TransparentMammoth

Parks & Recreation Commission · 2020

Parks & Recreation Commission

· recording 1 hr 58 min

Agenda

Agenda items for this meeting haven't been extracted yet. Read the agenda on the Town's site ↗

Transcript

246 passages · machine transcript

Automatically transcribed from the Town's recording with speech-to-text. Names and numbers can be wrong; the recording is the record. Open the Town's video ↗

0:00 All there, good job. Social distancing, physical distancing, sorry. So I did see Dan yesterday, so he assured me that he was going to join us. Let's see if that works. And Sean, I got your message, perhaps we can touch base after the meeting? Yeah, that'd be fine. That sounds great. Great. Welcome. So I just got a text from Matt McLean. He wants to know if there's a Zoom for Rec Commission or does he need the link? Do we think he's going to participate? Yeah.

0:37 Senator Malik, does he want to jump in? Yeah, can you forward it to him, please, Stu? Yeah. Thanks. Before we begin the meeting, I'd like to remind Sean and Laurel that their Form 700s are past due. Please get them in as soon as possible. Thank you for the minder. It's that magic time already, eh? You got an extension. When were those due? They were due like beginning of May or April, weren't they? They're normally due April 1st, and because of COVID, they...

1:33 Extended the deadline to June 1st. Which was yesterday. Okay, apologies. Yeah, I tried to do mine early and he told me I wasn't due yet, so I will do it now. Hey. I think we can give Dan another minute and then we can go ahead and get started. We have a quorum. Oh, there he is. Hey, Dan. Hey, buddy. We've got, who's here? This is a first for me, so a little piece is required. So we have the full commission plus staff.

3:28 Plus Matt from MLR. You guys all ready? Yeah. Jamie, you good? Yes. Okay. All right. Well, I will go ahead and call this meeting of the Town of Mammoth Lakes Recreation Commission to order for Tuesday, June 2nd. Roll call, please. Commissioner Cantoir? Commissioner Martin? Here. Commissioner O'Connell? Present. Vice Chair Turner? Hello. Chair Truex? I am here.

4:03 Thanks, Jamie. Okay, I will open us up for public comment. Kat, is there anyone in Sweet Z for public comment? There is no one in Sweet Z for public comment, no. Okay, and any public comment from any commissioners? You all again. You received a public comment email from Sharon Clark, but that's for agenda item later in the meeting. Yes. The only public comment I just want to give is I just want to thank staff for...

4:34 for conducting this meeting today. I know that you're all extremely busy and I really appreciate your time. So thank you. And with that, I will close public comment and move to the consent agenda. Item number one is to approve the minutes of the regular meeting of March 3rd, 2020. Not a lot on that document, is there? It feels like it was a really long time ago. I will move to approve the consent agenda. Second the motion.

5:04 The motion and a second. Any further discussion? Jamie, do we need to take roll call votes or can we just say aye? No, you can just say aye. All in favor, please say aye. Aye. Motion passes 5-0 and that brings us to our first discussion item. Item number two is the Parks and Recreation Department monthly department report. Yes, and good afternoon, everybody.

5:35 Rather hectic couple of months. As you know, I was reassigned to lead the public information efforts for the county, so have been somewhat disconnected, as you can imagine, as we all have with dealing with coronavirus throughout not only the county, but the state.

5:58 Our team has managed to kind of stay in contact via Zoom, but more so by Teams, which has been amazing and fortunate to get Teams up before we went through or started this pandemic back in February. So we were kind of one of the first departments to transition to the Teams platform, which has been fantastic. So we've tested it vigorously.

6:24 Robustly and frequently through the last three months. And we can say we're all very connected, even though we are not physically in the office, we are virtually connected as a team, probably now more than ever. So I'm really proud of Kat and Lauren, you know, kept it kind of going, kept it together, Kat more so, because I moved Lauren into the JIC team with me and public information. So Lauren's been kind of me with the JIC team and our team.

6:52 On the public information front, there's about 15 people from across the county, all different organizations. So I've been really proud of everyone's hard work on that team pushing communication and for Lauren keeping us on track with all our media placements, social, portal, websites. So the Mona County portal that you see and you access every day for a lot of the numbers and the...

7:15 The statistics is kind of what Lauren oversees on that team with Olivia from IT. So doing an absolutely fantastic job with that as well. So I want to credit Lauren. And then Kat has been our one recreation employee through this whole three months. So again, I want to recognize Kat for all the hard work. So Kat has been the mainstay for the department through this pandemic, done a Herculean job trying to keep us all together, keep me connected.

7:43 All of us kind of working together. And then Warren, as you know, is working with his team. We're able to bring in three seasonal employees to get more of our facilities and parks open. And then we've just been approved for additional two. So we're actually kind of back up to five. So Warren's, you know, working pretty much flat out, you know, getting everything going. And if you've been to a lot of our facilities through this time, they've been doing a...

8:12 Incredible job as well. So very proud of Warren and his team. So what I've asked Kat to do is to kind of walk you through the monthly department report and Kat has been organized as ever through this pandemic and we've been providing this to you over the last couple of months as well. And I know you've been communicating with Kat, managing certainly kind of our portals, websites, you know, Facebook, social, trying to keep the community engaged and updated.

8:40 on kind of what we've been doing through this really difficult time. So hats off to the world-class Parks and Recreation team. So with that, I'm just going to hand it over to Kat. Kat, if you just want to walk through the department report. Thank you. Sure. So I guess just starting off with our facilities, in the last couple of weeks, we've actually been able to open up quite a few things, which is really exciting.

9:03 At the top there, the Whitmore Pool remains closed at the moment. It's currently listed under Stage 3, the California Resilience Roadmap. So we're following those guidelines. We do have water in the pool and it is circulating because we had the guys from American League up to do the pool integrity test this week. Well, sorry, last week on Wednesday and Thursday.

9:29 That went better than expected. I don't know, Stu, if you want to expand a little bit on that now or? Yeah. Yeah, I'll touch it. I'll touch with it all on the deferred maintenance update. I think it might be best to give the Commissioner a brief update on kind of what we've been doing. So thank you. You keep going. Great. Okay. So in terms of our facilities, obviously Whitmore Recreation Area has been open the whole time, but we've got some more signage up there.

10:00 The guys have been putting in a lot of work down there, Warren's guys. Stu will also probably talk a little bit on deferred maintenance later. One of our pumps is down at the moment, but it's looking like we should have someone in town tomorrow to sort that out. We can get that irrigation up and going again. We were able to open courts one and two at the tennis courts last week, and we've actually just opened courts three and four as well, so that's an update. So all four of the tennis courts are open now. The restrooms are still closed up there. We're hoping to get them.

10:30 Open later this week and will continue to keep courts five and six closed for the duration of the summer because of the large cracks that are happening there. We also managed to get Shady Rest Park open which is really exciting. Shady Rest looks amazing. I don't know if anyone has been down there recently but Warren and the crew have put a lot of work in there and I think having a little breather from visits was good for Shady Rest Park. It looks amazing. The disc golf course is up and going.

10:58 The baskets are installed. We've had a lot of feedback over the last week. Everyone is loving the disc golf course. The signs and the information board are currently printed and they're awaiting shipment. So hopefully we'll have them soon and we will get them installed as soon as possible. And then we have the restrooms open at Mammoth Creek Park West. They remain closed at Mammoth Creek Park East. Our playground also is...

11:27 It's remaining closed, all of our playgrounds. That's sort of following CDC guidelines at the moment. With the nature of the amenity and with the age group of people on them, it's difficult to maintain physical distancing on playgrounds and we're still unclear about the transmission on playground surfaces. So for now, we're keeping our playgrounds closed.

11:48 We also managed to open up the Falcon Brothers Skate Park, which has seen a lot of traction this last week. Everyone is down there enjoying that, and the restrooms are open down there as well. Our mops are open. Everyone is out enjoying our mops.

12:04 In fact, I don't think I've ever seen as many people on our maps as I have in the last week or two. So that's great. My experience has been that everyone has been very courteous and is following the physical distancing guidelines and masks as well. So that's great to see. With regards to the Lakes Basin, the vehicle access is still closed at the Lakes Basin.

12:29 Bikes and pedestrian access is allowed from Twin Lakes up. Our maps are still closed from Twin Lakes and through up into the Lakes Basin. And that is kind of where we're at with our facilities. Obviously, moving into our recreation amenities, the Community Recreation Centre is still... Oh, sorry. Glitch there. The Community Recreation Centre will have an update later from Hayes on that.

13:03 Shady Disc Golf Park I updated you on. With regard to the dog park concept, that's kind of been on hold from March. That's something we'll probably try and start reaching out to people as we start to get all of our facilities up and running again and continue with that concept. Whitmore Recreation Area Planning, that is something that we are still obviously very interested in and are still pursuing.

13:35 Bike Park Concept, we haven't had any action on that in the last couple of months. And Prop 68 update, we're still tracking those per capita grants. I might let Stu take over and fill you in a little bit on the deferred maintenance projects. Thank you, Kat. So the team hasn't been idle at all during the last three months. We've been kind of managing.

14:08 This pandemic. So a couple of projects have been completed. A couple are underway. Kat mentioned briefly, we had a crew up performing pool integrity testing. Originally, it was scheduled for two days. They basically completed it in one afternoon and one morning. We're waiting on a finalized report, which we should receive.

14:33 Hopefully this week. But it went better than expected. So they perform just kind of rudimentary pressure testing, dye testing, testing all the integrity of the piping, skimmer baskets, grates. You know, I'm just trying to better understand the operation of the pool and actually said it was in better condition than what we all thought. So that was positive. And then they're able to repair a couple of...

15:00 Leaks on site as well. So we'll kind of get the update and we'll give you a more thorough report at a later time, but that went better than expected. Whitmore Recreation Pump didn't go as well as we thought. That was actually, that is the irrigation pump that provides all the water for irrigation for all those fields.

15:26 That failed last week. It was actually one of the items on our CapEx plan, if you saw that. Good news was we originally thought it was about a $10,000, $10,000 to $15,000 replacement. It looks like we should be able to get that fixed for less than five. The motor was actually in good state. It was actually the propeller that was seized, so they're going to come and replace that. So we believe we'll have that up and running by tomorrow.

15:53 So that's good news. Community Centre, Interior, AV and Sound, that was completed. The Mono IT Department fixed that before the pandemic hit. So the Emergency Operations Centre has been very thankful using all the greatest technology that we incorporated and installed in the community centre at one time. We'll hopefully get that building back.

16:16 We have the wall-mounted water fountain that was generously donated by Rotary. That's going to be installed on the small bathroom adjacent to the playground at Shady Rest Park. Shady Rest Park Pavilion Tree Limbing, the crew completed that during the closure. That was conducted about a month ago. And then the crew, in partnership with Public Works, has been transporting mix for the infields.

16:46 So they're hauling that down from Reno, I believe. So that's been going on as well. And then the bid for the Shady Rest Park and Mammoth Creek Park electrical work bid was received, and that's going to be awarded by council on June 17th. So that was upgrading the power amps, make it safer at Mammoth Creek Park and both at Shady Rest Park, and that was an $18,000.

17:10 Contract, the budget was about 10. So we've saved money in a few areas. We're spending a little bit more on others, but we're all prioritized on safety, ADA, accessibility, and so forth. So that is it. Unless there's any questions, I'll hand it back to Kat. Thank you. Thanks, Stu. All good. So we are still obviously continuing work with signage and wayfinding. Obviously, the signage that we have been a part of recently has been...

17:42 More to do with COVID precautions and responsible recreation guidelines. But I think if you've visited any of our facilities, we have some pretty great signage up there now, good graphics, and I think we are getting that message out clear to the participants that are using our facilities. So hopefully they will continue to follow them.

18:03 Our GIS inventory of parks and facilities, Eric is still continuing to finalise some of that stuff in our parks. With regard to the Parks and Recreations Amenities Enhancement Program, we're still looking at an early July launch date with that. I have a meeting with staff next week with regards to getting that information that we currently have collected up in the...

18:32 up on a portal so that we can then pass that over to Mammoth Lakes Recreation. And then I'm also working on our final list of new inventory that we would like to include on that Parks and Recreation amenities enhancement program. Our community programming is a little reduced at the moment, but we are continuing to try and find...

18:59 Ways in which to be somewhat innovative and think outside the box with the current pandemic going on. Our quarantinity of the day is still ongoing. It's quite a task to come up with something different every day. But we're now looking at trying to collate all of...

19:17 The activities that we have listed on our Facebook and get them onto our website. So there's a one-stop shop for virtual recreation programming or suggested activities that people can be directed to with that grouped into different categories, arts and craft, fitness, that kind of thing. So we're working on moving that to more of a web-based platform.

19:40 We do still have all of our summer programs, so that's camps and lessons, tournaments and leagues suspended. We have worked on getting some of our external providers to help out with being able to provide some recreation programming.

19:59 If you have a look down here, you can see that Playworld Technologies is now going to offer the two STEM LEGO camps that they were doing with us in person, online. Challenger Sports and UK International Soccer, our two external providers of soccer camps, are optimistic about being able to operate their camps in late June, July and August.

20:22 at Shady Rouse Park. That will be dependent on our organized group recreation guidelines, which we are currently working on, and the direction from the Monon County Health Department on that, but they are optimistic that they will be able to create a program that incorporates the physical distancing and hand hygiene and other measures that are required right now.

20:46 Challenger Sports also has a virtual soccer camp program that they began this week. I'm also chatting in the midst of talking with Clay Tyson, who is our provider from Ground Up Climbing.

21:03 It looks like they possibly will be able to provide some kind of modified climbing camps as well, which is something that we're going to help promote. We're not doing that in partnership within this year, but with the limited recreation opportunities available right now, we're certainly looking at trying to promote anything that our previous recreation partners can provide so that we can give the community something to recreate with.

21:30 And then in terms of our facility use agreement holders, so that's a lot of our youth sports organisations, Mona County Little League, Mammoth Lake Swim Team, AYSO, and our agility dog groups. We are currently, as I said, working on a drafting guidelines for organised group recreation activities to take place under the current stage and then in further stages down the phasing plan.

21:57 Obviously once we have that in place our facility use agreements will be dependent on those organisations following the guidelines that we set in place. So we're still working through that at the moment. One thing that we have managed to deliver and is going on right now is our Mammoth Lakes Virtual Fun Run. So this is in collaboration with Mammoth Track Club and Visit Mammoth and it's also a celebration of Global Running Day which takes place tomorrow.

22:26 The Mammoth Lakes Virtual Fun Run, there's four predetermined courses, anywhere from 400 metre super sprint around Mammoth Creek Park up to nine and a half kilometres out to Shady Rest and back.

22:38 So we're asking participants to sign up for one of the courses and then at any time over the course of this week they can run one of those courses using a fitness app of their choice to track that and then they're posting those results to Facebook and Instagram so that we can measure the results and award prizes at the end of it.

22:58 We're doing really well. We're on day two, and I think we have 48 people signed up already. We've had about 10 people complete courses and are starting to publish those results. So hopefully we'll continue with that momentum over the course of the week, and we'll finish with a bang this weekend and get a lot of people out there running on our mops. And then the other thing that we are looking at trying to create at the moment is a summer recreation challenge.

23:25 So that's something that Lauren and I have been working on. The idea being that we are trying to collate all of the recreation activities that are on offer in our community right now and award points to certain activities, encourage everyone to complete these activities, post photos of them doing these activities, they'll be awarded.

23:49 Points for each of them and then whoever has the most points at the end of the season will be the winner of our Summer Recreation Challenge. This can be anything from flying a kite at Whitmore to hiking duck pass to completing one of our summer camp packages which Lauren is working on. So there'll be a whole host of things there. We're hoping to launch this in July so that that Summer Recreation Challenge will take place over July and August.

24:21 Moving on to our organizational systems, structures and operations. We have developed our top three core functions in the hope that Whitmore Pool will open and that we will be able to provide some recreation opportunities throughout the summer.

24:40 Obviously, right now, we have not had a lot of customer surveys coming back in, but that's something we're starting to look at pushing out again soon to get some feedback on the virtual programming we have been able to provide and also some feedback on what people are looking for currently, what their comfort levels are, that kind of thing. We've been taking this time right now to review and amend our facility manuals, which has been great.

25:06 Tony Colisado Scholarship Fund continues to keep ticking upwards. We're over $19,500 now, which is fantastic. Some of those joining our virtual fund run have also been very generous and donations are clocking upwards there, so that's great to see.

25:25 In terms of our communication and engagement, we're obviously trying to be very proactive with that at the moment. It's one of the only ways we can reach people right now. So our engagement on Facebook is doing better than ever before, and we're working on trying to spread that to Instagram as well and make that a priority platform too, because that tends to be the way things are going right now.

25:48 Our team capacity and organisational culture. Obviously, even though we're not in the office altogether at the moment, we are still definitely working on developing our efficient and effective teams. And as Stu alluded to before, I think that we have done an amazing job over the course of this COVID pandemic challenge. We have stayed in touch. We know what everyone is doing and we're working.

26:14 Fabulously together. So I think that says a lot for our team and our leadership.

26:22 Professional development. There's been a lot of great stuff online right now. I am somewhat overwhelmed by the amount of information that has been coming in from not only CPRS but also other recreation agencies around the country. Everyone is being incredibly collaborative and sharing of their information and best practices and operating plans and things like that.

26:46 So I think this has been a really great time for the industry to work together and to share a lot of their knowledge. And in terms of our emerging trends, as I said, we are trying to be as innovative as possible with our virtual programming. I just read something the other day about a great virtual disc golf tournament. So that's something that we hopefully will be able to bring to the table soon with our new disc golf park.

27:18 And we will continue to look at ways in which we can engage the community and provide them with recreation opportunities during this somewhat challenging time. Awesome, Kat, thank you so much. Are there any questions for staff from Commission? I've got some questions. Okay, go ahead, Sean. Yeah, okay, thank you. First of all, great report. Is this the first time we're seeing this? I'd love to be able to scroll through this on my own, but I didn't see it in the packet that was emailed to us.

27:50 I think if you click on it in Granicus, it opens up. Okay. Okay. All right. I'll go through it in Granicus. Well, let me just ask some of the questions that I've got. Is there any way of counting how many people are using the Frisbee golf course? I've heard people who are using it are enjoying it very much. Just curious if there's any way of counting how much it is being used. Not directly.

28:20 Commissioner, it's part of the program that we have in our strategic work plan referencing. I think there's a section there on tracking number of park users. And I know there's some technology. It's just kind of been shelved. But we can kind of get you some numbers. We're very excited. All the signs and everything is on a pallet in the middle of an ocean probably making its way across the Pacific. So as soon as it does.

28:48 Arrival will be able to kind of get the T signs up, 18 T signs plus the information board. And at that time, I'm really hopeful that we can actually have a ribbon cutting, trying not to do virtual ribbon cuttings, you know, becoming so per se. But if we can do something virtual and something actually physical and respect our distancing, I'd be super excited. So, but we can get to some of those numbers, but we don't really have any way to track that, you know.

29:14 Okay. Yeah, that'd be great to know. And again, I've heard nothing but great things about it. So congratulations on that. You know, okay, I'm sorry, I finally did make it to the correct granicus scene then to be pulling this up. A couple other things with regard to virtual activities. Is there, so I know we are indefinitely on hold on being able to hold any of the camps.

29:41 I mean, realistically, are we going to be having any summer camps this summer at all? Or is it just too soon to say? Are we still holding out the possibility? Or are we just accepting the fact that probably no summer camps, as we were trying to identify them back in March, are going to happen this summer? I can bump that to Kat, because Kat's being the lead on our programming.

30:08 Sorry, it's hard to work out like this if someone is about to speak or not. It's much easier when we're all in the same room. So with regards to summer camps, obviously at the moment with the limiting, with the restrictions, sorry, on gatherings, it makes summer camps difficult to hold. There is, within the industry, there are ways of holding summer camps. They are considered childcare for a lot of people.

30:33 And there are childcare guidelines to be able to hold some of those camps. The difficulty that we face without a facility, it makes it very hard to follow the guidelines that are in place currently for childcare. For example, there's ratios of students to teachers, which is something we could follow, but their areas can't cross over, so they need to have their own bath restrooms, they need to have their own kitchen areas. With the community centre,

31:02 Currently occupied by the Emergency Operations Command and with our rec zone really only having one room, it makes it very difficult to separate the groups and keep them separate, which is one of the criteria for childcare. There are options with outdoor spaces and so we are certainly still looking into them and we are certainly still evaluating.

31:26 What it is that we can do. Lauren's currently working on guidelines for summer camp programs and what we would be able to offer under the current stage and as we move into later stages through the reopening plan, what we can and can't offer. So I guess the short answer is at the moment we cannot have summer camps. If things change, we will try and adapt and do whatever we can to fit in with that and that's where we are right now.

31:54 Okay, understood. Thank you very much for explaining that. Bummer all the way around. And whatever you can do as far as virtual camps go, I know that, you know, Mammoth Brewing Company, we do our trivia night. Actually, it's tonight, every Tuesday night. That's great to see you on that. Yeah. It's got a hell of a following. You know, we regularly have 30, 40 people who are participating, a lot of them from outside the area. I don't know if this, what other kind of activities you can offer our kids.

32:24 It's just, it's a really difficult situation. So thank you for being creative, Kat. It is difficult. And I think one of the things that we, that has kind of come back initially when this all happened, you know, there was an onslaught of providers offering online programming. And what has kind of come back from a lot of, a lot of the feedback that has come back from parents is that

32:48 Their kids have already spent an extraordinary amount of on-screen time with this whole situation, and they really want to see their kids get outside more. Obviously, you know, that's difficult to manage, but that's why we've sort of gone down the route of this summer recreation challenge to sort of provide a framework. Obviously, most children will still need to be supervised, but some of the activities on this, hopefully some of...

33:10 Our older age groups will be able to do and tick off by themselves. So it's more to provide a framework of getting people outdoors and active rather than increased screen time because there are a lot of online summer camps that are being offered right now, but I don't know if that's what people actually really want is what we're getting back. Yeah, okay, fair enough. And not much we can do along those lines. I was going to ask the question, how do you do a virtual soccer camp?

33:39 It's having your computer outside and having your parent film you and send that film back in for analysis and coaching. It's not ideal, but they're trying to come up with ways, like everyone else, to make something happen. Okay. All right. Well, you're smarter trying to figure this out than I am, so I won't even try to suggest anything, so good luck with that.

34:06 My only final comment was I know that there was a lot of very vocal desire for us to advance a dog park specifically and a bike park. And what I know we haven't met since March, but I would like to encourage us to continue moving those projects forward as best we can during this time. I found that

34:32 While it's very difficult to meet in person and some things have been handicapped because of the current situation, frankly, there have been opportunities to advance ideas because of this, various Zoom meetings. And I just, as a commissioner, want to make sure that the dog park and the bike park specifically as far as projects continue moving forward in a planning type role. I know we're all very busy.

34:58 No criticism in the sense of just vocally saying I'd love to continue advancing those projects. Thank you. That's everything I have to say. Thanks, Sean. Any other questions or comments from commissioners? That's something brief. Something I've touched on in the past, wayfinding and signage on the town loop. It's a little unclear where the bike path is going from about Old Mammoth Road.

35:30 West up the hill until you turn left on Callahan. When I've ridden my bike in the past, I didn't know if I was supposed to cross Main Street and go up on the north side and then back. So I'm wondering, with all the work completed there, has wayfinding been installed? Does anybody know? And if not, who would I contact to just kind of nurture that along if possible?

35:59 We just saw some proofs today, actually, from Joel and his team. Dan, so let me see where they're getting placed and see if they're addressing your concerns. But that work program is still ongoing, so. Okay, good. If you'd like, if I can make this work here. No, Hayes is speaking. Sorry. Let me talk to Hayes. There we go. Thank you, bud. All right. Can you hear me now?

36:31 We can eat now, buddy. So here's a couple photo sims that we received from Joel. We're looking at placing signage up towards Lopez's, and then this would be looking east, and then some additional signage at the bus stop over in the Liberty Bar kind of area, and that should kind of close the gaps on the signage from Old Mammoth Road moving up towards where the loop kind of heads south.

37:02 And so if you're riding your bike going west past the RV park and you get to Old Mammoth Road, will it be clear where the bike path is, the multi-use path? So there's a Type 2 sign at the intersection of Old Mammoth Road and Main Street. And so that will direct you to continue on the path going, you know, west on Main Street.

37:34 Kind of the area around Liberty where we have another type 2 sign and then making the transition to get on the bike path heading south will be a type 4-6 sign in that decision. Okay. I had noticed that there was pretty much abraded and worn away the image of a bike rider on the street at one point indicating on the frontage road there.

38:01 that that was a bike path of sorts. Is that something that's going in or not? I wonder. The bike symbolization in town is usually within the bike lanes. Main street, that's inside five feet or so. And then on Old Mammoth Road, it's a share of the road. So those bike symbols are in the center of the road because bikes are permitted to ride in the center of the street.

38:29 I don't recall any civilization on the front of the road unless it was put there temporarily during construction, but that would not have been the intent to have that first. Yeah, it was pretty far west up towards the local Frijoli street, I had noticed before. So anyway, that's it. I'm just curious to know what's going on along that stretch because it's always been a little big for a user like me. He certainly knows where he's going.

39:04 Thanks, Dan. Thanks, Hayes. So if it's all right with the commissioners, we can always come back to any comments or questions from staff later in the meeting, but I'd like to go ahead and move us on to item number three, the Community Recreation Center update while we have Hayes and Grady with us. So who's going to kick this one off? I can jump into this too. So we find ourselves again having a recreation commission meeting the day before a town council meeting.

39:34 So I cannot be too presumptuous with the actions that will be taken. I don't know where Town Council is going to land. So what I'm going to do is kind of walk through the staff report, which I'm guessing all of you have read because, you know, it's really exciting stuff, and give you an opportunity to ask any questions about what we'll be discussing in Town Council. And with that, the recommendation...

40:02 is to reject the bids that we received and to rebid the project. And the staff report kind of lays out three points. Why the bids were high, why we believe this project can be rebid within budget, and then we were asked to kind of talk about some of the financial impacts. So I'll tackle these one by one. So the bids were high. The low bid came in about $11,800,000, which seems well within our $13 million all-in budget.

40:32 However, that was only part of the actual cost of the overall construction project. Stu and I, working with our consultants, decided to pull out a couple of pieces of the project and purchase them directly to minimize construction overhead costs. And so the sprung structure itself, the chiller, the ice rink boards, and a couple of other minor items were pulled out of the bed.

41:01 Total cost of those items was about $3.3 million. We've also spent about $1.8 million on pre-construction costs. Now that's the design, survey, geotechnical reports, legal team, and the EIR. And so the total project would have totaled about $16.9 million worth of this that we received, which is somewhere in the name of a $3.9 million over budget.

41:31 We need to reject the bids because we are well outside of the $13 million all in. And while $3.9 million seems like a huge budget overrun, staff is actually pretty confident that we can get this within budget. Unlike the last bid where we went to town council and flat out told them they could not afford the project that's proposed, that is not the case here.

42:00 And I'm going to kind of walk you through a couple of things that will be in the presentation. So when we brought this back to, can you stop sharing, Kat, your screen? Thank you. So in front of you is part of the presentation from the June 5th, 2019 Meeting of Town Council where we more or less presented the 10 South fabric structure as an option.

42:41 This building does not include a community room, doesn't have a second floor, doesn't have an enhanced and kind of concession and rental space and offices and a number of storage rooms. The locker rooms are, you know, wood kind of, excuse me, timber frame. It doesn't have a second floor for a viewing platform.

43:08 Didn't have provisions for a second floor. Didn't have a lot of things. And we allowed, in public works, a significant amount of scope creep. Over the year that we developed this project with our partners, there were a lot of asks and a lot of additions to the project to try to make it better for the community. And we allowed this to happen because we were receiving bid updates along the way that said that this project was well implemented. And so we allowed it to continue to move forward with all the additions.

43:38 And at the end of the day, we frankly allowed way too much to happen. Hindsight being 2020, we probably shouldn't have allowed so much smoke creep, but again, our estimate said that we were within budget. So in order to move this forward, we would have to remove some of those extras. I'll walk through what a few of those look like. You can see that this is significantly different than what was proposed almost earlier. And this doesn't even show the second floor in the addition.

44:09 That second floor structural foundation, the concrete decking on the second floor, all those provisions to allow for future build-out was in excess of $2 million a month. There's a significant amount of metal stud framing, a lot of treatments, a lot of additions. All these things added up to a healthy amount. I don't want to go into all the details, but a lot of this information came from contractors.

44:39 And they kind of want to keep some of their numbers to themselves because it is a competitive environment. So a lot of information, frankly, was given to me in confidence. And so I don't want to, you know, use their trust and allow them to, if we do the authorization to rebuild this project and be able to reuse their numbers. But what we'll need to do in order to bring this thing within scope is to eliminate some of those extras.

45:08 And I don't have a full-blown red-line drawing to show you, but basically we'll be attacking all of those extras that I kind of discussed earlier. So the community room, the rental space, the office spaces, some of the storage rooms and so forth, the second floor addition, the provisions for additional build-out will be eliminated and will be reduced to more of like a community space and spaces for concessions, but it won't have full build-out.

45:38 As originally designed, the functionality will all still be there. It just won't be completely built out as you've seen these drawings or have you've seen these photosims or renderings. I'll stop there. See if you guys have any questions. Hold on, hold on. I'm trying to collect my thoughts. Part of that first plan that you put up was hidden by the thumbnails by the videos. Is there any community space in that?

46:22 original drawing that you put up? No. Is that yes or no? That was a no. Okay. And when was that drawing done? Is that something that we looked at originally? That's the original drawing from the presentation to town council on June 5th, 2019. Okay. Okay. All right. So what is in and what is out, basically? I mean, you know...

46:58 We had enhanced design features resulting in the scope creep, which is fine, and we all thought it was going to be reasonably priced and it was going to be within budget. But what exactly is being eliminated right now? Are you talking about going back to that original drawing? No. So right now the intent is to keep the footprint the same, keep the square footage the same, same pencil, graphic structure, all the same.

47:29 Exterior treatments, but to eliminate the elements that would have allowed for expansion into a second floor. Okay. Decking, that structural element was all steel. It was a steel, it's like a building within the building to have that type of height, the foundations, and then a lot of the treatments, the tile.

47:58 And kind of the furnishings were expensive, so we're going to reduce those. We're going to eliminate a lot of the wall space, so we don't have those structural elements, but we're going to keep all the spaces there. So if I have a, if I get, if I'm permitted to move forward with this, I don't want to be presented to a council, I will have a red line drawing that we will present that will show exactly what we are, the specifics of what we're going to propose in order to bring it within.

48:26 But right now the ideas are to eliminate all of those really expensive elements that were identified by the contract. So are you contemplating any kitchen element or any community room element in this revised concept? Probably not. I think those were expensive elements that we would probably step out for future use but wouldn't build out in this first round. That would probably be our recommendation.

48:57 It does leave the space. It just won't be framed in. So the bid won't include the framing is my assumption. But the space is still there, right? So there's still 2,200 square foot of space plus where the kitchen was going to go plus that storage room. So the space is still there. That's not going anywhere. And at a time, either we can fit within what we're trying to address here and hopefully Hayes will have some updated, you know, red lines for us later.

49:25 It's important to understand that what we're trying to look at from a programming point of view, can we still provide the programming in that space, right? And I think what we're seeing now is that, you know, we don't have that space at all. You know, we don't have an indoor space that we can do really any of this, perhaps, you know, part of the community centre, which we can't use right now. And then depending on how it goes this summer. So I just want to make sure that on the rental concession side.

49:52 That's the same area over there. We still have that space. We can still provide the programming. We can still move a lot of the material, the racks, the benches, all the fittings from the existing facility in there to get everything going and moving. It's just not going to be as built out and as elaborate, which is where we got into the trouble, if I'm correct there, Hayes, right? So we just went a little bit above and beyond the original scope. So we're trying to bring it down to making sure that we...

50:20 Meet the desired programming in a kind of more affordable manner to move this project forward. Right. That makes sense. And apologies again, because see the right side of the original drawing. Is there room for just an empty community room space, though? I can't imagine that being very expensive. It's just an empty space. Yeah, you're going to end up with probably...

50:48 3,000 square foot plus of available space. Okay. It's not going to be fully built out. So it wouldn't have like all the, you know, I'm losing the word here, the kitchen elements, any of the casework, you know, I don't know if we would go immediately after all the HVAC and so forth or use the HVAC from the existing building. These are things that will get worked out if we are authorized.

51:18 Like I said, I started this by saying I don't want to be presumptuous. I don't have authorization to go forward and I want to do a redesign right now. So I'm kind of talking a little bit out of school here and trying to give you an idea of what we would be looking at without kind of creating the terms here, if you understand what I'm saying. But to Stu's point, you know, all the spaces will be still there. They're just going to be built out differently or left vacant to be built out using some of the existing stuff that we have.

51:47 But if all the footprint will remain the same is what I would be recommending. Right. And it appears that all the programming needs for sports and recreation are literally satisfied. I think from a winter programming, you know, when we've got really into, I know we can talk about winter operations, but summer is significant and that's really where the need is, right? So the camp space right now, you know, we can't offer anything because we don't have really an available facility.

52:14 To even look at segregating these kids or look at these different programming choices. But, you know, with the space available, we can still do that within the footprint of the building. So we're not asking to shrink it down to the different size rink. It's still going to be the Olympic size rink. It's still going to have the three courts available. We can still kind of program everything we talked about in summer. And I believe if we're correct with the plan moving forward, Hayes, correct me if I'm wrong, but the four...

52:42 CMU lockers are still remaining in that base bid is what we're looking at, right? So we're still going to have the four 250 square foot locker room spaces, which are critical for not only winter, you know, hockey, you know, those type of programs, but the summer operations, our summer camps and programs. That was one of those elements we really looked at that was like, well, you know, we would really, I think, compromise this facility without those spaces.

53:10 And everything on, if my understanding is correct, Hayes, everything on the winter side, on the rink, the chiller, the boards, the concrete, was actually on budget, right? So, you know, we know that number. We know how that works. What we're getting beat up on is the other ancillary amenities that just kind of got us above and beyond the core function and the programming we kind of originally derived. So the original programming-driven design is satisfying.

53:40 We believe at this point, you know, we just started with this, when did we get this, Hayes? Not that long ago. We haven't had a real good talk. I haven't even talked to HMC yet, and I don't know if Hayes has kind of talked a lot about it. So we're trying to take an optimistic time to, you know, get this in front of council, get some direction to see if we can continue to move this forward. And at that time, I believe we'll be able to kind of get into the specifics and I'd be able to come back to you at a later time.

54:09 To really identify through the playbooks what's being proposed and what we can still do and provide for the community. But for right now, I believe if we keep the footprint, the space and all those areas that we've talked about, I still believe it'll meet the majority of the program. Yeah, and I want to jump in here too and just add that this is really difficult because the commission's not met in a while and, you know, things have been very fluid since the bid.

54:34 came in. So I want to make sure everyone understands that the staff is not actually asking the commission to make a recommendation to council. We'll just take them consensus comments coming out of this meeting because it's obviously difficult in this format and just with the timing and the fact that we've not been able to meet to really kind of delve into a lot of the details. But I really did want Hayes to kind of come and give us kind of, you know, his take on the staff report, you know, and then he'll give a more robust version at council tomorrow.

55:04 Okay, just one last question for me. I'm sure Sean has questions and others too. I don't want to usurp this, but in the report it says that the changes will have minimal impact on the initial community recreation center programming and will still allow for some minor added elements requested by commissions and council. What are you referring to there?

55:34 To try to reserve, I'm trying to, let me see if I can word this correctly, is to get the bid to a position where we can come back and add some stuff within our existing budget. So, and we think that is plausible. I'm going to circle back to the bids and I don't know if you took a close look, but our bids, our bid spread was tight. We had four bidders, all really, really good contractors. And the bid spread was, you know, 300 grand plus or minus.

56:05 And on a project of this size, that is a really, really tight thing, which tells us our plans and specifications were really good. We got repeatedly heard from the contractors that this was a really, really detailed, comprehensive, and thoughtful set of plans, which brings a certain level of confidence when you talk to the contractors and they give you some of the numbers, because they were consistent across the board. And like Sue said,

56:34 The elements that are really driving the program were all within what we expected. It's a lot of the elements that we added that are really, we don't really have any benchmarks to go off. Some of the things, obviously we bid this project twice. Stu and I have a pretty good idea of what certain things should have cost. Those things came in exactly where we expected them. It's really the stuff we added that was new that we really have nothing in town to go off of. We really relied on our consultant.

57:04 Provide us those facts and figures, and unfortunately they were off. So when we start to bring this project back to our knowns, it starts to make sense. And that's why we're kind of making these recommendations to continue to move this project forward. Is there a contingency built into these bids? Well, there was definitely a contingency in our estimate. But in these bids, like the, you know, the $11 million?

57:35 11.9 or whatever. No, no, those are, those are pure construction costs. There's no contingency in the contractors. Okay. Any more questions? Yeah. Can I ask, can you go back to the diagram? Can you play the diagram again? First one or second one? Second one. Then I'll follow up with a question. So, to be clear, in the upper right-hand side, wasn't that where the...

58:16 Community Center room was supposed to go, or actually even outside the box. Am I remembering that correctly? This is the, what was planned, was a multi-purpose room, community room, storage, janitor, mechanical, break room, kitchen area, another restroom, and then on top of this, this was all designed structurally to support a second floor, which was a steel frame with a lightweight.

58:46 Concrete decking to hold this entire space as a second floor. Okay. This was actually providing the equivalent of two of our existing community centers. Yeah. And the discussion was actually to have the second floor. And I believe that came out of the design actually a while ago. And is there any way of going back and adding this later on?

59:18 The expense, I think I was told was going to be significant, such that if we walk away from the ability to pre-plan for a second floor, it almost renders it impossible to do at a later time. Is that accurate? It does make it significantly more expensive, that is for sure. Can it be done? Absolutely. So we don't lose the option to do it, but we will definitely pay the premium because we would have to demo all of this.

59:46 Yeah. Dig down, put in new foundations. That doesn't mean it can't be done. Yeah. How much was that? What was the additional cost to put in the second floor then? The structural elements, the steel, all those pieces were in excess of $2 million. In excess of $2 million. Well, yeah, I'll just say that I know you're only looking for consensus and I'm certainly not going to stop the process that you're doing going forward.

1:00:15 By any kind of comment on my own. But at the same time, I'll just, you know, say vocally, this is very frustrating. And I know we're going to hear about it from the public. And as much as I hate to ask for the letter from Sharon Clark, I would like to hear it or see it if that's been forwarded to us or not. Hais, did you want to just speak about if council provides direction to staff tomorrow to proceed with the second bid? Do you want to talk about that in the timeline?

1:00:59 Yeah, the idea would be if we received direction to go ahead and redid it, which is staff's recommendation. We would work with our architects, I believe at no cost, to re-scope the existing set of plans, not redevelop a new set, just modify the existing plan set with redline markups and the project right out back to it. We believe we could probably do that within three to four weeks would probably be a reasonable guess, and we'll probably work backwards.

1:01:29 to evaluate some timelines to align some of the decisions to the decision making with some of the other town council decisions related to budget. I'll ask just one other question and that's of Matt McLean and Mammoth Lakes Recreation. Is there any update you can provide as far as fundraising for this or is it still too soon? And it may be too soon, but I was just wondering if there's any kind of questions along those lines.

1:02:02 What would happen if there's any fundraising opportunities to make up some of the shortfall? Well, that's a good question. I think, you know, the deck that we presented to town council back in late February, we... Did you lose Matt? We got this and then we lost Matt. We're gifting a lot of it. Okay. Anybody else back? Sorry. So as I...

1:02:42 was saying the fundraising plan we presented to council back in February was primarily centered around major gifting, large sponsorships and some salon events kind of with a last mile effort here in town. The challenge is going to be that this COVID situation has put a lot of pressure on businesses who might otherwise be inclined to support us.

1:03:12 Certainly on, you know, major gifters, they might still be a possibility. Salon events are going to be challenging as long as it's, you know, difficult to having intimate events in living rooms. So it's not out of the question, but I can't give you a specific or an accurate estimation on how successful those efforts would be in the current climate. It's going to be tough, but, you know, six months from now, it might be better. I mean, one thing I've learned over the years is that...

1:03:43 The landscape's pretty resilient, and a lot of it's just going to depend on how quickly we get back to normalcy and how quickly we have like a therapeutic or a vaccine where we can kind of get people together confidently and safely. Okay, thank you, Matt. Thank you, Matt. So, Hayes, so if there was an award, it would be potentially October that you'd be coming back to council? No, I think we would probably move faster than that. I think it...

1:04:24 We would probably push for sometime in July, getting back early July for going out back to bid, opening bids early August, and then we would provide probably somewhere between 60, 90 days for council to make a decision, depending on what the budget situation and other decisions that council needs to make, we would probably align our staff report with those presentations. So that could occur anytime between August and October. I don't think I'd pin down a date at this point.

1:04:53 Which is a key point, right? Because that decision is not tomorrow. The decision that council is being asked tomorrow is to move forward direct staff to rebid the project. And then based on the bids, they would be then asked to either take action in September, October on those bids. So I want to make sure that's clear. Yeah, the goal is to provide another opportunity.

1:05:22 Try to rein this thing in and get a project that still meets all of the expectations, but fits within the budget. And the one last point I'm going to talk to at Cal Council, and I'm going to kind of do this loosely here. I was asked to kind of look at what a project like this means to the community financially. And this is difficult because a lot of the businesses that look at how infrastructure investment impacts community, they cost money.

1:05:51 And we're not allowed to go out and hire consultants to do analysis like this. So this comes directly from contractors that have did the project. And I asked them a couple of very specific questions about, you know, how this money gets spent if you were to award a project, let's say, in the $8 million range. And they said this project is very labor intensive in that we would expect somewhere between 40% and 50% conservatively.

1:06:21 to be returned back into our economy as payroll. The majority of the subbase was local out of Bishop and out of Mammoth. And so I don't want to provide any specific numbers, but we could estimate that somewhere between three to four million dollars of our investment in this project would return back into our local economy through payroll.

1:06:50 Through hotel stays, through restaurants, and the hardware stores and such, and our partnership in the region. So just something to keep in mind. History has shown that, you know, in times of economic distress, governments turn to infrastructure projects, and I was asked to kind of speak to that. That is...

1:07:19 Pretty much the extent of my staff report. My presentation tomorrow will probably follow a similar format, just a little bit more refined. And again, you know, we're just looking for an opportunity to rebuild this project and take on a crack at it and then give Town Council a final say on whether or not... Thanks, Hayes. Are there other questions for Hayes? And then we can just get into some comments from Commission. No questions. I don't think I have comments. Thanks, Hayes.

1:07:54 Okay, so if there are no more questions for Hayes, then let's just kind of get into some general comments. Sean, do you want to start? And again, these are comments I can take to, you know, that we can take to council, but we don't need to make any, we don't need to have any formal motion. Yeah. No, I'm not going to make any Hayes. I'm not going to make any comments at this time. Okay. Laurel? Well, I want to echo a little bit of what Sean was saying earlier that I...

1:08:25 Not real thrilled that we are at this place again, but you guys have put so much hard work into trying to make this work almost kind of a square peg in a round hole here at times it feels like. So I want to commend Hayes and the Rec Department team and Grady's team and everybody who's been working on this for a long time. I have mixed with...

1:08:50 Feelings when I read the packet and saw where we were at again. But I totally understand. And I think, Hayes, you did a very good job kind of laying out the whys and hows we got to this point. Based on some of what I've been hearing around town, there's kind of a general assumption that it's just not going to happen now, obviously, because of what's going on. So good to see that we are not just throwing out

1:09:19 The baby with the bathwater here and all the hard work that's been done and still trying to see if it can work because I do see at the end of the day a lot of good benefit coming out of this even though I am chagrined that it is not quite what we were hoping for just as I was two years ago when those plans came out that were so pared down I kind of went but I've been unrealistically optimistic for the last two years that

1:09:47 Steel prices would go down or something. I don't know. So I, again, I'm not real thrilled with where we're at, but I appreciate that we're still moving forward rather than just giving up at this point because you guys have worked hard and I think this would be a great, great benefit to the town. So thank you. Thanks, Laurel. Christy? Yeah.

1:10:13 I mean, I'm with Laurel pretty much 100% and Sean in terms of being slightly frustrated. But again, you guys have worked so hard and I just, I trust that you're gonna make it great. But I, you know, I'm also trying not to get too wrapped up and, you know, town council essentially is the deciding factor tomorrow on the rebid. So just kind of letting it go to that. But, you know, to Laurel's sentiments, I echo them pretty much 100%.

1:10:43 I think it would be great for the community. I think we need it. I guess the other question I have is, you know, obviously if we pushed the bid off, the opening would be pushed off. And so are we good to keep using the other ice rink until that happens? We would have to renegotiate those terms. So it currently expires next June, June 30, 221. Yeah. So if we needed to push another winter, then we'd be back requesting the extension.

1:11:15 to the school district who've been very amendable through this process. So thank you. Thanks, Christy. Dan? Everybody's frustrated and disappointed, but I think that we just accept that and we put it behind us, we move on. You know, what's done is done. When I think about this, and it's becoming more and more clear to me, is that, you know, we went out shopping for something.

1:11:49 And that was an SUV. And we looked at a Toyota. And it was going to be great. And everybody would have been happy with that. Then we moved up to the VW Touareg. Then we realized, you know what? Porsche makes the same car and it's even better. And everybody got their sights set on all the bells and whistles of one conception of what we wanted. And you know what? We're back to where we started from, which is great.

1:12:18 You know, I've kind of come to the conclusion that we're getting what we always wanted with this plan. We're disappointed not to get the bells and whistles and the architectural Taj Mahal that it eventually grew into. But I think overall, my impression is that, you know what, this is what we need. This is what we can get. And, you know, there's nothing really to be disappointed in with that. We wanted something more.

1:12:46 Too bad. You know, it's unfortunate. But, you know, I think that this will work. And I can get my arms around it. You know, I want to sleep on all this a little more and ruminate on it. I look forward to seeing what Hayes comes up with in terms of, you know, a new floor plan. And I think it should work. I'd like to see at least the rough plumbing or, you know, getting the rough electrical and rough plumbing stuffed in for a kitchen facility.

1:13:16 You know, that's PVC under the pipe, under the slab. You know, if we could do that, that would be nice. But I think I'm okay with this. That's my overall impression. I do have some follow-up comments, if I may, Betsy, since I didn't talk earlier, because my biggest concern, what happens if this is rejected by town council? Town council completely reverses decision and says, we're over budget.

1:13:48 You know, right now we're looking at a loss of income as a community. And I guess my question is, what if, worst case scenario, is this something that Town Council very well could reject outright? I was waiting for Hayes to jump in there, but I think worst case scenario, Commissioner, is the fact that Council would, one, reject the bids. I mean, that's the action. Two, if they don't direct us to move forward the rebid.

1:14:21 The direction could be pause, right? Just hit the pause button. Let's just wait till we kind of get through whatever we still think we've got to get through. Obviously, budget is coming forward June 17th, and that's going to be a 3.7, I think 3.9 million, you know, change that we have to balance. So, you know, there's a lot of external factors and a lot of unknowns.

1:14:48 I think that's probably what we all understand could very well happen. So if that happens, that happens. The project goes on pause. Pros and cons either way. But that would be the other option that council could take tomorrow night. And Stuart Hayes, I don't know if I, I may have missed this earlier when I was having internet issues, but could you just also speak to what happens if we proceed, if council...

1:15:14 Opps to move forward with a bid and then the bids still come back high, then what happens? Yeah, honestly, I think if we go through this exercise and Stu and I put the effort into really, you know, to use Dan's analogy, get back to the Toyota, if we still come in high, we're going to have to have a difficult conversation about the future of this project. Because I think at that point, we've basically got it down to the

1:15:45 Most economically efficient project to meet the intent of the programming that we see feasible. And so we'd have to really make some difficult decisions and recommendations. Why hit a pause button unless there's some cost involved? Is there any cost in doing what you're doing to get a new bid in on the new content? No, it's a minimal amount of staff time, some advertising costs.

1:16:17 We're not anticipating any cost through our architecture structural team. So it's really, in my opinion, really a no cost. And, you know, to understand where we really are with the Toyota version, I love this analogy, to have that information going into the more difficult budget discussions later in the year with council, I think is important, but that is just my recommendation. Town council will make that call.

1:16:49 That's my view that if this doesn't get done, I don't see how anything can get done. You know, it's worthwhile. It's a major community infrastructure. So hopefully town council will at least see fit to not hit the pause button. Hayes, did you want to briefly talk about, might be a benefit here, why it's important now to move forward with the rebid and not wait? You said there was a number of factors relating to the...

1:17:23 The bid estimates that all the contractors are put forward. So there's advantages there as opposed to waiting another six, 12 months. The contractor community, there's uncertainty there. And a lot of municipal projects dried up with COVID. And so we're seeing better than normal numbers. And I even received a letter from one of the contractors saying,

1:17:50 We're seeing the best numbers we've seen in years from our subs. We really could try to work with us to find a solution. That and all of our contractors have their numbers. They've been through the business project. They have the subs lined up. So it'll be pretty easy for them to come back and provide that information again in a reskill project. It also mitigates our uncertainty. You know, these numbers are only good for so long until

1:18:17 You know, politics or the next steel crisis occurs. I need to stop paying projects during national emergencies and probably be better off. But I think it's important to try to move this forward as quickly as possible to take advantage of the work that's already been done by the contracting and subcontracting. Thank you. Thanks, Hayes. Are there any other comments from commissioners? Yeah.

1:18:51 I just want to say I kind of agree with everyone. Part of me is a little nervous because just who knows what happens next. This project seems like every time it goes out to bid, something else happens far out of our control. But I think the economic stimulus argument is really important. And I also think that Kat's points about programming and, you know, in a crisis like this, the needs that we have.

1:19:16 to be able to do any programming in terms of space and facilities. I think this project, we're still amenities deficient in our community and that's just not going to change until we build something. So I think that's kind of where I'm landing and I'm just, I'm kind of anxious to see what direction the council takes. To me, there doesn't seem to really be any harm in spending staff time to take it back out to bid because

1:19:43 There's not really any risk other than that if the bids still don't line up and the stars don't align, then ultimately the council rejects the bids yet again. But I don't think there's any harm in moving forward at this time when it seems like a pretty favorable climate. So that and the economic stimulus are my only comments. Stu, Kat, Hayes, are those kind of sufficient comments for you from commission to take to council?

1:20:14 Hayes has got a thumbs up. Yeah, I appreciate everybody's thoughts, opinions. It's very frustrating for all of us, as you can imagine. It was not our intent to bring it before the Commission the day before Council by any means, but we're at unprecedented times and we have to take unprecedented measures to keep things moving. So thank you. I really appreciate your time this afternoon on this item.

1:20:42 I think that's satisfactory for us. Kat, did you have any other comments at all on? Sorry. No, I think I'm good. Thank you. Okay. Thank you, Chair. All right. Thanks to all of you. So that moves us on. Does anyone need a break? Is everybody doing okay? Fine. Okay. Well, I'll keep going then. So item number four, the 2020 youth sports funding recommendations. We're going to move on to that.

1:21:14 Kat, I was really very appreciative of you putting this together for the commission so that we could talk about it before sending this on to council. So much appreciated and I'll let you take it away. Okay. So moving, sorry, let me just get my screen in order. Moving on to something, I guess, a little more positive, sports funding time again.

1:21:41 So each year, the Town of Mammoth Lakes awards funds to supplement organized non-profit and self-sustaining youth sports programs that may be in need of additional funding to provide enhanced programming or to foster greater participation for low-income residents. This year, once again, there is $36,800 identified in the Parks and Recreation budget.

1:22:03 for allocation to youth sports funding. This includes the $8,000 from Mono County. So I'd like to take this opportunity to thank the Mono County Board of Supervisors for their contribution. It's greatly valued and appreciated. With regards to this year, obviously things are a little different under the current climate.

1:22:25 The application period opened at the end of February and was initially scheduled to close at the end of March. With the COVID-19 pandemic, we decided to extend that application to the end of April. And unfortunately, it also meant that we had to cancel the eSports funding workshop.

1:22:49 This year we had initially scheduled a second workshop for October 13th and we are optimistic that we will be able to go ahead with that, whether that is virtually or in person, we don't know yet, but I think that will be very valuable this year considering that, oh sorry, Siri, I think that will be very valuable this year considering there is probably going to be a lot to talk about then.

1:23:19 With regards to the applications this year, we had 10 applications. So that was an increase of one. We had a first-time request by the newly formed Eastern Sierra Soccer Club. We've reviewed all the applications for funding. There's a couple of things that we would like to make the Commission aware of before we move into discussion on them. That is that the Mammoth Lakes swim team submitted their application significantly late after the closing date.

1:23:48 And all of the organisations have a non-profit status with the exception of Eastern Sierra Soccer Club. They are currently in the process of filing with the state for that. So they do not have one yet, but hopefully they will have that soon. There is a summary of the funding applications in your packet. I'll move on to that table in a little bit. Just a couple of other things that are...

1:24:18 Pertinent to this year. Obviously, the Tony Colasado Scholarship Fund was established in February of this year. We've received a lot of very generous donations. With that scholarship fund, as well as helping to provide partial and full scholarships for the programs that the Parks and Rec Department offers, it's our intent this year to also allocate each sports organization with two full scholarships funded by the Tony Scholarship Fund.

1:24:46 Tony Colosado Scholarship Fund. Those would be awarded at the discretion of each organisation to whomever they felt was deserving of that and their application process would be at the discretion of each organisation as well. Secondly also is obviously our current climate and the COVID-19 pandemic.

1:25:08 Currently, right now, the CDC guidelines recommends that no organized sports or activities take place in a group setting. California still has a restriction on gatherings. So at this time, none of our youth sports organizations are able to

1:25:28 Partake in the activities that it is they provide to the community. The Parks and Recreation Department are going to continue to closely monitor this. As I mentioned earlier, I'm currently working on guidelines for organized group recreation activities of which these youth sports organizations are and when they can take place and how they would need to be modified under the current stage and stages as we move down the line of reopening.

1:25:57 So there are just two things that are going to be dependent on our funding. The request for funds you can see right here now. Let me pull this up on screen, sorry. These are the funding requests for 2020.

1:26:18 They are outlined quite clearly there. As you can see, the initial requests were nearly $10,000 above what the funding amount is that we have available. So looking at that and taking into consideration that we had a new application from Eastern Sierra Soccer Club, what the town stop are recommending is a 5% reduction in the funding awards that were given in 2019.

1:26:48 And you can also see there that Eastern Sierra Soccer Club has been awarded 50% of the funding that, oh sorry, less than that, no, of the funding that they have requested. Today we are requesting that the commission do a number of things. I'll bring that table back up in a minute.

1:27:12 But we're requesting that the commission review the sports funding applications, which was in your packet, so hopefully you've had a chance to be able to do that, and just participate in a discussion to determine that appropriate funding for each organization. We're asking the commission consider the funding recommendations under column A that town staff have made. As I mentioned earlier, this represents a 5% reduction.

1:27:37 For each organisation's enabling the accommodation of the new Eastern Sierra Soccer Club. We're also asking that Commission allocate youth sports, the youth sports organisations to full scholarships funded by the Tony Colosado Scholarship Fund.

1:27:55 And we're also asking that you approve the allocation of funds dependent on authorisation by the Mono County Health Officer or the Parks and Recreation Director. Currently, as stated before, the guidelines restrict new sports organisations happening currently, but hopefully we will be moving out of this stage. There will certainly be modifications in place, and we ask that the Commission...

1:28:23 Accept those and also look at in the event that the current COVID-19 pandemic prevents these youth organisations from undertaking a 2020 or 21 season, those funds will not be awarded to that particular organisation. Are there any questions so far? Let me bring up the table for you guys. Thanks, Kat. I think we'll start with questions and then we'll kind of tackle these items one by one.

1:28:53 If I could ask a quick question in follow-up to what you just stated is if these teams are not able to participate this year, I mean, I'm doing this and just thinking about with regard to, for instance, the swim team, track club, summer type events, you know, what are the odds that they're going to be able to even organize and play this season? Some of the winter, perhaps, but I'm just...

1:29:22 With regard to the summer? It's certainly dependent on what Mono County, how Mono County moves through the phases. If we look around California and other counties, some of these sports organizations are starting to operate, obviously with large modifications to what...

1:29:41 Would usually be in place, but swim teams are beginning practices. It doesn't look like there will be any competition or USA swim competition meets this season, but they are certainly undertaking practices. AYSO and Little League, same kind of thing. Certainly no organized games or travel games, but there are instances of them starting to...

1:30:06 Starting to begin practice sessions and team drill training and things like that. So it really depends on where we are and what stage we are in the near future. I'm certainly hopeful of some of these organizations being able to hold modified practices, whether they'll actually be able to hold games is probably less likely.

1:30:32 I really want to commend Kat T because she's really been very much on top of the CDC and the NRPA recommendations and really working with these organizations to kind of, you know, assist them, you know, through this situation. So I really appreciate the time she's put into that. My question, Kat, is as of right now, can any of these organizations operate? I'm thinking about Husky Club. Will Husky Club meet any of the child care provisions?

1:30:59 So my last conversation with the Husky Club director is that they are hopeful of opening before school returns. I've heard conflicting things to that coming out of other school board meetings, so I'm unclear on where they are. Husky Club would be able to operate within some of the childcare limitations. Obviously, the numbers that they would have in there would be significantly reduced.

1:31:29 The information I have with my conversations from the Director is that they are looking to open in the near future. Like I said, I've heard conflicting stuff, so. Thank you. Thank you. Any other questions for Kat? I think the only other comment I wanted to make to the Commission was if one organisation or several organisations are not able to operate, it doesn't mean that the organisations that can then get to

1:32:04 Use all that money and then split it up and then share it amongst themselves. Do you know what I mean? That's not appropriate. So what we're saying here is the recommendation as presented by Kat and worked through the staff here is that if AYSO Soccer can operate their program in the fall, they will get their $1,100, $400. If they can't, then it is not available and it doesn't get carried over to next year. So then we have this, you know, double purse next year. I mean, this is just...

1:32:34 If you can operate, this is the money that the town has for you. If not, you know, it's not available. So we just want to make sure that everybody's clear on that at this time. And it's a really difficult situation to be in. You know, if you've got Little League starting right now for their program where they should have started probably several months ago, you know, unlikely to get their season. AUSO might. You know, again, you look at swim teams, 50-50.

1:33:00 Club Volleyball, Indoor Program, really difficult, you know, Eastern Sierra, you know, so there's just so many variables that come into play and the guidance is very difficult to follow. We're doing the best we can, things can change, but again, we're just taking that approach that the recommendations as presented with that 5% reduction across the board will be awarded based on their opportunity and capability to operate their seasons. If they cannot, then the funds are not awarded.

1:33:28 And the remaining balance stays with the town. I've got some individual questions about the organizations. But before we go there, following up with what you just said, Stu, how do we determine that they get the full amount? And I'm sorry to ask these what-if questions, but what-if questions, right? So let's say that we get to the fall and AYSO is ready to operate.

1:33:57 They start out, but then a resurgence of COVID comes around and they have to stop. Are they still going to get the full amount that we award them? Or is it a percentage based? And I don't know if you have an answer on that, but just curious if there's been thought put into that. I don't know if Kat's had a chance to talk about it. I don't know if we've talked about it. I think, again, unprecedented times calls for very...

1:34:25 Innovative, unique solutions. So happy to put it back to the commission if there's an opportunity for a discussion, if that does come forward. You know, we have a plan in place and we outline that in the letter of agreement with these organizations. So, you know, again, with a lot of these groups, you know, the funds I know from AYSO, you know, largely for uniforms and a lot of those upfront costs.

1:34:52 They're more than likely going to be purchasing all those uniforms up front. And then if we come back and say, okay, your program's not going to happen and they've paid for all those uniforms, they're out of pocket for all that money. And then we take, you know, so again, I would say case by case on a situation, but happy to receive input from the commission. That's a very good question. Well, sorry, any more questions on this subject?

1:35:22 I just had a comment to make, which is, you know, there has already been some questions about potentially some of the organisations that have a spring or summer league, specifically Mona County Little League, you know, what if they can get something together by October and they decide to do something in autumn? So once again, I think with that kind of thing, it has to come down to a case-by-case basis.

1:35:51 Fairly confident that the season is going to go ahead. So I think when the timing of the season shifts significantly, then that will also be a case by case discussion. Yeah, I think those are good questions. And I think, you know, it's just, it's really difficult to, you know, really have that crystal ball and know what happens in the future. But I do think that, you know, these funds are really important for these organizations to be able to operate if conditions permit.

1:36:24 I'm comfortable kind of moving forward and just, you know, kind of taking up any questions that are on any of the applications from any of the commissioners. Has everyone had a chance to look at the individual applications? Yeah, I did yesterday and spoke with Kat for a while to kind of go over all the intricacies of how this works. And it's intricate to say the least, especially in these times. So thank you so much for all you're doing.

1:36:53 You know, I think it looks good from my perspective after speaking with Kat. The one thing that I had a question on, I don't know if, you know, the public feels the same way, but there are some that award scholarships and some that use it for, you know, renting the field or the pool or whatever. So my only question was, you know, should more money go to maybe people who are offering scholarships, but at the same time, you know, that those rental fees are giant in themselves. So I, you know.

1:37:22 I defer to Kat on these. I think, you know, like I said, we had a good talk yesterday and I understand sort of how intricate it is. So I feel good with what's up there. Thanks, Christy. Any other comments on the individual applications? Sorry, I've got a question. So you mentioned that the swim team was late with their application. Is that right? Correct, yes. We had somebody last year who was late with their application. That wasn't the swim team, was it?

1:37:56 It was not swim team. I believe it was AYSO last year. Okay. Sorry, that was the year before that AYSO was late. Okay. Is there a reason why the swim team, I mean, I don't want to be cutting anybody off, but at the same time, I know we try and get people to make their applications on a timely basis. Was there a reason given at the same time why they were late? I think with regard to the swim team, they have an entire new board this year.

1:38:24 You know, COVID hit, people were busy. It was just hard to get it together. They struggled a little bit with that, so. Totally get it. Yeah. And then my final individual question is, what's the difference Eastern Sierra Soccer Club? They are new this year. They've never received money from this sports funding. Is that accurate?

1:38:48 That's correct. So Eastern Sierra Soccer Club is hoping to operate under something that had been formed earlier in previous years before my time. But the idea of Eastern Sierra Soccer Club is that it would be a travel team, which was their initial application. Since this application period, the interest that they have, it looks like they would probably be fielding two travel teams. And it's certainly something that I think...

1:39:16 There is a need for in Mammoth. And I think that we have, you know, AYSO. And then I think having a travel team is a good mix. And yeah. Okay. Thank you. That's it on my questions. Thanks, Sean. Dan, did you have any questions? I don't have any questions. I just think it's, as always, a very helpful process that's been conducted here by you guys.

1:39:46 Concur and approve of everything that's been recommended. I'd like to see this Eastern Sierra Soccer Club. That's exciting. And I'm glad that you made an accommodation for them by reducing everybody else a little bit. Club soccer is very expensive. Very, very expensive. A lot of travel, hotels, meals out, and registration fees. So every little bit helps. And it's kind of interesting to see.

1:40:15 Track Club requesting 100% more this year than last year, but it's small, so it doesn't really matter. So it all looks good.

1:40:29 Thanks, Dan. I think for me, just under normal circumstances, obviously we'd be able to talk more to these organizations and ask some more direct questions of them. Clearly that's not possible, so I don't want to penalize anyone. I am also happy to see club soccer come forward as its own program. I wish that they had submitted a budget just anticipating where those dollars would go.

1:40:55 I agree with Dan. It is, you know, it's an expensive proposition. And I'm hopeful, too, that, you know, that the money will really allow, you know, some participants that might not, you know, be able to play travel soccer otherwise. So I'm excited about that. I was really pleased to see the growth in the track club. You know, that was a new organization not so long ago. And it's, you know, just really, really come along, which is exciting to see. So those are my only comments.

1:41:21 So I think that takes us through item number one. Item number two is to consider the recommendations listed in the table. I am very comfortable with what Kat's presented. Okay. Okay. Super. So then that takes us to item number three, which is to allocate each organization to full scholarships from the Tony Colasardo Scholarship Fund, which I think is great. Does anyone have

1:41:56 Any other objections or comments? So we were just saying we would like for two to go to each organization? Or are we picking? Correct. So each organization would have the ability to award two full scholarships, but they would be at the discretion of the individual organization. So we would provide them with the funds from the Tony Colisado Scholarship Fund. They would...

1:42:22 Decide on the application process and the review process and the award process as well. Yeah, I think that's great. I think that's the way to go. They're in the best position to determine who receives the scholarship. I think so as well. I think they have a better knowledge of who their participants are and that kind of thing. So, yeah. Let me ask this question with regard to the scholarship fund. Is there...

1:42:53 What kind of precedent is there from other municipalities that are allowing the individual organizations to make the decision on who gets scholarship? Are we setting ourselves up for any kind of challenge or problem? If there's any kind of, I don't want to say fight, but any kind of disagreement within the organizations themselves as to who's getting the scholarship?

1:43:19 So the research that I've done is that with regards to scholarships, it seems to generally be in the hands of the individual organisations. They have an understanding of what it is that they want. So in a sense, the scholarship is another gift of funds for them to use how they want. We're directing the use of those funds as scholarship funds as opposed to the youth sports funding, which we are allowing the organisation to spend on.

1:43:47 Whatever they choose that is pertinent to their individual organisation. So the scholarship one has a little bit more direction on it, but we're still allowing the individual organisation to decide. And that seems to be standard practice across other agencies and new sports groups. I think we want to, sorry, certainly confirm their kind of scholarship program.

1:44:17 And to reiterate that it is for, you know, participation, that it's not for equipment, you know, not for paying rent, you know, not for those, you know, supplies and materials. These are, you know, these funds are dedicated to get our kids in our community on the field, you know, on the court, in the pool and so forth, right? So I want to make sure that, you know, that's pretty clear and I think we can do that. If you would like to see some other checks and balances, then we're happy to entertain that from a department.

1:44:46 The Commission feels that's needed or warranted. I guess my question would be if, you know, if we go ahead and proceed with this, then could that, you know, could that language be included in the MOUs? Yes. Certainly, yeah. Yeah, no, I don't, I will take it on advisement that it's best to give those to the organizations and allow them to award the scholarships. Yeah, I agree. I just, I think I do agree with.

1:45:24 With Stu, there should be some parameters just making sure that the funds are going to benefit kids that might not participate otherwise. Yeah, I agree with that too. I think it's a very important stipulation. Okay, so with that, so item number four, Kat, if you could just scroll down a tiny bit more. If someone would like to make a motion, we could probably use this language. I'll move to approve the allocation of funds to the youth sporting organizations.

1:46:03 as recommended by town staff. I'll second the motion. There's a motion and a second. Any further discussion? Jamie, since we typically do take a roll call vote on youth sports funding, this is the commission's recommendation that then would proceed to the town council. Could we have a roll call vote, please? Commissioner Contois? Just a quick question, Chair. So we do want to make sure that this language in four is in the motion as well. Okay. So I'll read it.

1:46:37 Technically, you don't have to read it. We can just add this to the motion if that's your motion, Commissioner O'Connell. Yes. The motion is amended to include all the language included in item four. Christy, will you also amend your second? Yeah, I amend my second to include all the language in item number four. Thank you. Okay, now we can go ahead with a roll call vote, please, Jamie. Commissioner Cantoir? Yep.

1:47:11 Commissioner Martin? Laurel has recused herself. Got it. Commissioner O'Connell? Yes. Vice Chair Turner? Yes. Chair Truex? Yes. Motion passes 4-0 and thank you to staff for forwarding this on to council for their approval with all requisite language. Thank you. Thank you.

1:47:41 And I do just want to thank Kat again for hard work. I know this is really tricky. This is really tricky to put together under the best of circumstances. So I really appreciate you working through this in the current situation. Thank you. Okay, so that brings us to commissioner reports. And also, since I kind of preempted our commissioner comments on the staff report so that we could get Hayes' presentation.

1:48:07 Please feel free in your commissioner reports. Anything that you want to comment on in the staff report from earlier would be appropriate. And I see Laurel's back. Thank you. Laurel, do you want to start with, we'll start with you for commissioner report. Great. Well, gosh, it seems like forever and I feel like I have nothing to report, but no, I've been actually out doing dog walks and been seeing the great efforts done by the crew to keep the parks.

1:48:39 As beautiful as they are with all the increased use and the restrictions on use and things like that. So I really want to commend Warren and team for doing such a great job. And I was admiring the fencing at Shady and hearing the chings or whatever you call that sound when the discs hit the chains on the golf course. So it's really great to see that being used and folks keeping their distance and everything now. So I wanted to.

1:49:06 Commend everybody for the weird, weird transition from winter to summer and rolling with it and making it as usable as we can because as I've said many times, our recreation amenities are necessary for our residents and our guests and especially in times like these. So thank you guys. I guess that's all I have to report. Thanks, Laurel. Dan? I have nothing to report, but it's good to see all of you.

1:49:37 Yeah. If not in person, looking forward to being together in person again. Thank you. It's nice to see all of you as well. Christy? Hello. Yeah, echoing the sentiments about being back together again. It's great. Back to the staff report, the only thing that I don't know if we touched on the Whitmore expansion, but just kind of reading through the bullet points, it's super exciting. So I hope that we can continue to kind of push forward with that. We love the idea about hosting tournaments.

1:50:11 Bringing people here and kind of just exciting there. To Laurel's point, the trails look amazing. You know, Joel's team too, I've seen them out a couple times and they're doing really good work. Everything looks great. I haven't checked out the disc golf course yet, but I'm looking forward to that. And then just a note to Kat and Lauren and Stu and the team, you know, this is just such a weird, strange time and the resolve and commitment that you guys have to making sure that we're putting...

1:50:40 Things, virtual, keeping recreation alive is just, it's really admirable and it's a pleasure to be and an honor to be a part of it. So thank you guys for working so hard and congratulations to Betsy. Thank you. I have a new job if anyone hasn't heard. What's your new job? Tell us. Well, we'll save it for my report. So, Sean?

1:51:07 Okay, all right. Well, I'll say real quick that likewise, I've heard great things about the discourse. So really glad to have that up there. It sounds like it's just the perfect COVID activity. So really glad to see that that's one of our success stories. So whatever we can do to promote that, that is a great success story. Stu, I've been trying to, I apologize, you and I have been playing phone tag for the past five days.

1:51:35 Because I did want to ask about campgrounds and any further updates since Friday. I know that this is a state county issue as far as when we're going to be able to open up campgrounds. I was going to talk to you further about what our communication is and if we can have that conversation privately or maybe now is a good time to at least just kind of update the commission on the status of campgrounds.

1:52:04 And the communication is on the monocounty.ca.gov site. Is that accurate? Yes, under the community slash recreation section. I'll jump on a call. I don't want to jump in the middle of Commissioner updates with Commissioner Turner, if that's okay. Just really briefly, that Camp High Sierra opens Friday. Mammoth RV Park has permission to operate on a limited capacity at this time. But no further updates on? Not on federal campgrounds. Federal, okay.

1:52:36 Thank you. Sean, did you have anything else? That's it. Thank you. Thank you. Okay, so really quickly, first of all, if anyone is interested, on June 13th, CAPRCBM, our Commissioner Association, is holding a Zoom training. So if anyone is interested in getting the link and participating in that, you do have to register, but if you could just go ahead and if you could reach out to me, I'll connect you to Paul Romero, who's the Executive Director.

1:53:06 It should be just a couple hours. It'll be similar to the training some of us went through here last October, which seems like a lifetime ago. But anyway, CAPRCBM is moving those trainings online and we can participate for free. So if you're interested, let me know. I've actually been having several meetings with CAPRCBM and I have to say that the outlook for Parks and Recreation in other municipalities is really grim.

1:53:33 I feel incredibly fortunate here in Mammoth that I think that our community really recognizes the value of recreation generally and of parks and recreation specifically. I have a number of friends, commissioners whose commissions have been dissolved. Their departments don't exist anymore. They've either merged with other departments or have been eliminated through budget cuts.

1:53:55 So it's a really difficult time. And, you know, in light of that, I just, I really, really want to call out our staff. I think they've just done a phenomenal job throughout this crisis. You know, Stu is the PIO, you know, Lauren joining, you know, that team, Kat, you know, like really, you know, keeping everything together on the recreation side, being really creative with, you know, with virtual things and other things to keep recreation going. And then I can't, of course, say enough about Warren and his team, so.

1:54:24 If you see Warren or our Parks Maintenance Team, please give them an elbow bump because they've really kept our parks looking great. I know it's been really hard. Our staff worked so hard to open and maintain parks and having to ever close a recreation facility is not anything that they or the rest of us want to do. So I'm just incredibly proud of everyone and I really just want to say that publicly.

1:54:50 Ironically, one of the last things I did before the pandemic was attend the CPRS conference with Kat, Lauren, Stu, and Warren. And it was fantastic and really got a lot out of it. And then the world really kind of imploded. So I wanted to mention that that did happen. And then finally, yes, I do have a new job. So Rich Boccia has retired from the Mammoth Lakes Foundation. So as of yesterday, I'm now the Executive Director of the Mammoth Lakes Foundation.

1:55:21 Congratulations. Thank you. Yeah, and it's just, it's very difficult times for nonprofits. So, you know, a lot of changes there. You know, things are tough. So I'm really just pleased to see the town just moving forward and our team working together so well. So thanks to all of you. In terms of agenda items, I don't know if anyone has any requests for agenda items, but...

1:55:46 For our adjournment, typically we don't meet in July, so we do have an adjournment on here for meeting in July, but I think that unless something comes up that's really pressing, we will probably just hold off and not meet again until August, if that is acceptable to the commission and staff. That sounds great. Unless something comes up, we need to deal with that, huh?

1:56:11 Yeah, and I think, you know, Kat, you pushing the staff report out, you know, to commission when we're not, you know, able to meet has been super helpful. I don't know about everyone else, but I get a lot of questions from the public. What's open? What's not? What can we do? What can't we do? And so thank you for keeping that updated along with all the other resources. And we'll continue to do that as we move into July where hopefully we have a few more things going on. Awesome. Thank you.

1:56:39 Okay, so unless anyone has anything else, then I will adjourn us to our regular meeting, hopefully, on the first Tuesday in August. I did want to say just one thing. I believe Sean, Christy, and I are on expiring terms, so on the off chance that this is our last meeting together as this commission of five, I just wanted to say it's been great working with all of you, and thanks for all that you do and give for our town and our community.

1:57:09 Yes, thank you, Laurel. Stu, do you have any updates on that? Will the council still proceed with commission appointments in July? I believe Jamie is on. So, Jamie, did you want to give commission a quick update on that process? Yes, we're proceeding as usual so far. The ad will be in the paper this Friday. The incumbents have already been notified and asked to reapply. I'm not sure how we will handle the interview process at this point, but I'm sure we'll figure something out.

1:57:38 Thanks, Jamie. And thanks, Laurel. Okay, so if no one has anything further, I will go ahead and adjourn us. Take care, everybody. It's great to see you all. Thanks, everybody. Have a good day. Bye. Bye.