0:00 Okay. We hope they'll last until the sun goes supernova. Exactly, yeah. Some of them will. So, you're asking for the capital costs for the science, then you guys would, who would install them? We can do that work. I've got some folks that can do that. Okay. That was actually even something that we talked about doing on the trail, on the SOS program? Yeah, on the summer stewardship days, we actually talked about installing them as well. Okay. Either way.

0:27 Get in the ground as quickly as possible. The ski area would probably help us out too at the one intersection. Okay. That was one of the things I was going to ask is since it will help keep people from accidentally entering their permit area, whether they would apply as well. Let's keep going just because are we back up on Granicus or are you taking it? Yes, we are. Okay. Thank you very much. Thanks, Jamie. Thanks, Jamie. Okay. So discussion is

0:56 What are we going to add to Steve Spidell's suggested use of the funds? And essentially, just to be clear, what we're looking at is a total of only $91,000 that we can spend. Is that right? I mean, if we're going to consider all these new projects, that's the magic number, right? Have we already, well, actually, no, I've got some questions on that. I want to add to the list, which is,

1:28 And it came up earlier today, and we've talked about it before, and that is Mammoth Trails and how we keep that alive and what that takes. And I think that plays into adopt a trail and public outreach and a bunch of the other things we're trying to do. If I may, Chair, I think it's a reasonable exercise to consider these other projects. I think it's productive. I think how we evaluate them, what criteria we're going to use.

2:00 Steve put forward this item because it's, you know, what we saw is ready to go, it's off the shelf, it's got funding, it's there. So is there other criteria that we can use to evaluate these other ones that we pop up? So I think, because otherwise it's just going to be keep adding and adding and adding and I know we have a pretty stringent process with Recreation Commission and Measure U and how we do those funding priorities, but maybe do we want to come up with something first?

2:27 Because what would we use? Otherwise, it's going to be a subjective thing. I don't know what Mammoth Trails is going to cost. I don't know what Adopter Trails is going to cost. We don't know what those other two signs are costing. How do they compare with what we already have presented? So anyway, I just want to put that forward. And again, a huge criteria in my mind is what is the mission and vision of this committee? And I know that that's an agenda item that always seems to be beyond after this. We never get to it because we're still trapped in this.

2:54 We need to be getting that mission and vision forward and foremost so that we can actually start working backwards. And as said earlier, that mission and vision then needs to be articulated. So that's frankly my biggest concern. But at the same time, just backing up for a second, because I'm not sure if I got clarification, it's $91,000 that we've got to spend, essentially consider all these new projects with. Is that correct, Steve? I'm afraid that's a little bit of an apple and orange.

3:24 Question, because what you have to consider, again, is $42,570 that has yet to be allocated or divided out. Okay. Then what you have then is a balance of about $90,000 to put into new projects. Okay. And your target for $13,14 is $300,000.

3:55 You've already voted, concurred, agreed on $142,000. May I? Yeah. If we consider these funds in a more fluid thought process, we have $43,570, not $750, that's why I got confused earlier. We have $43,570 that we're allocating two years out to a project.

4:28 Well, actually, that could be used for new projects, and we could allocate money from those years for that. So we're doing that as a placeholder, but that, if we look at this from a totally fluid standpoint, we have 9105 here in the 13-14 new projects funding. I don't think that we have spent enough time looking at those projects to see if that's the amount we want to spend there. But because we need

4:56 To do this and get this passed by the council, if we look at both of those amounts as fluid and nothing written in stone, then we can change that allocation as we move forward. One of the things I've said about this group and its spending from the get-go is that we can't have everything written in stone because as opportunities arise and as things happen, we need to be able to look at them. So our proposed at this time can be this exact whole budget here.

5:25 And then we can even save time because we don't even need to go over any more of the list today. If we approve this on that base that this is our draft budget, not our final, then the council can set about approving it and then we can start the hard work of looking at each one of these things through a magnifying glass, which we're not doing at this point, which we need to do. Do we then add the other projects to the list so that the council knows that we may in fact

5:55 So the list may be bigger than the budget and that we're going to refine it because I'd like to make sure that we have the opportunity then to actually discuss some of these things. Right. Well, I think you said it exactly what I was thinking because

6:08 You know, real world, that's exactly what happens. The money, some of it will carry over, then you start talking about it, and the opportunity either disappears sometimes to do it, or it gets too expensive for whatever reason, and then you can turn around and reassign that money, and I think that's what you're saying. I mean, that's real world. Okay, I think that's a fine idea. That's right. I allocate money for golf every week and end up putting it in my gas tank. There you are. One more question for you. With regard to the continued funding for 13-14, the $20,000 for the Mammoth Nordic 7-14,

6:37 $7,500 for the grant searching and writing. Have we already voted on those and approved those? No, we have not. So literally those funds can be fluid as well? Yes. Yes. In my opinion, and I don't know the solid answer to that, but that's how I view it. I view that as well as one, that kind of confirmation. So we would actually treat this as a preliminary budget? Yes. So $13,14. Yes. Yeah. And I think the other would kind of...

7:07 That would be my suggestion. Well, then this would be because just in the stuff we haven't visited, there's enough time going to be spent arguing each one of those. You bet. That we don't have enough discussing each one. Now I want to spend at least an hour on doggy bags. Yes. We've got some big issues there. No, I would agree. All right, so then this might be the easy budget, but the

7:31 Easy button in the sense of let's add these items that we just brought up to the tracking list. As of future. Approve this as a draft budget. Preliminary. I like the word preliminary. A working budget. But that we will be revisiting these at our June meeting. We'll probably revisit it throughout the year. I'll take those comments in just a second.

8:02 But I just, I wanted to be, actually, even before I entertain a motion along those lines, we'll take comments out there, but for right now, I just want to say, is that kind of the consensus that we're going in this direction? So I think what we do in that motion is just direct Steve to add whatever we agree upon to this page two of two. We identify them as a project. We just don't have any money assigned to it, per se, or we don't assign any money to these new projects in this funding column.

8:31 But have the total amount that we're going to be spending, which is that 91 plus the 43, but I also do want to have as a line item a contingency line put in there as well. How big do you want that number? Well, I think it depends. I mean, so for instance, that 43,570 that we're talking about, you know, that's up for a contingency amount as well. So it's, like you said, it's a fluid budget. So essentially we're playing with the 91 plus the 43 and we're going to identify

8:58 Out of those, the wayfinding projects, the doggy bags, the type 2 signage, the adopter trial, whatever the items are, Mammoth Trails, and a contingency out of that funding amount. I think that's what we've agreed to do. I just want to make sure that we add those to that spreadsheet on page 202. And I just want to be clear as well that what we're talking about is that these are all that we will be able to revisit in the continuing funding for 13-14, that we're able to revisit that number.

9:28 Everything that's on two of two, we have to revisit because we haven't done the deliberation yet. Right, right. That's exactly right. So those contracts can't be let until we say what parameters we want to put on them. So the only number that is written in stone, and again, nothing's in stone. This is what has already been voted on and approved. Just for confirmation is 142832. 142832. Correct. Thank you.

10:09 Because we've spent that. Which is, yeah. Right. Yeah. That's your comment from the audience. Hi. John Wentworth, MLTPA. Some specific projects that I think you might want to consider that need to be dealt with. The MLTS signage and wayfinding program. There is a sign currently in the possession of a forest service that will go at the entrance to the rerouted 12B that was built last fall.

10:38 We were up there with the staff yesterday to see if the volunteers could possibly do it. It's beyond the reach of the volunteers to dig a four-foot hole with the sonotube and all the rest of it. I would recommend that you allocate money to get that in there. Before you go on. What was that estimated cost to get that back in the ground? That's a different, it's a different, we're talking about, sorry, a wood sign that John was talking about. Those are four by four posts. Yeah. This is something different. This is something different. Yeah, and I remember discussing this at a previous meeting.

11:08 Or at least you bringing this up and this was something that you wanted to do but was where beyond your scope or when I say you, I mean volunteers. Sure. There was something you were going to do and what's the estimated cost of getting that in the ground? It's probably something the town staff would end up doing. Okay. Because these postal digger, I don't know what that estimated cost would be to set that. Okay. Okay. Probably a couple, a few thousand bucks. Not that much in the big scheme of things for the value that we get out of it. Great. I got a question on that.

11:36 Hope you don't mind me calling you that because we have way too many jobs going around. Makes it clear. Normally when the Forest Service does a project and signs are going to be pulled out of the ground in that project, part of the cost of completing the sign of the project in the RFP or in the budget put together by the Forest Service would be putting those signs back in the ground. That didn't happen in this case?

11:58 So I think you're getting the projects confused. The need to move this sign wasn't driven by the fuels reduction project. It was driven by the fact that we thought we were going to put the trail connector at one spot. We tried it. It didn't work out. It was leading to erosion onto the trail and other problems. It was too steep for the mountain bikes. And so we found another way to get around it. And that's what's driven the need to move the sign.

12:23 Let's move on. You said you had some other... Okay, so that's one that the solution that we're going to do for that with the volunteers is put a 4x4 post. I want to talk with you about the temporary signage program, which could work for this, is if you have someone in your shop who can still route...

12:39 Friends of the Inyo, and we have someone too at Friends of the Inyo has been doing a great job at helping. Okay, so maybe we can get Friends of the Inyo to make, we're going to make a temporary sign for this 12B that will say Panorama Dome Mountain Biking Trail. There are plenty of plaques, these MLTS plaques that we'll be putting along the bollards on the lakes basin path. We could inset that MLTS logo in that wooden plaque, use that same, you know, design program for all that stuff on.

13:04 Earthquake Fault, Mountain View, and then at least you've got kind of a system of temporary signs that all look the same. They'd be consistent. That'd be great. John, I just want to make this comment real quick. When you say we have a bunch of signs, how many? Fifty? Hundreds? With the plaques? Yeah, the little plaques. A hundred. Beyond what you're going to need to put us? Yes. Great. Let's make sure that we're getting all these added to the list because, you know, again, I think the goal here is just we're going to get this bucket list. We're just adding what we're going to call a future project, but essentially we're...

13:33 We're going to be reviewing these after we approve this temporary. If that program we just talked about can work, then volunteers on the summer stewardship days we're going to do on Mountain View and Earthquake Fault, we could get that done. You wouldn't have plenty of extra money in it, but that's how those things would get covered if we could do it. The second thing, the third thing, I guess, is I sent to Steve a list of kind of leftover things from our contract work with the signage and wayfinding thing. One of them are the maps. We've delivered the map files.

14:02 This is for the SPEE signs that were installed along Lake Space Path with a prototype. Steve's got it in his list. I would highly encourage you guys to authorize the town to put out for bid to get those new maps manufactured and put on the signs that need to have replaced maps on them. So you've got all the graphic files. You just need to get that stuff done. And is there anything else on that list, Steve, that we should bring up?

14:29 Which list are you referring to, John? This is a conversation I had with Steve over the weekend about some low-hanging fruit projects left over. I'm not going to go into a whole bunch of other things, but these are things that are immediate things that we could do. Nothing comes to mind right now, John. Unfortunately, that email's sitting on my desk. I understand. But getting those maps redone, manufactured by a paneer or someone, installed, get those things installed along the lakes basin path where the first signs are put in, that would be a great thing to get done.

14:58 So essentially we're adding these items to the bucket list. We'll be able to review these. And I think what might be best is coming back to our June meeting. If we had the opportunity as a committee or individuals, I should say, to read these, really come forward with what we feel is important and then have that discussion at that later date. But essentially what we're looking to do now then is to approve this preliminary draft budget.

15:25 Using both those adjectives. And I'll take your comment in just a second. But essentially, that's kind of the direction we're going. Yep. That's good to me. John? I just want to make sure there's some new information on a couple of those projects, the staging area projects, just so you know. So the staging area projects are not going to be implemented this fall. We, you know, through scoping, you all are aware of many of the issues and provided some of the comments. We're going to take a little bit harder look at some of the issues.

15:54 Both the Scenic Loop and the Shady Rest staging area. So the intent is to complete the NEPA and get decisions on both of those projects, but those decisions won't come in time to construct this fall. And so the need to find the additional funding for the Scenic Loop projects at this point is not needed. So I think you can strike that from your budget.

16:20 And we can revisit it at a later date and there may be a way to find that additional funding perhaps to the state OHV grant program to meet the full cost of construction. That's a good, that's good to know. So we're not necessarily striking it as much as just pushing it forward. Right. Keeping it, calling it future, calling it future. What about the Lookout Mountain? Both the Lookout and the 3S22 are on hold, the construction's on hold at this point. You said shady, so. Shady and scenic. Shady and scenic.

16:50 Projects. So all three are on hold. The NEPA is moving forward. The decision process is moving forward, but we've decided not to move forward with construction this fall. Good to know. Okay, so they're future. Any others? That's it. Do you want to let us know about it? That's good. Okay. Okay. They all ought to make a motion here. Came up with it. Do we need a motion on this, D? Yes. Okay. So I will make a motion that we approve the

17:21 What are we calling it? The tentative? Preliminary. The preliminary budget. Preliminary draft. Okay. The preliminary draft budget as presented and adding to the list all of those new projects without showing funding. You said approve. I think we're recommending. We're recommending. Recommending. Okay. I'll second. Can I get a clarification on what this looks like then? Is it my understanding that

17:56 The page two of two will list the projects but will not identify individual funding per project but come up with a total that those projects represent and then that added to the 142 will get you close to 300,000? Yeah. Well, actually it should get us exactly 300,000. It shouldn't be close to. It needs to be 300,000. And I would list, I would list them.

18:26 Just because... Well, to be clear, and I actually, you know, we've been working off this master draft tracking list. You've got your recommendations here, but all these items that we just added, just, you know, verbally added, is that being added to your page, too, that you've got here, or is it being added to this, and this is what we're approving?

18:44 I would strongly recommend that we go back to the master tracking list, that this thing that we've been talking about today is just a tool to help with today's conversation. I'm in agreement. So what we're actually talking about then is we're going back to the master tracking list. We're adding on these items that were just verbally discussed, but that we need to actually come up with some numbers that total to $300,000. Is that correct?

19:09 Well, that was my question because I'd heard earlier something about not identifying each individual project with an individual budget amount, but I think that could be problematic. No, no, if we have a preliminary amount in there for the project. Yes.

19:25 And then we can come back and discuss and move them around and so forth and make sure that council understands that this is our preliminary identification of funding for a particular project and that may change. As long as they give us that leeway to do it, then I think we're fair, clean, open. I would agree. Otherwise, it looks like we're asking for a blank check. And I mean, we don't want to go asking for a blank check. We want to show that these, we've given thought to these at this point in time.

19:55 We think that this is reasonable. Some of them may be placeholders. Some of them, you know, may be shifted at a later time. But, yeah, I think you need to go in with a list of, so they know that we're looking at things. We're totaling up to 300 and 42 because the total number is actually 342, 570. So, Steve, that's basically what I was saying.

20:19 I want you to put the numbers down as they occur here, except I want you to add, what, $913 or whatever it is to them? Add it anywhere you like, I don't care, so that it comes out to $300,000. But this is our preliminary draft budget. These numbers may, in fact, get moved to other projects, which is why we're listing all the other projects underneath. Does that make sense? So that is my motion. Second. So the listing of the projects will be what projects that...

20:47 We have not discussed and have not put dollar amounts to it. That's right. Which may change the preliminary draft budget. I'm getting a headache right back here. Would you also be able to seek council support for additional Measure R funds to support MLTS? I mean, would that be part of sending this forward? Do we put that in this kind of motion at this time?

21:13 I don't know. You mean would we ask for additional funding? I'm just curious. Bill mentioned it earlier, and I know that that's been discussed many times. I'm wondering if when they see this budget that drives that idea that $300,000, we're getting a lot done with it, but here's what else we could do if we had this amount of additional funding. I think that has to go through the Measure R process. Yeah, it would. I think that ultimately we could say the $84,105 for the signs needs to live under its own Measure R application.

21:43 Freeing that money up to do the trails and other things? That is trails. Well, the Mammoth Trails. So if we were lacking funding somewhere else, we could ask for one of the big tickets to live on its own as a separate application. Yeah, I assumed it would have to measure our application, but perhaps if council saw that, they would urge an application. Yeah, and it could... Yeah, and I don't know if we want to...

22:10 Cloud the issue, or if you want to make it clear? Let's just go forward with our motion as it is, but your point is well taken. So, do we want the motion written back to us? No. I'm fine with it. I'm comfortable, however it turns out that it will be vague enough that we can live with it. I am too. Yeah, exactly. Well, and I think the concept is right on. Yeah. Exactly. Steve, you want to take a vote? I'd love to take a vote. Stu Brown. Yes.

22:42 Sandy Hogan? Yes. Bill Souser? Yes. Vice Chair Bill Taylor? Yes. And Chairman Sean Turner? Yes. Move forward. Beyond that agenda, I haven't done it. No, we haven't moved beyond it. We've clouded the water enough to give us more time to deal with it. Which is exactly what we need. We kicked the can down the road yet again. Okay. But we're getting good at it. Yep. All right.

23:14 Let's move on to business matter number. We are going to review and provide direction to staff in the Recreation Commission regarding the committee, MLTSCC composition. Okay, if you refer to your previous agenda packets, we have our Mammoth Lakes Trail System Coordinating Committee roster. I think the latest date on that was April 15, 2013. It showed our previous committee composition.

23:52 Showed staff support and optional staff as well. Then our current committee composition made up with the names and what they represent and emails along with staff as needed and support and also optional support. So we currently have Sandy Hogan and my interpretation of reading through the enabling legislations

24:24 Sandy's been appointed to a four-year term, even though at that time she was representing the Mobility Commission, which no longer exists. So we've indicated that there is a to-be-determined representation. Bill Souser, also a four-year term, is a member of the Rec Commission. Then Mammoth Mountain has been invited a couple of times to participate, and they have chosen to withdraw there.

24:53 Membership in the Committee. Bill Taylor, the Vice Chair, representing MLTPA. Also a four-year term. Chairman Sean Turner, representing the Recreation Commission. And Stu Brown being the appointee to represent the Town of Mammoth Lakes. And then we have John Kazmierski representing the Forest Service under staff support, or under support. And then Ray Jarvis,

25:23 As being the town alternative, myself as the coordinator, and then we have optional people such as Hayes, Jessica, and Peter Berlusconi to use as we require. One quick question. You said that MMSA has withdrawn? That's correct. Okay, because the last I had heard, I thought that it had been represented that they were going to have Stacey Corliss. So that has changed.

25:51 I'm sorry, yes, it has changed. It looked like they were going forward with that, but then apparently on reconsideration they actually requested that their name be withdrawn. So currently we are a five-person committee. And if we're going to have to continue to do Granicus and sit up here, I think five is the number. I guess. I'm fine with that. Yeah, expanding to seven is a little awkward. I think so too. We have talked about bringing in other user groups, but I think that what we can do to that is just make sure that they are

26:22 Invited and get them as represented as much as possible. And we need each of us talking to them. And I think that maybe puts an exclamation point on my suggestion that we reactivate Mammoth Trails so that we're sure that we're connecting with the appropriate user groups. And with me representing, you can just say mobility slash LTC. That's probably actually.

26:54 Probably even better. Although I think that's, unfortunately, that's up to the council to make the determination. We can recommend that, though. Well, is there much further discussion we need to have on this subject, or is this the recommendation that we're providing to staff and the recreation commission? Yes. I will make a motion that we leave the current number of people on the MLT SEC at 5, maintaining the current.

27:23 Structure. Composition. Correct. I'll second that.

27:28 Any further discussion?

27:32 Let's do a vote.

27:33 Yeah, quickly.

27:36 We can just do it.

27:38 Okay.

27:39 Aye. Aye. Aye.

27:40 All those in favor? Aye. Aye.

27:43 Opposed? Carries 5-0. Thank you.

27:45 I was waiting for Steve to do the count, but...

27:48 Yeah, that's okay.

27:49 I'll make sure that I do it in the future.

27:50 That was a good quick one. I like it.

27:52 There's one additional item here that I want to double check and make sure it has no okay.

28:00 As part of your packet too, there was an email, save the date. This was an invitation to a webinar entitled, How to Plan an Effective Council Meeting. And that will be held Thursday, June 6th from 10 to 11.30 a.m. in the town-county conference room. So I just wanted to make sure that the committee is aware of that.

28:26 And as the email goes on to say, all commission committee members are strongly encouraged to attend, especially chairs and vice chairs. Please save the date on your calendars and reminders will be sent as well as the date approaches. Making a comment there that I wasn't asking for a vote? June 6th. At what time? 10 a.m. to 11.30. Okay.

28:54 Well, with that prompting, then we'll actually move on to business matter number three, which is the status and update of the MLTS and MLTS website MOUs and contracts. Should I like to be good? What's that? The MOUs were signed, I believe, by Marianna, and I should be getting them today. And the challenge cost share agreements, the council, I believe, voted to have Ray sign those.

29:28 I'm in the process of working with our grants and agreements staff to get the signature block change from Mariana to Ray, and then once that's done, we'll have the Ray sign them, and then the forest supervisor will sign all four MOUs and, well, it's actually five master challenge cost share and two supplemental challenge cost share agreements. So that's released down.

29:49 I'm sorry, one more time, the four MOUs are back in front of you then? The two MOUs were signed by Marianna. Okay. And they should be heading my way today, I think. Ray said he was going to be gathering them up, so. Okay. And then there's really two challenge cost share agreements, but there's a master and then there's two supplementals, so there's actually three documents to sign. And we're waiting for the signature block to be changed to Ray rather than Marianna.

30:16 Upon that change, we'll get Ray's signature, and then the Forest Supervisor at Armento's signature. Okay. Does that include the website one? Yeah, so the MOU is the web, the MOUs are the MLTS, MLU, so what the MLTS is and how the Forest Service and Town partner to deliver the MLTS, and then the web MOU. Okay. Any questions from the dais? John, comment?

30:55 A couple things I want to congratulate the Forest Service and the town staff for working so hard and with real persistence to make this happen. This is a, I can appreciate what a very difficult effort it was and the sustained effort of you guys and the town staff to bring this forward is really, it's a kind of a milestone. A couple things just to maybe, you know, close the circle on a couple things. Just in terms of the management plan and MLTPA's role in doing this, these are the direct results of

31:22 As was the MLTSCC that came out of the management plan effort that was in our contract. So the MLTSCC came out of that, an agreement as recommended by council to get the two organizations joined together. This is a continuation of that. Whatever you guys do with the management plan down the road, that fits. With the challenge cost share for Sharp,

31:43 It would be very helpful if somehow there could be provided a scope of work of what that's for. I appreciate that the way you had to structure that's all in federal, you know, paperwork and it's all to federal specs. But in terms of measure our funds, accountability, exactly what the scope of all that is, I think it would be very helpful to know that. We were up at Panorama Dome yesterday looking at, you know, where that parking area is going to be. There's a recommendation from the Sherman's Working Group that all that be a parking in the staging area.

32:10 Is that NEPA going to be covered in that? Do you have the design necessary to do it? I think this could be helpful for accountability down the road, that there's a scope of work. Everybody knows kind of what's going on with that. And I think the other thing is that as part of the management planning effort that we did under contract, MLTPA provided some legal direction to town about intellectual property. And I noticed in the Challenge Cost Share Agreement that there's all kinds of opportunities.

32:35 For the town to protect its intellectual property. I think maybe obviously the MOU, the challenge cost share. But I would encourage the town, you guys, to follow up on the draft intellectual property agreements we provided to the town about two years ago to start looking into that so that the things that the town is investing in, you're protecting your intellectual property. You've got a website out there right now that's well built. You can't go in there and just kind of take things out of it. But there are people out there that could go out there and just steal everything.

33:03 You know, steal you all blind, you might want to take advantage of the provisions in those agreements to start instituting and implementing intellectual property program, which could go over to a lot of things associated with the site. But I just wanted to thank you, John, for all your work and the Forest Service Institute and the town staff for bringing these things together and making them happen. Thank you. Great. Any further discussion on this business then? Let's move on to business matter number four. Did we cover the contracts too?

33:38 Well, the MOUs, I think that was discussed, wasn't it? The contracts are separate from the website. The status of the contracts for the website and maintenance, maybe Stu can give a quick roundup of where we're at in the work that's progressing on them. Maybe that would be helpful. Well, John, good update too. I mean, that contract's been signed. It's just waiting. The contract's signed. We're just waiting on the MOUs. Is that correct? And then we've got a letter of agreement.

34:05 I gave Steve to give to John for that additional work, so that's moving forward, that $12,500 for this fiscal year, so. That's for the trails days? Yes, for the trails days, right, yes. Specifically, the item is status and update on the Mammoth Lakes Trail System and MLTS website MOUs slash contracts, so I just want to make sure that the contracts.

34:28 What's the status of the website contract? It's fully signed, executed, and I think the start date, John, was April 23rd, if I'm not mistaken? Yes, and we're having a partner meeting at 1 o'clock this afternoon. We're working to integrate the Mammoth Lakes Trail System site in with the Mammoth Lakes Tourism site. There's going to be some very interesting opportunities coming, all that, and we've got a good meeting this afternoon to talk about a bunch of stuff. I think it's important for the committee to understand that there is...

34:56 We had a website enhancement contract with the town. That is no longer in effect. Ray is working on putting together some paperwork to make an extension for that. But right now, there's no way to add any new pages to the site. But hopefully, Ray will figure something out without being able to move forward with that. But the website is live. It's moving forward. A lot of interesting things are happening if you want to have an update. Yeah, we actually contracted last week, and we're going to have another meeting this week.

35:22 The hard launch has already occurred, I guess, or is the Memorial Day hard launch considered the hard launch? I don't know. We're trying to get everything ready for this weekend. And we are making efforts on the Forest Service end to make our current conditions page for the Mammoth Ranger District in line with all the destinations and trail names that are on the MLTS, the mammothtrails.org website, so that they basically, they talk to one another and they're kind of seamless and it minimizes the staff work on both ends.

35:49 So we've made some good progress. John, explain to me a little more about the website enhancement and why that contract is no longer enforced. There was an initial 90-day period to get going on that, and I'll leave it to Ray to characterize why that didn't move forward, but the contract expired without work getting done. And so the contract is no longer in effect, and I would raise working on a way to...

36:16 I'd kind of get things back up to speed, but I would defer to Ray in the time to give you some advice on that. Stu, I'm going to look to you to be Ray. Normally with a Measure R project, the monies are awarded. If it doesn't happen, an extension is asked for and usually granted by the rec commission to move that forward. As far as I know, this hasn't come back to the rec commission at all, so it would be my assumption that that work would still be just moving forward, so I'm a little not understanding the mumbo-jumbo of the contract situation.

36:46 Well, I think it's pretty simple. We weren't able to complete that work in that 90-day period, so Ray's trying to re-trigger and restart that website enhancements contract. There were some funding issues that was brought to our attention, so we're basically rewriting and then restarting that contract. Okay, since it's to measure our contract, if there are a problem with that, I would like that to come back to the commission so that we understand what's going on, make it an actionable item in case we feel like we need to take action on it. That's fine.

37:16 Thank you. We'll get to that this afternoon, though. No. It'll be June 4th, I think. That was a straight Measure R application. That's correct. Can you explain that? I'm sorry, John, I'm not going to ask you to put him again. What's the relationship with regard to the website? And you said it was being transferred to MLT? No, it's a coordination effort. What's happening is you've got...

37:40 MLT's website and the various programs that they do. You've got the Mammoth Lakes Trail System website. From the beginning, we've worked very hard to make sure that these two sites are going to be complementary. They're not going to be redundant. And it's going to make the workload on agency staffs and the staff, the contractor managing the site, more efficient. And so we're now having those kinds of meetings to start identifying efficiencies, finding ways that things can work more efficiency down the road with full agency participation.

38:09 The contract is signed, we're working, and we're doing everything we can to, you know, take a little time to get these things, get some bugs figured out. It's a new program, a lot of great opportunities, and we're all working hard to move that thing forward. Okay, thank you. And actually, I invited John Urdi to be here for the discussion on the vision and mission here at about 10.30. I was actually just texting him to remind him about that, so if there's any questions about that, he hopefully will be here shortly.

38:38 So we're able to move on from item number four from the status of the website and the MOUs. And let's have a discussion of business item number four, which is the status and update regarding U.S. Forest Service Trail-related projects. I think you gave it a second. I kind of gave that a second. I jumped ahead, but I thought it was important to mention it earlier. So they're on hold as far as implementation, but we're moving forward with NEPA. I don't have a timeline for NEPA. It's going to be now that we have a little more luxury to...

39:08 To wait, I may not be moving forward with the EA for the scenic loop projects until later in the summer when things quiet down a little bit, but the Shady Rest project is moving forward. So I imagine we'll have MEPA decisions by the fall on both projects, but that won't be in time to implement the projects this fall. So next winter the trailhead will still be at the park site? Most likely, yeah. The decision this fall could change that, but it...

39:37 If it involves needed construction, then we probably won't be doing anything. John? Thank you, Mr. Chairman. Just a reminder, in the Trail System Master Plan, there are things called nodes. These projects are clearly defined, the opportunities are as nodes of the Mammoth Lake Trail System. And I think it's probably, I know you guys got a lot of work, a lot of things on your plate. It gives you a little bit of time.

40:12 When you start working on your priorities and what it is you're doing with the system to look at these kinds of opportunities and evaluate them as they come forward and understand what kind of resources you want to put in there. The great opportunities, if they truly are part of the Mammoth Lakes Trail System, signed as such, they go by how it's lined out in the trail system, ask them for what a node is and what type of a node is. These are great opportunities. And hopefully the extra work that these guys have to do will give you guys some time.

40:41 Think about it. Consider a bit. How do they fit into the larger effort of the Mammoth Lakes Trail System? They're all within the physical scope. How do they fit into your priorities in terms of providing excellent recreation opportunities? So it's a little bit of a break. You guys can fit that into your work plan. But again, these are nodes. And go back to the Trail System Master Plan and look at what kind of a node is in and what services are associated with those.

41:03 Thank you. I guess I'll build on top of that because the one thing that for this committee to think about, we've talked to the town staff about, is whether or not any of these facilities would be taken on under special use permit by the town. And if they are, if the town could make that decision and say, yes, we do want to apply for a special use permit to construct and maintain, say, the Shady Rest facility, then it would be

41:31 Beneficial to include that in the NEPA analysis. It would be better to cover it there than to wait later and have to do another quick little process to get that in place. So something to think about. I think it's a good point John brings up about thinking about it as a node in the MLTS. And where that node ends up lying is to be determined through the NEPA document, NEPA process. So that's one of the ones, John, if I understand you, you're saying we probably ought to talk about early in our next...

42:02 Fiscal Year. Yeah. Yeah, I mean, I think... Agendize it. Let's keep our eye on our timelines for those projects, but when the EA comes out would be the time to comment and the town to make a comment saying we are interested in taking this facility on or special use permit or not. Right, so we need to talk about it beforehand. Yeah. Before, actually before then.

42:25 And there's, we've talked about the advantages and disadvantages, especially use permit liability versus no liability, a little more control over the look and feel of the place. So I could go over all that with you again if you wanted to have that discussion at a later date. All right, so think about it. Okay. All right, since we've already covered that, any further discussion on that? Let's move on to item number, I keep looking at this.

42:55 Five, which is the discussion regarding the MLT-SCC mission and vision. Again, I did invite John Urdi to be here just because, at least from a tourism standpoint, I actually would value his input very much. This, as I've mentioned before, I think is one of the most important things that this committee can do at this time. We need to, as it's been put, articulate exactly what are we doing here instead of just giving out money to anybody who comes and asks for it.

43:26 What is the goal? And let's get this clearly defined. Is there any presentation that, Steve, you want to make? Well, I think one thing, yeah, one thing I'd like to do is refer you back to kind of the enabling legislation that helped establish the committee and the seven items of scope of work. And if I might just briefly read through those, they were part of that draft.

43:56 PowerPoint presentation that I talked about. So if you remember that we are to recommend and prioritize projects for the Mammoth Lakes Trail System, including a five-year capital and minor projects list. Number two, recommend budget allocation for our prioritized projects to the Recreation Commission prior to submittal to Town Council from within the proposed annual

44:26 Three hundred thousand appropriation. Three, establish regular meeting schedules for project review and progress reports. Four, determine a process for implementation and funding based on the requirements of respective projects, technical, legal, fiduciary, timing, capacity, needs, etc. Projects and funding will be assigned by the committee to those entities to which best meet the project requirements and needs.

44:56 Five, determine requirements of staffing needs and engage entities as needed. Six, establish a budget for staffing the committee, incorporating the 6,900 appropriated from Measure R fiscal year 2011-2012. And then finally seven, identify the user groups that needs to be identified, I'm sorry, that needs to be included.

45:24 and determine the appropriate size of the committee. So I think we're working really closely and following quite a few of these items. So the biggest issue, I think, is the discussion in the mission and the vision of how do we prioritize? What is the process by which prioritizations are determined?

45:52 And let's actually, I think what I'd like to do with regard to this is let's go through the dais and have the ability for each of us to make a comment. Then we'll go to the audience. And we'll just try and, I think, keep our comments more just one at a time rather than back and forth. That's okay. Okay. Those are pretty much kind of like action items. And the nice thing about hearing about them is we've actually been going through them. I've always been taught that the mission vision is a little broader.

46:20 And I looked at our resolution, the original resolution, and it has two parts, there are three actually, but like one of them is to steward and enhance four-season and year-round recreation opportunities on that portion of landscape which lies within its municipal boundary as well as that portion of landscape that lies within its sphere of influence by working effectively with its partners, with its fellow signatories, da-da-da-da-da.

46:48 And another one, that one is a little more detailed, a little more concise one is the town desires to create an integrated year-round trail system within its sphere of influence that provides for a seamless transition between the town of Mammoth Lakes and the surrounding federal lands managed by the Forest Service and other agencies. And a part of that, of course, is the town desires to establish and formalize

47:16 A high level of interagency cooperation with the Forest Service to plan, design, etc. So, you know, in that resolution, those other ones are action items, and we're actually doing them, which is wonderful. But I think your mission vision really wants to capture the thought that the, to me, the MLTS is a seamlessly integrated trail system, really.

47:41 With paved multi-use trails and a broad system of soft-surface national forest trails, including groomed winter trails for both Nordic and motorized use. Something like that. So that's just kind of my first brain splat, you know, looking at what the town said they wanted to do. But I think we want to capture, you know, year-round. What's the resolution number on that? I just want to write it. The resolution is 12. It was adopted. I think it was 12.

48:09 Does it have a number on it? Yeah, it was from the agenda packet. It's a date on the back page? I don't think it was. Did it have a date? Oh, yeah, February 1st. Yep, February 1st of 2012. Yeah, I mean, it had, to me, it captured kind of the essence. You don't want to get too detailed down in the weeds, you know, the how-tos. But hearing that list, Steve, made me feel good. Anyway, it sounds like our checklist is happening. We're not that far off.

48:38 So I think it's important to remember where this all came from. This came out of an application that MLT prepared for the town of Mammoth Lakes to deal with trails, basically, in my mind at the time, recreational trails. And that was getting a lot of political heat and a lot of other things. It was huge. And we sat and had a meeting with the town manager and altered that to create the MLT SCC.

49:06 Which was a part of the original MLTPA process was to create this group, but to create this group to oversee a pot of money. In my mind, this was about recreation and recreational trails. Recreational trails and this type of recreation doesn't necessarily mean that it's a marked trail on the ground. If I'm snowshoeing, I'm just going out through the forest, but we need to provide the nodes and the capacity so that happens because it's a trail-like experience.

49:36 And it should not have not included everybody from motorized recreation winter and summer to non-motorized to fishermen. But primarily the focus, and it says so very succinctly there, is on recreation and recreational trails. To what extent that includes signage and wayfinding, because in my mind at the time those things would have gone on to their own Measure R application.

50:06 Did the spiel for this originally. We were talking about this is going to go to the on the ground trails and anything that was a big project could stand on its own could go through the process on its own, which is how we increase this pot of money. So I don't know. I am not a wordsmith for creating a mission or a vision statement. Sandy has started, but I think we need to remember.

50:33 That this was about recreation and recreational trails, not about finishing a sidewalk system or even necessarily MUFs if those MUFs aren't connectors to the outside trail system. There at the time were other funding sources for those. Those have since dried up. So we're being looked at as a funding source for municipal. And I think at this point we should just take measure A and move. Oh, well, no, wait.

51:00 I saw John come in, so I got to poke him a little. That was a long lead-up. Thank you. So that's it. I haven't created a mission or a vision statement, but I think we are all things, you know, trail-driven outside, even though a lot of these recreational things, snowmobiling, cross-country skiing, snowshoeing.

51:24 Don't actually all exist on trails or require trails. They require nodes and areas to get out into the forest. Stuart? Yes. So the way I see it, I mean, trails is just part of our recreation fabric of our community, right? So we spent a lot of time on rec strats, and that vision was pretty clear. It was pretty broad. It was...

51:50 I think it had a lot of good community engagement. And that vision is quite simple to be the best alpine recreation community in the country. So I think there's a vision for recreation, which is trails, municipal, indoor, outdoor, I think that would suit what we're achieving here. And then a mission is a little bit more specific, and it has to be more for the trails-related focus that we're with. So, I mean, it's not rocket science, so going back to the trial system master plan, it talks about a vision there, but I've actually put together a mission.

52:19 Which would be to provide an extensive integrated year-round trails network for the town of Mammoth Lakes, which will improve mobility and quality of life for residents and provide the widest range of outdoor experiences for both residents and visitors. It's a pretty, you know, it's exactly what we're doing. It's really taken from the document that we're following. Strategies there would be accessibility, maintaining character of the town and community engagement. They were kind of...

52:47 The document also speaks to goals and objectives, but I think that's specific to the trials as the master plan. And then I think the only other thing that we'd need to kind of identify would be maybe it's an annual process that we do, but we do need to identify priorities of funding and that criteria and how we want to address that, and that's kind of what we talked about previously with, you know, projects being ready to go, finishing complete projects, trails, signage, those type of things, leveraging the funds, you know, those.

53:13 Those ones that I think we can kind of come up with and use existing documents that are consistent with either Measure R, which I think is important to do. So that would probably be the next step. That's kind of what I've presented for the group. Sounds good. Bill? Well, I think you may remember that when I brought this up back in November or December, I said that as just a thought experiment at home, I was cooking French toast in the morning, and so I had to write the vision.

53:41 While one side was cooking and the mission while the other side was cooking. So I didn't want to overthink it. We wanted to keep this simple. We didn't want this to be lengthy. And I think Sandy and Stu in their recitation of principles that have already been adopted by the town pretty much captured what I was thinking. But literally I did do that experiment. What I had come up with as a starting point was

54:10 You know, a vision is supposed to be an end product. It's a description of the outcomes, if you will. And so, you know, I had a vision as an integrated set of trails, wayfinding and interpretation that provides, and I went beyond rec strats. I said the most inspirational trails experience in the world, not just in the country. You know, let's not, I mean, we want this to be, and in terms of a mission,

54:42 Again, we're a group of Mammoth Lakes Trail users providing guidance on the creation of the Mammoth Lakes Trails experience through program and budget recommendations. That's, you know, who we are and what we do. Do that one again, please. A group of Mammoth Lakes Trails users providing guidance on the creation of the Mammoth Lakes Trails experience through program and budget recommendations. So I think that captures...

55:11 The same flavor. So if we can identify the components that we want in the vision and in the mission, I think we can do this really quickly. The components I would have for the vision are the integrated set of trails, wayfinding, trails, wayfinding, and interpretation providing the best experience. And in terms of the mission,

55:40 It's who we are, a group of users, and what we're doing, which is providing guidance to the town. So those would be the things I would emphasize. I think that's fine. The only comments that I was going to make, and this is because I've had more than a few people and even a town counselor say to me that, you know, well, what about the sidewalks? And my feeling is, and I want to be clear on this, is that as we've all talked about, that this really is

56:05 The mission of what we're trying to accomplish, the vision of what we're trying to is get people out to experience the land that surrounds us on three, arguably four different sides. Or actually I should say completely surrounded. I want to make sure that our vision is stressed more towards the outside, the municipal area, but still within the sphere of influence. But I like the way that it's been articulated here. I would agree with you wholeheartedly.

56:34 We are trying to create opportunity for John to market. This is about locals being healthy and having opportunities to travel, but it's also about the long-term economic health and viability of a community. So the way you put that in trails primarily outside of the municipal, but in the sphere, or outside the sphere as far as I'm concerned, it's creating a recreational system.

57:05 And the reason why I asked John Urdi to be here, and I'm going to ask you to speak here in just a minute, I actually want to have John Kazmierski comment here before we bring John Urdi up, is because, you know, we were talking a little bit about what is the perspective, what is the perception from outside our committee. We're all residents. We all live here. We know what we want. At the same time, what product do we have to sell? We've already talked about that a little bit, but how is it going to be sold, and what is the perception? I'll let John Urdi speak to that here in a minute.

57:34 John Kazmiercki, did you have any comments? Yeah, I think I agree with everything you all have said. You've all touched upon the important parts of why we're here doing this. I think there's a couple things that I thought of that maybe you didn't really touch upon. You all referenced a lot of wording in the MLTS MOU. I think whether you were intending to do that or not, I think I would encourage you to read that MOU that defines what the MLTS is.

58:04 And how the Forest Service has agreed to partner with the town to deliver the MLTS. That's very important. The things that I didn't really hear anybody mention, well, actually, I think Bill and Sean kind of started mentioning about just getting the public onto their lands. I would make sure the vision has something about public lands. These are the public's lands. We want them to get out there. The Forest Service is in this partnership with the town because we see the opportunity to enhance the experience and get more people onto their lands.

58:32 To enjoy that, recreate, stay healthy. So that's why we're in it. And then the other thing that I would encourage you to think about is I feel it's an important part of the MLTS is the opportunity to engage the public in the stewardship of their lands. And that's something that we're already doing. This committee has allocated funding to support that. And I think it's an extremely important part of what the MLTS is and what the MLTSCC can do to

59:00 Help manage public lands. I also would encourage you to think about, nobody mentioned maintenance of existing facilities. I think we're all really focused on enhancing and growing the experience, but I've said it before, I'll say probably every meeting that the infrastructure is literally crumbling that we have today, and if we lose that, the world class

59:28 Trail System that we already have in place will, you know, we'll have trouble maintaining that. So we can build as much new stuff as we want, but if we fail to keep the campgrounds and the trailheads in good shape, we're going to lose people who come back to go to McLeod or to go to Duck Pass. If they see that place falling apart, that might be where they came, the only place they go, and they never come back because it's in such poor shape. So. It's the guest experience.

59:56 Comment, yeah. That's a dangerous slope, though, is my concern with that S word. And what I was going to say was that while I think everything that John has mentioned is important, I don't think they're actually component. Well, they're embedded in the mission and vision, but if we start articulating each component separately, first of all, the mission and vision are going to turn into, you know, something as fat as the trail system master plan.

1:00:25 And if we are creating the most, well, let me pick them up, public lands, it's not all just public lands. So, yeah, public lands are a huge component. They're the vast majority of what we're doing, but it's not just about them. And the stewardship is really a way to get to the inspirational experience.

1:00:52 I don't want to lose sight of any of the things he mentioned because I think they're critical, but I don't know if they need to be specifically called out in the mission and vision. I think both the vision and Stuart, or mission statement that you read and the vision and mission that you mentioned, they didn't capture those things, but maybe a little bit more wordsmithing could even grab on. You don't have to mention them specifically, but I just thought I'd say that's why we're here and that's what's important to the Forest Service. I actually...

1:01:19 I think they are, excuse me, I think they actually are embedded in there. So the fact that it doesn't actually say maintenance. I don't think you can have the most inspirational trails experience in the world if you're walking around on something that's overgrown and the signs are falling down. I mean, they are how we get to that end product. They're not the end product themselves. One more comment from page two of our, the trail system master plan, the vision, goals, and objectives.

1:01:48 And it actually speaks to the broader one that Stu brought up because it says, the TSMP, it envisions an integrated system of infrastructure and programs that support recreation and mobility simultaneously by seamlessly connecting homes, hotels, businesses, recreation nodes, and backcountry experiences. It's based on the notion that the recreational trail experience begins when you leave your home or hotel, not just when you park your car at the trailhead. For this reason, the plan includes a strong focus on providing facilities.

1:02:18 That'll, you know, on and on and on. So actually, it could be broader. And I think actually maybe some of the wording here kind of gives you the idea it's everywhere. It's not outside the town. It's everywhere. But I think that it's going to be important for us to focus on, you know, be, as everyone has said here, is really speak specifically to the priorities. Well, that's kind of in the goals. You know, there's vision.

1:02:44 There's mission, and then you list your goals and objectives and the action steps, how you get there. And I mean, actually, you know, that, I think first we do our mission and vision, and then we start. Exactly those points are how you get there. And setting priorities is obviously one of them. Yeah, and I think, you know, the reason that in my mind we are primarily outside of the municipals is because if I thought we were taking care of sidewalks and the municipal mumps, I never would have asked for $300,000, I would have asked for $700,000.

1:03:13 We can't do everything with 300,000 and there's a lot of maintenance and everything else that needs to get done and building the trails that needs to get done outside of those. Not that those shouldn't be built with Measure R, I'm not arguing it, but in their own applications. In terms of maintaining the existing, I agree with you, we really need to do that, but I agree with Sean what a slippery slope that is. How do we ever get government as

1:03:41 Their budget increases to reallocate money to something that we have taken over that needs to be government. We are government. We are government. We've already had our discussion here. Let's ask for comments from the audience. Good afternoon. John Urdi from Mammoth Lakes Tourism. Sean, I assume you just want me to give my two cents on what we should be doing moving forward? Yes, please. Okay.

1:04:12 You know, I think right now it's fairly simple. We've got a trail system master plan, and it's really the implementation of that. And I think that's what this group's vision is to say, okay, we've got this plan. How do we execute it now? I think a lot of things that brought up today are very important. There are very few systems that are in the country that are as extensive or as valuable as what we have here. I think a lot of you know that prior to coming here, I was in Jackson Hole. While I wasn't part of the Teton Valley Trails and Pathway organization, I worked very closely with them.

1:04:42 From the ski area side and just saw what they were able to put together. They did start a few years earlier than us, but they've implemented their master plan and they're moving on to phase two. Their master plan and their program is pretty extensive. Obviously, they've got the national park right there. They've got some amazing trails that even lead into Grand Teton National Park, which are a lot of fun. It's amazing riding your bike through the park and not getting run over by RVs.

1:05:09 For me, this is a huge asset for Mammoth Lakes Tourism. I think we all talked about it. We have a phenomenal system in place. What I need is I actually need the programs and the products to promote. I just came from a meeting. It was funny. I just met a gentleman who owns a house in town here. He spends a lot of time up here. He is building a house up in the Bluffs, so somebody that has some means. And we were talking about just the fact that back in, I think, 2008 when he first came up here,

1:05:38 He was expecting to have activities to be able to do, and he found that there really wasn't anything put together for him, and that's where I think itineraries and being able to build these trails and build these experiences into people is what we need to do. When we started talking about it, we started talking about the fact that the trail system is there, and you've got hiking and biking and horseback and all these things that are, when people think there's nothing going on here after Labor Day, there's a hell of a lot going on here after Labor Day.

1:06:07 We need to have those programs to promote. I always go back to the mammothtrails.org website because in the 27 years that I've been working in the hospitality and recreation and resort industry, it's probably one of the most user-friendly sites that I've ever seen. I can go on there with my kids and figure out that, no, we don't want to hike this trail because it's a 600-foot elevation gain, and that just leads to lots and lots of whining. So it's just very helpful to know exactly where we're going because even though I've been here for three years now,

1:06:37 I don't know where to go. So I think those resources are huge for us. It's a major amenity. As I mentioned, it's unique. There are very few places that have this sort of network available, and it's phenomenal. And it's very promotable. You know, it's something that, whether it's through high altitude training or talking about families or talking to the OHV crowd, there's a lot of stuff out there. And like, OHV is a perfect example. You know, Bill, you talked about snowshoeing. Sure, I can hop on my snowshoes, walk out in the woods.

1:07:06 Hopefully follow my trails back and not lose myself and my kids out there somewhere. Having those trails is a huge asset. I was coaching Little League last night down at Shady Rest, and there were a bunch of guys off on their motocross bikes. I have no idea where they're going. I have no idea how much of an asset that could be if we had the promotable piece that said, okay, here we're going. I know we've had OHV maps in the past. I know we've had all those different pieces, but it needs to be packaged.

1:07:33 Part of the conversation with this gentleman this morning was he asked me who's going to drive all the things that I think we need to promote because it's not me. We've talked about it with events. I don't put on events. Sean puts on events, I promote them. Other people put on events, we promote them. I don't create them. I'm more than happy to put my two cents in where it's asked. But the idea of even the trail system, it's not something I'm going to create.

1:08:01 It's something I need to get packaged up, handed to me and said, here's what we have now. Go out and tell the world. So that's a huge piece for us. You know, the experience, it's a huge part of our experience. While it may not be the sole reason somebody's coming here, it's a major amenity. You know, even if you look at just the, even if you just look at the lakes basin path, that is a huge amenity that is, again, unique.

1:08:29 I think we've basically gone out and said that it's the highest multi-use path in the country. We'll continue saying that until somebody challenges us and says they have a higher multi-use path in the country. That's how marketing works. Until somebody calls you on it, that's our moniker. And, you know, you go up there on any given day and you've got people hiking or walking up the road, running up the road, biking up the road, and taking advantage of those things. That is a very marketable asset. I think I've told some of you...

1:08:56 Just the scenery off of that path makes it very, very scenic for different people to take pictures of that and remember that experience, whether it's with Crystal Crag in the background or Mammoth Rock in the background. It's a piece that people take with them. The one thing I do agree with, and I agree with John 100%, and I know the whole supplanting thing is a pain, but the problem's going to be is that if we just continue to put new money into new projects, all we're going to do is we're going to...

1:09:24 Lose old projects because they're going to fall apart and you can't move forward and keep adding projects and have everything else behind you falling down. You know, it's kind of like sitting on a limb and sawing on this side. There you go. So I think there's got to be a way, whether it's going back to the voters or whatever it is, because it's great that we have this funding to develop new programs, but I do think that we absolutely have to go back and make sure that the guest experience...

1:09:49 Doesn't fail. When somebody comes up here and they're out on a path and it's washed out or they're out on a trail and there's no signage, we need to be able to go back and enhance that experience because my concern is it's great that we have the new shiny object out in front of us, but if everything else is falling apart behind us, then it's not going to help. So I have no idea how you do that, but it's something that concerns me. It concerns me just like everything else in town where, you know, if people aren't renovating their properties, that's a...

1:10:18 A negative force. You know, you look at what Jim Demetriotis just did with however many millions of dollars to the Sierra Nevada, that's great, but we have other properties in town that are falling down that either don't have the money or don't have the time, and that's a detriment to us, and I see the same thing with our assets. I think that's a huge concern. So I know that the supplanting thing is a big thing, but I think there's got to be some way to either go back and discuss it or re-vote it or something. I'm not as involved with that process, but...

1:10:45 That does concern me because, again, if I'm selling an experience and the experience is subpar, whether it's at a lodging property or on a trail, people aren't going to come back. So I think that's something that has to be addressed and discussed. So, you know, in general, I've said this before, I think regardless of who is doing it, I need somebody to build these programs, whether it's MLTSCC, whether it's MLTPA, whether it's MLR, whether it's another third party, we need somebody to put it together because I'm standing on the sideline waiting to be put in the game.

1:11:13 And until I have something to play with, I can't, there's not much I can do. Again, the MLTS, or the Mammoth Lakes, the mammothtrails.org website is still an asset that is hugely valuable to us. I needed ASAP because it is hugely valuable. And with the existing system, that becomes a massive, massive benefit. So those are my thoughts. Okay. Thanks, John. Thank you very much. Any questions? Yeah, John, a couple questions.

1:11:40 Because I agree with you on most of what you said, not all. I can't agree with anybody. Never. Everything. Especially the marketing guy. How do you, as an organization, how do you communicate with the groups out there, the user groups, that do things on a weekly basis that probably should make their way to you that I don't think are? An example would be the Mammoth to Bishop Ride, the, what are they on, I don't remember what they call it, the Pamper? The Pamper Pedal.

1:12:07 Yeah, which is a great event, which I can see a lot of our second homeowners and people wanting to come and participate in. I know that the bike group does weekly rides. How do you interact with all of them so that you can not promote, because they don't want them to go over the top, but you promote.

1:12:29 The weekly things so that when your friend says there really isn't anything to do up here but Mammoth Vela is doing a ride every Friday and the Snowmobile Association goes out on Sundays and so what form do you have to interact with those and how do you get that because there's a lot of organized stuff. Yeah.

1:12:49 We don't take advantage. Absolutely. You know, I think that a lot of it is we've put together in the last few years the events brochures, the posters. There are 150 some odd thousand that just went out this week to make sure they were out for Memorial Day. It's the same piece that we've done in the last few years. It's broken out in music, arts, and culture, sports, and fishing.

1:13:08 Three separate posters as well that get distributed. The websites. So the website, when you go to the event page, it does list a lot of the local weekly events, whether it's Mammoth Track Club meeting to do their weekly run on Wednesday morning, or the women's ride at Footloose, or, you know, all the different pieces. Social media is another way we're getting it out there. One of the biggest things that we're developing right now, and actually should be launched fairly soon, is a program called Your Tour.

1:13:33 One of the things that I've asked Christy Osborne, who's our interactive manager, one of the things that I've asked her to put together was an itinerary builder. You know, again, I've been here for three years. I don't know where to go. I want to be able to go in and plug in that, you know, I'm here for four days. I've got two young kids. I'm interested in hiking, fishing, and paddle boarding. It's going to throw me a whole list of things we can do. It's going to say, you know what, your kids are seven and nine years old.

1:14:02 You know, the walk around Horseshoe Lake is XYZ length. It's going to take you this much, and it's a very, it's an easy hike. You know, moderate hike up to McLeod, it's .6 miles up the hill. It's an elevation gain of 200 feet. It's going to get you up to a beautiful lake. This itinerary builder really takes the thinking out of it for people. Because people don't, one, if you're coming to a new area, which is what we want. You know, we have a lot of people that come here that know exactly where they're going. They're going to go and hike duck pass. They know that.

1:14:29 But we also want to get the people that have no idea what there is to do here. And we want to get the people to look at our website or look at this itinerary builder and say, wow, that looks like fun. That sounds like fun. Again, if you look at the mammothrails.org website and you look at the Duck Pass Trail, it's going to show you the elevation. It's going to show you beautiful pictures of what you're going to experience. It's going to tell you how moderate it is or how difficult it is. And you're going to be able to make an educated decision on whether that's the right place for you to go.

1:14:59 Ongoing activities. We put those out in our email newsletters. We put those out on the website. We put them out in different communications. We did, and I think we still have them on the back of the event brochure, we still have the weekly rides and the weekly runs and the weekly activities. They're not necessarily put in the calendar because that would be, they'd take up too much space. But I think on the back, I think it says ongoing activities. And it could have the

1:15:26 The High Sierra Tri training camps that they're doing. It might have the Velo Club. It might have the Track Club running. So that if people are here, they can see that's going on. The itinerary builder's great because you put in your event, or you put in your date range, and it's going to tell you all the things that are happening right there. It's not generic. So if they're coming during Palooza, it's going to say, here, Palooza is going on. You should go to Friday night.

1:15:48 Or you should go for Sunday morning and get up on Bloody Mary. It's going to break it down by date as to what's active. If the mountain's not open for downhill mountain biking, it's not going to be on there. But it may say that there's great riding through X, Y, and Z. Click here for bike trails. So my question still is, there's a Mammoth Trails group out there that has many organizations that belong to it. How do you interface with them so that...

1:16:14 In the past, it's always been up to them to come to you. It seems to me it would be advantageous if we created some scenario by which you were regularly meeting with them in their regular meetings. Or maybe you'd even be holding that meeting and paying for the privilege. That's out of our realm. That's where I see the MLR coming in. That's where I see, again, it's a user group group that coordinates. I don't care how the sausage is made.

1:16:44 I need the sausage. So those groups need to get together. It's like a restaurant association. Yes, I can work with each individual restaurant, but it's a lot easier if the restaurant association gets together and says, these are dead weeks. We want to do restaurant weeks. Can you promote them? Yes. So with us trying to chase people down, it's very difficult to do it that way. But that's where, you know, Stuart and I have talked about it with even the track project. You know, we were talking about the measure our dollars last week, and that's something where MLR would come in key. Okay.

1:17:15 Thank you very much. I'm going to just move us back to vision. I got my questions answered. John, thank you very much for coming in. Your perspective is valuable. Great. Thank you. Can I make one comment, Sean? Because the one thing I just want to address is, you know, when you package up experiences, we want to see that. We want to see as many people. We know not everybody can figure out things on their own and look at maps and figure out where they're going to go. So we need to add those packages. But those packages also translate into impacts on the ground and maintenance needs on the ground.

1:17:43 And so one of the things we have to be aware of is when we start packaging these things up, it's going to drive additional maintenance that we need to do on the ground, whether it's an OHV route that we're signing on the ground and we're maintaining those signs and we're putting it on the map and then it drives maintenance of the signs but also maintenance of the roads and trails as the use increases or, you know, pedestrian paths, pedestrian trails, restrooms, facilities. So we also in the Forest Service have

1:18:10 Tried to scale back the amount of information in the itinerary building in the wilderness. That's what we're directed by our policies to do. We want to make sure our partners are aware of that and not building itineraries and telling people where to go once they get into congressionally designated wilderness. So we will continue to push that and we want to make sure our partners are respecting that need. I think that's an interesting conundrum because, again, we could have the most pristine empty paths if we wanted to, but I think on the opposite side we need to figure out how to maintain them.

1:18:40 Because we do want people to use the public lands, and we do want to get people out there. I mean, for us not to tell people about the experiences is a disservice to the public. I think we can together figure out the balance there, and Christy's been working with us really well in trying to figure out what works and what doesn't. Absolutely. I like the comment that was made earlier, too, about making sure that we're engaging the public. Your point was, you know, you need the products and programs to promote, but at the same time engaging them, and it's got to be a two-way communications street.

1:19:09 Perfect. All right. Thank you. Well, and I just appreciate what both of you said because as I commented, if we don't have a well-maintained system, we really aren't achieving any of the visions that have been articulated because – and I don't think any of these actually say it's only new stuff because, again, you can't – it's like it doesn't matter whether it's the website. We know that the website –

1:19:39 It becomes stale in two weeks. And I do worry about the maintenance on both the segments on the National Forest, on the public lands, not just National Forest, but going farther to the other public and agency-owned lands, as well as what's happening in town. We've certainly seen some lapses in maintenance on the existing map.

1:20:10 Well, and I think that's, and that goes back to my comment about we have to figure out a way to be able to maintain the existing trails, even if we don't build anything else moving forward. To John's point, if we don't want to drive people to those trails because we're afraid they're going to get too much use, we need to figure out how to maintain those trails with funding or plans or something instead of going out and building a new trail and then not being able to backfill because, again, it's going to deteriorate behind us and, you know, we're going to be on an iceberg soon and that's not where we want to be. Great. Yep.

1:20:40 Thank you. Thank you. John Whitworth, I think you would... Yeah, I'll be brief. A lot of very interesting points being brought up. I think the first thing is that the Trail System Master Plan. As John mentioned, the Jackson Hole Plan, also done by Alta Planning and Design, the level of public outreach and engagement with our Trail System Master Plan is unprecedented. You will never be going astray of the public's intent because it is in that plan. And if anybody wants to see the volumes of documentation that we hear that thing, we've got them. We can provide those to you.

1:21:11 That's critically important. This question about maintenance is going to be a very interesting one going forward. This committee and the town is charged with accountability to public funds like Measure R and Measure U, which are funding this program. You're going to be obligated and the council's going to be obligated to speak to the taxpayer as to how those funds have been spent. There are a lot of ways to enhance full service ability

1:21:37 As an agency, the executive branch of government, to bring more resources to the Inyo National Forest and this forest, other than measures RNU. This committee in the town has got to figure out how to really develop and engage and enhance relationship with the federal agency, unlike anything that's happened in this community to date. It needs to be an example for the country going forward. I mentioned the forest plan revision process that's going on right now.

1:22:04 The idea that this town would not be participating in that process is shameful. Given the needs that these guys have for what's happening on these lands around here, the program that the public has said they want to invest to do on those public lands, the town has to be engaged in that process. There are ways to bring countless resources to John Kaczmerski in this forest without even talking about Measure R&D. Any as compliments? Any specific, though, you know, with regard to vision and mission?

1:22:32 Which is what we're trying to discuss here. Any input specifically to that and how... The management of the relationship and recommendations of the management of the relationship between the town and its public funds and the Forest Service. That is a very significant part that you should discuss. I don't know whether it falls into what you're doing, but that needs to be something that you have to do. Any recommendations, Ned? I don't want to get into that. I know you guys got a plan. But I'm assuming this is not the only conversation you can have about this. There's a lot of ideas. We've got a lot of people up there who could bring a lot of...

1:23:01 Horsepower to that discussion. Certainly the Forest Service can as well. Their hands are bound as being executive where they live in the federal government. But there are things that this community and the public can do to help them out a lot. Finally, I think that your question about how do these experiences get on that website, we've already built that program. It's in Mammoth Trails. We need to get, as Bill said, let's get that program going again.

1:23:28 Eastside Bellow that does that pamper ride is a member of Mammoth Trails, one of the charter members of that. We can develop all those experiences and all that information, feed it right into the website. That gives them a program that he's directly marketing and sending out in the world that's already in place. The final thing about the Trail System Master Plan, the contracts that we had with the town that were completed, $900,000 worth of contracts that, you know, to Sandy's point earlier, we leveraged as a non-profit about $400,000 to those contracts.

1:23:56 Leveraging a measure of money. That's over a million dollars invested in the implementation of that Trail System Master Plan. So in terms of your mission and vision going forward, maintaining continuity, continuing to invest in that Trail System Master Plan, stick to it. You've got a very solid foundation already in place. And let's get to where Jackson Hole is. We've implemented phase one of the plan. It's already done. We want to do the second iteration to be moving forward. So those are my thoughts. Thank you. Thank you. Let's move beyond where Jackson Hole is.

1:24:25 Fairly exclusionary system. Yeah, exactly. In order to keep things moving along, I'd actually like to make a suggestion and give a, oh, I'm sorry. Yeah, and I do want to hear from Pat. Yes. Okay. Thank you. I think you just need to, as you mentioned, be visionary and recreation is very broad and it does encompass a lot of different elements that you've talked about already.

1:24:52 But I think that's important. So sidewalks are an important part of a trails project because as you're walking around town and you're jogging through condo complexes to kind of maneuver in a circuitous manner, that is something that needs to be addressed. And so I do encourage you to be as broad and as visionary as possible. Another portion of the piece is interpretive programs. I know that that's part of a master plan.

1:25:22 But that's just something that you might want to keep in mind as well. And I would like to address this Mammoth Lakes Trails. I think the focus from the town is for groups to be voluntary, just as you are all volunteering your time. Those individuals that were attending those meetings are also voluntary. They can continue to meet, just like the special events groups and whatnot. They can meet on their own.

1:25:50 They can forward information to Mammoth Lake Tourism to John if they want to promote their events. Informally, I handle publicity for the Mammoth Lakes Women's Club. It's just one more thing. Instead of sending a press release to the sheet and the Times, if there's something noteworthy, I could just forward that on to Mammoth Lakes Tourism.

1:26:17 The mechanism is in place. I don't think you necessarily need to meet, and I don't think you necessarily need an MLR to accomplish these kinds of things. So I just wanted to point that out. Thank you. Thank you. Bill, you were going to make a comment? Well, I'm certain, yeah, I hope we'll have some discussion about this, but philosophically, I think it's always a good idea. You know, I've been doing this a long time.

1:26:42 Visions and missions should really be succinct. They should be something that everybody can recite right off the top of their head. Mammoth Lakes Foundation, Evan does this all the time. He can say, Mammoth Lakes Foundation supports higher education and cultural enrichment in the Eastern Sierra. He's got that one memorized. I happen to be on Mammoth Lakes Housing Board, and I didn't have to write this one down.

1:27:10 It's the mission of Mammoth Lakes Housing to provide workforce housing in the eastern Sierra and its immediate surroundings. So vision is an end product. A mission is kind of the who and how. And if they get too long, too wordy, you can't recite them. And so what I'd like to suggest,

1:27:39 Is we not actually try to write them and adopt them this time, but we've given some points. And Steve, do you think you could take the wording we've already discussed between, I think Stu brought some out of Rextrat, Sandy had some out of the resolution that formed this. I can provide you with what I wrote, and if there are any other ideas, and come back with one sentence provision and a one sentence mission.

1:28:10 That would be good. And I'll send my... Because most of it, you know, everything that was discussed here today is highly valuable, but most of that was about how you get to the end product. It wasn't the end product. Maintenance of trails is not the end product. It's a mechanism to get there. And yet we're going to have to go through all that stuff, and we're going to have to decide where that's important and when it matters. And, you know, while I said it's not about the public lands,

1:28:41 I'll tell you right now that the reason I'm sitting here is because I care about what happens on those public lands and how our users are connected to them. So that's going to have to be a huge component. So the goal of what we're trying to accomplish here today is essentially creating a one-sentence vision, one- or two-sentence mission. I know you said one-sentence mission. If we can do it in one sentence, that's best.

1:29:06 I understand. But as you said, you know, mission tends to be who and how, whereas vision is the end goal. And correcting my kids' homework these days without running on sentences, it may need to be two sentences. I'm just doing... It may need to be, but I would strive... It tends to be no more than that. I would strive, if possible, to make it one. Maybe we can all send just exactly our one sentence. Let's see him and let him...

1:29:33 Work it out. And I think there were some very key words that were used here this morning. If you guys could provide me that via email would be fantastic. Thank you. Let's move on from this business center. Any other comments on it? Okay, let's move on then. Finally, we're going to discuss the annual opening events for Mammoth Lakes Trail System. We have no more audience, but...

1:30:06 Steve or John Kazmerski, did you have any presentation on this? I mean, the dates, essentially, they already passed. We've, some of, you know, got our opening trails day coming up. I think something to celebrate is when the trolley starts delivering folks up to the lakes basin. It might be a, it's not the grand opening of the year for the trails, but it's a great day that, you know, a really valuable service begins and perhaps doing something up at Horseshoe or,

1:30:38 Down in town, just to, I don't know, it doesn't have to be anything grand or complex, just an announcement and maybe highlighting some of the things MLTSCC is working on, announcing the studies of the sharp trails and the lakes basin projects, so, I don't know, something real simple. When's the trolley opening? Is it 4th of July or is it, I think it might be like the week before the 4th of July, it's towards the end of June. Yeah, it's usually mid-June.

1:31:07 Okay, so it's not this weekend. No. But it gives us time to plan. It's a month away. Maybe a 10-minute ceremony, like do a press release, invite the sheet, invite the registering times. For this year, I have no problem with using that as our timing. I think that we're looking at this in a very narrow focus. Annual opening events for the Mammoth Lakes Trail System, I wish John Urdi were still here. I'd like to see the town do a grand opening.

1:31:36 of parks and recreation facilities so that when the lake basin is open and our parks are all snow free and the trails are snow free that we have a celebration almost as a promotional tool besides the celebration for those of us that live here that it's not freezing anymore to show the transition if you will from the winter season to the summer season so more than just trails.

1:32:03 You know, we all love it when Shady Rest Park and Trails End Park and the tennis courts are all open for the season. So I see this as not just a trails thing, but an actual event of some type, if you will, that celebrates that passage from the winter to the summer season. We all know we don't have a spring season. So I'd like to really, this year maybe we just do something real simple.

1:32:33 Buses start, I don't know what it would be or how we fund it, but I would like to look at this in years going out as that special event or that tool to... Do I remember there being a line item on the tracking list that was discussed? Or am I thinking about something else? There was. And again, not that we're going to necessarily approve or use any of those funds, I just want to make sure that it was discussed in the investor tracking list.

1:33:02 Well, as far as this year goes, A for the comments on that? Well, I would say June 22, well, June 1 is National Trials Day. June 22 is our pool and it's our roller-ranked multi-use facility opening, so we're kind of doing a grand kind of celebration there. And then July is Parks and Recreation Month. It's like it's a national Parks and Recreation Month. So we're going to be programming a lot of activities and programs throughout that month. That's kind of our kick-off. June 22nd?

1:33:30 But July is our big parks and recreation month. And I think the timing's always awkward, Bill, because of the spring and who knows when everyone's going to clear that and all that type of stuff. However, 80% of the time, 90% in recent years, we have opened the Lakes Basin and our trails and our parks are open even in the snowy years on Memorial Day. I don't know one year when I know that in my belief criteria hasn't been met in the past to open the Lakes Basin, but it is the pusher of the businesses and therefore the pusher of the town.

1:34:00 To plow the Lakes Basin Road by Memorial Day. That would be what I would shoot for, but obviously that has to be a moving target because when we get an 82, 83, Memorial Day still has eight feet of snow on the ground. Eight feet? July 4th had more than that. Yeah. Or 96, I think it was. Yeah. Well, let's get back to just as far as, you know, we can talk about future years. Is there anything we want to try and do this year?

1:34:30 You know, I'll bring the root beer. But if there's anything that we want to do... National Trail Days is June 1, although that doesn't give us time to promote anything. I hate to use the 22nd, but that's the obvious one, because I hate to let people think that our trails are actually opening on June 22nd. That's a little late in the season. Our trails have been open for...

1:34:55 Several weeks already. It's the day after the beginning of summer, so maybe that's not a bad one. An event like that too, you know, I don't know how many people it reaches as opposed to putting something on a website. Mammoth Tourism is doing a lot of promotional videos now on their website or they do, you know, one, two minute segments. Maybe we can work with Mammoth Tourism just to do a quick two minute video.

1:35:18 We are open for the summer. Campgrounds are open. Here's the dates when everything will be fully running. And I think one of the highlights that we wanted to emphasize, we're going to try to do a press release soon to say Red's Meadow Valley is now open. Campgrounds are opening on these dates. Even with the blowdown, it's cleaned up. It's as beautiful as ever. A lot of people, we saw our visitation in Red's Meadow go down significantly last year because I think people heard all the bad press about thinking it was closed. They couldn't hike their trails. So I think we have a need to get out the word that...

1:35:47 It's fine. Everything's good. Come see us. Well, if we were to do something, I mean, what we're talking about doing, even if it's just a 10-minute little, you know, how do you do kind of thing, just talking about the successes of MLTSCC, I know that this is not even two weeks away, but at the same time, it might be. We will have people, and that is up in the right direction. Would we even want to do something in conjunction with the National Trails Day?

1:36:18 I mean, it is National Trails Day. We already got a summer stewardship program happening on that morning up at the Panorama Dome. If we were to do something, and if we are talking about something being as just simple as making a presentation that's only 10 minutes long about what MLTSCC is doing, it sounds like this is something that we could make happen within the next 10 days. And I don't know if we need any kind of budget.

1:36:51 All we're talking about is giving a talk, having us up there. I'll be there that morning. Just do it at the Trails Day. At Panorama Dome at 8.30? You'll have the bagel breakfast. That's right. Yeah. Just maybe do that. Do a press release, press release announcing. Who would do the press release? I believe it would probably come jointly from the Town and Forest Service. We've done many of those in the past. Okay.

1:37:22 Can you and Steve work on that? Yeah. Stu, Steve, John. Probably in this case, better to go with Stu and John rather than Steve. Yeah, Stu and I can do it. Yeah. I've done it in the past. Thanks, Stu. Didn't mean to volunteer you there for work. It's okay. So it'll be a little... Again, the goal is to keep it simple this year, to do something larger next year.

1:37:52 Yeah, because it's on, it's item number 741, and it's bucket number four, future. You may be able to include in there, too, that the MOUs and agreements have been signed. Yeah, that might be good, yeah. It formalizes the MLTS. Yeah. Use a master tracking list as a way of...

1:38:12 Explaining to people what we're doing, how we're doing it, how they can follow it, the successes that we've had so far. And obviously the people who are going to be up there are engaged people anyway for Panoramidos summer stewardship. So I think that's kind of audience to reach out to. And, you know, I certainly wouldn't want to get it any closer. And just reaching out. Let's do that. That's good. So that's just a consensus item? Yeah. I'm for it.

1:38:40 Thank you, Steve. Thanks, John. I'll take a crack at it. Send me something. New projects. Are there any new projects that want to be added to the list? I know we already had this discussion. So this may be a very quick little item. Is there anything that anyone wants to add? Yeah. All I will say is that we really, as of yet, haven't found how to integrate the new products we've come up with into the list and have that discussion. So I'm more interested in starting that discussion at our next meeting than I am.

1:39:12 Adding anything else to it now. Or even at our July meeting, first July meeting. One thing that's not a new project that's on the list, but somehow I would like to have in the discussion, and probably I should have brought it up when we were doing the earlier item, and I've mentioned it before, is the data management. We collect all this information. We've got GPS waypoints.

1:39:35 Friends of the Inyo has collected some, Inyo National Forest has collected some, MLTPA has collected some. I imagine that the town has collected some. And once again, it's somewhat like the website. If it isn't coordinated and if somebody isn't accountable for collecting all that stuff, making sure that there's no redundancy and where there are overlaps, that things seamlessly mesh and that the information is then available to potential users,

1:40:04 You know, all that stuff gets lost. And I don't know exactly how we go about assigning an accountable party to make sure that the data is kept current and... Bill, are you referring to MLTS data library, collection and maintenance of GIS, use information and other relevant data, maintenance and operations? Yes, sir. That would be part of it. Item 461. Yeah. And, yeah, it...

1:40:35 Is for future discussion. I just, I want to make sure, I think it's a critical item, I think that the quality of the data that we have already collected is eroding as we speak, and it's not because people aren't out there doing work, I happened to mention this to Paul McFarland, and he said, oh yeah, we GPS'd, I think they GPS'd the OHV route from here to June.

1:41:02 We already have that. Yeah, so one, we're getting duplication. If they did it and you did it. But that data now lives somewhere. How does it then move to the website? So it's this integrated. Let's agendize that again. I think it's really critical. I don't want to do it now. I did have just one question. What's the status of our PowerPoint?

1:41:32 Town Council Workshop. Now there's the presentation. Do we have a date to work with the town? A presentation about what we've been doing this year? Yeah, my plan is to have a, let me consult my oracle here. Okay. The plan is to have a draft of the PowerPoint to present on Monday, June 3rd to this committee.

1:42:03 Great. Hopefully there'll just be a few little comments and I can crank that around before midnight and then be able to present it to the rent commission then on the following day, Tuesday, June 4th. Perfect. Then hopefully there's a few comments and we'll be able to turn that around and then be able to present to the town council with our budget for the 19th. Great. I knew you were on top of it. Right. It's going to be a joint.

1:42:36 Workshop, we have an hour with the Recreation Commission, so we'll probably spend half of it with the Measure R, if we even need that much, and then the MLTSCC would be the 5 o'clock, June 19th. 5 to 6. Yep. Great. What time is our meeting on June 3rd? June 3rd meeting should be a 1.30, back to our regular, just wanted to confirm. Yeah, that's what I thought. Okay. All right.

1:43:11 Future agenda items, then again, just moving on to that, that our meeting is on June 3rd. Any comments on that? I mean, everyone's got it on their agenda, so they don't even really need to read it. We'll be coming back with the vision of mission. That'll be back. Are there any staff reports? Committee report? Visual committee report? Actually, I have one announcement. We have an ID team scheduled to kick off the

1:43:50 Studies of all the trails that we want to be looking at this summer. So one of the things possibly to agendize on a June 3rd meeting is a discussion about the priorities. We kind of have everything on sharp on the table right now. I could come to you with a list of kind of pre-prioritized the way Forest Service views a lot of those projects in sharp and have a quick discussion hopefully about

1:44:17 What we'll get looked at on the ground and what may be the lowest priorities. John Wentworth mentioned today the parking area, panorama. There's some complexities with that and with a couple of the other proposals that may drive Forest Service to say we're not going to look at these right now. But I can come to you with a prepared list of here's what we're prepared to do and have you guys make some adjustments based on how you see the priorities. Does that work?

1:44:47 I think maybe probably a 15-minute discussion would probably be needed. That's good. Please include that to the agenda for June 3rd. I think the IPT meeting is June 15th. Somehow, you know, we talked about this before, in terms of the scope of work and outline for how the SHARP project is going to go forward.

1:45:11 You know, well, but remember, I've brought it up before that, you know, when we do a contract, we have to have some kind of a scope where, you know, A is happening before B, B is happening before C, and how's the public being engaged in this process? What are we doing?

1:45:29 I can explain all that in a minute. If we could have, I'd like to see it in writing. I hate to do that to you. We've already put the document in writing for the work. I mean, we can further define that, but. Do we have that document? That's the challenge I'll share. I mean, yeah, there wasn't, there really wasn't a scope of work. There were some tasks identifying people and costs, but in terms of, like I said, I don't know.

1:45:57 You just talked about having an ID team. Is there any public input in advance of the ID team? I don't understand how it's all working. It's a review of the NEPA process is what he's asking for. Well, it's more than just in terms of this particular program, what's the sequence of work? That is the NEPA process as it relates to this one is what you're asking. Well, but it's more than just the NEPA. It's the overall because it's more than just.

1:46:23 I'll come prepared on the 3rd to give a presentation on how I see it going forward, and hopefully that'll meet you. That might be perfect, and it doesn't have to be. I'm not looking for the Encyclopedia Britannica. Yeah, I'm not trying to create it more work. I don't want to see it in my arms. Yeah. We want to make sure you're interested in that. Thanks. Okay. All right. We covered a lot. We did good job. Good job. If there's a motion, then. I'll make a motion. We get out of here. Okay. Second.

1:46:52 All those in favor? Aye. Opposed? Oh, good. And adjourned. Thank you very much. Good meeting. See some of you in two weeks. Thank you for your motion about the budget. I was thinking exactly the same thing, but you put it better than I did, because I went, wait a minute, you know, this is a preliminary. It is. Oh, yeah. That's not too much work. That's not too much work.