Housing Needs Study / housing strategy

The FY26-27 Final Budget says a Housing Needs Study was completed in March 2026 [1] Final Budget Adoption FY26-27.pdf, p. 35[2] Final Budget Adoption FY26-27.pdf, p. 32. It says the current highest need is middle-income rental housing (81% to 120% AMI), with one-bedroom units the priority type [1] Final Budget Adoption FY26-27.pdf, p. 35[2] Final Budget Adoption FY26-27.pdf, p. 32. A regional housing needs study report published the same month estimates that 1,170 households in the Town have unmet housing needs [3] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. The FY26-27 budget lists planning for the remaining phases of the Parcel with a focus on middle-income rental housing [1] Final Budget Adoption FY26-27.pdf, p. 35. A staff report filed with the March 18, 2026 meeting describes a proposed Option Agreement that could give a 2-3 year window to work out a new vision for those phases [4] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3.

Updated

Findings

12 findings

  1. 1 Housing Needs Study completed in March 2026 found middle-income rentals are the Town's highest current need

    Updated

    The FY26-27 Final Budget (filed with the June 17, 2026 meeting) says the initial step toward a housing strategy "is complete with a Housing Needs Study completed in March 2026" [1] Final Budget Adoption FY26-27.pdf, p. 35[2] Final Budget Adoption FY26-27.pdf, p. 32. The Final Budget Adoption FY26-27 says the current highest need is middle-income rental housing in the 81% AMI to 120% AMI range, with one-bedroom units the priority unit type [1] Final Budget Adoption FY26-27.pdf, p. 35[2] Final Budget Adoption FY26-27.pdf, p. 32.

    The FY25-26 Final Budget (filed with the June 18, 2025 meeting) had described the study as underway [3] FY25-26 Final Budget.pdf, p. 33[4] FY25-26 Final Budget.pdf, p. 30. It said the update of the housing needs assessment was "scheduled to be completed by the end of 2025" [3] FY25-26 Final Budget.pdf, p. 33[4] FY25-26 Final Budget.pdf, p. 30. That budget also said it was "somewhat unknown what AMI groups need the most assistance" or which development products were needed most [4] FY25-26 Final Budget.pdf, p. 30.

    The FY26-27 budget says staff need a housing strategy to help prioritize housing projects for funding [1] Final Budget Adoption FY26-27.pdf, p. 35. The Final Budget Adoption FY26-27 also says staff began a series of informational presentations to the Council to develop consensus on a future project [1] Final Budget Adoption FY26-27.pdf, p. 35.

    Why it matters

    The FY26-27 budget presents the study as the first step toward a strategy for prioritizing which housing projects get funding [1] Final Budget Adoption FY26-27.pdf, p. 35.

    Sources

    1. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 35

    2. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 32

    3. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 33

    4. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 30

  2. 2 Regional housing study estimates 1,170 Town households have unmet housing needs

    Updated

    A staff report for the April 1, 2026 Town Council meeting, prepared by Housing Manager Marcus Sproll, was an informational item on the final 2026 Regional Housing Needs Study Report [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. The report says the Town, Mono County, Inyo County, the City of Bishop and the Eastern Sierra Council of Governments have worked on the assessment since January 2025, and that the final report was published in March 2026 [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1.

    The staff report says the study's quantitative housing needs model estimates that 1,170 households have unmet housing needs in the Town [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. By income, it lists 389 low-income households (≤ 80% AMI), 560 moderate- to upper-middle-income households (80% - 150% AMI), and 221 upper-income households (≥ 150% AMI) [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. By our calculation, those three groups add up to 1,170 [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1.

    The same staff report says the Town lost approximately 1,200 residents, or 14.5 percent of its population, from 2010-2025 [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. It calls this the largest loss of any jurisdiction in the region [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1.

    The staff report says 48% of the need (560 units) is for households in the 80%-150% AMI range, which it calls "missing middle" [2] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3.

    The Eastern Sierra Regional Housing Needs Study says SMR Development provided additional project support under contract with the Town of Mammoth Lakes and Mono County [3] Eastern Sierra Regional Housing Needs Study.pdf, p. 7.

    Why it matters

    The staff report says the regional study will serve as the foundation for a forthcoming Regional Housing Toolkit [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1.

    Sources

    1. Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf

      attachmentmeeting/filed date Document date (date stated in document) p. 1

    2. Attachment 2 - Nov 5th Town Council Staff Report.pdf

      attachmentmeeting/filed datep. 3

    3. Eastern Sierra Regional Housing Needs Study.pdf

      attachmentmeeting/filed datep. 7

  3. 3 Regional employer survey: nearly two-thirds say housing hampers recruitment and retention

    Updated

    The April 1, 2026 staff report says nearly two-thirds of employers surveyed for the regional study reported that housing availability hampers recruitment and retention [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. It says businesses estimated they could grow 23 percent more over the next five years, on average, if adequate workforce housing options were available [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1. It adds that employers cited a need for all types of housing, with a particular need for rental units [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1.

    The study's page 90 says that of 119 employer respondents who completed one question, 79 percent reported having employee turnover, with a weighted average of 25 percent per year [2] Eastern Sierra Regional Housing Needs Study.pdf, p. 90. It also says 71 percent of respondents indicated that housing availability affects their ability to recruit and retain workers, either "somewhat" or significantly [2] Eastern Sierra Regional Housing Needs Study.pdf, p. 90. Another bullet on that page says 45 percent of employer respondents report offering some form of housing assistance [2] Eastern Sierra Regional Housing Needs Study.pdf, p. 90.

    They are not Town-only figures [3] Eastern Sierra Regional Housing Needs Study.pdf, p. 7.

    Why it matters

    The survey results link housing availability to employers' ability to recruit and retain workers across the region the study covers [1] Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf, p. 1[2] Eastern Sierra Regional Housing Needs Study.pdf, p. 90.

    Sources

    1. Item 4.12 - town staff report_Regional Housing Needs Study Report.pdf

      attachmentmeeting/filed date Document date (date stated in document) p. 1

    2. Eastern Sierra Regional Housing Needs Study.pdf

      attachmentmeeting/filed datep. 90

    3. Eastern Sierra Regional Housing Needs Study.pdf

      attachmentmeeting/filed datep. 7

  4. 4 Staff report describes a proposed Option Agreement with a 2-3 year window for the Parcel's remaining phases

    Updated

    A staff report filed with the March 18, 2026 meeting (the file is titled "Attachment 2 - Nov 5th Town Council Staff Report") says the Town staff have discussed exiting the Disposition and Development Agreement (DDA) with Pacific West Communities (PWC) [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3. The report says PWC "has indicated a willingness to end the DDA and work with the Town on a new vision for the remaining areas of the Parcel" [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3. It says the updated Housing Needs Study, together with market studies and other tools, will help inform what is built on the remaining portions of the Parcel [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3.

    The report says PWC's requested $7.2M is needed to fill gaps in its development budget [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3. It lists three conditions in a draft loan commitment letter narrative in the March 18, 2026 staff report, one of which is an agreement giving the Town the option to amend or terminate the DDA before any funds are disbursed [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3.

    The report says terms that "could be included" are "an allowance for a window of time (2-3 years) in which to work out a new vision for the remaining phases of the Parcel before deciding whether to terminate the DDA" [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3.

    The report also says the Town's affordable rental portfolio is primarily restricted to households earning below 85% AMI (488 units), with 22 restricted units for households over 85% AMI [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3. The FY26-27 Final Budget lists planning for the remaining phases of the Parcel, with a capacity of up to 220 new units and a focus on middle-income rental housing [2] Final Budget Adoption FY26-27.pdf, p. 35.

    Why it matters

    The staff report links the Parcel's remaining phases to the new needs study, and the Option Agreement was proposed to allow time to rework those phases [1] Attachment 2 - Nov 5th Town Council Staff Report.pdf, p. 3.

    Sources

    1. Attachment 2 - Nov 5th Town Council Staff Report.pdf

      attachmentmeeting/filed datep. 3

    2. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 35

  5. 5 Fund 245 FY25-26 budget lists $4,580,478 in total revenue, led by Measure L

    Updated

    The FY25-26 Final Budget says Measure L was passed by voters in November 2024 to raise the Transient Occupancy Tax rate from 13% to 15% [1] FY25-26 Final Budget.pdf, p. 30. It says the Town Council voted in January 2025 to dedicate 100% of Measure L proceeds to Housing Now! initiatives [1] FY25-26 Final Budget.pdf, p. 30. It says the revenue accumulates in the undesignated section of Fund 245 and is unrestricted for any housing needs under the program [1] FY25-26 Final Budget.pdf, p. 30.

    The budget says staff used a baseline TOT of $25.0M to determine the budgeted Measure L revenue for Fund 245 [2] FY25-26 Final Budget.pdf, p. 32. Its table shows Measure L at $3,850,000, described as 2% of gross receipts (rounded) [2] FY25-26 Final Budget.pdf, p. 32.

    The FY25-26 Final Budget also says Fund 245 receives any unallocated Housing Reserve funds from the General Fund budget [1] FY25-26 Final Budget.pdf, p. 30[2] FY25-26 Final Budget.pdf, p. 32. It says that number is $730,478 for FY25-26, "bringing the total revenue to $4,580,478" [1] FY25-26 Final Budget.pdf, p. 30[2] FY25-26 Final Budget.pdf, p. 32.

    The FY26-27 Final Budget repeats the same FY25-26 methodology and figures [3] Final Budget Adoption FY26-27.pdf, p. 34. According to the FY25-26 Final Budget, Fund 245 received $730,478 in unallocated Housing Reserve funds from the General Fund budget for FY25-26 [1] FY25-26 Final Budget.pdf, p. 30.

    Why it matters

    The budget documents show how much money the FY25-26 budget expected to flow to Fund 245, the Housing Now! fund, and where it comes from [1] FY25-26 Final Budget.pdf, p. 30[2] FY25-26 Final Budget.pdf, p. 32.

    Sources

    1. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 30

    2. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 32

    3. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 34

  6. 6 Housing Now! unit counts rose from about 200 in the FY25-26 budget to about 270 in the FY26-27 budget

    Updated

    The FY25-26 Final Budget says that since 2021 the Town has committed funding under the Housing Now! brand [1] FY25-26 Final Budget.pdf, p. 30. The FY25-26 Final Budget says the income levels ranged from extremely low (< 30% AMI) up to upper-middle (< 200% AMI) [1] FY25-26 Final Budget.pdf, p. 30. The same budget said development capacity on Town-controlled sites was for at least 500 additional workforce housing units [1] FY25-26 Final Budget.pdf, p. 30.

    The FY26-27 Final Budget says approximately 270 new affordable workforce units have been created under Housing Now!: 108 built, 14 converted from market-rate units, 75 under construction and due within the next 6 months, and 72 in pre-development [2] Final Budget Adoption FY26-27.pdf, p. 34[3] Final Budget Adoption FY26-27.pdf, p. 32. It says almost all are in the low-income category (80% AMI or below) [2] Final Budget Adoption FY26-27.pdf, p. 34[3] Final Budget Adoption FY26-27.pdf, p. 32. It says a handful of rental and for-sale units have been created in the middle-income category (81% AMI - 150% AMI) [2] Final Budget Adoption FY26-27.pdf, p. 34[3] Final Budget Adoption FY26-27.pdf, p. 32.

    The FY26-27 budget lists the following projects to continue in the upcoming year: - conversion of for-sale market-rate units to deed-restricted workforce units under the Bridge program; - completion of 75 low-income rental units in Phase 2 of the Parcel (Kingfisher); - the start of construction of 72 more low-income rental units (Kingfisher II) to complete Phase 2 by 2028 [4] Final Budget Adoption FY26-27.pdf, p. 35[3] Final Budget Adoption FY26-27.pdf, p. 32.

    Why it matters

    The two budgets show what had been built or was underway at each stage, and that almost all of those units are in the low-income category [1] FY25-26 Final Budget.pdf, p. 30[2] Final Budget Adoption FY26-27.pdf, p. 34.

    Sources

    1. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 30

    2. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 34

    3. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 32

    4. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 35

  7. 7 2021 staff report proposed a three-year, $336,000-per-year agreement with Mammoth Lakes Housing

    Updated

    A staff report for the July 7, 2021 Town Council meeting recommended that the Council consider approving a professional services agreement between the Town and Mammoth Lakes Housing, Inc. (MLH) [1] Agenda (PDF), p. 146. The report says the agreement "is proposed as a three-year agreement with an annual payment of $336,000 for each year", a $6,000 increase over the past agreement, with quarterly payments proposed [1] Agenda (PDF), p. 146.

    The report says MLH has assisted in affordable housing development of 82 rental units and 48 ownership units [1] Agenda (PDF), p. 146.

    Why it matters

    The staff report describes the Town's proposed payment to MLH for housing-related services [1] Agenda (PDF), p. 146.

    Sources

    1. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 146

  8. 8 The 2017 Housing Needs Assessment estimated about 600 new units were needed over five years

    Updated

    A document filed with the February 10, 2020 meeting ("Item #3 - Information related to the Town Density Program revisions") summarizes the 2017 Housing Needs Assessment (HNA), which updated one completed in 2011 [1] Item #3 - Information related to the Town Density Program revisions, p. 80. It says the HNA showed about 600 new housing units were needed over five years, and about 340 of them should be priced below market [1] Item #3 - Information related to the Town Density Program revisions, p. 80. An October 18, 2023 agenda packet also says the 2017 Workforce Housing Needs Assessment estimated a need for 595 additional workforce housing units between 2017-2022 [2] Agenda (PDF), p. 110.

    The Item #3 - Information related to the Town Density Program revisions says these were "estimated to be about $310 / sq ft on an RMF-1 lot in 2017", or about $370,000 per 1,200 sq ft townhome [1] Item #3 - Information related to the Town Density Program revisions, p. 80. It adds that costs are estimated to have risen at least 15% since 2017, to approximately $350 / sq ft [1] Item #3 - Information related to the Town Density Program revisions, p. 80.

    The 2011 assessment was completed by RRC & Associates with the Town and MLH, according to the Housing Element Update filed with the April 9, 2014 meeting [3] Housing Element Update, p. 149. The FY26-27 Final Budget still refers to the Town's 2017 Housing Needs Assessment [4] Final Budget Adoption FY26-27.pdf, p. 34.

    Why it matters

    The records show a history of needs assessments (2011, 2017, 2026), each with its own estimate of the number and type of units needed [3] Housing Element Update, p. 149[1] Item #3 - Information related to the Town Density Program revisions, p. 80[5] Final Budget Adoption FY26-27.pdf, p. 35.

    Sources

    1. Item #3 - Information related to the Town Density Program revisions

      attachmentmeeting/filed datep. 80

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 110

    3. Housing Element Update

      attachmentmeeting/filed datep. 149

    4. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 34

    5. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 35

  9. 9 Annual reports show an unawarded $1.1 million CDBG application and earlier completed CDBG and HOME projects

    Updated

    The Agenda Item 5 says it "was not awarded" [1] Agenda Item 5, p. 21.

    The Housing Element Update (filed with the April 9, 2014 meeting) says a CDBG grant for acquisition and energy-efficient upgrades to an existing multi-family structure for affordable housing was completed in 2012 [2] Housing Element Update, p. 149. It says a HOME grant for First-Time Homebuyer loans was awarded in 2010 and completed in 2013 [2] Housing Element Update, p. 149. The 2012 annual progress report (filed with the March 20, 2013 meeting) also says the CDBG project was completed in 2012 [3] Agenda Item 6, p. 30.

    The earlier annual progress report for 2011 (filed with the March 21, 2012 meeting) gave the completion year as 2011 [4] Agenda Item 3, p. 29.

    Why it matters

    These older reports show one grant application that was not awarded, and grant-funded projects that the Town reported as completed [1] Agenda Item 5, p. 21[2] Housing Element Update, p. 149.

    Sources

    1. Agenda Item 5

      attachmentmeeting/filed datep. 21

    2. Housing Element Update

      attachmentmeeting/filed datep. 149

    3. Agenda Item 6

      attachmentmeeting/filed datep. 30

    4. Agenda Item 3

      attachmentmeeting/filed datep. 29

  10. 10 2023 agenda packet says the Town contracted with BAE Urban Economics to analyze short-term rentals

    Updated

    An October 18, 2023 agenda packet says the precise relationship between the prevalence of short-term rental properties and the lack of long-term housing is "not known" [1] Agenda (PDF), p. 110. The Agenda (PDF) adds that the same firm has been retained by Mono County for a similar study [1] Agenda (PDF), p. 110.

    Why it matters

    The packet shows the Town used an outside firm to study how short-term rentals relate to housing availability [1] Agenda (PDF), p. 110.

    Sources

    1. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 110

  11. 11 Town Housing Element policy H.4.E calls for periodic review of codes and fees that may constrain housing

    Updated

    The February 10, 2020 document lists Policy H.4.E under Goal H.4, "Reduce governmental constraints to housing production and affordability" [1] Item #3 - Information related to the Town Density Program revisions, p. 80. The policy reads "Periodically review and update Town codes, ordinances, fee programs, and procedures to ensure that they do not unduly constrain housing development while ensuring development impacts are adequately mitigated" [1] Item #3 - Information related to the Town Density Program revisions, p. 80.

    Why it matters

    The policy is a stated Town commitment to review codes and fee programs in relation to housing development [1] Item #3 - Information related to the Town Density Program revisions, p. 80.

    Sources

    1. Item #3 - Information related to the Town Density Program revisions

      attachmentmeeting/filed datep. 80

  12. 12 2016 annual progress report shows an affordable-housing fee-waiver resolution was "not yet completed"

    Updated

    The Annual Element Progress Report for January 1 - December 31, 2016 (attached to a staff report filed with the April 12, 2017 meeting) lists program H.4.B.1 [1] Staff Report.pdf, p. 36. It is to "adopt a resolution waiving a proportion of the application processing fees for developments in which at least 5% of units are affordable to ELI households" [1] Staff Report.pdf, p. 36. The report gives a date of 31-Dec-15 and the status "Not yet completed" [1] Staff Report.pdf, p. 36.

    Why it matters

    The report shows that a fee-waiver measure for developments with affordable units remained incomplete as of its 2016 reporting period [1] Staff Report.pdf, p. 36.

    Sources

    1. Staff Report.pdf

      attachmentmeeting/filed datep. 36

Updates

Added after this page was first published. The summary and findings above are unchanged.

: ESCOG pre-reading packet says housing is a high priority in all four member plans but not an authorized ESCOG program and 2 other updates

One says housing, emergency preparedness and transportation "are high priorities in all four plans but are not authorized ESCOG programs" [1][2]. The same takeaway says the City of Bishop "already names ESCOG as a partner on Highway 395 and calls for a regional housing needs assessment with the other three agencies" [1][2]. The packet was filed with the November 12, 2026 ESCOG meeting, both in the agenda and as Item 4.1 [1][2].

The Agenda (PDF) says the ratings "reflect how directly each plan addresses the topic" [1][2]. The housing row is labeled "Housing (not an ESCOG program)" and rates all four agencies "Strong" [1][2]. The row's entries read as follows: - Inyo County: a comprehensive workforce housing strategy (Goal 1B) [1][2]. - Mono County: a top public priority (73%) and an affordable housing plan [1][2]. - City of Bishop: a regional housing multi-year needs assessment with Inyo, Mono and Mammoth Lakes (Objective 2.1) [1][2]. - Town of Mammoth Lakes: "Housing Now!" with a focus on the "missing middle" [1][2].

The list also includes moving the regional CEDS into action, dedicated funding for economic development and nonprofit capacity, and a regional workforce hub connecting businesses and schools [3]. The Agenda (PDF) describes this as "Living wages, full-time work with benefits, 'not 2 or 3 jobs,' and median-income residents able to buy a home" [3]. The page then asks the Board which elements of "this vision" ESCOG's own vision and mission should speak to directly [3].

  1. Eastern Sierra Council of Governments Joint Powers Authority Special Meeting 2026-11-12: Agenda (PDF), p. 22
  2. Eastern Sierra Council of Governments Joint Powers Authority Special Meeting 2026-11-12: Item 4.1 - ESCOG_Workshop_2_Pre-Reading_Packet.pdf, p. 5
  3. Eastern Sierra Council of Governments Joint Powers Authority Special Meeting 2026-11-12: Agenda (PDF), p. 27