<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom">
  <title>Water and Utilities · Transparent Mammoth</title>
  <id>tag:transparentmammoth.com,2026:topics/water-utilities</id>
  <updated>2026-10-16T00:00:00Z</updated>
  <author><name>Transparent Mammoth</name></author>
  <link rel="self" type="application/atom+xml" href="https://beta.transparentmammoth.com/topics/water-utilities/feed.xml"/>
  <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/"/>
<subtitle>Records from 2013 and 2014 say the settlement limits MCWD&#39;s water use to 4,387 acre-feet per year, and MCWD&#39;s general manager said the $3.4 million payment would come from reserves  (Planning and Economic Development Commission — 2013-08-14, 1:07:24) (Attachment 1 Exhibit 2 Draft SEIR part 3, p. 3) (Agenda Item 1 Attachment 2, p. 120). In 2026, MCWD adopted a new Urban Water Management Plan and Water Shortage Contingency Plan, and a regional broadband consortium grant of $600,000 over three years was awarded  (MCWD UWMP Presentation.pdf, p. 1) (Item 5.2 - CASF Agreement- Staff Report rev&#39;d by coco.pdf, p. 1). Other records cover a 2024 road project in which MCWD would reimburse the Town for utility work, development conditions involving MCWD, broadband funding programs and landfill capacity  (Agenda (PDF), p. 138) (Agenda (PDF), p. 159) (Agenda (PDF), p. 39) (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2) (Attachment 1 - PEDC Resolution No. PEDC 2022-03 for TTM 21-001, UPA 21-001, DR 21-001, and ADJ 21-006.pdf, p. 169).</subtitle>  <entry>
    <title>A 2013 settlement with the Los Angeles DWP limits MCWD&#39;s water use to 4,387 acre-feet a year; MCWD said the $3.4 million payment would come from reserves</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/1</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-1"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">In answer to a commissioner&#39;s question, he said the $3.4 million is a lump sum due within 60 days of the July 11 settlement (at 01:14:14)  (Planning and Economic Development Commission — 2013-08-14, 1:07:24). Asked whether it would come out of ratepayer increases, he said &#39;It is coming out of our reserve funds&#39; (at 01:15:14)  (Planning and Economic Development Commission — 2013-08-14, 1:07:24).

The July 2014 public review draft Subsequent EIR for the Inn at the Village says future water demands, including diversions, extractions and deliveries in MCWD&#39;s service area, are not to exceed 4,387 acre-feet per year under a &#39;recent settlement agreement&#39; between the Department of Water and Power and MCWD  (Attachment 1 Exhibit 2 Draft SEIR part 3, p. 3). An agenda packet filed with the May 28, 2014 meeting also says the 2013 settlement limits the amount of water MCWD can use to 4,387 acre-feet annually  (Agenda Item 1 Attachment 2, p. 120).
Why it matters: The records show the settlement sets an annual ceiling on the water MCWD can use in its service area, and that MCWD&#39;s general manager said the lump-sum payment would come from district reserves rather than ratepayer increases  (Attachment 1 Exhibit 2 Draft SEIR part 3, p. 3) (Planning and Economic Development Commission — 2013-08-14, 1:07:24).https://beta.transparentmammoth.com/meetings/clip289/#t4043</content>
  </entry>
  <entry>
    <title>MCWD adopted its 2025 Urban Water Management Plan and 2026 Water Shortage Contingency Plan on May 21, 2026</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/2</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-2"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">A Town Council Agenda Action Sheet for the June 17, 2026 meeting says the MCWD Board adopted the two documents on May 21, 2026, and that they become effective on June 22, 2026  (MCWD UWMP Presentation.pdf, p. 1). The sheet says the Urban Water Management Plan is required to be updated every five years and presents information in five-year planning intervals for the next 20 years, through 2045  (MCWD UWMP Presentation.pdf, p. 1). It says the Water Shortage Contingency Plan is a required element of that plan and outlines actions to take during various levels of water shortage  (MCWD UWMP Presentation.pdf, p. 1). The sheet says MCWD was making minor edits to the final documents, with no substantive changes  (MCWD UWMP Presentation.pdf, p. 1).

The sheet lists the item as informational only  (MCWD UWMP Presentation.pdf, p. 1).

For earlier history, an MCWD plan document dated November 2011 says a new state requirement for the 2010 plan was a compliance water use target reducing per capita water use by 20% by 2020  (Item 1, p. 81).
Why it matters: The action sheet says the Urban Water Management Plan will serve as a guide for MCWD strategic planning for long-term water supply reliability for the Town  (MCWD UWMP Presentation.pdf, p. 1).</content>
  </entry>
  <entry>
    <title>Staff recommended $3,087,033.68 for a 2024 road and multi-use path project, including about $109,120 that MCWD would reimburse the Town</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/3</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-3"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">Two bids were received  (Agenda (PDF), p. 138). Staff identified no irregularities  (Agenda (PDF), p. 138). The packet says the low base bid was below the engineer&#39;s estimate of $3,200,000  (Agenda (PDF), p. 138).

The packet says MCWD would reimburse the Town for that scope, valued at approximately $109,120  (Agenda (PDF), p. 138). Staff recommended using funds from unallocated capital reserves to cover the base bid and Alternate 1 plus a 10% contingency, for a total of $3,087,033.68  (Agenda (PDF), p. 138). The listed sources are Road Rehab fund balance $1,617,537.85, remaining FY23/24 Fund 210 $500,000, FY24/25 Fund 210 $400,000, Fund Balance – Future Capital 990 $460,375.83, and the MCWD reimbursement of $109,120  (Agenda (PDF), p. 138).
Why it matters: The packet shows MCWD-requested utility work was bundled into a Town road contract, with MCWD&#39;s share to be reimbursed to the Town  (Agenda (PDF), p. 138).</content>
  </entry>
  <entry>
    <title>The Inyo-Mono Broadband Consortium grant was awarded on June 15, 2026 in the amount of $600,000 over three years</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/4</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-4"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">Staff recommended that the ESCOG Chair sign the forms and that staff prepare a Request for Proposals for administration services  (Item 5.2 - CASF Agreement- Staff Report rev&#39;d by coco.pdf, p. 2).

An agenda packet filed with the July 6, 2022 meeting says the IMBC can request up to $200,000 per year for four consecutive years  (Agenda (PDF), p. 502).
Why it matters: The staff report describes the IMBC award as reimbursement of up to $200,000 per year over three years, paid from a CASF account  (Item 5.2 - CASF Agreement- Staff Report rev&#39;d by coco.pdf, p. 2).</content>
  </entry>
  <entry>
    <title>The Town accepted a $500,000 state grant for broadband design work under the Local Agency Technical Assistance program</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/5</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-5"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">A November 2, 2022 Town Council staff report prepared by Town Manager Daniel C. Holler recommended accepting the California Public Utilities Commission (CPUC) Local Agency Technical Assistance (LATA) $500,000 grant award  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 1). The report says the grant was received on August 31, 2022 by the CPUC, and the Grant Award Letter to the Town was received on October 17, 2022  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 1).

The report describes the LATA program as granting local agencies up to $500,000 for preparatory work needed for broadband development, such as strategic planning, environmental review, engineering and design, and staff time  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2).
Why it matters: The staff report says the Town must incur expenses first and then seek reimbursement, and that Town staff is ready to provide the cash flow  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2).</content>
  </entry>
  <entry>
    <title>A 2022 Town staff report says SB 156 allocated $6 billion to the CPUC for broadband, including a $750 million Loan Loss Reserve</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/6</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-6"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">The November 2022 staff report says that with the enactment of SB 156 in July 2021, $6 billion was allocated to the California Public Utilities Commission for broadband deployment across four program areas  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2). It lists Middle Mile ($3.25 Billion), Federal Funding Account/Last Mile ($2 Billion), Loan Loss Reserve fund ($750 Million), and Local Agency Technical Assistance Fund ($50 Million)  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2). It describes the Loan Loss Reserve fund as available to municipalities to serve as security against financing models that attract private investment  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2). It says the Town would continue working with GSCA to determine the option to leverage the Loan Loss Reserve to attract private investment  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2).
Why it matters: The staff report presents the Loan Loss Reserve as a possible later step after the grant-funded design work  (Acceptance of California Public Utilities Commission $500,0000 Broadband Design Grant and Authorization to Proceed.pdf, p. 2).</content>
  </entry>
  <entry>
    <title>A 2022 environmental addendum says waste would go to the Russell Pass landfill, with an estimated closure date of November 1, 2103</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/7</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-7"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">A copy of Planning and Economic Development Commission Resolution No. PEDC 2022-03 filed with the July 12, 2023 meeting contains the same addendum text  (Attachment 4_PEDC Resolution 2022-03.pdf, p. 171). The addendum estimates the project would produce 18,607 pounds of solid waste per day, 5,670 from residences and 12,937 from commercial operations  (Attachment 1 - PEDC Resolution No. PEDC 2022-03 for TTM 21-001, UPA 21-001, DR 21-001, and ADJ 21-006.pdf, p. 169).
Why it matters: The addendum&#39;s capacity and closure figures come from state sources it says were accessed in December 2021, so they describe conditions as of the 2022 document  (Attachment 1 - PEDC Resolution No. PEDC 2022-03 for TTM 21-001, UPA 21-001, DR 21-001, and ADJ 21-006.pdf, p. 169).</content>
  </entry>
  <entry>
    <title>Mountain Meadows MWC meters all water connections; Crowley Lake MWC does not currently meter connections</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/8</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-8"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">The CEDS Annual Report says the Mountain Meadows MWC already meters all water connections and has a tiered rate structure, and that the Crowley Lake MWC does not currently meter connections  (Item 4.5 - CEDS Annual Report_combined.pdf, p. 35). The same statement appears in a project list filed with the June 26, 2024 meeting  (Item 4.3 - Attachment B 2024 Mono County CEDS Project List 6.3.24.pdf, p. 5).
Why it matters: The project list uses the metering difference to describe the need for the Crowley Lake meter project  (Item 4.5 - CEDS Annual Report_combined.pdf, p. 35).</content>
  </entry>
  <entry>
    <title>A 2014 document says MCWD completed an irrigation retrofit at Mammoth Middle School</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/9</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-9"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">A document filed with the May 7, 2014 meeting (Agenda Item 3), in a section on water, says the Mammoth Community Water District completed an irrigation retrofit project on fields and landscaping at Mammoth Middle School  (Agenda Item 3, p. 43). It says the work included fine tuning and installing new sprinkler heads, installing a Central (Irrigation) Control System, and setting up an efficient irrigation schedule  (Agenda Item 3, p. 43). The same page says water consumption decreased by just over 2% since 2009, with a slight increase in 2012 after a 5-year downward trend  (Agenda Item 3, p. 43). It attributes the reduction primarily to lower system losses and water conservation efforts, citing MCWD&#39;s Urban Water Management Plan as the data source  (Agenda Item 3, p. 43).
Why it matters: The page connects irrigation work at a school to its reporting on water consumption trends  (Agenda Item 3, p. 43).</content>
  </entry>
  <entry>
    <title>MCWD will not serve Snowcreek VIII Open Space parcels outside its service area until three steps are taken, including LAFCO approval</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/10</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-10"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">A staff report in the April 12, 2023 agenda packet on tentative tract map TTM 09-002 (Snowcreek VIII) says MCWD commented that the map&#39;s Open Space zoned property is outside the MCWD service area  (Agenda (PDF), p. 159). It says that, as stated in the SMPU conditions of approval, MCWD will not serve parcels outside its service area and outside the Arcularius/Dempsey Agreements until three steps are taken  (Agenda (PDF), p. 159). They are: 1) LAFCO approves extending MCWD&#39;s service boundary to include the Open Space zoned property; 2) the Arcularius/Dempsey Agreements are amended to include the area outside them; and 3) the agreement on providing recycled water to the Snowcreek golf course is completed  (Agenda (PDF), p. 159). The report says the other two requirements will be completed before approval of any permit for development outside or partially outside MCWD&#39;s boundary  (Agenda (PDF), p. 159).

The same packet includes proposed Condition of Approval #13 language that says annexation of the Snowcreek VIII area into MCWD shall occur before the Town approves the final map  (Agenda (PDF), p. 97).
Why it matters: The staff report ties water service for these parcels to LAFCO approval of a boundary extension plus two other steps  (Agenda (PDF), p. 159).</content>
  </entry>
  <entry>
    <title>Two development resolutions require easements to MCWD for Well 17 access and for three monitoring wells</title>
    <id>tag:transparentmammoth.com,2026:topics/water-utilities/finding/11</id>
    <updated>2026-10-16T00:00:00Z</updated>
    <link rel="alternate" type="text/html" href="https://beta.transparentmammoth.com/topics/water-utilities/#finding-11"/>
    <category term="machine" scheme="provenance"/>
    <content type="text">The agenda packet says that before a building permit is issued the Developer shall grant MCWD an easement, by separate instrument, to document and preserve MCWD&#39;s access to Water Production Well 17 from the west  (Agenda (PDF), p. 39). The easement is to be configured to accommodate drilling and construction of a future replacement well  (Agenda (PDF), p. 39). Condition 47 requires water sub-meters for each individual condominium unit under CA Senate Bill 7, with installation verified by MCWD before a certificate of occupancy  (Agenda (PDF), p. 39).

The separate Resolution says easements shall be granted to MCWD for existing monitoring wells Well #14, Well #19 and Well #30 before acceptance of the Phase 1A public water, sewer and recycled water irrigation facilities  (Agenda (PDF), p. 54) (Attachment A - Resolution PEDC 2024-11.pdf, p. 14). Condition 35 of that resolution requires the applicant to obtain MCWD water, sewer and recycled water irrigation permits and pay District fees before the Town authorizes construction  (Agenda (PDF), p. 54).
Why it matters: The resolutions make easements for MCWD wells conditions that must be met before a building permit is issued or before water facilities are accepted  (Agenda (PDF), p. 39) (Agenda (PDF), p. 54).</content>
  </entry>
</feed>
