldn't affect the track, that wouldn't affect the field, okay? So that's, I've got, you have to do some of that. I mean, there's some of the things if you're going to do the track, you have to do, like the curving, like the fencing probably we'd have to do, but we might not do the terracing, maybe the terrace seating, maybe we wouldn't do some of the walkways.

58:00 So we do the, but that's going to be 100,000. Okay. Okay? So that's the magnitude. Now if you told me, so if I had to come up with a, if there was a greater shortfall, say than the 100,000, say there's 200,000 or 300,000, then I'd really have to determine whether or not I want to do any of it or just wait to do it completely in the following year.

58:26 There's a lot of variables with that, and I've talked about it with our architect, and there's, you know, you have to consider this and this and this and this and this, and I think we would go through that, and I don't know exactly where the decision would be. We might delay the whole project if we're shy of the money, because it just, there's risks that you take when you do part of it and you don't complete all of it. Yeah, and you've got the commitment today for $600,000 net momentum made.

58:55 And that's contingent upon, that is, that money is contingent upon the measure R funding. So one of the requirements that we need to meet to, in order for this $600,000 financial commitment to be made is that we have $500,000. So they are, they are linked. And I guess, you know, I would need to come back to this whole maintenance.

59:24 If we take these dollars that we're looking at, you're looking at about $125,000 a year that we're going to have to put, $25,000 being the general maintenance, $100,000 being set aside as a reserve to replace these things when they need to be replaced. $100,000? Or is it more like $25,000 to $50,000? No, it's $100,000. If you're looking at $400,000 for five years and $180,000 and $10,000 to $12,000, you're looking at $18,000 basically each year for the $1,000.

59:53 So I think there's some questions.

1:00:23 That would be helpful. Well, the life expectancy of 12 years for the field comes from the manufacturer, field turf. So, I mean, we can work with dentists or whatever to make more colors. So the track itself is 180,000 for 12 years. Or 15. Because we really think that it's going to be more than 12 because of this.

1:00:53 $30,000 to $40,000 a year for the sports field. If it only has a five-year life, no. If you can get a 20-year life out of it, then... The five-year life... ...on both the field as well as the track. Five years is for painting. It just needs to be painted. It's painted every five years. Okay. So it's actually, you know, and then the staff estimate is a little bit high, too. So if you're looking, if you're looking at $60,000, $70,000 a year, it means...

1:01:22 And a deferred, that means capital cost. And these funds you are thinking needs to come from Measure R? Well, if we build a project. That was part of the Measure R process is that we would initially start with the majority of it being planning, the second part of it being the majority implementing.

1:01:50 And lastly, it would all be towards maintenance. There'd be, you know, I mean, you've got to be realistic about it, yeah, with maintenance replacement. So, you know, I think as we go forward on a bigger project, we'd have to start doing some of the math on replacement and maintenance and start allocating that, maybe not this year, next year, but year five, six, seven, we need to start putting some money aside for that for maintenance.

1:02:19 Because otherwise we're in the same situation where we are now where we've got a couple that's 20 years old and he's $300,000 in improvements. Okay, guys, this is going to hold over to Tuesday. We're not making any decisions. And we have some people that are on the timeline here. So I'm going to cut short our track project for the moment. And we will move on. Thank you.

1:02:48 We're going to move now to items F and G, Manager Plan CEQA, and Manager Creek Department Conceptual Plan. How are you? CEQA. CEQA.

1:03:25 Yeah, we're going to the Park and Recreation Master Plan CEQA and the Mammoth Creek Park Conceptual. It's a Charger Recreation Master Plan Initial Study, or Miticated and Educative Declaration. Mammoth Creek Park Conceptual should follow that.

1:04:05 So it's for our C-Quad. Just really here to ask any questions. And this is for the Mammoth Creek, right? Or no, this is for the Mammoth Creek, right? Well, I guess, I think we need to move forward with it. Before we can do anything else, we need to get our Mammoth Creek. And since the SNC grant wasn't able to be used for that, I think we have to.

1:04:37 So what was the SNC grant able to use for this? Just to clarify. Alan explained that last time. We initially had proposed the grant be used to fund a joint EIR for both the Trail System Master Plan and the Parks and Recreation Master Plan, and the SNC in reviewing our application felt that the Trail System Master Plan was more suited to the goals of the grant program and the Prop 84 grants.

1:05:07 That fund it. So that was their decision as the awarding agency, and we didn't really have too much opportunity to argue with them about that. So we have taken some advantage of being able to share some resources, some analysis, and put that into the Parks Recreation Master Plan. There's some efficiencies there, but ultimately we can't cover that in our separate document. So this is the $43,320. Correct. And then what will they enable?

1:05:34 Is it like 39,832? The consultant chairs. Put it by the town? Put it by the contractor? The town put that 10% in, we do that as a standard. So it's 43,320. It would be the maximum, in all likelihood, we would not leave that amount. It would be paid out of what it would be actual. Yes. Yes. So it could be less than 43,320. Right. Hopefully, I mean, just because the...

1:06:00 In terms of the scope that's been written by the consultant, that's not to exceed contract amount. As often as the case with CEQA documents, issues come up, you need to do more, you know, another study that you didn't realize that you had to do at the outset, and so it just allows a little bit of wiggle room. So is there anything else waiting on this then? Everything else is kind of unfolding until this is completely crazy? Things are progressing, but it's certainly easier to move forward meaningfully when you have an adopted plan to rely on.

1:06:29 And obviously that gives us leverage as far as getting, you know, additional grants, potentially for future facilities, is that often kind of looking at an adopted plan is important to those awarding agencies. It's kind of silly to do anything else first. I mean, you kind of have to do this one. One question, because it was originally spoke of, and it was actually between SNC grants there, so maybe this falls under that same thing. Because we have allotted some money.

1:06:56 Earlier for the biological and cultural study to already be done. Was that done for this? Those studies did cover the Parks and Recreation Master Plan. That should not be an additional cost. The consultant's estimate, really what they need to do is take the technical studies and incorporate that information back into the

1:07:21 into the MND. So there is some work to sort of digest the information that was provided by the technical consultants, but essentially the legwork has been done, the fieldwork has been done, and those reports are written. Because the cost is still in there for the biological. There is a small amount of work associated with that. I didn't total it, no.

1:07:50 How much is this going to be affected by what's going on? How does this work in conjunction? This is a high-level plan. It doesn't actually get down to master planning, programming, or prioritizing any of the parts. Okay.

1:08:19 It calls out things like how many acres and parkland we need for how many thousands of people. And there's some suggestion and stuff, but it's a higher level of, I think, what Rex Stratts is going to be dealing with. Do you agree to this? Has anything like this been done before? I mean, at least at this level that we're talking about? Is that what you were just asking? Is that what she's asking? Is that what she's asking?

1:08:45 Oh, I mean, for the plan? Yeah. Plan itself? There was another Parks and Rec Master Plan that was put together, but I don't think it was ever planned. The Parks and Recreation element of the general plan, which is the current, that's the current planning document that guides. But that means that you need a negative declaration, right? Right. Is that critical to finish the trail system?

1:09:12 Two different projects. So currently the trail system master plan is being analyzed. I'm in the IR. We're progressing on that. Work is moving forward. So those two are not related. Could this give you, though, Terry? It sounds like this was initiated under the general plan. Could this be looked at as a planting? Is the general plan responsible for finishing? Yeah, this is going to be one of my questions as far as, you know, hasn't this already been in a budget before?

1:09:40 Has this been a budget and just never got funded properly and therefore it can't be completed? And would it therefore be considered supplanted? I think it was lack of funds that prevented from that adoption moving forward. And to this point, I mean, obviously there was a lot of, you know, as we went through the grant, SNC grant process, you know, hope that that would be able to be used as a source of funding. But currently that hasn't been included in the budget.

1:10:05 Under question 7, it said, yes, Town General Funds were used to develop the park and recreation master plan. In addition to the measure, our funds were awarded in 2009. So the question was, was this originally conceptualized and paid for out of the general fund? I think in an ideal world that the master plan would have been, the adoption, the completion of the CEQA would have been completed as part of the total project.

1:10:32 That's the match that's coming from the town that they pay for the master plan. And our piece of that is to pick up the CEQA, which is very minimal. Sure. So it's not a matter of are we supplanting that. It's a matter of that. That is the other piece of it that's already paid for out of other areas. But I guess my question is based on what I read the sheet is that it was something that was initiated previously or part of the general fund initially.

1:11:00 Then it's considered as, all right, it's a project that's already been initiated, then it can be considered supplanting, unless it's a new project, in theory. The supplanting piece actually talks about maintenance supplanting, it doesn't talk about new plants. Okay. This is the maintenance piece. Okay. So, all right. It's adoption of a policy document. Right.

1:11:27 Everyone doesn't need to get done with it. So this is awesome. They won't get everything else done. Yeah. The town cannot adopt the Parks and Recreation Master Plan until the sequel is completed. Yeah. And the commission spent a lot of time on this. And I, for one, want to stop spending time on things and end up gathering dust on town shelves. I want to start spending time on things that were finished. Sure. And are then used. Well, then that's another thing. Yeah. Okay. All right.

1:11:58 Okay, so questions on the mandatory part of conceptual schematic planning. And I do have some comments or questions if you want me to start. I'm working on where you guys start. Yeah, you know what, I kind of agree with the outline so far, but I think that the direction, even if we move forward with this,

1:12:31 from the commission and then go to the public rather than go to the public to see what their thoughts are on the park and then coming back to the commission. I think it's backwards. I think, you know, we have a better understanding, we have a good understanding of all the parks and what they represent to the community and I think it's incumbent upon us to come up with what that park should be and then take it out to the public.

1:13:00 And then my other concern is do we really want to spend our money on another plan when we don't, you know, our priority I think is trails and park and

1:13:30 We don't have the money to complete that either, so do we plan another part that we just put on a shelf and wait until we have more money. And I think that's a measure U question that will come up later. And I think measure U is clearly defined. You can always go to this and begin to plan for that part. And those are my thoughts on what I mean. It's way ahead of the game here, but that's kind of my thoughts on what I think.

1:13:56 Conceptionally, it's good. I think it should start here and then go to the community if indeed we adopt, you know, go forward with this application. I think there's lots of opportunity for panel to be part. So I think it's an important one for us to start looking at. But I guess in this time where, you know, truly there's not a lot of money out there, I almost think that the commission could probably work on

1:14:27 Thank you. Thank you.

1:14:54 Starting and spending money and spinning wheels. I think that, you know, that's kind of one of the things that we're here for. And, you know, I guess we have no life, so use us. And just let's move it forward. But I do think it's important. But I think maybe that's something we don't have to ask for. Yeah. Well, my comment would be is that we should look at these associations first. That was my comment last week.

1:15:25 I hope these condo owners even weren't in that park there. The last thing I heard was they didn't want any buildings in it there. It was a gear marked for a dog park. It's a way of saying the general plan was gear marked as an active park, but it doesn't belong to condos, it belongs to the town. Exactly.

1:15:53 Before we bring that money on, we should put, we should add more input, I need more input. Input is part of the plan. And here's my take on, very similar to where Terry and Tony are coming from. There are plans for that part that have been done by several staffs going all the way back when Camille White was part of the town. I don't know if anybody has been here that moment for Dennis and myself.

1:16:23 I would love to have all of those plans trotted out if they still exist. I saw them just today. And I would love for the commission to go over those and try to create our own conceptual plan of the park, then take it out for public comment. And then when that work is done, look at what it would cost us to hire a consultant or do it in-house to move that forward rather than hire a consultant to do the whole thing and tell us what we want.

1:16:52 I think as a community and as a commission we should be able to figure that out on our own. In fact, it had been figured out in several different iterations over the course of years, including we've talked with Dennis about what we can do for special events. We have everything including the kitchen sink in an unfinished CEQA document where we're going to put the multi-use facility over there so there's no end to the information we already have.

1:17:21 At our disposal to put something together to move forward. So that would be my take on that particular. We didn't ask any questions. We just made statements. But that's where I'm leaning from this one at the time. And I would agree. And one of the things we're looking at is the CIP. I think that's going to come into this. And then the usage. So I think all of that.

1:17:48 Can be pulled out, used, and we can start, you know, playing something together instead of just saying, yeah, we're going to put this money out there for that. I would tend to agree with your answer to the end of this bill to answer your question. So I'm going to go with that. It's as good as you got it. Okay. Okay. Thank you. Thank you. I'm going to move this around again in general. Absolutely.

1:18:15 John, with your permission, you got any place to go, buddy? No, sir. Okay. Maybe so, I've said that later. Greg has to be out here at a specific time as well, so I would like to bring Greg forward. He's going to be covering the things that were Peter Burgess Cronies. Greg, can you give me which one of our, besides Trails End Park, was the Mammoth Creek Park West? Trails End Park, yeah.

1:18:44 What I wanted to do just as a follow-up to last week's discussion on Trails in Park is offer some

1:19:16 options to the commission to consider for measure our award. Last week we submitted a grant application that included just completing the design of the park, which we do need to do. We're at 60 to 70 percent design completion now, which is substantial. I mean, you have a pretty well-developed design. No matter what you do going forward, you need to put together a complete design, a set of contract bid documents.

1:19:45 So that we can advertise the project and award it and move forward from there. The piece of paper that I just handed you gives you some options. It gives you various elements within the park. And these numbers reflect separate projects. Or I should say it includes design plus playground or design plus picnic pavilion. You'd have to add those two numbers together to get a total.

1:20:14 This does not contemplate awarding the whole project, which if you awarded an entire project, you're going to save some money, but obviously there's considerations to be had there. But the point is that we wanted to give you some options, sort of a menu that you could pick from. We listed playground first because we've got the playground equipment, so it's sort of intuitive that that makes sense that we would want to get that installed.

1:20:41 It's $238,000, almost $239,000, but that includes a lot of site work that would have to be done in addition to just simply installing the playground equipment. There's a lot of grading work to be done, drainage, concrete work, etc., ADA access. A lot of those elements have to be done in order to get to the playground equipment once it's installed. So that's what's reflected in that particular number. And then as you go down the list, you can see Picnic Pavilion,

1:21:11 Little Brothers Skate Park, the proposed running track around the entire park, the water play area, and the skate park completion items, which are various items that go along with the skate park. So I don't have a whole lot more to say. I'm here to answer questions as best I can. But we wanted to at least give you these options so that you could get the playground equipment potentially installed.

1:21:41 Skate park completion items for 285. Is that for the Little Brothers Park or is that for the entire skate park? I'm going to ask somebody who's smarter than I am right now and that would be Hayes because he helped put these numbers together. So the completion items was as additional benches. Do you want him up here? Why don't you come on up here and speak into the microphone? Start over.

1:22:10 What you're looking at is the completion items, which includes updating the coping for the park, a shade structure, additional benches, additional path and paving areas, and some other ancillary facilities that would go to complete that portion of the skate park. The portion is currently being used? Correct. Okay. So, just one other quick question. The 375 and the little rollers, that would be for the 8,500 square feet.

1:22:41 The new Little Brothers Park. Correct. And that would be complete. Correct. Would it need any benches or those benches and other items that are listed below? So each one of these is listed as separate. So there are some carryovers between the two. So there's savings when you do more than one project. But to answer your question specifically, yes, some of these things are overlapping. Was this project ever part of the town budget for use of this?

1:23:10 No, not the Little Brothers. It's just the completion of the Trail Sand Park. I mean, was it once forecasting to be completed? Was it once part of Park and Rec as part of their budget? In other words, we're coming back to the supplanting issue again. I mean, is this basically, are you guys coming to measure art because the general fund's empty? Or was this part of it? Was this initially envisioned to be part of the general fund to be paid through the Park and Rec budget in a normal course of the year?

1:23:39 To my knowledge, it was set up to be phased. And so it was never identically done all at once. And kind of the conversation is that because there is nothing on the ground yet that hasn't been done, no money hasn't been set aside previously other than just the planning, that it would be okay to move forward to something like that. That part does not be considered something that's already in the ground and already done.

1:24:08 The playground equipment was given to town, wasn't it? It was a grant. It was a grant, okay. Hey guys, do you want to answer that? Funding for this. We'll get it all down. The funding for this came from Mellow Roots, fractional use. Well, that kind of disappeared. We got staffing out of that and skate park.

1:24:39 There's money for that, and the first thing I purchased was the playground, because that was the second phase to go in. Fractional Melrose kind of faded away, and there's a little bit of money out there still, but it's not enough to... That paid for the equipment. That paid for the equipment. So we had purchased that equipment with full intentions of putting it in with the second phase, and then, you know, we hit the wall and everything went away.

1:25:06 But other than that, everything else was just kind of a concept design that did not make completed. Well, it was designed enough to do CEQA, so it's fairly... Right. And that's not my expertise, so, you know. I don't get somebody else to know. Yeah. I'm sorry, are you asking a question then, essentially getting to, is this a plan? Yeah. Yeah, and I don't believe this is a plan. Okay. What's the total number?

1:25:36 For all of this. I think this is lower. I think this adds up to about, I just roughly added as a minute ago, it's like 1.7.

1:26:02 Yeah, I'm assuming that the irrigation until we don't have to tear it up later and all of that. Does that, to do that, does that require the $53,000 planning money or can we just do that? We need to complete the design. Okay. Again, we don't have a final design. Let me rephrase that. We understand where the elements go in the park, but we don't have a completed set of engineering drawings and specs so that we can actually

1:26:32 Move this thing into an advertising and a bid award phase. So that $53,000 completes the entire design for the whole park. Planning, right? Not planning, design. Design. Yeah, engineering design. So that we won't have to come back again and say the design's not done. The design will be completed as part of that effort. So then it's just a matter of

1:26:59 When you come back again, if you do the playground this time, and next year, year after, or whenever in the future you want to do picnic pavilion or some other element on here, then it's just, then all we need to do is put together a set of bid documents for that element of the park only, because you'll have a completed design. So, if we approve the planning. Design. Design. Design. It could be done in like three or four months until they get started here. Yeah.

1:27:29 Could we also get the equipment in by next summer if we got the design worked done? Absolutely. Oh, yeah. Yeah. I mean, because the design could be completed, you know, assuming the final reward is in December, you know, we could complete the design, and then in the spring and early summer you put out a bid spec and award the thing and get it done. So it could be a next summer project. The grind line portion of that?

1:27:56 That's two separate contracts, two different people, right? The way this is set up, it's two different elements to the overall park. Right. So if we wanted to move forward with the playground side, there is not necessarily a cost savings including planning for the brothers and the $20,000 for crime line in the planning process. No. This completes the design, everything.

1:28:25 For everything, nobody's little brother. Yes. The little brother's planning part of this, if I understand it, is better than $20,000 all on its own. And it's a separate person. If there's money to be saved by bunching it up, then it makes sense to bunch it. But if there's no money to be saved so that we can phase it, then it seems to me that it would make sense to phase it.

1:28:51 I think, you know, when you're talking about a total of $53,000 to complete the entire design, breaking it apart may save you a small amount of money, but then you're coming back again at some point in the future to complete the design.

1:29:14 And depending on how far in the future that is, you may have just eaten up any savings that you realized. Yeah, and I'm not looking at it as savings. I think it's most cost effective to do the whole design now. What I'm looking at it is, at some point, we're going to be looking at what the cash flow for this year is. Right, yeah. And if that $20,000 is a deal breaker, not me, but the town of Mammoth Lakes, finally seeing something put in down there, then what I'm asking is, is it possible to pull that out?

1:29:41 We have, you know, a skate park that's functioned very well and getting a lot of great use. It's a great facility. I'd really like to see that playground equipment be the next phase of the park and it's just me speaking personally. So that's my question. Can we break that out and still do the playground if that $20,000 gives us another park? Yeah. Go ahead.

1:30:10 You could separate the two.

1:30:43 But by bringing them together and incorporating the plans from grind line into the final design, you're going to end up with a more rational product. You're talking about 8,500 square feet of impervious surface that needs to be taken into consideration for drainage and all these facilities. And yeah, they're separate, but when you look at it as a system, you need to think of it as a whole. So designing it at one time will incorporate all those ideas and ensure that there's no future problems when we go to design the other aspects of it.

1:31:10 And we're not going backtracking and digging up and fixing problems. So what I hear you say, Jane, is that that $20,000 couldn't be renegotiated somehow and brought down. So... You know what he's saying? He's saying that in the correct way that the town does business... There you go. Right there. The correct way that the town does business and they were charged the maximum amount...

1:31:41 That $20,000 is what it would cost. Go ahead. And so what K's and Peter are trying to do is protect your interest. What I'm telling you is that we have a relationship with them and chances are they would charge you that.

1:32:12 Again, on the figures to build this game apart, the $318,000 is the maximum cost that could cost you using prevailing wage and using every single possible cost available. Will it cost you that? Probably not.

1:32:41 Did I explain that right to you? Yeah, no, that's right because we have a public process that we have to be a part of. And so when we do engineering design and estimates or we have to go hire consultants to do design, that's what this is based on. And I appreciate what Jane's saying. I think you explained it very well. If you're on the side of that process negotiating something a little bit differently, we still have to work within our...

1:33:08 Rules and regulations and all that. But it's likely that you can get these services for less. I have one question because the question's been asked but it hasn't been answered. This came to us about a year ago and it was only $25,000. For the design. Yeah, so what we're saying is that of that $53,000, $20,000 is... No, it was $25,000 for the whole thing, not just... Right, $20,000. $20,000 is...

1:33:37 Is part of this number for the Little Brothers Skate Park. The balance of that is what we think it's going to take to complete the design for the park, for the rest of the park. So, yes, it's higher, it is higher, yeah, no, I get that. Despite how powerful and dynamic the economy is right now.

1:34:02 Consulting fees still go up. You get new fee schedules every year from consultants, so you always have to anticipate some increase in fees. Will it be that much? I don't know, but I can't predict what it's going to be. If you put out a competitive process, there's a very good likelihood in today's economy that it's going to be less than that.

1:34:31 And I would suggest that that 10% is probably a bit high for where we are with the design. Maybe if you're starting at the very beginning, you'd have a 10%.

1:34:58 But we're already 60-70% of the way through the design. So a lot of the potential unforeseen situations, you know, you've already worked through them. Wait, is this a contract out all or is some of this in-house? I'm pretty sure it's contract out, right, yeah. The whole thing? Yeah, we don't have the capacity right now to do that design.

1:35:19 So, sorry, was Little Brother Steve Park always envisioned to be a part of the trails in the park? Is it always part of the original trails? I don't think so, but I don't know that for sure. Yes, it was, but no, not in that state. When we envisioned it, we went and we asked where we could put it, and they said, we talked about front.

1:35:48 So yes, it was always

1:36:16 The idea to have a theater area and something for disabled use, so yes, but in that theater area, not quite that much. I guess the reason why I'm asking, there's more simplistic areas of the current Volcker Brothers Cave Park where beginners can still, they still see kids dropping in and doing.

1:36:46 We also have a beginner skate park out at Shady Vest. So now we're going to have effectively a third skate element. Would you be able to save money by doing something else with that portion of the trail in the park? Is there something else that can be done there aside from another skate? I mean, this would be the third skate element in a town of 5,000 to 10,000 people. Is that necessary?

1:37:14 I mean, it's kind of a question. Is it worth, to Bill's point, the additional $20,000 of planning costs, or design costs, to create such an element? Are we getting a little bit redundant here with having multiple components already out there? It's a bigger question. It's $20,000 additional, and we're going to be fighting over pennies here in about a week.

1:37:40 So is this a $20,000 element that's really needed for Trails-In? Or can Trails-In be completed without that and have it still be a phenomenal escape park? We already have the inner park, the shade rest. Why do you need another one? Quick question. Are those all rhetorical questions? No, those are answerable questions. Honestly, well, I think, and not to, I would suggest that you guys are better equipped to answer that question than I am.

1:38:10 You know, when it comes to planning the facilities and whatever elements go in that park, you know, I think you guys can probably better answer that question. I mean, I have an opinion, and if you're trying to cut costs and save money, there's other places you can do it as well. So, I... We'll be looking at those twice. Yeah, no, and I understand that, but do we need another beginner skate park? I don't know. I don't have kids that use the skate park.

1:38:44 Just a question. Yeah, no, I know that, and I'm avoiding answering your question. If you want a world-class part that has all of the aspects of the favorite part, you are real close to having a ball, and you are missing a very teeny-tiny section. So, if...

1:39:11 That's what you want is a world-class park that's going to attract, again, it's part of disabled sports, so it talks about using it if you get that part in there, in their overall summer plan. So I think the question is, do you want every single aspect of the skateboard park which you are so close to having, or do you want to

1:39:38 Finish it right where it is. Yes, it's definitely usable. Yes, it's a very good park right as it stands. Okay. I don't want to touch any particularly bad affairs, but in the Little Brothers, is there an opportunity there, age-restricting it, because I see Little Brothers as being almost an age-restricted park anyway, to add time and element so that it can be shared by VMS.

1:40:08 And the little kids on their bikes as well as, I mean, I have kids that are really disappointed because them and their buddies can't go to the park anymore, where one of them used to skate, one of them used to be in that. So there's an age range there from, you know, 14 down that we have no, we have such limited apartment, we have such limited funds. Could there and that little brothers be a way to make that happen? And the old one, we didn't go there because

1:40:38 We're told engineering doesn't allow us to go there. I want you to know something. You are not touching your... I actually think that you could even make it by space if you wanted to. But one of the things that happened that we thought was interesting is, and I didn't do it, we sent out and did a questionnaire at the elementary school. We interviewed 288 kids.

1:41:08 And 38 middle schoolers and 49 high schoolers. And interestingly enough, skateboard park use, or bike park use was only issued answered 17 times. And I don't know why. A climbing wall got more response than that. You know, a zip line. Yes, you could.

1:41:36 The only thing is what I don't know is part of our idea of this was like freedom of movement and it was the idea of making sure that this park had aspects for the disabled and I don't know how that works about adding a disabled part of the skateboard park and trying to add that into bicycles too.

1:42:05 Actually, I've seen those guys in the wheelchairs, so they're actually pretty incredible athletes out there. So, you know... Jane, have you seen any of the towns or parks and students who have that in place? Actually, Grindeline right now is building in Texas a skateboard park that's 62,000 feet that has the wheelchair...

1:42:36 Mark. Both of you. Okay. Let's rate this back in. Do we have any more questions for Ray? I'm thankful because you know how disappointed I was that we didn't get this in the first place. I appreciate your effort and I thank you guys for going above and beyond. Hopefully that helps. Actually I messed with the questions that were just asked.

1:43:04 Does Grindeline have the ability to design the rest of that part as a bike and skate park? And handicapped. And handicapped. Well, I don't know. Because good looking, I've seen skateboard park designers and I've seen ball park designers. I can call them and ask them. And the more. Okay, good. I appreciate that. Okay, another theater that I have in front of me here would be

1:43:35 The Community Center Tennisville Court Rehab Project. And I met with everybody earlier on this, and my comment on this again was, so you guys all know, there's no budget with asking for $250,000, but it doesn't break it out in the house being used. So the next question was also, instead of putting a new court refurbishing court that we would like to plan courts seven and eight.

1:44:07 What's the other question, too, is that we need to take the entire park, though? I mean, that's really the issue here before we do the task force. We have to have plans for this particular park. Because we're going to completely re-look at this park, correct? But that's what we were talking about last time. I think it comes to...

1:44:36 Court 6 and 7? Yeah, but I mean, Court 6 and 7 are a different part of that plan. You just have to find out. I mean, there's also the playground wants to be covered with a library, I mean, parking. Yeah, I guess, and I don't know in the scope of Measure R and how it's been written, basically what I would ask is that, you know, next Tuesday, and that doesn't give anybody a whole lot of time, but next Tuesday is when we award these things and we can have another discussion.

1:45:07 That that comes back to us and not a $250,000 figure to redo courts that have been identified as supplanting but as doing the plan for the park. And that then we could do the other two courts that have been identified. And that is something that Measure Arc can move forward on. So then we could have something tangible in hand. And I also see regardless of the supplanting, if that is on the other courts or not,

1:45:37 The advantage to me of planning the park and building the two new courts are then when we get around replacing the old courts, we have six courts maintained on the ground of all time for use. And somehow that makes more sense to me. Even if the old courts didn't get in such bad shape that one or two of them had to be closed, we still maintain six open courts. Right. And one more comment, just since you've got the representatives in front of me.

1:46:05 When anyone's putting together an application, it wouldn't hurt for them to come before the commission and ask questions up front so that the application comes in as something that we're looking for. I already checked that one off. I got that. Okay, so effectively we're asking them to come back and revise their plan.

1:46:33 So what you would like to see is an application for planning the community center part, a complete plan that would include, yeah, yeah, okay, we can do that. Last year we did put in a plan that actually specified replacing the six existing courts and adding two additional courts for a new tennis center.

1:47:02 I'm Dale Lonnie with the Mammoth Lakes Tennis Club, and last year we did put in a pretty specific plan of what we would like to do, and at that time we said we needed to replace the end of life

1:47:22 Tennis course, all six of them, with a new tennis center. And what we tried to do was, so we weren't asking for a million dollars, we said, why don't we do this over a five-year period? We could do two courts per year for around $200,000, and that would also include one year of planning for the new courts.

1:47:47 And we would end up in the fifth year with the two brand new courts, courts seven and eight. This year we actually went to the town here, Arasconi, and asked that instead of doing it in that time frame, is to change it so we ended up with courts seven and eight first. So just like Bill said, we would always have at least six usable courts during this five-year period.

1:48:12 Somehow this got changed around a little bit. I was not aware that Peter was asking to replace courts five and six next year rather than do this original plan that we talked about. But that's the way how it came out in this application. I do want to stress, though, that the tennis center is going to be a brand new project. This is actually going to turn into eight brand new courts and an entire, again, very nice...

1:48:39 Tennis Center that will attract visitors, be great for tournaments. It will be a big draw right next to the Norge Village where a lot of people would be interested in coming if they knew that there was tennis within walking distance. So I do want to stress that it's not just this $250,000 that was asked for this year is not just going to be

1:49:02 Two courts that we're going to replace next year, and it's not for anything else. It's part of the big picture of replacing, having eight new courts at a brand new tennis center. I do want to stress that this isn't maintenance on old courts. This is six brand new courts on the existing footprint of the old courts, plus two additional courts up on the hill to the Evo.

1:49:27 East of it, I believe. Do you understand the need for us to first plan out the entire park and understand what the community wants out of that particular park first before we start on the tennis court project? Because they're part of that park.

1:49:40 They're an element of the park. It is part of the park, but the tennis courts are, we're asking this as a separate issue from what's going to happen with the community center and the old library and even the playground that's there. That is part of the park, but the tennis courts, we're asking for this as a separate part of that park. But what if the plan comes back and says we need to rip up those two tennis courts you just left? Well, I...

1:50:07 In talking with the engineers here, I mean, the easiest way to do this would put the new courts on the existing footprint of the old courts. So I don't see that there's any conflict. I mean, those courts are already there. They're surveyed. They're out there. We put the same courts, we put new courts on top of the old footprint. I don't see, you know, how there's any kind of conflict. If whatever happens with the community center and that side of the park would be separate.

1:50:34 Unless they decide that where the existing courts are shouldn't be where they should be placed. In other words, what happens if the master plan comes back to that park and determines that the existing courts are not properly placed?

1:50:50 Well, they've been there for 40 years. I don't know why they would come back and say if they got properly placed. You know, I can't really answer that question. I'm just thinking that we should keep coming back to the need to, you know, let's make sure that we do all the proper planning for us before we start expending hundreds of thousands of dollars in a particular direction. It takes an extra, what, three to four months, five months, I mean.

1:51:12 To do the proper planning so that we have a master plan for the park, not just for the tennis courts, which are an element of the park. You know, and I agree with you, and again, the way that we originally, our original application last year was for one year of planning prior to putting in the brand new courts. Well, this one year of planning could be also incorporated.

1:51:35 The entire park. Sure. What we're asking for specifically the Mammoth Lakes Tennis Club in our letter of support to the town was specifically the tennis courts. But I do agree with you that if we took one year and did a plan, an overall plan, which included the tennis courts, which covered the CEQA and the grading and the new parking lot and whatever.

1:51:59 This is going to happen with the community center. That's a great idea. But what I need is some sort of, what we would like is at least a commitment or money to get this plan working this year. This is what we would really like to do. I think that's where we need to take the conversation personally is how to get that plan paid for and how to get that piece, that element completed. Okay, well, like I said, we would be very happy with that if we could hold one question to do that.

1:52:29 Aren't you getting in trouble with supplanting this planning? Well, there is a question on the old courts, whether it would be the two new courts, no. Were the people doing both courts? We know for sure that the two new courts would not be. Not be. The question on the old courts, dear, is should the town not have put replacement funds aside from the replacement of the courts if they paid for in the first place? Isn't that part of the life cycle costs and maintenance costs?

1:52:59 Therefore, would that not be supplanted? Exactly. Yeah, so, and that's a very gray area. We have some other applications that I think are flat out black and white, and we can't go there, but that one is kind of gray, but the planning is not, and the two new courts aren't. No, you're talking about two courts. Yes. Court Saturday and wherever they would go. But I think, though, I mean, to your point, I mean,

1:53:29 Yes, the town and the Parks and Recreation Department should have, over the last 40 years, put money aside to replace these courts. It should have done, you know, the proper planning to make sure that these things are being replaced in time and fashion. It's the same as what we've done last week? Yeah. So, because they have it. Is what we're talking about eligible for measure of our funds? Well, whether it's a new project or not, and that, believe me, there will be a lot more discussion on a lot of our projects before we're done.

1:53:58 Yeah, because you're acting like making sure our funds aren't going to be eligible for any plot of land that the town has. I mean, are you going to have to buy a new park facility before you put that? And I don't understand why you could replace the cost of existing facilities. And that's what the question is, the planting. The other ports are existing, and so it would be if we replaced those ports.

1:54:26 Is that supplanting? And since they are already there and they have been there for many, many years, then the replacement of those...

1:54:36 Would be supplanting. That was what was discussed the other day. But that discussion is still not over. But it is that it was announced when I was at the Council. Yeah, but in theory, they should follow another responsibility of the Park and Rec Department and the general fund. And so it's not that it won't be done. It's just that it shouldn't be part of Measure R. It should be part of the normal Park and Recreation budget and making sure that the town makes those tough decisions too.

1:55:00 Fix the courts, replace the six courts after we complete the master plan. That's the question that really has to take place, is who pays for those six courts that are 40 years old that should have been maintained and upkept over the last 20 years? I know that you're startling with this question of what supplanting is. I view it differently, obviously, than I think a few of you do. But in any case,

1:55:26 Even if that is going to be something that you're going to have to discuss for a while, we still need these two new courts. And in order to get these two new courts, we need to have a plan. And in order to have a plan, we need to get some funds. So, again, I would be willing to come back next fall with a plan, hopefully with the calendar behind us, and show you the plans for the entire park, the two new.

1:55:51 To new courts, that would be... We're talking about even sooner. Well, that would be even better. I just want to discuss that this is... Well, that's what we're asking. They can come back and adjust this application so that it puts out that we need funding for that plan.

1:56:11 And that could come back to us next Tuesday. That would be, that would be fine. As long as that's okay that you could do that within the future. See what that cost is and how it falls into the future. Yeah. And you'd be working on it this winter on the plan physically. And this master plan needs our department. They are right now, the money that was given last year, last funding period is $24,000.

1:56:39 Geotechnical and survey work has been contracted. So that is being done as we speak. So there is, you know, we have got a startup to it. But we don't have, what we don't have is engineering plans and showing the entire park and the... Okay, well, like I said, I would be happy to work with the town on that. But I just want to put us out there and let you know that we still, this is an issue that has to be addressed. And whether it comes from major art funds or the...

1:57:06 General Fund. General Fund. These courts are, they've reached the end of their lifespan and any money, and we're not asking for maintenance funds to fix cracks, do any of that work anymore for these existing courts because they're past that.

1:57:23 The work that we had done this year, the courts are looking very nice right at the moment, but winter is coming, the cracks have already started, water's going to get in there, the cracks are going to open up, and they're going to be needing repairs next year. That's not what we want. What we want to see is a brand new...

1:57:39 How many cores are going to be affected by root systems?

1:58:08 By what? By root systems from trees. Oh, well, all of them. All of them are affected by root systems. Yeah, all of them. There definitely needs to be some major tree removal around the perimeter of these themiscores, too. These trees are coming up in a heating and uplifting. Yeah, there's a whole lot of them. All right, guys, we're an issue going around this circle for the second time. Okay, well, you heard me and you know how I feel about this. Thank you very much.

1:58:37 Next, we're going to bring up Brian, Madam George. Evening, commissioners. Thank you for doing this in more detail. You're welcome. Thanks, Stuart. Thank you, gentlemen. This is lit. Hey, thanks. All right.

1:59:07 Okay. You want me to jump in? Jump. I'm still concerned that this hasn't changed at all, and there has been no discussion since this was brought to us last year. I just spoke to Tony, and kind of something that possibly came up is that we can put a subcommittee together. We can work with the town, we can work with the commission, we can work with you, and anybody else on the authority.

1:59:43 Let's put a piece of plan together. Let's look at all the different pieces of equipment out there. Is there a piece of equipment that can do the trails as well as snow play or any other thing that we might need that piece of equipment to do? I'd like to see us fund you at the level that we funded you last year. Let's do the program that you did last year again. Let's all sit down together. You said we didn't invite you to the table. Let's invite you to the table. Let's all sit down and figure out a plan because

2:00:13 I can't see funding what you put together here. I guess we can sit here and start picking it apart and picking pieces apart, but what you gave us last year was the operation of the grooming for the trails that we have and some maintenance for your equipment that you already have. And I would like to see that the commission, that the town, and everybody involved in this list.

2:00:37 Have that sit down. Let's have that subcommittee and let's put something together so that when this comes back again, we have a little bit more knowledge as to what's going on. We know that the machine that we're going to be putting that type of money out for is something that can be used and, you know, multicasted instead of just one. And I guess that's where I would be coming from. I have a hard time.

2:01:04 You know, what we're looking at here, you know, what's been given to us as office space, telephones, web, and I'll first kind of touch base on the website and the trail system that you want to do as well. The town has been working with the MLTPA on MLTS, now the trail system. There's a website that's being built, and that website should incorporate

2:01:32 Motorized, non-motorized, every aspect of any trail, no matter what that use is, should be in one website. We shouldn't have standalone websites all over the place. If we have that one website that is just incredible, that shows everything that can happen, everything that's there, then MLT then can take that and use that as a marketing tool and something that they can use as well.

2:01:55 You know, somewhere we have to all start working together towards that because we just don't have funds for everybody to be doing their own thing. And everything we do, we have to look at what are all the uses that can happen. And I guess that's kind of where I would have to come. I appreciate the invitation. I'm still happy to see these and kind of happy to see them. I'll agree with Jerry.

2:02:24 In my standpoint, we weren't happy to kick what we did last year. Program going. Great program. We did that sort of job. If we ask some God, we need to have that. I think we were better to see it better price-wise than we were last year. That would be great. As I've said in the past, I see the importance of a town group. I guess I look at it more as the group program before service runs. A town-owned.

2:02:51 Maintain, pay for all the gas insurance. Excuse me. Gruber and Matt Thornton's part to decide for him to really bump out some trails in addition to what the Gruber could do would be to lay out a trail system, prioritize what trails go first, work with the town on getting permits from a forest service for it so that then the program is town-owned equipment.

2:03:21 So that's really the vision of grooming that I would see moving forward. Again, that's just me. Very good. I have to agree. I mean, you guys did a great job last year. I'm just looking at the finances here now.

2:03:47 As Kerry mentioned, I mean, we've got $20,000 allocated for marketing. Salaries are close to, you know, almost $80,000, $90,000, $100,000. So I guess, you know, it goes back to what I mentioned last year about having a public-private partnership. And in order to do that, I think we probably need to have a little bit of a sit-down and whether it's a sub-community, whatever the case may be, try to figure out what the partnership is between them.

2:04:15 Like I said, there were a million accolades last year. It's an excellent job. And, you know, it's just a matter of how to make it work. Because what we're looking at now is that, you know, we've been looking at facilities and equipment. And now we're looking at programming. And the programming is $200,000 of the budget. Which is, you know, I'm not quite sure where to go with that. So,

2:04:46 I agree the program needs to grow. I'm not sure that it needs to grow at this rate at this time. And given the financial situation the town may be facing here shortly. Yes, indeed. I'm not quite sure. So I would agree. I think if we could put together a subcommittee or can we, you know, I'm just... If you don't want to be official, it doesn't have to be. You can do the subcommittee. I'm just...

2:05:16 Wait to hear from you guys as to how you want to structure it because, again, there's been a lot of, you know, what you're looking at and some of the numbers you're citing as far as being things you're not certain are relevant to measure our funding, that's entirely at your discretion, obviously. And the numbers you're seeing are just our effort alone to present to you what we feel like it would take to do an A-rate job.

2:05:41 That's comparable to the peer resource that we've given you information about have been doing this a long time. So, you know, we have no illusions as to whether or not you're going to line item everything and say that's a great idea. The only reason we included marketing expense in there is in previous iterations of measure our applications that we were counseled to consider what we're going to do to create a facility that drew visitors.

2:06:07 It made sense to me at that point that if we didn't have a full-blown recreation department and our tourism department was in flux that perhaps we ought to look into trying to find a way to make sure that if we're going to provide a facility and an opportunity to recreate, we ought to go ahead and reach out and market to those folks. So if you feel like we're at a point now where the marketing efforts are going to be better handled by...

2:06:28 The private Mammoth Lakes Tourism, that's excellent. That's one of the most things that we have to do, and we can focus more on the core part of what we want to do, which is just create an order of preparation opportunities. And I think that, you know, once we do this, that's one more thing that you're looking at facing, okay? You know, you have what you have now, how do you improve it? So that's, you know...

2:06:50 World class or A class or whatever you want to put it and then what other options do you have in moving that forward and going back. But it's just a conversation that needs to happen. I was hoping that it happened last year and I guess, you know, we were all in flux. It's a busy summer. Yeah, so, you know, we all need to take that step back and sit down and have that conversation. It should include, you know.

2:07:14 Would that $5,400 amount still be about the same to run? You know, that was certainly appreciated and welcome. I actually wasn't the person who put forward that application for funding. So, you know, to the extent that that's going to help facilitate us doing the level of, providing the level of service we provided last year.

2:07:44 Quite nominal, but again, based on what we've seen with weather and other things this year, a lot of things are still in flux, so I can appreciate that you'd like to make some kind of contribution, but I'm just not certain exactly how we're going to get rolling at this point based on the lack of things that we've accomplished over the summer regarding planning to maintain what we did last year, and of course our ambitions were to see it grow by this year, but I can appreciate and understand that that's not going to happen this year, and if we can get this...

2:08:12 Meeting Brokered, where we actually sit down and decide whether or not Nordic Recreation is on a one to three year timeline, a four to six year timeline, or longer, then we'll actually have something to work with in regard to putting our heads together and maintaining what we started. And that's part of rec strats too. I'm aware of that. That's why I mentioned those numbers. Ryan, you have been a great leader so far.

2:08:39 And your foundation was born in 2002, that's all those stuff. And you raised $75,000 up to date, right? You've tried the hardest. And it's even more than that, you say. But I'd still like to know this. First of all, this is a big chunk of money, you understand, Mammoth. I'm going to let it be here in the darkness. I ask you about the focus.

2:09:09 Target more than the number of participants. You cannot come up with them right now or possible by next year? If we're blessed with some funding to actually do some outreach and test the water and take people's pulse locally and also find an effective way to reach our visitor base and ask them that they'd like to have that opportunity in addition to the other winter recreation choices that typically draw people here, we can come up with that number for you.

2:09:38 Our organization doesn't have the capacity to do that kind of drill down detailed information as far as how many visitors we're going to deliver to you for Nordic Recreation next year. How do you make this decision? Well, I'd just like you to look at it from the big picture perspective, which is if you live in town and you like Nordic skiing, that facility is going to meet your needs. If you have family that visit that don't alpine ski, it will meet your family's needs.

2:10:07 People show up in town and they've not Nordic skied before and Mammoth Lakes Tourism is doing their job in marketing that alternative recreation choice. We might find that a lot of people want to take advantage of it. Maybe you can't come up with a percentage of decisions out here. Tough for me to do. I'm not a Mammoth Lakes guy. That can be part of our conversation. Certainly, yeah. I'd be happy to try to arrive at something that we can all buy into. Any other questions from Brian?

2:10:35 I agree. Your question, where'd you get the $75,000? Has that been mostly small donations? Definitely. Definitely. Yeah. I mean, you know, it's probably our largest cash contribution to date has been $5,000. Okay. But, yeah, it's been, you know, we've had numerous fundraising events at what was, unfortunately, now the ski museum. That's a perfect venue for a lot of people in town, and I felt like it was a perfect fit for us.

2:11:02 But, you know, it's just membership contributions and some of those more formal fundraising efforts. And, you know, there are people out there that like to see the type of stuff we're trying to do. So it's been, you know, we've been privileged to have people recognize it at that level. Brian, thank you. You're welcome. Appreciate it. Thanks very much.

2:11:39 So let's pull out Mammoth Creek Park, West, the playground equipment upgrade to the line. Supply financing. Supply financing. Supply financing. Tell me that. Hey, man, I haven't found it yet. Oh, sorry. So Bill, in the case where it's obvious about supplanting, how does one get it into the general funding? We do that through a number of workshops with

2:12:08 Town Council. Do you have any questions? We're done. We're done. Critical. I'm sorry to get you. No, I've got a couple of them here that. And since you're standing there, we'll be able to go to the Whitmore Pool Modernization. Right. Because it's the same answer. When I go to Council. Huh? When I go to Council. I'll back you, buddy. We will. I'll back you.

2:12:36 And the whole commission doesn't know it, but we're actually working towards bumping up the number of workshops we have with the council on a manual basis so that this stuff can be brought forward to them. I think... Well, we'll be improving that list for you. Yes. And that's always an ongoing process. There's a lot of other information out there that I have that you have not received over the years that I will give to you.

2:13:05 It'll help me make these decisions. But if anything, you know, it helps being on the tour and being able to see the real issues that you're having to deal with. Well, I can tell you about it all day long, but until you, because people look at the playground and think, oh, it looks great. Yeah, the colors look good on it, but. But your comments, you know, just about, you know, the real liability, that we face a liability, needs to be explained, but I think for Measure R,

2:13:36 It's just a classic supplanting. Yes, I think part of the problem in the past has plainly been, you'll recall back in the day when we were underfunded, oh yeah, we're still underfunded, but we did used to have a lot more communication with council and we were able to bring this stuff forward. Somehow without those meetings, the fact that we need that open stuff isn't percolating through the system to the council.

2:14:05 And I think the council has given us word that they're willing to up their commitment to communicate with us so that we can, as a department, bring this stuff forward in a more timely fashion so that you aren't duct taping things for 15 years before we finally get around to repairing them properly and replacing them.

2:14:28 I'm going to do the ice rink for Pete, so I don't know what questions you may have on that. How is this any different? Or is it supplanting as well? I mean, it's got to be the same exact thing. I mean, effectively...

2:14:52 Prior to Council, and you moved the ice room into the school year, and you took the lease. What did you tell me? You know, this is a lot more. It's a new facility. It is a new facility. It is a new facility. It creates something we haven't had before, even though it was planned. But it was planned originally in a different location. Was it planned prior to Mission Orbeen Pass?

2:15:22 And was it funded prior to measure art? What they're trying to do is avoid turning back the $500,000 grant that was originally for a slab at Mammoth Creek Park, not for a slab at the current location. So they got permission to move that grant to its current location. But since the project isn't even in the same location, I have to say it's...

2:15:52 A new project. My problem with it is, administratively, anything that measure R builds, the town administration can bill measure R back to the maintenance of it, and operation of it. And we know that currently the ice rink loses, you know, $160,000 a year. And since the annual operating cost of some of these can get billed back to measure R's weighs heavily on anything I look at.

2:16:23 It's also the fact that we don't own the land, though. It's the other critical piece. It's not town-owned land, so there's lots of planting, which, I mean, I haven't seen the exact timeline. When did a city council prove it? When was Measure R funded? When was it moved? I mean, there's, it seems to me like there's a question of timing and also a question of, it's not town-owned property. Well, we have been operating this facility in a temporary fashion for, over the past,

2:16:52 What, 12 years? At this location? Not at this location. We had it at the RV park for five years. We took a several-year break, two years, I believe, we were off. And then we moved it over here for the last three seasons. And if you recall, I came to you guys and explained to you the condition of the facility, and that was my big push.

2:17:22 We need to move forward. I lost 20,000 gallons of fluid again, you know, with the pipe breaking. That's why we closed early. So, you know, if we want the facility, you know, whatever you guys want to do, we'll do it. I think that, you know, our comments at the last program were that it needs to be time and land, and that process is happening right now, of sessions.

2:17:51 I don't know where that is. I don't know what the answer is yet. So truly, I can't see us moving forward with $430,000 when those questions haven't been answered. And so I think there's a lot more questions prior to us even trying to move forward. And I understand there's that $500,000 grant out there, but boy, the amount of money that you have to put out above that $500,000 and then on a yearly basis and a maintenance basis,

2:18:21 So we have an idea on this one.

2:18:51 Unless you have any questions that are specific to the project, I would say we move on. We have to make a decision on Tuesday. I have all the tubing for the slab, yes. We purchased that because it took so long to build this stuff and we were going full blow construction.

2:19:20 You know, I just want to make one comment. You know, there's still the $325,000 surplus from utility tax, and that's where that funding should come from, to supplement the $500,000 for the ice cream. I think the council has already moved some of that, but I don't know. Yeah, well, you know, if it was $430,000. $430,000. $430,000.

2:19:43 No, but from the utility. The surplus of that should have gone towards the slab. And it still may. Explain that so people don't understand that. Well, there was. It's not the measure U that was just that. It's not measure U. It is the surplus of the utility tax that was voted in 1996 that is expiring here shortly because there is 325,000.

2:20:11 That is still there as a surplus. So whether it's been allocated for something else or not, I do not know. But that money should be used because that bond was passed to complete the parks. And if this is indeed a park, you could help complete that and keep that grant in-house. So I think that's where it should come from. I would agree. I would agree. And we did put that out there once before.

2:20:42 It's not in my current budget. I don't know where it went.

2:21:11 The budget process was difficult. The fact is, we still have to pay the lease to the school. We had to put a fence in. That's a $44,000. So that $160 is not all savings. I don't know what it is, but it's not that much. Shall we go to the tumbling equipment? Yes, she is.

2:21:47 I've been writing that down too, so I think that's something we can research, because I've obviously been taking notes and

2:22:30 Looking at long time, life long, you know. So I had to research all that. We've had our equipment for a long time, you know. So I know Matt's the air board, the bar, the mini vault. So I can look at all that for you. You know, we've heard, you know, Steph can answer that too, but, you know, over the years, I think, you know, it's ebbed and flowed.

2:23:03 You know, it's typically more of a local program, you know, than an out-of-town program. So it's hard to put a, you know, quantifiable number on it. But they only ran single or, you know, a couple of days a week programs. You know, what we're trying to put together are camps, you know, so we're going to significantly increase the number than what's been done in the past. You know, once you have this equipment, it's a great investment. We can really grow and expand it. So, you know, I would say 50 to 100, you know, consistent

2:23:31 Folks, and then, you know, from a camp perspective, we can grow that. Is there a cost for those participants? Yeah, so it's programmed. It's going to be, I think, a $50 a month fee. They can buy a punch card, you know, $10 per to use the equipment. So it's just a normal rated, you know, program that is subsidized by the town, you know, to grow that visitation. Yeah, she has to pay, she's paying the insurance, you know, for that, to run that program. You know, we don't pay for that.

2:24:05 You know, as per the contract, the instructor pays that. So she'll pay that fee. So it's a numbers game for her. So it's incentivized for Michelle to get there and really sell that program. And that's the way this opportunity is set up. You know, the 80-20 split. I think it'll work out well for her to really grow that business. She has a core group already. I mean, that's the advantage with this program. It's not starting new. You know, we can just expand and augment what we have.

2:24:34 Well, so the instructor gets 80% of the revenue and the town, you know, keeps the 20%. But they pay the, you know, the insurance fees, yeah. And that 20% is really just our start-time administration and your marketing fees, you know, that's all kind of split up through our different, you know, marketing channels. Community center, right. Yep. And it's already been voted. We've already got the insurance, you know, drawn up through risk management, so. We store the equipment.

2:25:10 I think it's a good use for that facility where we've lost, like you said, the martial arts program.

2:25:39 Quite a nominal lacrosse for, you know, a long game over a lot of years. Michelle? Michelle? Well, I think in the application there, she's rated as a level 8 gymnast, which is pretty high, if you've seen that, and then she's qualified as a level 1 through 5 through U.S. Gymnastics, so, not too sure how many of people in town have something like that. If you have some former equipment already in style, in the form of mats. Right, we have a lot of those old, thin mats that...

2:26:14 This is the only equipment which goes bad. A high bar, a low bar. Yeah. Much like the, yeah, platinum equipment. Yeah. So far, the program was out of Snowflake for two years.

2:26:41 Until the inspector moved away. Yeah, she made the choice to move, so we, she came to us, so we. And all the equipment is portable? Yep. And there's enough room at the community center of storage. Yep. As long as we have Stephanie and John clear at that little back room. And John will be for... They've got one. This will be for girls only? Nope.

2:27:07 It's predominantly a female sport, but obviously we're not going to preclude any participants that want to join the program. Coming out of the sport, gymnastics is the basic for any sport. I think it's a great core baseline, absolutely. Yeah, the cross training, I think, is, yeah. I mean, to have this equipment gives us that capability as opposed to just a mats and a wedge mat, you know. And having a sandbox outside.

2:27:37 Once it gets a park going, you can set the equipment outside. That's what we used to do. We used to do our things outside the sandbox and fly in the sands, you know. It has a good potential for this sport in this town. And you also will have some elite gymnastic girls, maybe Olympic girls, coming to this town.

2:28:07 So I think what we'll do, Terry, is investigate, obviously, the life of that equipment and then look at, obviously, budgeting it in.

2:28:33 You know, general fund. Absolutely, we can. Yeah. Another question, shall we do it? Yeah. The low bar, whatever it shows you in the future. Yeah, we got the beam, just the beam, the one that goes up and down, or the swinging bar. Yeah.

2:28:57 It's actually a free form right now. We don't want to bolt anything to the floor. So they assure us it's actually a mobile thing we can pull out and pull in. I think there's some supports to it that we're not seeing in that picture. But we'll make sure it's safe, absolutely. But yeah, good questions. Any more questions on that? No? No, let's...

2:29:27 I want to move on real quick to the matching funds to Mammoth Lakes Trail System enhanced signage and way forward. And Johnny's here. Good evening. Ray asked me to fill in Peters on vacation. MLTPA actually wrote the application for the SNC so we could answer any questions you might have. This is contingent upon you receiving the grant.

2:29:55 It's contingent upon the S&C awarding the grant. If the S&C awards the grant, it would be a 10 to 1 match. And if they don't award the, if it doesn't get awarded, it comes back to measure R. And this puts, extends the trail signage on the trails of town property. Correct. This would, this is truly a shovel-ready project. All the messaging is done, all the locations for the signs have been done, all the specs are done.

2:30:24 This is how a town loop happens in town. This would be the signage necessary to make that facility happen. It's a very, very competitive project, and it's an excellent match. It's an excellent opportunity. You've got our money in there. You've got Measure Our Money already committed into this project. It's a very attractive, compelling project.

2:30:51 Yes, and I think that's what makes it attractive to S&C in that the federal money is already going to build half of it. It's already going to be there. S&C can put their money into it and you've got a complete first phase of the signage for the trail system. Okay. I have a few more questions for that one. Anybody have any more questions? You'll sit down. Let me show you. Am I up next? Let me get my notes. Okay.

2:31:22 Okay. Thank you for bearing with us in the last. No, these are important discussions. I appreciate you guys taking, deliberating and having a good look at everything. So this is over two years. Any way of spreading that out? Your request from 246, 520, would it be possible to award a portion now and a portion of the next funding cycle? I don't have any problem with that. I think that...

2:32:05 There are a couple components to this. As you all know, we are going, we're requesting money from the town, from whatever funding source they can get it from to make this whole. And this is brought upon the chaos that's happened with town staffing, supplanting issues and stuff like that. That first meeting is set for Monday of next week. We'll start talking with town about how to go down that course. Certainly last fall when we took a portion of our request,

2:32:34 Put it over to the spring award. Things like that are no problem. I think if we can reliably know that the project cost that we've outlined over the two years, come hooker by crook is committed and it can flow, I think we're going to be okay. Sean, you understand that while it's a two-year ask, it's $246,520 annually, not for the two years. Okay. Thank you for that. It's $246 per year. Okay. How about that, John?

2:33:03 Excuse me? For two years. And I think one thing, Kenud, you've asked about in the past is is this an ongoing thing and we're going to come back every year with these kinds of dollars. And I think that one of the key components of this is to put together a management plan for this system. This system, I couldn't come back, I couldn't have come before you in the spring and said there wasn't even something called the Mammoth Lakes Trail System even existed. Now, I can go into detail if you'd like, it is something that's going to happen.

2:33:30 And a key deliverable coming out of this ask for the next two years that can be ready for the 2011-12 budget cycle will be a management plan that identifies roles and responsibilities for service, town. We can measure our general fund however we want to do it, but there'll be a plan in place that says, okay, for 25 years, for 100 years, this is what we're looking at, how we're going to run this thing. And that's something that we have some, I've already got somebody working on that. We have raised money.

2:33:59 We're bringing $30,000 now to this application for this first year to already get working on that, to start getting those things figured out. When you look at the sharp trails, there are about 10 miles of trails already identified that are going through CEQA, that are going through NEPA, that theoretically could be ready for construction next summer. The questions are already coming up. Who's responsible for what? What is the Forest Service going to do? What is the town going to do?

2:34:24 And this is the burden of a community that's got 75% of its land mass is overlapping jurisdictions. We're anticipating that. We're ready to get into that. And we need to get into those conversations and start getting that stuff figured out. John, just personal opinion. There's some cloudy areas about Measure R only being used on town-run facilities. I'm partnering with the Forest Service.

2:34:53 How do we break that out so people understand what R is paid for that is town run versus what the Forest Service has done? I mean, it would be the same trail in different sections. So how do we balance that out and educate the public so that they understand this issue about town maintained? Excellent question. The looking at new projects like the projects in the Shermans, there's measure of money that went into the Sherman Working Group to come up with that planning proposal.

2:35:25 The town and the Forest Service, the town obviously understands, measure our funds are involved in this. They have a willing partner with the Forest Service. We need to sit down with those guys and say, look, how are we going to do this? And these conversations haven't happened yet because the planning process hasn't happened. That's happened. Forest Service has given their green light to move ahead. In the Charles System Master Plan CEQA process that's going on right now, we've been going to those meetings.

2:35:53 Getting, making sure that the two agencies are in sync, everybody knows who's NEPA, who's CEQA, how all those things are going to work together. You sit down and say, look, this is, you know, measure our investedness to some degree. How do we leverage those resources to bring it forward? I think the second thing is that we've invested very successfully in our technology, in the technology, in the tools that we have to do these kinds of projects.

2:36:19 So we are a fully competent professional GIS staff. It's going to be very easy. We're starting to talk with dentists next week about taking all of the facilities involved in the system, putting them into a contemporary technology platform that there's not going to be any doubt in anybody's mind as to who does what on what things. This is something that we can turn around very quickly. Every single one of these signs, we can, going back to the baseline documents, who paid for it, who's responsible for the maintenance,

2:36:48 How many miles of trails have to be maintained? Who owns what? That's a key thing that we can do. We've talked with Ray about doing this, is getting all these things to the light of day so they're there. I don't know if you know the sad fate of the environmental documents for the 1991 trails plan. No one can find them. That's not a situation that we're going to be in anymore. We're developing the kind of 21st century capacity that's going to make this system possible and to make it work, realize its potential, and continue to your...

2:37:17 Point, I very much look forward to coming back to this commission and this community and saying, look, we've got all our partners together, this is what this thing looks like going forward. But we're right now in that critical stage where we're building things, we've got the partners at the table, we've got a lot of things happening, we want to really make sure we don't mess this up. What the shuttle ready nature, John, is there, in the past, you've been really successful at garnering additional grants, funds, cooperation from other entities, any...

2:37:44 Yes, a couple things. The first thing is we just talked about that grant for the S&C. That's exactly, I think it weighs about 10 pounds. But that's the kind of thing that is an opportunity that we can go after and get.

2:38:09 That would be $400,000. And that includes not just physical science on the ground, but also a significant component to invest in the website that you're talking about, Terry, to get the 21st century technological components built into that system, part of that coming from the SNC to move that forward. You know, to be honest, MLTPA was involved in the rec strats process, and we were certainly involved in that because we saw the opportunity to...

2:38:35 Line up a partnership between the town and the Forest Service. Certainly the trail system hopefully can benefit from that, but we think the whole community can benefit from that. And to have the capacity in place to be able to bring that partnership to bear. And there's a, we have a labs meeting, the final of the three labs meetings is on Thursday night this week. There's a woman from the U.S. Department of Agriculture is out here talking about world development opportunities. I'm trying to figure out how I can, we can be in two places at the same time. But to have a full and

2:39:04 And robust shot at programs coming through the federal government that this partnership can engage, you know, that's one place where we're looking and we want to be set loose on that. The second thing is when the S&C fell to pieces a couple years ago and we didn't have any money for six months, we lined up, we've got a folio that big of grant opportunities that we're waiting now, if this commitment going forward looks like it looks like we've got some very excellent grant rights.

2:39:35 And we want to get to work and start analyzing these projects and start writing specific targeted grants to each one of these things. They're just knocking things, $5,000, $10,000, $15,000 things, boom, boom, boom, boom, boom, boom. And I think another very important thing is the opportunity with Mammoth Lakes Tourism. And I think that that's a key thing that we can do the kind of product development that we're not going to have to deal with the marketing, but we develop the products necessary that John Urdi developed, deliver them to him in a way that he can take these things and we start going.

2:40:04 So that's a semblance of what we're looking at. I think there's a lot more time. Who helps you to prioritize what needs to be done first? The way that we work closely with a designated representative from the town. While Dana Straubis here, she was our authorized representative. Now we work with Ray Jarvis. Everything that we do, we consult with Ray. And Ray, if there's a specific project that's developed some cohesion that needs attention, for example, the secret process we're working on now,

2:40:35 Ray and I will talk and say, okay, we need to put some effort, we need to put some resources in this to make sure this thing gets done properly. Then he will sign a change order and say, okay, work on that. Let's make sure we get those things covered. Everything we do is done in consultation with town staff. So, if you're awarded measure art funds and you're awarded money from the council, you'll still answer to Ray? Oh, yeah. Yeah. And we will, I mean, I thought that the supplanting conversation you had was very worthwhile. I mean, even this evening, you guys can now make,

2:41:06 Okay, here's the low-hanging fruit. We can get these things out of the way. There'll be more things to come, but I think that that was very informative. And I think that, you know, with the lawsuit hanging over our head and all these other kinds of things, and with this trail system, at least, being built and being rolled out in front of our eyes, I think we can figure out a way to make sure that the funds, whether they're R or their general fund, are being applied to the legally appropriate places, and that we can keep this thing moving forward.

2:41:36 Planning is almost over here now? Planning, Dito, this is a very interesting thing because this is not just one thing that happens. It's an organic, growing, living, breathing system. So while we're getting ready to build things and put things in the ground, more planning efforts are coming online. While we're going through environmental things, we're getting ready to do programming.

2:42:01 All of it happens simultaneously. The Lake Spaces Special Study on Thursday evening up at the Westin, that potentially is lining up to be something that looks like a shoreline working group process. The shoreline working group process is now in the position to implement trails out in the shorelines that were on the 91 plan that didn't get touched for 20 years. This partnership with the Forest Service, all of these things with the trail system happen simultaneously at the same time.

2:42:25 It's not like we're going to build one thing and stop and then program and maintain it. It's all the different heads of the hydra happening all at once. So we need to have a lot of different skill sets and we can put people and attention at it, get problem solved, move things forward and on, keep them getting them developed in a whole bunch, many different opportunities happening simultaneously. So what I can see here is planning is going on.

2:42:57 Well, yeah, planning is going on, construction is going on, programming is going on, marketing is going on, product development is going on, the engagement with the local community and businesses, the benefits of this to the economy is going on. All of these things happen simultaneously. They're all happening at the same time.

2:43:21 Do you see some bulldozers out there? Well, there are bulldozers, and these are not things that MLTPA is responsible for, but it's part of the system. There are bulldozers that work right now. I'm sure you've seen up on Lake Mary Road, the tunnel that's going on up there, foundations are going in for the signs along the lakes basin path coming all the way down from the lakes basin. There's $400,000 coming from the stimulus fund to put things in the ground. We're going to have a community sort of outreach. Paving is done. Huh? Paving is done. A lot of things are happening.

2:43:51 A lot of things are happening simultaneously. And next summer could be a very busy construction season. So that's something to think about also. You know, you bring up a good point. I don't think planning will ever be done because when planning stops, you start, you stop evolving. You don't move forward. You go stagnant as soon as you stop planning. Her business, my business, your son's business now, if he isn't planning for the future, he's not moving forward.

2:44:19 So I think that's always going to be a part of the planning. That's why I want to look at the future. Okay. Yes. I don't want to, I think, you know, there needs to be some clarification because I'm like planning what we've done. They, you know, the funds may shift a bit, but we will always be planning. Well, I understand. Any kind of stocks that you have to plan beforehand, right? Well, and any rebuild you have to plan. Any rebuild. Yeah. Any kind of business plan.

2:44:48 The question is, with all of this and with your planning, you have put a very robust data management system here, and that is with MLTPA. But the town, there's a lot of ones that have gone into building that. If MLTPA went away tomorrow, is that something that...

2:45:09 The town has access to? Who owns that? The town has all that information. None of the information that's gone into the data development is all public information. And we work very closely with Nate Greenberg, the GIS coordinator, to make sure that the data protocols are adhered to so that the corporate data set that Nate is responsible for at the town is responsibly managed. We use the GIS a lot for these planning purposes, to develop ideas and do that kind of stuff.

2:45:36 But all of that data is owned. It's all public data. If MLTPA disappeared tomorrow, you have it already. You have it now. It's constantly being updated, and it's available to you guys right now. So we'll never see a situation like 1991 where the trail plan is lost ever again. I, you know... Somehow store it on a hard drive or it's available. Yes. In my apartment, the server that we use is in my apartment. It's actually next to my desk. And we have...

2:46:04 All of the documents, all of the data, all of the information that we use, we're building all this on a digital platform. This is designed for the 21st century. With redundancy? I mean, there's multiple storage locations. Yes. It's all stored off-site. Hard drives are backed up weekly and sent off-site, so it's all redundant. It's all there. It's not going anywhere. Okay. Good. The future is safe.

2:46:30 When it comes to accountability on projects being done, is that also through Ray, the town? Yes. And I think that, you know, we all appreciate how complicated it is when you've got, we're not dealing with one agency, we're dealing with two. And we're dealing with fundamentally changing the culture and the history of this place and how these people get along. There are learning curves and there's a certain amount of Sisyphusian effort involved in bringing people to the table.

2:46:57 You know, following up, following up, following up, making sure that things get done. But our commitment is to getting these things done and not to saying, well, someone didn't return my phone call so nothing can happen. We call them, we call them, we call them, we call them. Thank you. Thank you. Thank you all very much.

2:47:34 Yeah, each of you to bring your score sheets, not for anyone else to see, but just so that we can then discuss the scores. On Tuesday? On Tuesday, yeah. You can throw out the Whitmore Pool, the multi-use ice facility, playground equipment. The pool is on, right? Yeah, those are for sure. Yes.

2:48:03 Community Center? Well, the Tennis Court will be new out there. Who else is on the agenda that evening? We're about to go over that and meet with Stu later. You want to go over the whole thing now? Actually, Stu, all you can do is, because it's not on the agenda, is just give it to us in your manager's report. Today, let's not on the agenda.

2:48:33 Now, tell us what is on. Okay. So, tentatively, we have six items. The first one was the now track motocross.

2:48:46 But I suggest rescheduling that in December. I haven't really reached out and spent a lot of time with far service and ski rides, so I think there's a bit more discussion we need to... Okay. You're going to want to do it for you on that, too. I've had a chance to do the research. Okay. Yeah, history. Yeah. But you'll want to make sure the public knows about that, because I've been approached, there's people who are planning on coming to that. So I think we need to do that for the diligence. Yeah. Okay.

2:49:13 The second one is an interview steering committee nomination, which was appointing someone from the commission to that steering committee. That does go to council on under the third of the following day, so I don't know if we want to wait to see what they do or where it is going and nominate someone. Well, I think we can put a couple of us forward and then see what the council comes up with. Gotcha.

2:49:41 The third one is very similar, so that's a commission appointment to the rec scratch strategy sub-communities task forces. Again, that goes to Town Council on November 3rd for their adoption recommendations. So we can do the same there. We can wait to their recommendations. I'm not too sure how that's coming along. Rob's putting it together right now. So is that something you want to keep on? I would keep that on for an initial discussion in the event. Because remember, we have Tuesday and Thursday.

2:50:11 So we can have the Thursday meeting. We might not have it in the last month. Okay. Well, we're going to make it Thursday next week. Yeah. Okay. Where is our meeting going to be? Election day. Yeah. It's in the town of Canada. It's in the fall of Tuesday. Yep. That's over there. Thank you. The fourth one was...

2:50:37 Keep you some of the placeholder each month is the CRP workshop continuing discussion. We just keep that rolling along. Keep it rolling. Check the gray. The fifth one is the measure of R implementation policies. So that was kind of that supplanted discussion. We can bring back those notes from the workshop. And you can look at formulating some type of policy or correction or no. Do you want to do that? Where do you have the measure R?

2:51:06 And measure R, what is the last one? Yeah, I move measure R to number one or two anyway. Then you and I can talk about that. Yeah, you'll get me to your work. So that's what we have right now. Consent was a recreation guide update and a special event payment process update. I was just going to drop that for your review, essentially, just what you needed all the time on.

2:51:34 We need to measure R up front so that it doesn't fall into Thursday's meeting. We'll come to enough meetings. And I anticipate taking pretty much the whole Tuesday schedule. You can look at the community center, but I don't know if it was booked at that time.

2:52:06 If two people come from each project that we're moving forward with, we're only talking about 12 people or so. If you remember, the same person represents several of them. And there's plenty of room for them to sit in the audience. I don't know that the difficulty would be, we've made the commitment to film all the measure of our stuff, and I don't know that we can do that there. Is there any reason why we can't head from here? Yeah, that's it.

2:52:36 Okay, and since this is not a regular meeting, I won't call for a director for anybody else's comments.

2:53:05 But I would call for a motion. A second. I have a motion to adjourn and a second. Any further discussion? No further discussion. All those in the favor? Aye. Opposed? As you generously, thank you all for your time.