TransparentMammoth

Town Council · 2013

Town Council

· recording 2 hr 32 min

Agenda

Agenda items for this meeting haven't been extracted yet. Read the agenda on the Town's site ↗

Transcript

305 passages · machine transcript

Automatically transcribed from the Town's recording with speech-to-text. Names and numbers can be wrong; the recording is the record. Open the Town's video ↗

0:00 And number two, emphasis on enhancing quality of life. John, let's make it. Okay. Are we expecting one of these? Drale's going to be here from the U Committee. So let's give her a couple more minutes to show up. Yeah, because we've got two else in the U Committee.

0:28 No, no, I meant it's not here. Joyce

0:58 Yeah, okay. Okay, Jason Trent, right? Yay! The gang's okay. The gang's out here. We're not sure. No Sean. Oh, okay. I just fixed him, so I don't worry about him. He's on the road. Okay. We're getting the better half. That's right. He said at least one of us. Okay, then, if you guys are ready, even though he's probably going to check right in here.

1:24 We'll just go ahead and get started so we have plenty of time for questions, comments, and I'll just turn it over to Bill Sauser as our recommendation chair. And I thought the best way to start us off here was to have Stu over the Measure R and your timelines, and then if there's any questions on those, we'll be glad to answer them, and then we'll move on to number two. It'll be the same thing, Stu. Great.

1:53 Thank you, Council. This is our annual workshop with two committees, two advisory bodies. So it's part of the new coordination, which I believe is kind of a Council direction to

2:20 Better either align or more concurrently streamline both those awards. Measure R, as you know, has been running for, I think, four years. I think this is our fourth award cycle for the fall. It's our first award cycle for Measure U in the fall. Yeah. We were unable to conduct a Measure U fall award last fall, just an insufficient fund. So we've done two spring awards, an extra award, and then something in between.

2:49 But anyway, so what we want to run through here is the Measure R4 award, and right next to it or behind it is the Measure U4 award. So what we've tried to do and what both commissions were striving to achieve with this process is to align them as close as we could, understanding that we can't actually put them on top of each other. We just can't do meetings at the same time. Staff can't support them, and I think you might have applicants doing both. So you can see we just ran through. If you want to just quickly run through the four.

3:19 Award timeline. We're sitting right here on October 2nd, which is kind of our annual discussion on the cycle and the funding priorities. We would come back to the Council once the Commission meets next Tuesday to approve essentially the whole packet of Measure R. So you'll see that in a couple of weeks. What will be interesting is the packet for that will be written...

3:48 Now, presented to the town clerk, who's actually Wade, who Pam's put it together. So we're going to be a little bit out of sync. So the packet that you'll get will be drafted before the commission's actually met, if that makes sense. So if there's any changes to what we're presenting, then we can kind of talk about it now and incorporate it, and I'll verbally present it at that time.

4:12 But anyway, so what we've got is October 16th is when the Council will approve, review and potentially approve that fall award cycle. October 21 is when we would open. And we're looking at closing on November 15th. So kind of give you essentially that full four weeks, which is very typical. December 3rd is when the Commission would review the applications. At that time they'd be put online on the website, everybody could start looking at them.

4:43 And then we've scheduled the two dates, December 10 and December 17. And then January 7, so we obviously skip the two weeks of Christmas. And then we'd be back in front of Council on January 15. So that's Measure R. Any questions on Measure R? No, on December 3, it looks like you're actually going to have both groups meet, that project's underlined, would be meeting together so that you can deal with who's applied under both and how to figure it out.

5:14 Yeah, the whole purpose behind that meeting is, and that will be the first time we've done that. Yes. So that both committees will go over all the applications, and if one is in one place and we feel it really well as the other, or whatever that shuffle may be. Good. Yeah. Thank you. We've been hoping that would happen. Yeah. Yeah, pretty much that's the only thing different from the way we've run it in the past. Other than that, it's pretty static. Yep. You know, we've...

5:41 As we've gone through the last four years for R and one year for U. It's just a little later. So essentially Measure U is the same timeline. It's about two, two, two and a half weeks later. So that application period is scheduled to open November 11, and Council would see that packet on November 6, which is that next available commission meeting. So you want to kind of put them right on top of each other.

6:09 That application period is just cut a little bit shorter so we can fit in that meeting that we just talked about. So it would open November 11, close December 2. You have the special meeting on December 3. They run through their review process, but the bulk of their review process is actually a little bit interesting. One's in December, one's in January. We just kind of split the Christmas and the holiday. Which is usually advisable only because looking at so many applications that we receive from the GU,

6:40 The committee has a lot of questions that we'd like to have answered and have the opportunity to prepare those and come back a couple of weeks later on Christmas. And then that award is scheduled for February 10th. And at this time, the Measure U fall award is the only scheduled award on the annual site that we've kind of really dealt into that discussion. February makes it early enough to keep the plan.

7:10 Yep, and also it times well into the town budget cycle too. So both of those cycles, you know, if they're awarded in January, February, they fit right into the mid-year budget review and then we can start rolling in March for the annual budget cycle. From my perspective on that, the one thing that we have to work on, and this is me, I'm not the chair, anything else for Measure U, is the emergency funding. How do we handle that? You know, in Measure R, we have the opportunity.

7:40 So in the spring, if something is underfunded or if an opportunity comes along that is screaming, we have a venue to pursue that. With Measure U as of yet, we're going to have a fall award. But then if there's an overrun or if there's an emergency we have not yet set up the protocol for, are we just going to say no to everything?

8:03 That might be enrolled over, yeah. So that's something I think that the committee is going to have to get their hands around that. Has the committee discussed that? No, I think we kind of, you know, I know I think it wasn't expressing the fact that we're happy to run, but, you know, it's a lot of work. And actually, I have to admit, it's the only times we've done, what seems to be the oopsertunities over the last year's cycles were where the town wanted to ask for an allocation, so maybe that'll keep us in line, too.

8:33 Well, I think Town Council has the prerogative to obviously do that at any time. So if the committee feels strongly about an application, and the council does, I mean, that would be a process. I just, again, for me, there's a process with Measure R to allow that to happen. Right. And once we have a process set,

8:57 I hate to see Council start stepping out of the process because then it happens on a regular basis and the whole thing gets hosed. That's exactly what I meant. Maybe you set a date for an emergency. So, you know, any emergency that might need to come through has to come through by such and such date. And if that passes, then you're done until the next season. So we're going to schedule the emergency.

9:20 Well, no, but you could say it's either going to come to this point. And so, anyhow, if it doesn't happen, then you just move on. I really didn't want to get into the emergency discussion here. I just wanted to advise councils that that that's an area that we have not dealt with yet that I think is important that we need to deal with. How do we deal with that? Took that totally out of contents, but okay.

9:44 The last time we did an emergency piece, it was for the airline subsidy out of Measure U. Well, we didn't have a protocol for that. And we need a protocol for how to bring that sort of thing forward. Any other comments on the timeline? And then we'll just move on to the priorities. So both advisory bodies have presented.

10:12 They're funding priorities for Council. This is kind of a workshop to really discuss them and get some feedback. Again, they'll be coming back to the Council at those times that we talked about. So the Recreation Commission have revised their priorities. I think they're in your packet there. So there's still, I think there were four priorities now. There's three priorities and four principles. But anyway, so number one remains the same to finish parks, trials and recreation projects that remain incomplete.

10:42 Number two is actually a new one, so that's Invest for the Future, which is, you know, talking about setting aside funds for future town goals, priorities, capital projects, etc. And then three was the phase completion of Trails End Park. We've still got a couple of phases to go. The principles, I think very similar. One was being emphasis on cooperative efforts that significantly leverage measure our funds, emphasis on recreation and trail enhancing projects.

11:13 Emphasis on enhancing the quality of life for residents. That's a new one. Because before it actually talked about more of a visitor type of experience. And then the last one there really is just that it has to be some link to the existing Parks Recreation Master Plan, Trail System Master Plan, or REC strats. So not many significant changes apart from one understanding that

11:41 The Commission feels strongly about putting, you know, if there's no applicable applications, then those funds should be set aside. There was discussion about setting aside a future account as well, if that's something that we want to look at, bank account. But anyway, that was the priorities as we currently sit. Okay, so one question. MLTSCC already has quite a range of things.

12:08 They're not having to file another application, are they? The $300,000 is set. They're committed for the five years. But they will come forward with whatever the next set of priorities is or next summer's priorities. Is there any questions on that? I have one, I guess, and I don't know that it makes a difference because when you're typically talking about quality of life, it speaks for residents, but I don't recall having the word for residents put in there because I think there is a quality of life period.

12:41 You know, I don't know that it was specified specifically. I didn't have that on my notes anyways. Let me talk in the meeting a little bit about how, you know, the economic factor goes both ways. You know, good quality of life for residents, you know, and a stable workforce. It contributes to a good visitor experience. And so I guess I was just, like I said, because typically when you're dealing with quality of life, it's typically speaking of a resident, but I don't know that we actually specifically had that verbiage in there. But anyways, I don't know if it's important or not.

13:09 Well, you're going to be bringing something back to us with the final ones, right? So you'll have a chance to work that out. We can talk about that again on Tuesday. Measure U, these were established last year by originally that steering committee and again affirmed by the application committee recently on August 13th. The only changes that were made were to number one, you can see, which is economic stimulus.

13:36 Slash Sustainability. The committee felt strongly that it should be not only stimulating the economy but a sustainable project. High impact remains, something that's ready to go and that's implementable. So it's actually there, ready to go and it's something that can be implemented straight away. Leverage remains and then exists in current plans and studies. So that was something that was added previously that was

14:05 I believe that was planning for the future, which I think was a little bit ambiguous. So I wanted to make sure that it was, you know, existing or is at least thought about in many of our plans and studies that we've been working on and have adopted. When we say leverage, do we mean, what exactly does that mean? I mean, are we leveraging funds, obviously, but we... Not totally relying upon Measure U or one funding source. They're able to bring, I think, matching funds or...

14:34 Leverage resources, volunteers, income services. Okay, so leveraging all resources. We didn't want anybody to become dependent on their view of the, that's their sole funding, so it's very particular. Right. Well, I guess that's what I was just going to clarify, is that leverage goes across a pretty broad spectrum. No, we're not talking about leveraging by going out and loaning money or borrowing money.

15:00 What we're talking about here is leveraging in that somebody is bringing the bulk of their funding with them and they need us to put in the last piece or to partner with them. So the more money you bring to the table, the higher the rating would be when we're looking at that particular application.

15:21 Because, I mean, it's just leveraging, usually, I would think, would mean, like, going out and bonding the money. Right, no, we're on the other side of the coin. The inter-synergistic relationship, the 10th this year, where we have four different events that have shared and resourced, and that's been highly encouraged.

15:44 Yeah, like it's the 10% needed to pull down federal money. Yeah, that's a huge leverage. Obviously, you want to go there, yeah. Making your money go further.

16:14 Are we comfortable that regardless of who it is, whether it's town staff or MLT or the college or anyone else, that we have enough people in the right places looking for grants to leverage projects with? Have we had any talk of any of that? That is something that we did deal with in the

16:46 Both measure R and U because applicants have come forward with applications with fundraising as part of it. But my understanding was that the town attorney's opinion was that we could not use R and U money to pay for fundraisers. No. Would I like to see people working on getting grants? Yes. But from the standpoint of just managing R and U, it is my understanding that someone else is different and it's just asking the attorney once.

17:16 That those funds cannot be used in that way. As I recall, after the track record, had proposed $25,000 for professional funding. Right. And we actually, they were asked to renew that portion because it was appropriate to use the money. It's kind of like going to find a policy. Yeah. I just wanted to make sure we all had our eyes open and where everybody is aware of grants and the power of them. Grant matches with grants and grant writing. That's the same type of thing. It's kind of...

17:45 I think that leads into the next one too, which is the recreation facilities planning. And a lot of that process we've been going for quite some time. Terry's been doing a great job with it. We're just trying to keep up. But really the goal there is to get through a prioritised list of projects. And once we get to that list of projects, then you can actually start to identify what funding sources they have. Then we can actually start to identify what grants might be applicable.

18:14 Like, for instance, the State Park Grant that we received previously for the, actually the Sarbanes Grant for the ice rink. You know, once you have identified project, try and find, you know, grants, funds, you know, whatever it is. And Trails End Park is the same situation. So we've identified that's a priority. We're out there sourcing grants. We had that grantee come down and have a look at that facility. They determined that installing synthetic turf is not an applicable component of that grant. So they recommended that we consider funding it ourselves.

18:44 So the Commission now is going to say, OK, we'll consider funding that, but we also want to consider putting aside or encumbering the matching dollars, which is the $250,000 of what that grant could be. Then we're leveraging those funds or matching those funds, and then we have a pool of $500,000 to go and complete some of those phases of those projects. So I think that's when it helps. It's helpful for staff to understand when we get the direction from Commission and Council to certain specific projects, we can actually go and...

19:12 Research applicable grants. So it's just some examples of how that works. But previously it's been very difficult because we've had such a laundry list of ideas and projects, right? Nothing's been privatised, it's been frustrating. The discussion between the commission and staff has been a little awkward because, you know, we're going one way, they're going the other way. And so I think we're starting to align. Or that a grant comes along and it's like, oh, that sounds like a good one, let's go get that. But it's really not anything anybody's planning on and it doesn't necessarily fit into the grant scheme.

19:42 I think we'd rather be utilizing our adopted plans to try looking for the money rather than, you know, oh, maybe we can get this money, let's do this. Do you have a deadline for getting those priorities set after the Measure R process, I presume? Well, so we're trying to get them done. We've got another meeting on Tuesday.

20:11 And then we've got another workshop plan after that. I think we're almost there with our schedule. Terry could probably speak to a little bit. Well, you know, I don't know. I think we're still kind of trying to figure out exactly what we're trying to pull out of this. We've done, we've gone through all of the plans and we've put numbers towards those priorities. I think we already showed you guys that information that we did. And so now we're looking at what those priorities are and then looking at, you know, what might

20:41 Come out of our top priorities on that, looking at each of the parks, what type of usage is done at each of those parks and how does it fit into those priorities and then what do we need, you know, to sustain what we're doing plus grow into, you know, what we see the future might hold. And so that's kind of what we're looking at next. And I think we think that this is maybe the most difficult point because we're trying to rate them and evaluate them and come up with.

21:11 Some sort of system that will hopefully work for all of us. And we decided to do it ourselves. We don't want to pay someone else to do it for us anymore. And that's part of master planning, looking at each of the, you know, we have some parts that are not master planned, and so taking the priorities that we've already came up with, plugging them into each of these parks, and then, you know, working on a public process and, you know, working on a master plan for those. So I think that's the question, too, so moving forward, is that something that the town and

21:40 Commission and staff can take on, which is a master plan, which is actually a very specific type of project, or is it something we want to look at? Master planning, you know, some of our facilities, I think, you know, we looked at Community Centre, Mammoth Creek Park, you know, what other parks, or, yeah, Whitmore, what other facilities do we really want to take a good look at? You know, what's the current usage? Where are the needs? You know, we have a little bit of information in our parks and rec master plan.

22:02 But specifically moving forward and where we want to be in the future, where we need to invest our dollars, that's really probably going to be the next step for the Commission in regards to is that something we want to look at and consider and, you know, move forward with. Because the last bit of information we looked at is the CIP list, which has a long list of, laundry list of deferred maintenance. And so, with no funding. So, anyhow, that's...

22:28 We're looking at, you know, what do you tackle and actually bring up and what is obsolete and, you know, kind of see if we can move forward with that, so. And how. And how, yeah. We need to start looking at partners. We're building a new pool. Is the pool in Mammoth? Is the pool at Whitmore? What does the rec facility look like? Is it a 100,000 square foot, $30 million behemoth? Is it a $2 million tent?

22:57 Of all the things I've worked on in the years I've been on the commission, I'm having a hard time getting my hands around the whole thing. Thankfully, Terry is leading us through this effort. We're at another turning point right now. It's a chicken and egg. Do we determine what our needs are and then plan the parks around the needs, or do we look at what can fit in the park?

23:26 So it's just not as easy as it sounds or looks, but we are making great progress and having great conversations. Slow, but still moving forward. I want to go back to tents because, you know, we can discount tents, but if you go to Breckenridge in Colorado, they're one of the more successful resorts. They've got lots of tents in their downtown. Sprung structures. Yes. Different than tents. Sprung structures. Just want to make sure we're aware of that.

23:56 That they make them that are attractive and functional. Absolutely. And less expensive. If you go on sprung.com, you can take a look at them. There's a lot of different tents and shapes and sizes and colors and textures and all kinds of stuff. Oh, that's true. Just going back to facilities, once we're moving down this path and we're kind of prioritizing

24:26 Facilities, you know, in there as well as a lot of maintenance items. You know, we have a lot of facilities that are in need a lot of repair. So funding those is very difficult, you know, and we presented some items at the commission meeting last time, put them forward as measure our applications. The commission said, no, that really should be a general fund obligation. So, you know, we're kind of at this point where once we get through these priorities, we really probably need to have a good, you know, discussion on funding strategies.

24:52 General Fund Obligation, Measure R, I mean, we need to have these facilities repaired, maintained, you know. Totally fair. Either be replaced, but how, what's the best way to kind of, you know, get that done? Considering the stress of our general fund, but also understanding the capabilities of what Measure R could provide as well. So, we'll probably be a little bit ahead of it right now, but I think moving forward, that'll be a good discussion maybe for a mid-year funding or budget review or, you know, coming into this. For me, does the maintenance items, do the maintenance items even belong on our...

25:21 Thank you.

25:50 One of the other things that we've talked about at our last meeting is looking at a lot of our items that are on the CIP, citing for the snack shack out at the ball field, is that we're looking at putting a list together of items that maybe we can go to the community and have community come forward and help us, you know, if the town can put forth the material, then maybe we can get the labor to get something taken care of, and the snack shack's a perfect example of that.

26:20 And so we're looking at taking some of the items that are, you know, of great need and putting that list together so that we can go out to the community and say this is what we need to do. And so that's one of the things that came up at our last meeting and that we think is kind of a high priority to start putting that together so that we can reach out to the community because the community in Mammoth Lakes is huge and it's always, you know, been very helpful in getting a lot of those things done. So, you know, we think that's a really kind of a positive move.

26:48 For some of those items. I was pleased to see Councilmember Eastman out at the Volcom. Not me. My crew. I was impressed that they were installing the neighbors at the park and that's a great relationship and maybe that could be promoted somehow and encourage more people in the community to come forward like that. On your trails, you could do it. I don't know if it's realistic. John, you might know.

27:18 We have a great trail system and an emerging trail system and so does Lake Tahoe and a lot of other places, Park City, wherever they are. There might be an opportunity with what we were talking about to instead of adopt a highway, adopt a trail where someone has a quarter of a mile section or something like some business and they pay for the maintenance of that section or something. Okay.

27:45 The Summer of Stewardship Programs have been very successful, and I know Councilmember Raimondo has supported those efforts. Good. So anyways, we're definitely looking at that, because there's a lot of items that are on that list that, you know, could be community items we could take after the community. So, anyhow. And actually, I think Adopt-A-Trail is on our...

28:05 List of items for MLTSCC to deal with, yeah? Yeah, but I think that one has always been just the trail cleanup. I don't think it's been anything more formal than that. Yeah, well, we need to, you know, delve into it and see what it can accomplish and what it can't be able to help support. Yeah. Well, every community I visit in Canada has a Rotary Park. They do. And we've got two clubs here.

28:35 And those are some of the things that we're looking at, really trying to reach out in some of these facilities, some small items to help out. Anything else on that one? Any other questions? So the next one, which is D, wasn't included in the packet, but I just brought along the, I'll just pass these around, it's the Measure U event application form. So back, I think Mayor Pro Tem, I'm not too sure, it was a long while ago,

29:09 Could have been the beginning of the year that we started to address this issue of special events, the role of town in funding special events and so forth. And there was a lot of discussion among the application committee, the Mammoth Lakes Events Coalition. So the action that was directed to staff was to convene a special event task force, which we did. We met, I think, four times, a little task force, five times.

29:37 Seems like ten times, but I'm sure it was five times, but a very, very productive group. So I want to thank everyone that participated in that group. And they put forth a criteria, and the criteria was based on a number of questions that were presented by council to the group in that very defined scope of work. There was also questions from the events coalition. There were comments from a lot of those community groups, like the Foundation, like Mammoth Lakes Foundation, that put forth a lot of their...

30:07 Request for consideration in regards to information about that topic. So after those five meetings, we put forth this application. The first two pages are essentially the guidelines for the funding program. And then the pages three, four, and five, and six was whittled down from, I think, ten pages, which is the current application form. The Measure U Application Committee reviewed this at the last meeting.

30:35 As did the Recreation Commission, so both of the advisory bodies have had a chance to review it. I think some great input's being directed at the form. I think everybody's in a pretty good place with it. Again, this will be part of the application process coming forward this fall. So you would see this in its entirety again on November 6th when that whole packet of information comes forward. So we've still got a little bit of a way to go, but at this time I thought it'd be a good little workshop item just to at least talk about it.

31:04 You know, certainly with the committee members about the project. I can quickly go through it. So the first thing was kind of establishing a mission statement just for events. So if you're an event producer, you would just specifically use this form if you're applying for a capital or something, a project or something outside a special event being a recreational event that is open to the general public or an arts and cultural organisation being performing arts, visual arts and arts-based education.

31:31 You would be directed into this form and this process. The committee spent a lot of time on the funding guidelines and also the funding eligibility, which is on page two. The funding guidelines were and have been used in the past, not as any set policy, but as a guideline for the application committee. So two to three year events applying for a maximum of 30%. And these guidelines were actually brought forward by the events coalition themselves.

32:02 So it's kind of self-policing. What the task force did, though, introduce was a for-profit or commercial funding guideline, which was kind of the maximum of 10%. So they felt it was... I thought it was specific to this type of guideline only because a lot of the applications that we looked at didn't actually fund for-profit organisations. A lot of the cities actually were all non-profit funding support.

32:33 But again, the committee felt strongly that they wanted to still support for-profit organisations, so that was where that number is there. And then funding eligibility, so instead of saying what it will fund, the committee felt that it's probably a little bit easier to say what it won't fund, which is kind of this guideline here. I know everybody wants to have a little discussion on first-year or one-time events, but again, that was something that the committees and commissions felt that for a first-year event,

33:02 Because these are public funds, they wanted to be a responsible steward of those funds. So if it's a first year event, they really wanted to see that application come, that event move forward, be something that was sustainable or something that they think that would have some longevity and that would be considered for funding. And then certainly one time events was the same kind of thought process there. Now if the...

33:29 If application was very compelling or the applicant felt that it was really a one-time event or a first-year event that really was strong enough to stand on its own, then that application would be considered by the application committee and be able to come forward. And then you can see all the other bullets that they went through as well. So that was something that was probably discussed, I think, at every task force meeting and we've had considerable discussion since at the latest committee meetings.

33:58 And then the last section there is the responsibility of the funding recipient. These were carryovers from the existing award, so nothing's really changed there. However, we did add bullet number three, which is to acknowledge the town's funding level in existing sponsorship packages. You want to make sure the town logo's been identified. It's been promoted as such. Have a plan for administering the required event surveys. We thought that was very important.

34:27 They wanted to make sure that there was a minimum of at least 50 event surveys for smaller events, and there was discussion among larger events to collect up to 4% of event participants. And then I think that was the ambiguity in regards to what's a large and what's a small event, but again, that was something that the committee kind of determined with the application itself. And then that was really it. And then the application form was specifically just for events, as you saw. So there was quite a bit of detail put forward there.

34:58 If it's an existing facility that wanted to be upgraded for a specific purpose for a specific event. So again, the capital improvement there for that funding should be something that event. But if you were to build a community center or something. Correct.

35:22 You could do that, okay. That's correct. So if you wanted to get a stage to put in a specific area, you could do that because that could be used by multiple events. By everybody. It wasn't just one. It's not just building or building each other. For your own facility. I think the ones that we had the most comments on were the profit versus non-profit. A lot of back and forth on that. And the other...

35:54 We spent a lot of time on the survey. And actually the first year events. And first year version one time events. And originally that was listed as a not funded. I will say that I still think that these percentages up to 30% of an event is pretty high for any type of a grant. So anyways, but there's strictly guidelines. What is the consideration? Did you guys come up with a process?

36:24 The application process to consider a first year event? Same application. The applications will be brought before the committee. My assumption here would be brought before the committee by the staff. And if we thought there was merit to it, we would include it. You know, staff currently goes through all of the applications. And if there's a question on one, whether it meets the criteria to move forward or not.

36:51 Then they bring that forward to committee who decides whether to move it forward or not move it forward. And I think the issue is all around risk management. We didn't want first-year events coming in and assuming, oh, we could just go through the application process just like anybody else and it's going to be just fine. We wanted them to realize there was going to be an extra level of scrutiny because it was a first-year event. It could be a totally valid first-year event, but they needed to understand that we were in the business of risk management and protecting public funds.

37:19 Wisely spending public funds. So that was the point of even calling out first-year events. I can appreciate that, but I still say that first-year events, that typically stuff like this is used to seed money. They just have to prove that they're going to deliver. I see the merit of that for sure, the thought process. I just wonder.

37:46 How many events we've actually gotten off the ground had they not been given money? You know, the county, when, you know, for Oxford first kind of started, it wouldn't have happened had we not gotten money from the town in the county at that time. And it's, you know, it's growing and, you know, it's, you know, I don't know how many other events, if you needed that seed money or not. Like I said, I see where you're going with it. It's kind of, it is kind of good to have proven.

38:15 The other thing I know the county does, I would be limited to five years. They start at one, then up to five, and by the fifth year, you're fed off. And typically events that have already occurred, you have a performance record. So you have some feeling of the management that goes on, those kinds of things. Yeah. And the first year event, it's just to understand that they thought it through. I was on the task for someone.

38:45 And we really struggled with this, and we felt pretty strongly not to include first-year events or one-time events, but, you know, as it was presented to the measure committee and also to the commission, I think we felt that we felt comfortable bending a little bit and, as Joyce mentioned, it failed.

39:11 It just seems to me that all, I mean, almost all, the history of all the events, and that's really when we needed it to get going. You won't make it through a lot of these four or six or seven years.

39:33 Well, if I hear what they're saying, they're just saying that there's more scrutiny of a first-time event to see whether or not they have a business plan that's going to work, et cetera. And it's also presumed, I mean, if someone gets funding for the second and third year, they're not guaranteed four, five, six, or seven, right? It's just if they continue to get money, it's going to be on a decreasing amount. And it can be up to 30%, but could be less. These are maximums. Yeah. I would venture to say that probably the U Committee,

40:03 is going to establish a funding level for events. I don't know, you know, I cannot speak for anyone on that committee but myself, but I think that that funding level will probably preclude the events getting 30% funding regardless how new or old they are.

40:25 And again, it'll depend on the event. Which is why, even though I support for-profit events in Mammoth because most people that are doing for-profit events really aren't making much of a profit off of them. And the ones that are aren't asking us for money. But at 10%, I'm fine with that because I...

40:45 From a personal standpoint, don't know that I'm ready to fund any event at a level larger than 10%. So for me, I was comfortable with that. And so this does say seven-plus years, so there really is no cutoff. It could be kind of an indefinite ask. So anyways, which is, I don't know. There are going to be some town-oriented or local-oriented events, using the kids' fishing festival as an example, that are never going to be in a position to make money.

41:17 So there are some events that are going to require a certain amount of funding, you know, ongoing.

41:42 I see you guys are in a tough position because

42:11 I mean, a lot of money has gone to the events, there's no doubt. But something that's really interesting, I mean, looking at our summers over the last three years since we really started funding these things, even though we've been going through one of the worst recessions in history, Mammoth just experientially experienced its three best summers in history in the middle of a recession. And it's not because of snow, weather, or anything else. It's because of us drawing those people here.

42:39 I mean, it was, I know for a lot of people it was choking to realize we didn't understand that we spent $450,000 on events last year, but I'm sure that realizing we also did a million dollars for first or second July.

43:00 And the question still needs to be answered. If there's a stage that's purchased and that's put in from these funds, does that eliminate part of the subsidy that needs to be had by some of these special events or a sound system or something that eliminates them having to rent something somewhere else and bring it in and have that expense?

43:28 Does that, you know, help alleviate the subsidy that you have to give them for their events? So those are things that we need to look at as well. It's my understanding, too, that part of the rationale for this timeline is also so that successful events can grow, so that events that have done a good job, you know, that have room to grow and room to, you know, add days and be increasingly successful would have a resource to do that. So are you guys setting the stone in these guidelines or are they still...

43:57 Yeah, we did go over the guidelines quite a bit, and, you know, one thing I'd like to just draw attention to is the event mission statement, which was not in our priorities, but it will be important. It's to support events that improve the community, culture, and economy of Mammoth Lakes.

44:23 By enhancing the quality of life for residents and or enhancing the visitor experience. So that may not be a priority, but that is still our mission statement. So it may not be listed as a guideline. With events, it is always tough. Having been involved in several nonprofits, there's a pot of money available. It behooves me to go after that money regardless. You have to do it. I understand that. As those giving out the funds...

44:54 Trying to sort out what is an ask because it's your job to ask and what is the need. We've given out funds to establish events that have been around for 20 years or longer because it's going to enhance their event. But until this and the performance report as it's laid out here, we haven't had any way to go back and see if that money enhanced their event or not. So then the following year, it's part of the budget and now the amount you can get grows.

45:23 It's convoluted. It's a winding street. But I think we're getting it. With the report backs and asking for the surveys, it'll go a long way. So if someone says, I need 10 grand extra, and it's going to enhance and bring in more people, we'll be able to see from year to year whether it actually enhanced or not, and then judge next year's award based on that.

45:54 In the past two awards, I've had some rough calculations, I think the social processes were scored, but 60, my calculations were 62.32% went for capital projects. Those were basically recreation and they were mobility. The special events, arts and culture and special events, including recreation, special events, entertainment events, and arts and culture, was 30%.

46:21 That's not bad. And then there was operations and maintenance that had to do with ice cream things and things like that. And that came up in 7.6%. So really, I think between Measure U and Measure R, we've really been trying to lean towards capital. We've realized that we do capital projects and funding, whatever.

46:45 And I know that a lot of people were really worried that Special Events was getting all this money. And that's one before I ran the calculations because I had the same feeling. And as a matter of fact, the first year I followed that publicly because I was a stingy person. I was the stingy one on the committee. I didn't walk on it. And then after the end of that season, I saw how wonderful it was for us and for our visitors and for our locals.

47:11 We tend to have very few capital projects. We have Whitmore, we have wayfinding, but those are fairly large dollar values. On special events, they're small values, but there's a bunch of them, so it looks like, well, we're doing a lot of special events in terms of dollar values. So this event application will come back to us wherever it was on the timeline? November 6th. And have the special event groups had a chance to come in on that?

47:45 We had one meeting at Recreation Commission. We had one meeting at the Application Committee. They'll have another opportunity in October on the 15th as well to comment as well. Then we just had other items. I'll just say other items. Look around the room, Bill, or are you going to just... No, the only other thing that I would mention is, and Sandy's talking about percentages that were spent here or there.

48:14 The process I believe the town is currently going through in how we're dealing with the bookkeeping on measures R&U is going to go a long ways in us being able to answer some of these questions. Huge. I'm anxious for it to be done and have its own system up and running so that we can just go in and print out reports that are going to tell us these things.

48:34 I would love to comment on that. And I know it's something that I brought up before the council. And so I think with what we're doing right now, we're going to have the basis and what we've done in the past is going to be reconciled. And in talking to Cindy, she felt that possibly her staff would be able to have the time. But I don't know if that's the town buying QuickBooks.

49:03 Okay, so the town purchased QuickBooks. Because we use it at the airport as well. Okay, so she felt that it would be something that they could keep up on. If not, I really feel that we need to have like a long-term contract with an accounting firm that will stay on top of this, reconcile it, audit it on a yearly basis. And so if it isn't something that we can do within our finance department as opposed to...

49:29 Contracting out each year and then trying to catch up, that once we have it caught up, I think that the cost efficiency would be there to actually outsource it if that's what we need to do. Do I remember correctly that maybe in the spring or whatever we actually identified accounting support for you, Stuart? I mean, there were pieces of people to get this done, right?

49:51 The tracking and everything up to date on it because I was expecting that's going forward. It is, yeah. We originally looked at a recreation program administrative position and then we just scaled it back due to the needs of just this reconciliation. So we're just trying to get this done right now and then we can look to the future. So this will actually go back to the beginning of our and the beginning of you and we'll get that full reconciliation and then it can just go forward. Yep. And then when this is done, I think we probably want to go back and revisit that our new administrative position that...

50:20 Funding is currently paid for this process to be done. Although it would seem to me with the great job that Measure U has done as Council has spoke in bringing money into the coffers.

50:35 That perhaps that's a new position that the general fund could spring for. We have generated the tax dollars necessary for it. Allow us to use it. You want to pinch him in the oven? I just want to make sure that we don't go backwards, that we stay on top of it. And however we have to stay on top of that is what we need to do. And if it's outsourced to an accounting firm, then that's what it should be done. But anyways. And my understanding is that Stu is supplying those

51:04 Thanks to that. He's been extremely helpful. He has. That's what I understand. My thought was the council approved someone so Stuart didn't have to be reviewing invoices and things like that. Yeah. So I think once it's presented, it's going to be great. Just moving forward.

51:30 Yeah, I think the question is, will a new financial software system that the town's exploring be great? And I think that's really what we need to know. That's a larger key. What's that? Right. Any other last comments?

51:50 All right. Oh, I'll likely have, yes, I have seven minutes for the public, yes. I said a quick one with regard to the comment about public input or special lens groups having input. I'm wondering what kind of outreach there is for what you do, because that's the first link. Even though I'm tied in, it can kind of figure yourself out. It's hard to, from the outside, there's like a measure you web page on the town website, but it's from last year. So if somebody wanted to find out or...

52:19 Is there any, like, is there going to be an ad that says get your applications in by just to be sure it's a competitive development process? I think there's two points. So, David, is it the question on supplying input to the proposed process? And then the other one is to actually submit the application. So the first one is, you know, we just post this meeting everywhere where we normally post it. You know, it goes out to town news and all the town board and things.

52:48 In regards to the application period, we do the press release, it goes on the website. We don't typically take out an ad in the paper, but again, if it's an event-producing application, the events coalition is probably the best source for that, because they meet monthly on that.

53:06 But you can always leave out. I want it to be in a broad region. Gotcha. Don't you put it in your email blasts and that kind of stuff? Goes in town bulletin, goes in once a month through paper and things like that. So we do the best we can. And the information on the website right now is really vague on what's been in the past, and this reconciliation will give us the information that we can kind of, you know, we can update that whole.

53:35 Because when I went back to say, okay, what was funded back? Right. You know, you just can't find the information. Yeah. It's really not there. So this is going to give us that detailed information so we can update that. Any other? Evan, you got your hand up first. Thank you. I'd like to maybe take this in just a little bit different direction. I mean, toss this out. It's probably not possible.

54:02 If you read back through all the Measure U stuff, everything that was sent out to people, everything that was discussed on the phone when those of us on the campaign committee, special events were never discussed other than funding transit for the events. You can look at every piece of literature that was sent out. You can go to the website. You can go to the town council videos. Special events were never discussed.

54:32 And I agree that special events have been a key part of the success of our summer business. And what I'd like you to consider is, you know, special event money used to come from the town through the TOT, the marketing and tourism dollars. And what I'd like to see considered, since John now is going to be the wealthiest person in all of Mammoth in the future with the T-Bit money,

55:00 The money wouldn't come from TBIT, but the money could come out of TOT that you guys allocate to him, and a pool could be set up outside of Measure U for special events. And if you go back and look at anything that was written, and John Wentworth probably knows this also because he chaired the campaign committee, but we never talked, we never sold special events.

55:28 And I'll just speak to that because I'll continually speak to that. Is the money that was given to these special events was specifically for marketing. And so when we had a marketing organization, that money that was actually sent to subsidize or to fund some of these events actually went to Mammoth Lakes Tourism because

55:55 They're marketing these events, and so as opposed to giving each individual group the $2,000 that they were getting or the, you know, $1,000 that they were getting and, you know, really was there a marketing plan that was put to that, most of the time not, that it was much more effective to leave that money within Mammoth Lakes Tourism so that it can do what it's supposed to do, and that's market the event. So there was never a subsidy such as this that was ever, that ever came out of Measure A.

56:25 It doesn't mean it has to be like that if events are so successful and it's worth putting money into them. I'm just saying you can read all the Measure U stuff. Voters never voted to fund events with Measure U. Okay, John, you had your hand up also? I am respectful of everybody's time. Oh, okay. You're withdrawing your hand? Okay.

56:54 All right. Thank you, Commission and Measure U Committee for your hard work, which you may continue to do during the application process. Thank you.

1:05:11 Tonight, for our Pledge of Allegiance, we have representatives from the Mammoth Lakes Women's Club. Could I ask you to come forward by the podium and lead us in the pledge, please? I pledge allegiance of the United States of America and to the Republic for which it stands, indivisible, with the injustice for our own. Thank you so much. Thank you. Our next item, which I am...

1:05:54 Pleased to mention is introduction of our new interim town manager, Dan Holler. Dan, could you say a few words? Yes, thank you, Madam Mayor Pro Tem and council members. It's a pleasure to be here, and it's an honor to be invited to be the interim manager for Mammoth. It's exciting. After two days on the job, I can still say that, so looking forward to working with the employees here in the community and the council to tackle a number of opportunities and challenges in town, but what a great place to be working.

1:06:24 It's quite exciting, actually, so pleased to be here. And we're glad to have you here. Next item in the agenda is public comments on items that are not on tonight's agenda. Just come on up to the podium. Good evening, Council John Urdi, Mammoth Lakes Tourism. Welcome. Just a couple of quick updates here. We are into October now, so we are collecting on the remittance for September.

1:06:59 TBID, those remittance are due by October 20th. So we are in the process of getting those in. We have people registering into the new BasicGov website, which is great. It's very exciting for the town, very exciting for the process here. So, again, people need to get those into us by October 20th, and that also includes TOT. So TOT we've moved from the end of the month to the 20th of the month with the idea that it will give us a much better barometer for where we are, where we're going, and really even by segment.

1:07:28 How we're doing. So that's exciting to have out there. So again, October 20th. Secondly, I just wanted to give a quick update on kind of where we are with the government shutdown and tourism. It has been a big impact for us on the tourism side here. Probably the biggest local impact is that our Welcome Center is closed. Because we share the facility with the U.S. Forest Service, and it is a Forest Service property, they have locked that door. We were fortunate enough to be able to work with them to put a sign on it that says,

1:07:57 Please visit the Mammoth Lakes Tourism offices right next door. We have become the Welcome Center for Town. We have staff from ESEA in working with us and making sure that we're giving people the information that they need. Yesterday it was very important. Caltrans was reporting that 120 Tioga Pass was closed, and there were a lot of people that came in and asked how they could get around that.

1:08:17 We were able to explain to them that it wasn't closed and really just explain that if they had reservations in the park, they should enjoy Mammoth Lakes and stay here for a few days, and we've got a lot of folks doing that. So that's been the good news. The other good news was that our campgrounds were concessions, so the Forest Service was allowing those to continue to operate until this afternoon when we got the email that said that those will no longer be operational. Our campgrounds here in town, our guests that are currently in the campgrounds will be asked to leave by Friday at noon.

1:08:47 So that being said, most of the people that have been coming through the office are Europeans, a huge number of Germans coming through, a lot of them in RVs. So we've been working with Mammoth Mountain RV Park. They've got availability. They also have some tent camping area in there as well. I've had conversations with Mammoth Mountain Ski Area two years ago when we had the issue where recreation.gov was booking people in the Lakes Basin when we had 17 feet of snow on the campgrounds.

1:09:15 We actually set up a temporary campground, RV parking campground at Canyon Lodge. And so I've had that brief conversation with John Regal Bruggo at the Forest Service as well as Ron Cohen up at the mountain and I think we're going to work towards having a contingency plan there as well. We are finding that most people are either traveling from Death Valley, Las Vegas, Los Angeles to the Bay Area through the park or vice versa. A lot of folks that were planning on staying in the park

1:09:42 Are very disappointed, but at least very reasonable when they come into our office and we give them the activities that they can do here. So taking full advantage of that, but it has been a challenge and we are prepared to do this as long as we need to. We will have our Mammoth Lakes Tourism Office will be open over the weekend. We'll serve again as the Welcome Center.

1:10:03 We have Mike Johnson who works in the Welcome Center. He is a Forest Service employee. He will become a Mammoth Lakes Tourism employee, not representing the Forest Service. But Mike is excellent because of his knowledge base and the fact that he speaks German. That's helpful. Yeah, he's very helpful right now. So that's the update as we know it right now. John, can you explain to me why if in our campgrounds the concessionaires who are the people that

1:10:32 Take care of the people that are in the campgrounds and collect the money, clean the toilets, drive around each individual campground. If those are concessionaires and they're able to work, why would the campground be closed? I wish I could explain it. It's the federal government. You can't? No. John Rebelberger received a call from his bosses, said that this is the way that we're going. The concessionaires are going to be out. I knew that it was a possibility if this went maybe five or seven days down the road that they might start to...

1:11:00 To do that, but after two days to receive that information was very disappointing. One thing that I didn't mention, which I am very fired up about and really, really working hard on, is that the plan right now is that they're closing our campgrounds for the winter. To me, that's totally unacceptable. Reds Meadow is slated to close October 14th. That maybe I can understand because it's 10 days away, 12 days away, but Twin Lakes isn't scheduled to close until October 31st and Shady Rest.

1:11:28 Is not scheduled to close until mid-November. So them preemptively closing us for the season takes a huge segment out of our lodging base. And it's just, it's unacceptable. Common sense be damned? There is nothing to do with common sense involved. Okay. So there's nothing really missing as far as a staff or workforce that, you know, if we were able to come up with it, that they could keep it open. It's just, they just want to close it. Yeah, because it's on federal property and they are federal contractors through a concession,

1:11:58 Again, they at least have had the leniency for the last two days because they were concessionaires. You know, I hope this isn't a sign that the government is really anticipating that this is going to be a much longer term problem, but it really isn't a sign that it's a good thing. But I am working at least at the very, very, very least. I would like to see them at least say that if this is even a two-week or a three-week problem, that shady rest is something that they could reopen for the remainder of the season. You know, Twin Lakes would be great, but shady rest at the very least having that.

1:12:28 taken out of the system is a big loss for us. I wonder if there's any opportunities in any other areas that we may have access to or we could put in interim. They're all on any forest land.

1:12:40 All the campgrounds, like all the way up to Lee Viney. Well, I know the campgrounds, but I guess what I'm thinking is just in a case, you know, where last year we had to stick people up on Mammoth Mountain's parking lot. Right. Just because they may have nowhere else to go. Well, we do have landed the airport, but I wouldn't call it a camping experience. Well, and I think, you know, the biggest challenge, too, is, again, a lot of the folks that are coming through are in RVs. And, frankly, they're not going to run into much that they're going to find from here on down the pike.

1:13:09 The toughest part is when somebody comes in and they're here for four weeks and their plan is to go state park or national park to national park. You feel really bad for these folks that have probably saved up years and years and years. So our goal in the tourism office is to make sure that these folks know what they can do here so that they can still enjoy things and get up into the lake space and at least enjoy the fall foliage, et cetera, and try and salvage as much of their trip as possible. Thanks, John. John, do you have adequate staffing on the weekends?

1:13:38 Yeah, so what we've done is we've worked with ESEA to provide one member per day from ESEA, and then my staff will be there for the duration. We've taken our conference room and pretty much turned it into a welcome center with all the collateral that we could possibly find and drawing maps for folks, and it's, you know, I think that the people that are coming in are incredibly appreciative. That's the great thing. So even though they know that this is a disruption of their vacation, and they're also coming in, and I had a German couple in yesterday that was looking for a

1:14:06 A nice higher-end experience with a spa, and, you know, it's great to be able to point them up the hill to the west end. So, you know, we had folks that already had booked into Best Western. They were supposed to be here for two nights. They booked in for four nights. So, I think that there is a silver lining that we do still have our amenities, and even though we've lost Devil's Post Pile. So, Devil's Post Pile is closed. The Reds Meadow Road is open, but the Post Pile and the Trailheads down there are closed, but people still can get down into the area. So. Thank you. Great.

1:14:36 I'd like to add one thing to that. John knows this, but I received a real nice email from a political consultant. He represents a lot of state congressmen and senators. He actually wrote a letter saying, an email saying what a great job the marketing department had done in light of what's happened. Just really keeping people notified and letting them know what's going on. So I just wanted to throw that out there for the rest of council.

1:15:06 Good evening, Betsy Truax. I just wanted to really just praise John and his staff because they really reacted really quickly to this situation and they're out there on Facebook, they're helping a lot of people right now and they really deserve a lot of public recognition for taking that on, so great, great job. Evan Russell with the Mammoth Lakes Foundation. I want to follow up and say thank you guys for the Measure U funding we did get this year and the tent structure that we were able to bring in that was

1:15:41 Used by four groups and a couple other events. Our group did a kind of a recap at the end and we looked at the good things and the things that we had issues with with the structure and we've been starting to work on what options we have for next year. And I think, John, you kind of led into it. Foot and mouth or am I okay? Yep.

1:16:18 You led into it with the structures they have in Breckenridge and we came around to what holds up in the weather and the wind here and certainly the Little Eagle sprung structure, the fire department temporary building they put up when they were building the fire department and the sprung structure that's at the airport as the waiting area, all from the same company. So we contacted the sprung people.

1:16:46 And they said, yeah, we have these all over snow country. They don't vibrate in the wind the way the tents that have loose flaps do. And they said, here's an example of one we did three years ago in Keystone, Colorado as a performing arts center. So we started a dialogue with the Keystone people, and I went back there two weeks ago to look at this thing. They got it up in nine months from inception to opening.

1:17:16 for a July 1st season. It's about a 7,200 square foot structure that only has capacity for maybe about 400 people. But anyway, our events group is going to look at and put a business plan together for a structure that we think could be about 10,000 to 12,000 square feet

1:17:43 Be able to accommodate around 800 people for indoor theater seating and about 500 for dinner seating. So I think it's a very good option. We also think that there's some possibility to leverage some funding for this with some outside third-party sources. We will probably come back with a request from Measure U.

1:18:13 For some long-term funding. And we're going to talk to the college and see if there's an educational fit that works with this. But I'm just planting the seed. We'll come back sometime in the next two to four weeks with a business plan that shows how this could be a year-round facility. We can do it on the foundation property. And I think it's a very good option for a long, or let's say a short-term facility.

1:18:43 Fix. As Little Eagle, I think, was supposed to be a three-year facility that came off of Vail after they had the fire at the top of Vail Mountain and the Two Elks Lodge burnt down. They moved it to here and it's going on 10 or 12 years now. These things have a, you know, a lifespan of about 30 years. But they can be moved and letting you know what we're working on. Thank you. Questions?

1:19:13 Evan, on the brochure, the site you have circled, that's the location here? That'd be the location that we're talking about. And that's the area that you cleared a couple summers ago for the blue sky? Yeah, yeah, we think if this was, say, a 90 by 120, that's about 11,000 square feet, it has a roof peak of about 33 and a half feet. If we had a little small outdoor amphitheater for like 500 to 1,000 people, we think the structure would block the wind and

1:19:42 Push it over that and make the bowl very usable. We've also looked at wind considerations and certainly everybody we've talked to say trees, you know, plant more trees. And the cost is, is it one tenth of a? It's considerably less than it goes up in a considerably short period of time and it has great acoustics and they say it's about 20% more efficient to operate from a utility standpoint.

1:20:15 Great, thank you. Sandy, can you? My name is Stacey Powells and I am standing up here as a member of the community and not a member of the media tonight. I wanted to let all of you know that I am spearheading, let me preface this with, this morning I was reading all the stories about what was happening with the government and the National Park's been closed down and my friends and family and the businesses here in the Eastern Sierra that are suffering and I just blew a gasket, so to speak.

1:21:02 And I am spearheading an Occupy Yosemite event on Friday at 1 o'clock. And it's already gotten NPR has picked up this story. Outside Magazine has got this story. KCET did a story on this already. So it's getting a lot of coverage. And we are all meeting at 1 p.m. at Tioga Mobile Mart. And then we are going to be going into the park because Highway 120 is still open. And we can tell them we're going to Oakhurst or the Bay Area or Merced or whatever.

1:21:29 And we're going to pull up to Tuolumne Meadows and have a little sit-in for several hours and with signs and show our protest and how upset we are what the government is doing to our little communities here, especially in the Eastern Sierra. It's just – it's horrendous. So I couldn't sit any longer and not do anything, so this is my little way of giving it to the government, so to speak. And if I'm arrested – sorry, honey. So I just wanted to let you all know what's going on.

1:21:57 Been there. Okay. And I hope that maybe you'll join us and be at Toyota Mobile Mart at 1 and do in there and have a little sit-in. We'll have signs and we'll have food and Scrabble and whatever, but enough is enough already. So there you go. Stacey, is there a way for people to contact you if they want more information? Yeah, it's all over Facebook. Steve Searles has shared it. John Urdi was actually quoted in the KCET.

1:22:20 Article that was out. So people pretty much know how to get through me through Facebook. And the article did say something about starting at noon and meeting at 1. That's incorrect. We're meeting at 1 and then driving up there. We, you know, we'll get to Tuolumne Meadows as soon as we get up there. And we'll be there probably until the sun sets. Okay. And there are several news crews that are following us into the park. So there you go. We're going to take a stand. So hopefully you'll all be there. You too, John. Thank you, Stacey. Thank you, Stacey.

1:22:59 Councilmembers, I'm Sandy Hogan, and I'm speaking as an 18-year resident, and I'm going to try to explain a little bit about what we've been hearing from the public about the town council's lack of transparency, excess number of closed sessions, and the general feeling on the public's part that they're being left out of the decision-making process. I'm going to use one example, a recent example, to kind of hopefully...

1:23:25 Illustrate the problem and also show how to solve it. And pardon me for reading this, but I don't want to miss anything because I gave it a lot of thought. The example is found on your last town council agenda in a closed session negotiation to purchase Sam's Wood site. This in spite of the fact that there'd been no public discussion of this other than random individual comments. How this came about part of it was there was an interim

1:23:53 Events site feasibility study that was presented to the Recreation Commission in early September and I and many others were not happy with how Sam's Wood site was rated. I spoke as a member of the public at that meeting about the inadequacy of the report and that I for one supported the acquisition of the site. I do. I think it's a great site. Many others may also support that acquisition but remarks such as mine

1:24:21 Or Councilmember Raimondo's support, which was a recent headline in the Mammoth Times, doesn't constitute a public process that leads to a Council decision to start purchase negotiations. Yet that's exactly what happened two weeks later. At least that's what it looked like because that's what it said you were doing, negotiating in another closed session. We all know that the only sure revenue that we have right now is found in Measure R and Measure U.

1:24:48 And also, therefore, the appearance is that the Council is also considering ignoring the public processes in place involving those tax measures. Here's what I suggest is a public process for this subject. One, let's wait for the final feasibility study. Let the Rec Commission and let the Measure U Commission review that study, and if it's inadequate, we'll send it back to the consultants so it's adequate. But, you know, I mean, first of all, let's make sure we have a good report.

1:25:18 At last week's Recreation Commission meeting, Commissioner Turner appropriately noted that it's time for proposals to start coming forward, to start being generated. These proposals would properly come from the public, from members of the commissions, or the Measure U committee, and be agendized and publicized so that the public is an essential part of this discussion. Sam's Woodside, I also feel, should be really evaluating potential

1:25:47 Winter Wreck opportunities because I think it's got some really good winter wreck potential opportunities. Other proposals such as the one that just now that the Mammoth Lakes that Evan talked about, again, he said he's just planting a seed to get the discussion going. This is the appropriate way to do it. Should also be agendized for public discussion because just these two examples of proposals involve the long-term commitment of both Measure U and Measure R funds.

1:26:16 The council should ask the bodies, the rec commission and the measure you committee to fully vet the proposals and offer recommendations as appropriate after inviting the public to participate in the discussion. That means we publicize these things. This may entail joint meetings and additional public input, but these two bodies are charged with the process of evaluating proposals and recommending funding for council approval. That's why we exist. That's why you appointed us.

1:26:44 We're talking about a long-term investment of our limited tax dollars, and the only ones we have that we can talk about are R&U. The next part of the public process occurs with open council deliberations, including additional public comment, including funding possibilities involving measures R&U and anything else the public wants to see openly discussed. We need to know and acknowledge what we will forego if we lock up those funds for the long term. Some good things could happen.

1:27:14 We're going to forego a lot of other stuff. We've got to have public input on that. To keep the process intact, actually, and this is another little process step. I used to hate the word process when I was with the federal government, by the way. But I learned that there's importance to it. The council's proposal is to go back to the recommendation and measure your committee for allocation amounts, because it could be varying amounts from either one, although that could have been resolved in the initial commission and committee discussions.

1:27:43 Council would then give its approval and then go into negotiations. I know that's a lot of process, but that's what we set up and that's why we exist. A full and open public process is often messy and long, but that's the process that's been missing lately and that's why the council has received lots of criticism. That's why. You know, appointed commissions, committees and task forces are advisory to the town council. Just let them do their job. Don't be impatient. It's hard to be.

1:28:11 And let the process work. The point of my comment is that Town Council, by jumping to a discussion of this particular land acquisition in a closed session, I'm winding up, has skipped many essential steps. This has happened with other issues, in addition, and the citizens are not happy. I'm sure that some of you think that what you've been doing is showing leadership and initiative, and you may not even understand why the public is unhappy with your actions, but you left them out, and that's the main issue. Many centuries ago,

1:28:41 A wise Chinese ruler named Lao Tse said something to the effect that the test of true leadership is when the thing, whatever it is, is done. The people will say, we have done it ourselves. So anyway, hopefully getting back on the process track will lead to future success and not criticism, and I'm offering it in that spirit. Are there any questions that I can answer? Thank you, Sandy. Sandy, I just, I think you're a bit ahead of the process.

1:29:14 I don't think that the council or the town has had any intention on making decisions without public input. I know you feel differently, but... I just chose one example, and it's an example that I support. Yeah. That's why I chose it. There are... Well, my whole point is that shouldn't be on your closed session agenda until you've gone through the rest of the process. That's my point. Yeah. I mean, it was a mistake having it on the agenda. Now, maybe you didn't discuss it. I don't know that.

1:29:43 But I know that it was on the agenda. And that's all I'm saying. I don't know that we've made any public decisions on anything that hasn't gone through the public process. So I don't know why this particular one wouldn't go through the public process either. I just picked this one up. Right. It should go through the public process. But it shouldn't be on your closed session is my point. But maybe I'm incorrect. I don't know. This will be for the new town manager and for the town attorney to work with you on. These are just in hopes of...

1:30:14 Answering and understanding why some of the criticism has been coming. Thank you. Any other public comments? Seeing none, we will move on to councilmember reports or additions to the agenda. John? One quick report. We did, Jane Bear was here at our last meeting, I think, and she did let us know and they did complete their improvement down at the skate park.

1:30:44 The improvement was intended to go for little kids and practice has proven that the bigger kids are using it because it's fun for them. It's an education process to try to educate the bigger kids to let them know that this was intended for the little kids and to please let them use it. They had a soft opening a week or so ago, well attended on a windy day. But if you get a chance, if the public gets a chance to go ahead and drive

1:31:12 Drive down there at the skate park by Mammoth Creek Park and see what a great facility that is and how many people are using it. I was by there almost on a daily basis over the last week to 10 days and there's been anywhere from 15 to 50 kids using it, adults down there. So it's a great facility and I want to once again congratulate Jane Baer for her efforts in making improvements down at the...

1:31:42 At that park. Oh, also wanted to mention real quick, I just thought of it, and I'm sure he'll tell us about it when he gets back, but Rick Wood went over to Germany last weekend and participated in the Berlin Marathon. And in his age category, which I believe is 60 to 64, Rick Wood was 13th overall in that age category and was the first

1:32:13 What had the best time for American runners in that age category, so great effort by Rick and we'll hear more about it when he gets back into town. Thank you. Thank you, Jeff. Michael. I have nothing to report. Matthew. I have nothing to report. And I also have nothing to report, so we will move on to reports from commissions or departments. Steve. Thank you, Mayor. Sometimes you always see me at the meetings and oftentimes I don't speak.

1:32:47 I feel like my message is sometimes redundant. I don't want to lose the ear of our audience. But with that said, I want to speak to you again and maybe again next meeting. We'll take the chance. But the bear's super busy right now. The term that they're going through is called hyperphasia. Depending on your body weight, the size you are, you're drinking about four to five gallons of water per day. They're putting on tens of thousands of calories per 24 hours.

1:33:16 A couple of calls that we went on was for dead bears on the side of the road. Both bears had fallen over while they were walking and gone to sleep. They're eating themselves into a coma. It's kind of like us on Thanksgiving. Yeah, we woke the bears up and moved them along. They were just fine. So yesterday I was with 10 bears. That's a big number right in downtown Mammoth. We see the sow with a cub.

1:33:42 Weiner is suckling about a block and a half from here right now. I just left there. It's a really magical time. It's really great, but very, very busy. The community has done a fantastic job. We haven't run any over and killed them this year. It's unheard of. There hasn't been a single depredation permit issued this year. None of them have been shot, poisoned. We haven't had any problems at all.

1:34:08 The other day we had a bear in a car. I'm sorry about that. And the car did get a little messed up. But we are having some issues, and I don't mean to make light of that. We're having whole dumpsters knocked over by my house. Three men couldn't move a dumpster. And the whole dumpsters flopped over but locked. The bear got no food reward. And so we have to come out and write those dumpsters.

1:34:33 But other than those small things that we're taking care of every day, all of us in the morning when we go to work, we do see messes or people that are forgetful. It annoys the heck out of me. But for every person that screws up, thousands and thousands of people chose to do the right thing. So if we have a bear hit by a car tonight, if we have an incident, we haven't had any in refrigerators to speak of. None of the nonsense that went on years ago. The community is doing an incredible job. But if something happens tonight or tomorrow night,

1:35:03 It just, it doesn't discount what we've accomplished. What we have the potential to do when we put our mind to it. We're leading the world in what is possible. But I want to make it perfectly clear, it's Jurassic Park out there. Tons of coyotes, deer on every street, more deer than we've ever seen. No big high impact, high speed fatalities on 203. Some hits around town, we've had to put some deer down.

1:35:31 But nothing again like years past. People are doing a fantastic job. As I've spoke at the podium many times before, the bears are locked down basically plus or minus five or six days by Halloween night. So we have 30 days left. And we just ask people, you've done a fantastic job. Food out of the cars, lock your garages, lock those dumpsters. Drive slow and look for the wildlife. And I'm just...

1:35:56 It fills my heart to see what we're getting done. It's an amazing, amazing thing. So keep it up. If you have any issues, any problems, any questions, please call 937-BEAR. If you can't get this message and you're going to screw up and you're going to do the wrong thing, call me in advance. I'll come over. So that's what I have to say tonight. I appreciate it. If the council has any questions, I'd be glad to answer. Stephen, one more story, if you would, please. Stephen had an occasion as well as one of our police officers.

1:36:26 To come in contact with a young deer. Can you share that, please? On Lake Mary Road, you know, like I say, it's busy. It's Jurassic Park. You're talking about the fawn. We pulled up on the call. The bear was in the bicycle lane on a busy road going up to the lakes basin. And it was a young fawn. Not spotted, but almost.

1:36:50 And, you know, get the guns out. You know, that's what we do. It's a sad part of the job, but that thing needs to be euthanized and not suffer. So I walked over. I will use the officer's name. It was Luke. And so we walked over there. And, gosh, you're going to, you know, do something. It's a hard part of the job. Shoot a baby fawn laying there. And the fawn was looking at us with big eyes and big ears. And Luke said to me, I don't want to shoot it. You thought you had to shoot it because you thought it was hit by a car?

1:37:19 Yes, sir. And I believe it was brushed by a car. And I said, I don't want to shoot it either. He said, well, let's put the guns away and go mess with it. So we went over there. And we slowly articulated all of its legs. And it didn't bite or kick. It wasn't screaming. We played with its back. And next thing, two full-grown, you know, all emotional were carrying this little baby fawn.

1:37:43 And we carried it off the road and put it over in the woods where it would be safe and possibly the mother would come back. So Luke is a great guy and so he likes the deer. So he went and a couple hours later he went and snuck up and he checked and it was sound asleep. It wasn't breathing hard, it wasn't anxious, it wasn't suffering in any way. He texted me and kept me apprised of what was going on. He went up a couple hours later and checked on it.

1:38:11 And it had just needed some sleep. And sometimes we all feel that way too. So the little fawn almost got shot with a shotgun. And boy, did we learn a lesson. You have to shoot everything that's been hit by a car. But thank you. Yeah, thank you. The police department is doing a great job. The community, the hospital, the schools, everybody's doing their part. I've said this so many times. And again, at the risk of being redundant, thank you so much.

1:38:38 30 days, folks. That's it. 30 days. And we can put this in the history books. Nobody can ever take this from us. They can't sue us for it. We own this. So thank you very much. Steve, just one more comment. If the campgrounds do stay closed, does that mean more of the bears will come down into town? No, they're all here. Okay. They're all the young liars. They're hiding here. It's on balance right now. I thought so, but I thought I'd ask.

1:39:06 But you guys take it seriously what John Urdi was speaking about. I've spoken to this council before. I've spoken to all the different committees. You know my message. Up in the Lakes Basin, I think it's one of the most valuable things we have to offer. It's truly God's country, and I don't use that word very much.

1:39:25 But there's no mosquitoes up there, no flies up there. The fishing is just off the hook. The fall colors, the wildlife. There's ospreys up there right now that you can watch every day. Ospreys. I mean, how cool is that? Before the shutdown, before what you guys just discussed, all the campgrounds in the lakes basin have been barricaded shut. You cannot trespass.

1:39:48 You can't play with the kids. You can't unload your bikes. And everybody's parked and got the road all jacked up because they can't go and use property that I think we own. And so we have, this is a tough time, and this isn't the time to speak about it. But I didn't want to upstage John's comments or yours, but you're taking it very seriously. There's a bigger picture after they open up the government again.

1:40:10 We need to have better control of the lakes basin and let people come up and have a quality experience with their family and their children, and we're not doing that. So days and days before this all hit the fan, all those campgrounds, Mary both sides, Mamie back, George, the most beautiful campgrounds that we have to offer were locked up tight. It's wrong, and I'll never stop speaking to it. But thank you again for your time. Thank you, Steve.

1:40:39 Any other departments? Peter Berlusconi, Public Works. So just following up with John's comment about the Little Brothers and Sisters Skate Park, currently the ribbon cutting I think is scheduled for 11, 5, 13, and Stuart will have more information on that soon. I just want to follow up on the Mammoth View project and the Edison Underground in Rule 28 to 20B project. We met with Edison yesterday on the phone.

1:41:14 The project's moving forward. They've got their funding allocated to start design work. And so the Rule 20A, 20B portion is moving forward. We also have been coordinating with the Viewpoint Condo Association and additional undergrounding to the west. Edison has indicated that they really need a deposit, an engineering fee deposit to do any more work on that. Currently, Viewpoint Condo is not interested in

1:41:42 Paying for that fee. And so the westerly undergrounding will not go forward unless there's a fee paid. But it's good news that the undergrounding is going forward on 20A, 20B. Some of the work will likely start next summer, and then they'll finish it up to 15, which is when most of the other improvements for that project will start. Peter, do we have a schedule for when the

1:42:09 The road cuts that the water district did this summer when those might be paved. I believe next week, though, start next week. Doing the overlays for that. Okay. And is that someone from within the community? Like, is that black gold or is it someone from outside or do you know that? Qualcomm, I think, was the low bidder. Qualcomm? Yeah. They're the ones that did our airport runway. Can they complete that project in a week or is it more like two weeks or do you know? I think it's about a week and then they'll have some striping, a day or two striping.

1:42:38 Good. Just curious. Thank you. And then to follow up on the other project that we're working on, the Meadow Creek Connector Path, that project was paved Monday. And so that project will be finishing up in the next few weeks. But it's... On that one, Peter, you know, this is a beautiful section of the bike path going, I guess, from the creek over to the existing one. But they didn't pave all the way to the curb. Does something else go in there?

1:43:06 Well, essentially, that will be a shoulder area. It increases that separation, so it's a class one bike path. Oh, okay. So it'll just have gravel or something filling it in? Yeah, just have gravel to meet the design standards. Okay. All right, great. Thank you, Peter. Any other questions? Thanks, Peter. Union Council, Cindy Myron, Finance Department. I'm kind of following up on John Urdi and talking about the TBID and TOT, and, you know, our basic gov transition has been a very long year of process.

1:43:39 But we're there. So we're in the testing process. Finance has been very busy in testing. It will be available to the public to be able to sign on, register, probably by Friday, no later than Monday, to be able to sign on, be able to pay their TBID, TOT, online. The goal is then to be able to transfer that onto business tax so that they can pay their business tax online as well. It will allow us much quicker reporting.

1:44:08 for Council and staff to be able to project revenues going forward. It's really a big deal. We're really excited. So that's all I have. Thank you. Thank you. And I could say I signed up today, so it's working. And actually, Pam, could I ask you to report really quickly on the fact that there's going to be software and IT upgrades on Monday?

1:44:38 The town offices will be closed for the public because we'll be getting a new file server installed and a number of staff will be getting new computers installed at their workstations as well. The new exchange server is not part of this transition that's happening on October 7th. That will be happening soon, probably within the next month or so. At that time, actually, we'll be getting a new domain name, so our website and our email addresses will change. However, the old ones or the current ones will still work moving forward.

1:45:08 But we're all very excited. As you know, we've had a lot of problems with our IT in the last few years. All of our IT hardware and infrastructure is really old and outdated. So I think that this could be really good for the town and to help our efficiency. Also, as part of this transition, the long-term contract with Mammoth County will be implemented on October 7th as well. Great. Great. Okay. So does that actually mean, Cindy, that people won't be able to sign up on Monday?

1:45:40 Or are we, yeah. They're not going to be able to sign up. We're not going to be able to get the information. They will be able to sign up on Monday. We won't get the emails to be able to approve it on Monday because our systems will be down. But the public will be able to do their part. And Michael, what you were able to do is in a testing mode. So you're in a testing process. Right now we're working in a development.

1:46:07 Process to work out all the bugs, but we're very, very close. Good. And it is really, really exciting. Are we web-based on that? It's web-based. It is web-based. It is web-based, so I'm really, really looking forward to 395 and our internet speeding up. So what she's trying to tell you is, since you were doing it as a test, while you're in Italy, you'll have to sign up again. Okay. Okay, thank you. Any other departments?

1:46:34 Seeing none, we'll move on to the consent agenda. Is there any items that anyone wish to pull? In that case, I'll entertain a motion. Okay. I'll make a motion to make a motion to council approve consent agenda items number three through six. Second. Was that a second? Second, yeah. Okay. Having a motion to second, could we have a roll call, please, Pam? Yes.

1:47:05 Yes. Yes. Yes, with an abstention on three and four. Okay. Then we will move on to policy matters. And what we have is a proof of a proclamation in recognition of a couple of Wild Iris honorees. So, Susie, do you want to get us started? Good evening. My name is Susie Baines. I'm Director of Programs for Wild Iris. And I am here this evening to request the Mammoth Lakes Town Council.

1:47:39 to proclaim October 2013 as Domestic Violence Awareness Month. Briefly, just some statistics about domestic violence. The agency as a whole received approximately 900 calls, and I should preface that by saying this is for fiscal year 2012-13. As a whole, we received approximately 900 calls from victims or others concerned on their behalf, and that would be law enforcement, medical providers, family, friends, etc. Specific to Mono County,

1:48:10 We provided over $14,000 in direct aid for things like emergency medical treatment, food, clothing, emergency transportation, mental health services, household establishment. We were able to provide 16 bed nights for clients and their children, and we spent approximately 1,600 hours, which equates roughly to 32 hours per week, working directly with victims on issues connected to advocacy.

1:48:35 Emergency responses, counseling, transportation, support groups, referrals, and such. Due to the budget cuts that we've experienced over the last few years, our awareness activities for Domestic Violence Awareness Month have tapered over the years. Our focus these days is to bring awareness throughout the year by collaborating with other agencies and through print and radio and social media. This month, our Facebook page will be featuring 31 facts in 31 days.

1:49:03 So every day during the month of October we will post a fact about domestic violence on our Facebook page and then every Friday we will invite our followers to tell a friend about Wild Iris and also to donate $31 to help support Wild Iris and the services that we provide. Domestic violence still remains an issue at epidemic levels, killing approximately three women every day in the United States. Domestic violence thrives in silence.

1:49:30 So it's our duty to work together to end domestic violence in our community and our nation. This year we're focusing on our community taking a stand against domestic violence and we're calling out to everyone in our community to offer the support to those that we know or suspect may be victims of domestic violence and that as good citizens we call law enforcement when it's appropriate, that we hold perpetrators accountable for their actions and that we support organizations like Wild Iris

1:49:59 That offer no cost services to victims of domestic violence. And I do have some awards to give. I don't know if we want to go there. Let's do this part. Okay. I would entertain a motion for approval of the proclamation. Second. So moved. Okay. We'll just do it all in favor. Aye. Opposed. All right. Real quick while you're doing that, Jo. Go ahead. You mentioned 900 calls in the year. Yes. And...

1:50:27 That didn't register with me as much as three calls per day on average. That 900 translates to just about three calls a day on domestic violence. And those, and I should point out that that's an agency as a whole, that's not just Mono County. Oh, it's not just Mono. That's Inyo and Mono County. Okay. But those calls also don't account for the people that walk through the doors every day. Okay. I think last year we saw

1:50:57 Well over 500 clients. And I want to say it was probably 580 some odd clients as an agency. So we're busy. Yeah. Okay. I just wanted to clarify. Thank you. Sure. So I do have, in light of the focus this month, which is taking a stand against domestic violence, I do want to take this opportunity to honor two extraordinary individuals for taking a stand against domestic violence.

1:51:42 One of them, unfortunately, we just found out this evening is unable to be here, but I do want to sing her praises to the council and to the public because she has done some amazing things for us. That is Claudia Silverman. Wild Iris and the offices of Claudia Silverman and Gephardt have worked together for years to ensure the justice and the safety for our mutual clients. About four months ago,

1:52:07 Wild Iris contacted Claudia to request her services for a client who was at risk of losing her restraining order due to lack of legal representation. Wild Iris doesn't currently have funding that allows for financial assistance for legal representation, so our request was pretty large. Not only did Claudia not hesitate to provide this legal assistance, but she continuously thanked Wild Iris for allowing her such a rewarding opportunity.

1:52:36 This particular case has taken much longer than any of us expected, and Claudia continues to represent our client with grace and compassion, often using her own personal funds to offset the cost of gas and travel to meet with the client and to go to court, and she has spent many unpaid hours preparing for the client's hearings so as to ensure the safety and well-being of this client and her children. Claudia has clearly taken a personal stand against domestic violence for the safety of our community.

1:53:05 And so, unfortunately, I wish she was here, but it is with great appreciation that we present her with a plaque, a token of our gratitude for the exemplary service to victims of domestic violence. And we will present that to her, but I will let her know that you were here to do that. My second honoree is Stacey Powells, and we all know Stacey. So, I'll wait until she gets up here before I sing your praises.

1:53:37 So as the news director and radio personality for our local station, KMMT, Stacey has made it her personal mission to inform the public about domestic violence. She does this for the simple reason that she is appalled that domestic violence is a problem in our beautiful community. Stacey regularly provides PSAs about domestic violence, makes sure that Wild Iris is a regular guest on her Exhausted Parent Network show, and that we're featured with some regularity

1:54:05 On her daily morning news piece, all to talk about and bring awareness to the issue of domestic violence. As a nonprofit who has received, again, numerous budget cuts over the last few years, advertising is a luxury that we simply can't afford with regularity. The exposure that Stacey has provided to our agency is priceless. And we know that people are listening because we hear that they heard about it on the radio. But beyond the exposure, it's Stacey's heart.

1:54:35 And her true desire to make sure that victims understand they don't have to live with violence and that there's a place to go for help that makes me proud and honored. I'm going to get all emotional now. To present her with an exemplary service award for her dedication to the victims of domestic violence. So thank you, Stacey, from the bottom of my heart. Her dedication assisting victims of domestic violence.

1:55:09 Thank you so much. Thank you. Okay. Our next item is appointment of interim town manager. Andy, do you have anything to add to the agenda?

1:55:46 Not really, other than to explain to the public, if anyone cares, that the reason the council has to take this action tonight to formally approve Dan's contract, even though he's been working since yesterday, is the Brown Act says that you cannot set the town manager's compensation at anything other than a regular meeting. So this is the first regular meeting. The council has seen the parameters of the contract before. They do reflect the direction that's been given to me. Dan has seen that Dan's okay with them.

1:56:13 And I'd join everybody else in welcoming Dan and being excited that he's here. Great. Okay, thank you. Questions from Council? Any comments from the community? Welcome. I think we can all echo that. So, do we have a motion? I'll make a motion to Council approve option one, approve the attached draft employment agreement for Dan Holler to serve as interim town manager. Second.

1:56:40 We have a motion in a second. We'll have a roll call for you, please, Pam. Yes. Yes. Yes. Yes. Yes. Motion passes 4-0. Dan, I just want to say thank you and welcome. Welcome. So now's when the ball and chain goes around the ankle. Great. We're happy to have you here.

1:57:04 Next agenda item is to review and prioritize potential town projects for the 2014 Regional Transportation Plan and State Transportation Improvement Program. Peter. Mayor Pro Tem, Bacon, Councilmembers. This is a continuation of the discussion we started back in September 4th regarding basically all the STIP program and all projects that might be reviewed by the Council.

1:57:35 The town will need to provide priorities to the local transportation commission. The next meeting is set for October 17th. There will be likely another meeting in November and the final recommendations that need to go to the CTC will be the first week of December. So reviewing the STIP is important. It provides lots of funding for our infrastructure.

1:58:03 Capital Improvements that we're not really able to fund otherwise. In this report, I really consolidated the projects from the previous one where I listed really everything that's in the basket and to really look at realistically the priorities that have been discussed at the LTC with Councilmember Bacon and Councilmember Lehman to narrow the discussion related to those projects.

1:58:32 And focus on segments of those projects since we really have limited funding. We do expect to receive about $6.331 million for the region in this particular cycle. We currently have an $8.4 million reserve that's available to be programmed in this cycle. The LTC has received a notice of intent of Inyo County to program a Lanchuk-Artego project.

1:59:02 Which will have a $12.05 million contribution from Mono County. So as we talked about the last meeting, the MLU projects have been a high priority for this council as well as the LTC as a whole. We've received a lot of benefit from that. So staff would expect that that would be a high priority going forward as well. If you don't mind, Peter, when you get to the point of the questions, can we take each one at a time and have our discussion and then work through it?

1:59:32 So that's kind of the overview of the projects. We expect there will be between $2 and $3 million to reprogram for local projects, assuming the MOU projects are fully funded. And the Mono County is looking at, just to kind of review the projects that they're looking at,

1:59:59 They have about a $500,000 match that they need for the Rock Creek Road that they're working with the FHWA on. And then they're also looking at about a million dollars to reconstruct the airport and Rock Creek Road access to the Mammoth Yosemite Airport. One of the questions, we'll be discussing those items. Our current projects that we've discussed and the staff is working on is a lower Canyon Boulevard project.

2:00:28 That project will be under construction next summer and we don't expect any cost increase needed for that project. The subway access road is funded through right-of-way and so on that project we also don't expect any cost increase. There isn't construction funding for that project and the project itself is shown on the ALP. It could be funded through the FAA money if it's available and that something will be

2:00:59 Looking at the long term for when we start talking about the terminal. Meridian Boulevard, Groundabout, Signal Relocation Project. We have reviewed the cost for that project and we don't think that there's any cost increase needed for that project. And then the Mammoth Creek Gap Closure Project was a TE-funded project. We do have $69,000 that was funded through the STIP and we'll be looking for other funding for the construction of that project.

2:01:33 Table attached kind of lays out the projects that staff sees as potential priorities, but we want to look at really three questions to assist staff and the LTC commissioners as well. Are the MOU projects the highest priority? So that would be one question. And then

2:02:03 Should the Mono County projects for Rock Creek Road and Rock Creek Road to the airport be a high priority and funded off the top versus through the equal allocations between the town and the county? And then the sidewalk segments, since we know we're not going to have enough money really to fully fund a sidewalk from where it ends currently at Angels to the village, what segments of that?

2:02:32 Sidewalk are the highest priority. And staff would help you to go through each of those segments, but we can leave council for discussion. Sure. So let's look at the first question first about the MOU projects. And just for the benefit of someone who didn't hear your longer presentation, can you explain what an MOU project is and how it's funded? Essentially, MOU projects are state highway-funded projects that

2:03:03 We coordinate different regions to complete a project, a large project. So Inyo County, Mono County, and San Bernardino County were one of the first counties in the state to form an MOU to fund these large-scale projects. Essentially, over the last, I guess about 10 years, we've completed between the counties, and Kern County is also included in some of the MOUs,

2:03:33 Well over several hundred million dollars worth of construction projects that would, any one county or region would not have been able to complete on their own. And am I correct that when it's an MOU project there's also 40% comes from the state? Correct. So the MOU, if it's a four-party MOU, 10% comes from a participating party like Mono County, 10% would come from Inyo County, 40% would come from the project where the...

2:04:02 Facilities being constructed. And then that makes us eligible for IIP money, which is the interregional fund, which is 40%. So that's state money that really makes the project feasible from a constructability and financial standpoint. Some of the projects completed include the independence four-lating project, the Highway 14 overpass at 58 project.

2:04:31 Parts of Freeman Gulch Extension through Red Rock Canyon area. The Black Rock project. And we funded the environmental work for projects on 395 towards Atalanto in that area. So those are the MLB projects. It really has been a benefit not only for us but for anybody that's using the 395-14 corridors to come to Mammoth.

2:05:04 This MOU, this agreement between the counties is financial leveraging on steroids. And as Peter said, and I don't know if it was emphasized enough, but hundreds of millions of dollars of projects on 395 have come to fruition and are in the planning additionally just because of this MOU. The state and the federal government love stuff like this for counties to go together.

2:05:32 So is that a yes? It's an emphatic yes. I know you weren't here at the last meeting, at the September 4th meeting, but we did discuss those in detail on essentially $271,870,000 projects that have been completed. That project this summer that was finally completed was an MOU project north up at Topaz? Correct.

2:06:00 So Mono County, if you want to get in there. High Point was actually done as, it did not take any local funds at all, it was done with state funds. Oh, safety? It was considered a safety issue. Safety, thank you. So actually, in the scheme of things, that really helped our local area because 40% of the money didn't have to come from Mono County, just the preliminary engineering and enough design work so that it was eligible for an HSIP project, which was fully funded for the work that was done for construction.

2:06:28 Thank you. Michael, any comments on number one? No. Nope. Two no's and a yes? No, I meant no comments. We were about to say no. So being on LTC for five years now, I really understand the value of the MLU projects. And the good news is that the Atlantic Cartago, which would be that huge piece down at the...

2:06:55 South end of 395 appears to have a high priority with the MOU counties. So I would say that we should definitely say that MOU projects are priority. So I'm looking. Is there consensus on that? Yes. And I think for the public, people may wonder why we have such an interest down there. Okay. Well, then I will add to that. It's because that's how the majority of our visitors get to us.

2:07:23 It's a bottleneck. It's a bottleneck. It's dangerous. It's that slower speed. I mean, yes, it's interesting to go past the Crystal Geyser water plant and watch little bottles going along. But, yeah, it's a great improvement in the safety of our visitors getting to us and any of us who have to travel south to be safer as well.

2:07:45 Okay. Then the next question is, should the Mono County projects for Rock Creek Road and the Hot Creek Airport Road be considered regional and come to the top of funding or be out of the Mono County portion of the shares versus town shares? Right? So comments? I'd like a further explanation from Peter, if I can, what the dynamic is on that. I'll make some dynamics comments. Thank you.

2:08:15 That'll be all I need, Jo. Oh, well then let me start it off is that I will try to be, let's see, we're choosing civility. So essentially the Rock Creek Road changes work into a federal grant that's going to actually change the road

2:08:42 From Tom's Place on up. And this is something to do with the intersection and things like that. The Hot Creek and Airport Road is the existing county road. These are both existing county roads. Yes. When we were, as a council, asking for help with the airport subsidies, what we were told by the supervisors at that time is, well, they'd take care of the airport road and we would take care of the subsidy.

2:09:10 That's what I was thinking. Yes, and so there's that history as well. Having listened to the discussions and being a part of the group, since these are both still county roads, my feeling would be that no, they're not, they should come out of a county share, not out of a combined share. That was the intent, isn't it?

2:09:29 Correct, because they are still both county roads. But will they get done, though, is that the question? Yes. Because that was bad, bad shape. Yes, we know how bad the road is, and we have taken that into consideration. Yes, they would still get done. The difference is, let's say there's $100,000. Obviously, the months, it's probably, you know, however many million. But I work better with smaller numbers. Essentially, if we say it's a Mono County project, it comes out of their...

2:10:00 $48,000, and we get $56,000 because of the county population. So if we say we want it to be a regional project, it comes off the top, and if it took $50,000, then we would only have the remaining amount, we would have 60% of the remaining amount for our projects.

2:10:22 I don't know, Matthew, do you have anything else to add as the other LTC member? Well, the only other thing, the Rock Creek Road Project, I believe that includes the bike lane and all that as well, right? Well, the bike lane is part of the federal piece. This is just the intersection piece. No, this is actually the full road. Oh, it's a match for the full road? Right. 11 miles, I believe. You know, it's funny, and thank you for noting that, because when we were asked to do our individual priorities, I said it was a priority for me.

2:10:52 But I didn't mean that it was a priority to be funded off the top. And I think that's where I'm going with it. I like the idea. I think it's great and should be. But if I have to look at the road going to Rock Creek and a bike path versus a road to the airport, between the two, I'd put the airport first. And I think it's just because it's needed badly.

2:11:15 And I think the road to Rock Creek, while I would love to see that go up there, I love the idea of the bike lane and everything else. I think as far as, you know, looking at the number of people coming in and the first thing they see when they come to Mammoth when they land in a plane is this road that's torn apart or when they have to take an ambulance to the airport. It's not a comfortable ride to an ambulance.

2:11:38 So are you saying that you think that should be considered regional and come off the top? Well, all I'm saying is if we have, I would just like to see the airport, if anything, be given a priority even over Rock Creek if we have to. Okay. Yeah, I mean. But not necessarily, but.

2:11:55 But trying to influence them on their portion of the money? Yes. Yeah, trying to influence them. Because the reality is, is I also did put that as a priority, but recognizing it still as a county route. What I'm thinking, Jo, is that there's five Mono County supervisors that make up the board of supervisors for Mono County, five of them. Three of those five, the majority of them, represent the community of Mammoth Lakes. So I'm hoping that the

2:12:23 Supervisors that represent the community of Mammoth Lakes will make the airport road a high priority to get that done as soon as possible. Okay, so what I'm hearing is that we both see them as high priority, airport first over Rock Creek, but both as a priority coming out of the Mono County funds. Yes. Okay. Got that, Peter? Did you? Yeah.

2:12:49 Just had a question repeated then. So the request for those is not come off the top. But do you have a priority of those three roads as well? Well, we have – so what we're saying is not come off the top, but the priority would be – well, isn't it kind of Hot Creek and Airport together? Correct. So it's the portion of the Hot Creek Road that goes to the airport. Yes. Okay. Right. But the access to the airport, more important, not to say that the Rock Creek Road is not important, but –

2:13:16 Lesser of those two priorities. Maybe we can't split them, but if there's a lack of funding, I would say that it goes to the airport first. Yeah, okay. Then the third question is the question of sidewalks on Main Street. And what sidewalk segments have the highest priorities? And the ones for the benefit of the audience are Sierra Boulevard to Mountain. That's...

2:13:45 That's Angels to, or no. Yes, that's Angels to Texaco. Texaco 76. Mount Boulevard to Viewpoint, which is? Which is in front of the Mammoth U project, and they are, we've been working with them on the improvements that they have within that section. They're not responsible for the full improvements, so this would help augment that funding for their project. Okay, so that's like a leverage on. Okay, Viewpoint Road to Minaret.

2:14:15 And that's that last piece in front of Viewpoint Condos. Okay, the same place where we have the undergrounding issue. Okay, 8050 to Minaret, that's the fireside side of the road. That's from 8050 in front of Whiskey Creek fireside where the wall is. Yeah, yeah. And 8050 project did provide the town with $75 cash to help with that construction project. $75?

2:14:41 $75,000. Oh, okay. And then we have submitted a use permit for 8050C, which is a tower hotel project. Okay. And then forest trail to the post office? That's a section that we designed a few years ago. It's a sidewalk that go in the median, basically from the fire station to the post office and connect, make that connection. Oh, okay. From the fire station, okay.

2:15:11 Wait, where does it go now? They're hired from the, from Kittredge. From basically Kittredge. From Kittredge up to the post office. Up to the post office. Okay, there's nothing there. So, is that within the area that we'll be hearing from shortly on the consultants coming back on the Main Street design? Correct. The alignment, the design alignment pretty much is consistent with the proposed plan that has been.

2:15:38 So their idea of bringing everything closer to the street, she would not be putting this in and then replacing it in a couple of years? Correct. Okay. And that project also included rehab of the road, but the town crews did the pavement reconstruction a couple of years ago because it got to be so bad. Okay. And where would that go? Would it be out by the front, by the berm? It would be in the berm. In the berm.

2:16:07 That project hasn't recently been discussed with Caltrans, so we may have some challenges there. I'm glad to see this, all of these. I'd like to do them all. I mean, how many realistically, maybe we look at the table on the next page. And there's really items one and two. Item one is

2:16:37 With the STIP project, we will end up having to acquire right away from the Fireside Condominium Project. At least we'll have to do an appraisal and go through that process. They could certainly refuse any purchase and just donate the land, but since it would be a STIP project, we'd have to go through that process. So that estimate is about $685,000 for that section of sidewalk. We have had discussions with Fireside and the properties along that section.

2:17:08 So they understand the project and the options that we had to locate the sidewalk. The challenge there is ADA access. If we're away from the curb, it's a problem. It makes it harder. The other item really is the sidewalk from Minaret all the way to Angels, and that's an estimate of $2.3 million. We know that we're not going to have all of that money, and so that's why...

2:17:36 At this discussion, it was kind of deciding what is the priority in front of the Mammoth View project, and then we look for other funding on either side or downtown Main Street. The downtown section, we're estimating, is about a million dollars to put the sidewalk in from... I think the viewpoint to minarets...

2:17:57 Pretty important one, as is 8050. Okay, well, let's do it this way. Why doesn't everybody get... I'm going to make up... Yeah, we're all going to vote for our top two priorities. The other... And those sidewalks to the west, basically from Mammoth, mountain view, that includes streetlights on both sides of the road so that we can basically increase the safety along that section, which is really... Mountain Boulevard to viewpoint, about 80% of that's going to be done, right?

2:18:26 With the... Mammoth View is really just responsible for the bus stop area and their connection, the street connection, intersection improvements at Mammoth View. No, but it's already being paid for under this project we're working on with the undergrounding, right? Well, that's undergrounding, but that's not putting in the sidewalk. Yeah, that's just undergrounding. But I thought we were doing this simultaneously because...

2:18:51 That was a question. There's some pieces on the property. You know, they've got access that's going through their property that is getting done at the same time with the undergrounding. But this is down on Main Street. Right, but we have the cables are on Main Street now. So those will be undergrounded and the alignment for the electrical wires will be in the existing shoulder.

2:19:17 That's out there today. Where the retaining wall is. Yeah. So the sidewalk requires removal of the retaining wall, reconstructing it, and putting in a sidewalk. We'll have to basically make the bench about eight feet wider. Okay. I guess my question is. It's just why it's so expensive. I thought when we were undergrounding, we were trying to do this simultaneously with the sidewalk so we wouldn't have to do, go lay it down and then retaining wall and then have to dig it back up, put a sidewalk into the retaining wall.

2:19:46 So isn't that kind of our plan or can that be done? Yeah, so we applied for an H-SIPP grant to help coordinate the funding cycle. We were recently informed that we would likely not get that grant. It's not official yet, but that's what we've been informed. So the electrical work is designed so that it won't have to be redone for any work related to the sidewalk or the firewalls.

2:20:14 But there'll be a bench there, basically, and we're going to have to have another retaining wall, right? Yeah, so it'll be a retaining wall similar to what we have on Lake Mary Road. Okay, and that's just for the electrical piece? No, that's for the sidewalk. That'll be the sidewalk. So if they put the electrical in, it's just going to be a ditch, and then we're going to have... Paper on top of it. Okay, and then will there be a new retaining wall there, or is it going on top of that existing? Okay. So the electrical will go in the existing shoulder between the fog line and the retaining wall.

2:20:44 Oh, oh, okay. So it's coming, it's a lot closer to the road. That way there's no interference with future construction for a sidewalk. Okay, I got it. So, Peter, so as part of Mammoth View's project scope, completing that whole section of sidewalk is not part of their scope of their project? Correct. Their project approvals included all the sidewalk on Alpine Circle and Mountain Boulevard, and it only included the bus stop.

2:21:13 Construction right by their hotel along Main Street. So that's about 140 feet. Is that something we can still negotiate with them on or not at this point? I would say not. I think they'll be coming forward with a, you know, they have an application for a development agreement. They're going to be coming forward with some additional requests. All right. Okay. So.

2:21:37 How about if we try, if everybody gives their first and second, and we'll see what we come up with. And Michael's been chomping at the bit. So do you want to take your first and second first, be first on it? Well, my first is, is have a man with you do that section of the sidewalk. Well, that's not one of these. I'm really concerned with the 80-50 area. That's a really dangerous area for pedestrians.

2:22:07 Viewpoint to Minaret, that section's dark and it's a very dangerous area. So I would say C and D for me. So viewpoint is your number one? Mm-hmm. Okay. I said viewpoint to Minaret. Yeah. Versus mountain to viewpoint. Okay. Yeah. He's talking about that last little section. Okay, so you're in front of Novato's basically. Yeah. Novato's down, Novato's down 100 yards or so.

2:22:35 Down to almost their project. Is that correct? Is that what I'm reading that? Just to the intersection of Viewpoint Road. So that's not in front of the Mammoth View Project. Right. Right up to that project. Right to their project. Got it. John? To me, to say that the Viewpoint Road to Minaret Road is a high priority would indicate that we would be accommodating

2:23:02 Really only the people that viewpoint condominiums to that corner. So I'm looking for higher pedestrian areas and the highest pedestrian area for me is the 80-50 project on Minaret and also the highest safety issue. I listed number two, Forest Trail to the post office as number two just because, again, I think there's more pedestrians at that location.

2:23:30 As opposed to any of the A, B, or C. I could be wrong, but that was my thinking. Okay. Yeah, I mean, I agree, John. I just think that whole area from Minaret down, that whole area is just a major issue. No question. And to try to get B done is definitely high priority, too. Matthew. I think, unquestionably, D is the most dangerous area and probably the highest priority.

2:23:59 As far as number two, I personally would think that Mountain Boulevard to Viewpoint only because there's that retaining wall there and it's a long stretch where a lot of people actually do walk from between Whiskey Creek and so that one for me is a priority but the only thing I consider is money is which one can realistically get done first. And so...

2:24:26 You know, I would say B would be my number two if we can afford it, but if not, then I would go with either of the other two. And I'm going to agree a lot with John because the pedestrians who think 80-50 has just got to be taken care of. We're just lucky we haven't had somebody plastered to that retaining wall yet. And since that focuses to the village and then the other piece being

2:24:53 We're trying, you know, eventually we'll connect our two business districts, but I think we're a long way from doing that yet. And so in that case, I would take my second choice as being the forest trail to the post office just because it is another high transit area and that poor little frontage road does not work very well as a sidewalk. So that, in looking at it,

2:25:20 The 8050 to Minaret is definitely the first priority. But then beyond that... First trail. So then we're split on... Yeah, I think beyond that, even though Michael had the viewpoint to Minaret as his number one, two of us had Forest Trail as the number two. I would actually switch to the Mountain Boulevard to view over the viewpoint road. I didn't realize it's that short of an area.

2:25:53 And that is, I mean, I prefer that the developer paid for that, but, you know, I think it's got to get addressed. You have a new project going in there, and it's not going to look so great if it's not, you know, completed. Okay, then with that having been your, because that then became your first priority? Well, I mean, okay, then we have a tie. We have a tie, Peter, for both.

2:26:19 Mountain Boulevard to Viewpoint Road and Forest Trail to the Post Office is being the tie for the second. Okay. What's the timeliness of this? Do we have two more? Well, essentially, there'll be... So, Hona County's going to discuss their projects and priorities on the 15th.

2:26:41 Correct. And then the 17th is an LTC meeting. So there's an LTC meeting to tie and pull them all. There'll be another discussion in November to kind of finalize the overall projects. And so we certainly could have another discussion at Council either the next meeting or the first meeting in November. It'd give the four of us here time to digest what's before us and would also include

2:27:10 A fifth member of the council. Correct. Andy, just a point of interest is that, you know, Matthew and Sandy Hogan and I sit as our LTC commissioners. After the meeting where the commissioners have discussed priorities, is there a way for that interim tally sheet or whatever matrix to be provided to all council members?

2:27:39 Yeah, we can, sure. I don't want to, you know, because it's not really, because Matthew and I, since we're sitting on that, we can't really turn around and talk to anybody else. So is there a way to have staff distribute whatever comes out of that with some kind of a cover report so you have some more information? And then we can bring us back at the first meeting in November to finalize. And then we, basically, I'll go ahead and refine the numbers for these segments so that those numbers are

2:28:08 Ready to go for whatever we submit to the CTC in December. If we can find a couple more pennies, we can maybe do some more. So there's a couple of options on the, to kind of go back to the MMFU. So, I mean, the 80-50 fireside section, you know, conceptually, we've talked about a few different scenarios, and really two. One is, it could be an ad-grade sidewalk with a curb right against the retaining wall. Certainly, that's definitely not the most desirable situation.

2:28:36 The other one that we've done and we've talked to 8050 is, I mean not 8050, well 8050 and Fireside both, is cutting the retaining wall down and really keeping the sidewalk elevated and then bringing it onto Fireside's property with a pathway that will be ADA compliant. So whatever we build, Caltrans is under a consent order that they cannot construct any facility that's not ADA compliant. So what that means is it just makes this sidewalk section.

2:29:06 Very expensive. Even though it would qualify for an exemption, Caltrans can't have a facility in there right-of-way or adjacent to the right-of-way. So it'd be somewhere lower than the top of the existing retaining? Yeah, so we were talking about cutting the wall down about four feet, having an elevated eight-foot sidewalk that would meander through the fireside's property to keep it in the eight-story. And we've done design work enough to do some cost analysis for that.

2:29:34 That worked. So that's why it's, you know, a half a million dollar section of sidewalk. I think that would be considerably better than going on to, staying on the street. Oh yeah, because that's, that doesn't mean, unless you put bollards along the whole thing. Yeah. So that answers that question. The other one that is somewhat, you know, we've been to discussions with Caltrans for many years regarding snow removal coordination and having,

2:30:01 Dealing with the snow storage that we have on Main Street with the snow berms. We do have a work item in the overall work program this year to try to hopefully figure out that. The main sticky point with Caltrans has always been they don't have any money to help truck snow. And so, you know, that town doesn't have any money today. We can help some because we get reimbursement from the state for snow removal, but we certainly don't have all the money that would be needed to truck snow.

2:30:29 So that leads to some type of an assessment district or something, some other method to help fund that part. So that makes that section of sidewalk just problematic to make sure that it's open in the winter year-round. I just wanted to highlight that. Versus the one to the west, they've actually agreed that that's the best place for it at the wall, at grade, with a new wall there, but the shoulders and everything.

2:30:58 So far they've said that they'd cooperate with the snow removal for the sidewalk. That's great. Okay, so you have our consensus, so there's not really a need for a motion? You don't need a motion, we have consensus, and then we'll bring this back first meeting, and we'll send out an email with an update after the LTC meeting. Okay, great. Thank you, Peter. So then with that, we will go into closed session. All right.