Mammoth Arts and Cultural Center (MACC) (CIP GF9)

Town budget documents list a Total Budget FY26-27 of $18,970,000 for the Mammoth Arts and Cultural Center (MACC) (GF9) [1] Final Budget Adoption FY26-27.pdf, p. 36[2] FY25-26 Final Budget.pdf, p. 34. The FY25-26 Final Budget lists $16,800,000 [1] Final Budget Adoption FY26-27.pdf, p. 36[2] FY25-26 Final Budget.pdf, p. 34. A staff report in the March 3, 2026 Parks and Recreation Commission packet says the Town Council awarded the $15,862,000 construction contract to Spiess Construction Co., Inc. on July 2, 2025, and that completion is scheduled for spring/summer 2027 [3] Agenda (PDF), p. 8. The June 2026 final budget text lists Measure U Capital funding reserves of $4.5 M, a $3M Mammoth Lakes Foundation (MLF) contribution, Kern Community College District funding of $7,500,000 and private donations as funding sources, and says the Town expects to open the facility in summer 2027 [1] Final Budget Adoption FY26-27.pdf, p. 36.

Updated

Findings

  1. 1 Final Budget FY26-27 lists a $18,970,000 total budget for the MACC, compared with $16,800,000 in FY25-26

    Updated

    The Final Budget Adoption FY26-27 document, filed with the June 17, 2026 meeting, lists "Total Budget FY26-27 $18,970,000" for the Dave and Roma McCoy Mammoth Arts and Cultural Center (MACC) (GF9) [1] Final Budget Adoption FY26-27.pdf, p. 36. The same $18,970,000 appears for GF9 in the 2026/27 CIP list in the March 3, 2026 Parks and Recreation Commission staff report and in the Tentative Budget FY26-27 [2] Agenda (PDF), p. 8[3] Tentative Budget FY26-27.pdf, p. 17.

    The FY25-26 Final Budget, filed with the June 18, 2025 meeting, lists "Total Budget FY25-26 $16,800,000" for the project [4] FY25-26 Final Budget.pdf, p. 34. By our calculation, the FY26-27 figure is $2,170,000 higher, an increase of about 12.9% [4] FY25-26 Final Budget.pdf, p. 34[1] Final Budget Adoption FY26-27.pdf, p. 36. A March 19, 2025 staff report estimated the total project budget at approximately $16.8 million [5] Award MACC architectural design services.pdf, p. 2. A December 4, 2024 agenda packet listed $15,500,000 for the project for the 2024/25 fiscal year [6] Agenda (PDF), p. 191.

    Sources

    1. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 8

    3. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17

    4. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    5. Award MACC architectural design services.pdf

      attachmentmeeting/filed datep. 2

    6. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 191

  2. 2 Town Council awarded the $15,862,000 MACC construction contract to Spiess Construction Co., Inc. on July 2, 2025

    Updated

    A staff report in the March 3, 2026 Parks and Recreation Commission agenda packet says the Town Council awarded the project's construction contract to Spiess Construction Co., Inc. on July 2, 2025, "in the amount of $15,862,000" [1] Agenda (PDF), p. 8. The report says over 30 people attended a groundbreaking ceremony on August 6, 2025 at 100 College Parkway [1] Agenda (PDF), p. 8. It says construction began in the summer/fall of 2025 with extensive site and utility work [1] Agenda (PDF), p. 8.

    The Agenda (PDF) says this contingency amount is reflected in the total project cost of $18,970,000 [1] Agenda (PDF), p. 8.

    Why it matters

    The contract amount is one part of the $18,970,000 total project cost [1] Agenda (PDF), p. 8. The report ties the contingency, not the contract, to that total [1] Agenda (PDF), p. 8.

    Sources

    1. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 8

  3. 3 Latest budget text says the MACC is expected to open in summer 2027; earlier 2026 documents said spring or spring/summer

    Updated

    A staff report in the packet for the February 3, 2026 meeting says staff contracted with AMS Consulting in 2025 "in anticipation of the facilities opening in the spring of 2027" [1] Agenda (PDF), p. 21. At 1:21:26 in the Parks and Recreation Commission recording of February 3, 2026, a speaker presenting the department's priorities said, "And we still look to have that opening in spring" [2] Parks and Recreation Commission — 2026-02-03 14:30:00, 1:16:09.

    The March 3, 2026 staff report says Edison Theatre will not be available for public use until the new center is officially opened [3] Agenda (PDF), p. 8.

    The most recent record is the Final Budget Adoption FY26-27 text, filed with the June 17, 2026 meeting [4] Final Budget Adoption FY26-27.pdf, p. 36. It says the Town broke ground in late 2025 and "expects to open the facility in summer of 2027" [4] Final Budget Adoption FY26-27.pdf, p. 36. The June 3, 2026 agenda page has the same wording [5] Agenda (PDF), p. 108.

    The budget text says groundbreaking was in late 2025 [4] Final Budget Adoption FY26-27.pdf, p. 36[3] Agenda (PDF), p. 8. The pages do not explain the difference [4] Final Budget Adoption FY26-27.pdf, p. 36[3] Agenda (PDF), p. 8.

    Why it matters

    As of the June 2026 budget text, the Town's stated expectation is a summer 2027 opening [4] Final Budget Adoption FY26-27.pdf, p. 36[1] Agenda (PDF), p. 21. Earlier 2026 documents gave spring 2027 [4] Final Budget Adoption FY26-27.pdf, p. 36[1] Agenda (PDF), p. 21.

    Sources

    1. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 21

    2. Parks and Recreation Commission — 2026-02-03 14:30:00

      transcriptmeeting/filed date

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 8

    4. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    5. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 108

  4. 4 Budget text lists four MACC funding sources: Measure U reserves, a Foundation contribution, college district funding and private donations

    Updated

    The Final Budget Adoption FY26-27 text says funding sources for the new Performing Arts Auditorium project "include Measure U Capital funding reserves of $4.5 M, $3M MLF contribution, Kern Community College District (local bond measure) funding of $7,500,000, and private donations" [1] Final Budget Adoption FY26-27.pdf, p. 36. The Tentative Budget FY26-27 and the June 3, 2026 agenda page list the same sources and amounts [2] Tentative Budget FY26-27.pdf, p. 17[3] Agenda (PDF), p. 108.

    The FY25-26 Final Budget text, filed with the June 18, 2025 meeting, lists the same four sources and amounts [4] FY25-26 Final Budget.pdf, p. 34. The text does not give a dollar figure for private donations [1] Final Budget Adoption FY26-27.pdf, p. 36.

    The project is described as a partnership among the Mammoth Lakes Foundation, the Town, Cerro Coso/Kern Community College and private donors [1] Final Budget Adoption FY26-27.pdf, p. 36.

    Why it matters

    Outside sources named are the Foundation, the college district and private donors [1] Final Budget Adoption FY26-27.pdf, p. 36.

    Sources

    1. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    2. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 108

    4. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

  5. 5 CIP carry-over tables list $11,000,000 in grants/donations for the MACC in 24/25 and $3,500,000 in 25/26

    Updated

    The columns show $1,820,000 under TOML - GF Committed, $4,400,000 under M - U and $11,000,000 under Grants / Donations [1] Table 1 - CIP Budget Outlook for 24-25 Carry Over.pdf, p. 1.

    The columns show $3,570,000 under TOML - GF Committed, $4,400,000 under M - U, $7,500,000 under Other and $3,500,000 under Grants / Donations [2] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1[3] Agenda (PDF), p. 52.

    By our observation, the $7,500,000 matches the Kern Community College District figure in the budget narrative [2] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1[4] Final Budget Adoption FY26-27.pdf, p. 36. The pages do not reconcile the two [2] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1[4] Final Budget Adoption FY26-27.pdf, p. 36.

    Why it matters

    The grants/donations column fell from $11,000,000 to $3,500,000 between the two tables, and the pages do not explain why [1] Table 1 - CIP Budget Outlook for 24-25 Carry Over.pdf, p. 1[2] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1.

    Sources

    1. Table 1 - CIP Budget Outlook for 24-25 Carry Over.pdf

      attachmentmeeting/filed datep. 1

    2. Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf

      attachmentmeeting/filed datep. 1

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 52

    4. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

  6. 6 The MACC scope is a single-story, about 7,482 square-foot, 239-seat theatre addition to Edison Hall plus site work

    Updated

    A March 19, 2025 Town Council staff report says the MACC scope "includes the addition of a single-story, approximately 7,482 square-foot, 239-seat performing arts theatre with support spaces, a new trash enclosure, reconfiguration of the existing parking lot, and other site improvements such as walkway connections and landscape/revegetation of the disturbed site" [1] Award MACC architectural design services.pdf, p. 1. The Final Budget Adoption FY26-27 text, the Tentative Budget FY26-27 and the March 3, 2026 staff report give the same 7,482 square feet and 239 seats [2] Final Budget Adoption FY26-27.pdf, p. 36[3] Tentative Budget FY26-27.pdf, p. 17[4] Agenda (PDF), p. 8.

    The March 3, 2026 staff report says MLF completed dressing and rehearsal rooms, new restrooms, concession spaces and other interior improvements [4] Agenda (PDF), p. 8. It says the Town's Parks and Recreation Department will manage the facility and coordinate annual programming with several organizations [4] Agenda (PDF), p. 8.

    The Attachment C - 2023 CEQA Addendum says the original study assumed 298 seats [5] Attachment C - 2023 CEQA Addendum.pdf, p. 146.

    Why it matters

    The seat count differs between the staff and budget documents (239) and the EIR addendum (250) [1] Award MACC architectural design services.pdf, p. 1[5] Attachment C - 2023 CEQA Addendum.pdf, p. 146.

    Sources

    1. Award MACC architectural design services.pdf

      attachmentmeeting/filed datep. 1

    2. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    3. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17

    4. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 8

    5. Attachment C - 2023 CEQA Addendum.pdf

      attachmentmeeting/filed datep. 146

  7. 7 The Town bought the MACC land from the Mammoth Lakes Foundation under a purchase and sale agreement the Council authorized July 3, 2024

    Updated

    In March 2025, a staff report said the Town was in negotiations with MLF to purchase the overall 8-acre parcel including the existing theater building [1] Award MACC architectural design services.pdf, p. 1. The FY25-26 Final Budget text, filed in June 2025, said the Town and MLF had "come to terms on the sale of the facility and surrounding lands" [2] FY25-26 Final Budget.pdf, p. 34. It said MLF would dedicate a portion of the proceeds to complete the MACC project [2] FY25-26 Final Budget.pdf, p. 34.

    The Tentative Budget FY26-27 and the June 3, 2026 agenda page say that on July 3, 2024 the Town Council authorized the Town Manager to execute a purchase and sale agreement (PSA) with MLF for the acquisition of the property [3] Tentative Budget FY26-27.pdf, p. 17[4] Agenda (PDF), p. 108. They say "various minor amendments" were authorized on May 7, 2025 [3] Tentative Budget FY26-27.pdf, p. 17[4] Agenda (PDF), p. 108. The Final Budget Adoption FY26-27 text says the same [5] Final Budget Adoption FY26-27.pdf, p. 36.

    The Purchase and sale agreement with MLF for Edison and MACC - clean describes the property at 100 College Parkway as approximately 7.94 acres and a 6794 square-foot building commonly known as Edison Hall [6] Purchase and sale agreement with MLF for Edison and MACC - clean.pdf, p. 1. The 2022 lease describes the building as approximately 8,000 square feet [7] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1.

    The March 3, 2026 staff report says the property "was recently purchased by the Town from the Mammoth Lakes Foundation" [8] Agenda (PDF), p. 8. In return, the Mammoth Lakes Foundation donated back three and a half million dollars to the town for that facility." [9] Parks and Recreation Commission — 2026-02-03 14:30:00, 1:16:09 The same dollar amount, $3,500,000, appears in the Grants / Donations column of the 25/26 carry-over table [10] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1.

    Why it matters

    The records show the site moving from Foundation ownership, leased to the Town in 2022, to Town ownership by 2026 [7] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1[8] Agenda (PDF), p. 8.

    Sources

    1. Award MACC architectural design services.pdf

      attachmentmeeting/filed datep. 1

    2. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    3. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17

    4. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 108

    5. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    6. Purchase and sale agreement with MLF for Edison and MACC - clean.pdf

      attachmentmeeting/filed datep. 1

    7. Restated TOML and MLF Lease Edison Hall 111622.pdf

      attachmentmeeting/filed datep. 1

    8. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 8

    9. Parks and Recreation Commission — 2026-02-03 14:30:00

      transcriptmeeting/filed date

    10. Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf

      attachmentmeeting/filed datep. 1

  8. 8 The 2022 lease records the Foundation's $9,000,000 pledge and the Town's $2,500,000 Measure U pledge for the MACC

    Updated

    The First Amended and Restated Lease Agreement, effective November 16, 2022, says MLF "has publicly pledged to contribute a minimum of Nine Million Dollars ($9,000,000)" [1] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1[2] Agenda (PDF), p. 238. It says MLF obtained this "through a combination of 'Measure C' funds and private donations", toward the total costs to design and construct the MACC [1] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1[2] Agenda (PDF), p. 238.

    The lease ties the Town's pledge to MLF's pledge [1] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1.

    The original Lease Agreement in the July 6, 2022 agenda packet states an effective date of July 1, 2022 and carries the same pledge recitals [3] Agenda (PDF), p. 473. A 2018 staff report says the Town Council approved a reserve allocation of $2,500,000 to the MACC construction project on May 17, 2017 [4] Staff Report - FY2018-19 Final Budget, p. 23.

    Why it matters

    The lease recitals expected construction could take up to two years [1] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1.

    Sources

    1. Restated TOML and MLF Lease Edison Hall 111622.pdf

      attachmentmeeting/filed datep. 1

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 238

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 473

    4. Staff Report - FY2018-19 Final Budget

      attachmentmeeting/filed datep. 23

  9. 9 Records since 2019 describe Town Measure U support of up to $300,000 a year for operating the MACC

    Updated

    A Town Council Agenda Action Sheet for April 17, 2019 says the Town has committed $2.5 million in capital funds, reserved in the Measure U Fund [1] Cover Page, p. 1. It says "The other funding commitment is up to $300,000 per year in operational support from Measure U revenues", which would need a formal agreement with MLF [1] Cover Page, p. 1.

    The 2022 lease says the Town pledged the amount reasonably required to maintain and operate the MACC upon certificate of occupancy, "which the Town estimates at up to Three Hundred Thousand Dollars ($300,000) per year" [2] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1. A May 17, 2023 agenda packet says, "The Town has committed up to $300,000 annually for operation and maintenance funding from Measure U for the expanded facility (second phase)" [3] Agenda (PDF), p. 251. A budget narrative in the May 3, 2022 agreement says the planned operational funding of $300,000 for the future MACC had been allocated and set aside to fund a $2.5M commitment to construction [4] Attachment 4.1 - Measure R and U Budget Requests.pdf, p. 5.

    Sources

    1. Cover Page

      attachmentmeeting/filed datep. 1

    2. Restated TOML and MLF Lease Edison Hall 111622.pdf

      attachmentmeeting/filed datep. 1

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 251

    4. Attachment 4.1 - Measure R and U Budget Requests.pdf

      attachmentmeeting/filed datep. 5

  10. 10 The Town contracted with AMS Consulting in 2025 to update the MACC operating plan and pro-forma

    Updated

    The 2022 Parks and Recreation Department Strategic Workplan, filed with the February 1, 2022 meeting, called for coordinating with MLF to "execute and fund a contract with AMS Planning and Research to complete an Operating Forecast for the proposed MACC" [1] 2022 Parks and Recreation Department Strategic Workplan.pdf, p. 12.

    A staff report in the packet for the February 3, 2026 meeting says that "In 2025, staff contracted with AMS Consulting to update the 2022 Operating Plan/Pro-forma in anticipation of the facilities opening in the spring of 2027" [2] Agenda (PDF), p. 21. At 1:21:26 in the February 3, 2026 recording, a speaker said the department was working with its consultant on the operating plan and pro forma and that the fee schedule would be seen the next month [3] Parks and Recreation Commission — 2026-02-03 14:30:00, 1:16:09.

    Why it matters

    The records show the Parks and Recreation Department preparing an operating plan and fee schedule for the facility ahead of its planned opening [2] Agenda (PDF), p. 21[3] Parks and Recreation Commission — 2026-02-03 14:30:00, 1:16:09.

    Sources

    1. 2022 Parks and Recreation Department Strategic Workplan.pdf

      attachmentmeeting/filed datep. 12

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 21

    3. Parks and Recreation Commission — 2026-02-03 14:30:00

      transcriptmeeting/filed date

  11. 11 HMC Architects did initial MACC design for the Foundation; a March 2025 staff report recommended a Town contract with HMC

    Updated

    Staff recommended allocating $100,000 in Measure U funds to MLF for the design work [1] Resolution authorizing $100,000 in Measure U funding for updated architectural, design and cost estimates for MACC Project.pdf, p. 1.

    A March 19, 2025 Town Council staff report says initial design was performed by HMC Architects under contract with MLF [2] Award MACC architectural design services.pdf, p. 1. Staff recommended that the Council authorize the Town Manager to finalize scope and fee negotiations and execute an agreement with HMC Architects for design and construction administration services [2] Award MACC architectural design services.pdf, p. 1. The report says the architectural and consultant services "were originally estimated to be approximately $1,182,500" [3] Award MACC architectural design services.pdf, p. 2.

    An HMC Architects Proposal filed with the July 7, 2021 meeting includes a rate schedule listing Principal in Charge at $235 per hour [4] HMC Architects Proposal.pdf, p. 4. It says the rates are effective July 1, 2019 through June 30, 2020 and "subject to change one time annually effective July 1st" [4] HMC Architects Proposal.pdf, p. 4.

    Sources

    1. Resolution authorizing $100,000 in Measure U funding for updated architectural, design and cost estimates for MACC Project.pdf

      attachmentmeeting/filed datep. 1

    2. Award MACC architectural design services.pdf

      attachmentmeeting/filed datep. 1

    3. Award MACC architectural design services.pdf

      attachmentmeeting/filed datep. 2

    4. HMC Architects Proposal.pdf

      attachmentmeeting/filed datep. 4

  12. n1 Town records say MACC property was purchased from Mammoth Lakes Foundation

    Updated

    The FY2026-27 Final Budget Adoption document says the Town Council authorized the Town Manager on July 3, 2024, to execute a purchase and sale agreement with Mammoth Lakes Foundation for the property acquisition, and authorized minor amendments on May 7, 2025. [1] Final Budget Adoption FY26-27.pdf, p. 36

    The same document describes the MACC as an addition to Edison Hall at 100 College Parkway on property recently purchased from Mammoth Lakes Foundation. [1] Final Budget Adoption FY26-27.pdf, p. 36

    Sources

    1. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

  13. n2 Timeline of routine actions

    Updated

    April 17, 2019: A Town Council agenda action sheet describes up to $300,000 per year in Measure U operational support as the Town’s MACC funding commitment, subject to a formal agreement with Mammoth Lakes Foundation. [1] Cover Page, p. 1

    November 16, 2022: A November 2022 amended and restated lease agreement says Mammoth Lakes Foundation had publicly pledged at least $9 million from Measure C funds and private donations toward MACC design and construction, while the FY2026-27 Final Budget Adoption document lists a $3 million MLF contribution among project funding sources. [2] Restated TOML and MLF Lease Edison Hall 111622.pdf, p. 1[3] Final Budget Adoption FY26-27.pdf, p. 36

    July 3, 2024: The purchase and sale agreement filed with the July 3, 2024 meeting describes the property at 100 College Parkway as approximately 7.94 acres with a 6,794-square-foot building known as Edison Hall. [4] Purchase and sale agreement with MLF for Edison and MACC - clean.pdf, p. 1

    July 2, 2025: A March 2026 Parks and Recreation Commission staff report says the Town Council awarded the MACC construction contract to Spiess Construction Co., Inc. for $15,862,000. [5] Agenda (PDF), p. 8

    February 3, 2026: A February 2026 Parks and Recreation Commission agenda packet says Town staff contracted with AMS Consulting in 2025 to update the 2022 MACC operating plan and pro forma in anticipation of a spring 2027 opening. [6] Agenda (PDF), p. 21

    March 3, 2026: A Parks and Recreation Commission staff report says the facility was scheduled for completion in spring or summer 2027. [5] Agenda (PDF), p. 8

    June 17, 2026: The FY2026-27 Final Budget Adoption document lists a $18,970,000 total budget for MACC, compared with $16,800,000 in the FY2025-26 Final Budget; by our calculation, that is a $2,170,000, or 12.9%, increase. [3] Final Budget Adoption FY26-27.pdf, p. 36[7] FY25-26 Final Budget.pdf, p. 34

    June 17, 2026: The FY2026-27 Final Budget Adoption document describes MACC as a single-story, approximately 7,482-square-foot, 239-seat theater addition to Edison Hall, with support spaces and site improvements. [3] Final Budget Adoption FY26-27.pdf, p. 36

    September 2, 2026: The FY2026-27 Final Budget Adoption document lists $4.5 million in Measure U Capital funding reserves among MACC funding sources, while a September 2026 CIP carry-over table lists $4.4 million in its “M - U” column for the $18.97 million project. [3] Final Budget Adoption FY26-27.pdf, p. 36[8] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1

    September 2, 2026: The September 2026 CIP carry-over table lists $3.5 million under “Grants / Donations” for MACC, while the September 2025 carry-over table listed $11 million in that column. [8] Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf, p. 1[9] Table 1 - CIP Budget Outlook for 24-25 Carry Over.pdf, p. 1

    Sources

    1. Cover Page

      attachmentmeeting/filed datep. 1

    2. Restated TOML and MLF Lease Edison Hall 111622.pdf

      attachmentmeeting/filed datep. 1

    3. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    4. Purchase and sale agreement with MLF for Edison and MACC - clean.pdf

      attachmentmeeting/filed datep. 1

    5. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 8

    6. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 21

    7. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    8. Table 1 - CIP Budget Outlook for 25-26 Carry Over.pdf

      attachmentmeeting/filed datep. 1

    9. Table 1 - CIP Budget Outlook for 24-25 Carry Over.pdf

      attachmentmeeting/filed datep. 1