Planning & Economic Development Commission · 2025
Planning & Economic Development Commission
at 09:00
On the Town's site: Agenda ↗Agenda PDF ↗Minutes ↗Video ↗
Agenda
Agenda items for this meeting haven't been extracted yet. Read the agenda on the Town's site ↗
Transcript
96 passages · machine transcriptAutomatically transcribed from the Town's recording with speech-to-text. Names and numbers can be wrong; the recording is the record. Open the Town's video ↗
0:42 Yeah. Good morning, everyone. I would like to call to order this morning's planning and economic development commission meeting, which is October 8th at 9 a.m. With that, may we have a roll call, please? Commissioner Deaver is absent. Commissioner Fleming? Here. Commissioner Grand? Yes. Vice Chair Verruck? Here. Chair Vanderhurst? Present. Thank you, Jamie. Would everyone please stand for the Pledge of Allegiance and Nolan?
2:07 Would you care to lead us this morning? Ready, begin. I pledge allegiance to the flag of the United States of America and to the republic for which it stands, under God, indivisible, liberty and justice rule. Thank you, Nolan. All right, I'd like to open public comment now. Public comment, if you have a matter that pertains to something on today's agenda, I would ask that you hold on to your public comment until we open that agenda item.
2:40 But if you have public comment on a different matter, now is your opportunity. So does anyone in Suite Z have public comment they'd like to submit that is not going to be covered on today's agenda? Do we have any staff updates or presentations for public comment? No? Jamie, do we have anyone in the virtual world that wants to submit public comment? No. All right. Then I will close public comment and we'll go to public hearings.
3:10 4.1, consideration of use permit 24-003, major design review 24-006, and adjustment 25-005 for a six-unit multifamily residential apartment project subject to the town's density bonus ordinance located at 54 Mono Street. And the way I'd kind of like to see this morning's hearing
3:39 Play out is we're going to listen to a presentation or listen to the staff report and I think we also are going to have a quick update from the town attorney about our responsibilities here this morning and then I will ask if the applicant would like to make a presentation and then we will open it up to public comment. Public comment is five minutes per person but I definitely want to hear everyone's opinions, everyone's thoughts.
4:08 And then we'll bring it back to the commission for questions or thoughts or some clarification needed on anything else. So with that, I'll pass it off to Nolan or Gina. Gina, I believe, are you the staff contact this morning or is it Nolan? The staff contact is Gina and as indicated, we do have Andy Morris on Zoom. He's just going to provide a brief just overview of the role of the planning commission in this matter.
4:39 Andy, thank you for joining us this morning. I'm happy to be here. The floor is yours, sir. Oh, okay. Okay, so this is kind of a very basic thing about Planning Commission meetings or the PEDC and their role. And I know that the commissioners are aware of this, but I think for members of the public, it might be helpful to know what the commission's role is and is not. So the commission's role is to decide whether any project, including this one, meets the town's standards.
5:08 There are findings you have to make in order to approve a project, or if you want to deny a project, you have to make findings in the other direction. The development code has standards for when a project can be approved and not approved. So your role is to decide, can the findings be made for approval or for denial? Does the project meet the town standards or not meet the town standards? And everything is meant to be looked at and decided upon.
5:34 Using that lens, answering those questions. Does it meet the standards? Can the findings be made? The commission's role is not to decide, is this a good project? Is it a bad project? The commission's role is not to decide whether you like the project or whether you don't like the project. Whether you think that this is the kind of project that should be in this zone or not. That's not your role. The commission's role is to decide, again,
6:02 Does it meet the standards? Can the findings be made? So as you continue your discussion of this today, and I know that it's come before you before and you're hoping to make some kind of decision today, bear that in mind. And for the audience as well, please bear in mind that the commission is not deciding is it good, is it bad, does the commission like it or not like it? It's does it meet the town standards? Can the findings for approval be made? Thank you, Andy. You're welcome. Any questions for Andy on that clarification?
6:32 Andy's going to be with us the entire meeting. So during public comment, if you do have questions, I would rather not have public comment kind of fall into Q&A. So what I would love to have is when we do get to public comment, have staff take note of any questions that may be raised. And then once we close public comment, either Andy, Nolan or Gina will have a chance to answer those questions. So with that.
7:01 Gina, did you want to take away, start our staff report? Sure. Let me share my screen. Okay. All right. The property owner of 54 Mono Street is requesting a use permit, major design review, and adjustment for a six-unit multifamily residential apartment project subject to the town densities bonus.
7:30 bonus ordinance. This item was continued from the August 13th, 2025 commission meeting and following the continuance of the item, a special PEDC meeting was also held on September 23rd to conduct a site visit with the PEDC, the applicant, the neighbors, and the water district.
7:49 The proposed apartment project consists of six multifamily dwelling units within a single structure at 54 Mono Street. The project features one level of understructured parking for seven vehicles and an exterior parking area for three. The application includes a density bonus request to permit double density on the site for three additional dwelling units through the town's density bonus ordinance. The density bonus request requires a minimum of three of the six units to be deed restricted
8:16 for workforce housing. However, the applicant has agreed to deed restrict all six units in exchange for four concessions, one which is automatic and three additional concessions. Of the six units, four are one-bedroom apartments and two or three-bedroom apartments. Additionally, an adjustment is requested to allow for one of the guest parking spaces to be located within the front setback.
8:39 The project is located on a .25 acre vacant parcel in the residential multifamily one zone. The adjacent parcels on the north, south, east and west sides are also zoned as RMF1. There are multifamily developments to the north, east and west of the project and a single family home to the south. The proposed unit...
8:59 The proposed use is a multifamily residential, which is consistent with the general plan use designation because the property is located within the high density residential one land use designation, allowing for residential multi-unit townhouses, condominiums, and apartments. The base density for an RMF1 site is 12 units per acre, or three units in this case. However, the town density bonus increases it to six.
9:28 The original subdivision of the former lot into the two parcels that are now 54 and 56 Mona Street was approved by Town Council in 1990 under entitlement.
9:37 tentative tract map 36-158, and the conditions of approval included that the two parcels shall be limited to and share a single driveway within the 30-foot easement, that a one-foot non-access strip along Mono Street extending southward from the proposed shared access easement to the southern property line be dedicated to the town to prevent any other access to the parcels, and that a utility easement for 56 Mono Street be created through 54 Mono Street.
10:05 However, the resulting final parcel map recorded in 1992 inaccurately described the shared access easement as an exclusive access easement appurtenant to parcel two and failed to record a utility easement for 56 Mono. Although the recorded parcel map does not accurately reflect the conditions of approval for TPM 36-158, the conditions are still in effect and limit the access to the two parcels and
10:33 The project is requesting to utilize the density bonus program to increase the maximum density on the site from three to six units. In order to receive the bonus, at least three of the units must be deed restricted to the occupancy restricted level. The project will be deed restricting all six of the units, but will require additional concessions, which are allowed by the density bonus program to make the project feasible. The project is allowed one automatic concession.
11:04 which will increase the lot coverage from a maximum of 50% to 60%. The additional concessions, which are allowed because the project is exceeding the required number of deed-restricted units, include a 20% reduction in the south side yard and rear yard setback from 10 feet to 8 feet. The reduction of one guest parking space to allow for a total of two guest parking spaces and to waive the requirement to provide private 60 square feet of outdoor open space for each dwelling unit.
11:34 To ensure the project will remain as occupancy restricted units, a workforce housing agreement shall be executed by the property owner and the town prior to certificate of occupancy. This agreement can ensure the property management enforce quality of life regarding parking, noise, guests, etc. The workforce housing agreement requires that units be rented only to households certified by the town, that at least one occupant shall be qualified resident, which is defined as a person who works
12:02 A minimum of 30 hours per week at a business located within the boundaries of Mono or Inyo County and that the units shall remain de-restricted for a minimum of 55 years. Here's a site plan of the project which includes three exterior parking spaces, two of which are covered by an overhang and one of which is located in the front setback, a trash enclosure, ADA access to the first floor unit and snow storage. The project will be providing 43% on-site snow storage.
12:34 Prior to the certificate of occupancy, the applicant will provide a snow management plan to address the remaining. This is allowed pursuant to the density bonus program. You can also note the 35 or the 30 foot wide access easement that is located along the northern border of the property.
12:52 Since the staff report and plans were published, the applicant has revised the site plan to shift the building two feet from the rear property line towards the front property line. In doing so, the rear setback has now been increased to 10 feet, which is the standard setback for all properties in the RMF1 zone, and the front setback is reduced from 20 feet to 18 feet. The rest of the plan is not changed based on this.
13:18 The street-facing facade of the building provides habitable space with windows, openings, and a pedestrian entry as required by the applicable development standards for residential multifamily projects. The building forms and facades provide variation in visual interest through the varied roof lines, a roof overhang that extends over two of the exterior parking stalls.
13:38 Thank you so much.
14:04 The second comment was regarding concerns that snow removal operations along the rear property would impact adjacent properties. To avoid the need for snow removal in the rear setback, the building footprint has since been flipped so that the pedestrian access is along the front setback rather than the rear setback. The third comment raised concern over increased traffic noise and associated
14:28 The project is consistent with the applicable town density bonus program, which was analyzed pursuant to CEQA and concluded that the town density bonus ordinance would not result in any new significant environmental effects. Additionally, the workforce housing agreement will further reiterate the need to manage parking and manage any quality of life or code compliance issues that may arise. The last comment
14:54 raises concern over the project's proximity to 28 Mono Street. However, when measured, the building is 55 feet from the 28 Mono Street property line, therefore providing sufficient buffer area. And then a few more comments that were received yesterday, which I believe Commission received already. One comment regarding the increased density is not compatible with surrounding neighborhoods.
15:24 Our response is that density bonus projects are required to be compatible with the neighborhood and required to meet objective design standards that apply to RMF1 properties. All RMF1 properties have the ability to meet maximum density and are subject to the RMF1 standards. Another comment talking about encumbered land that cannot be counted towards density.
15:52 The town is required to measure density based on the gross area of the property prior to any required dedications. This is per municipal code section 17.148.020 zoning terms and definitions. Another comment regarding the need for sound and visual mitigation fencing.
16:16 Sound and visual mitigation are not required for the project. However, if the commission feels strongly about it, it can be required as a condition of approval. And then finally, the utilities for 56 Mona Street must be relocated as part of this project. Utilities for 56 Mona Street are currently not in an existing utility easement.
16:43 With that, staff's recommendation is to adopt the Planning and Economic Commission resolution, making the required CEQA and municipal code findings and approving use permit 24-003, design review 24-006.
16:59 and adjustment 25-005 with conditions and modifications to the site plan to move the building two feet to the east, resulting in a 10-foot rear setback and a concession for a reduced front setback of 18 feet, as recommended by staff. Thank you, Gina. Nolan, did you want to add anything or should we go to the applicant? No, we can, I think, go to the applicant.
17:27 If they have any follow-up or if the commission has any questions, we are available to answer. Any questions at this time from the commission for either Gina or Nolan? Would the applicant care to make a statement? Well, first of all, thank you very much for meeting on 23rd on a very special meeting to make the exception to come on to the on-site and make it clear what is going on about this project. So I think major confusion here, the lot 56 has is like regarding the
18:04 Shared driveway. And when we bought this property, town has provided all documents to us and we are very clear that driveway is shared driveway. The land is owned by the 54 Monash Street and they are granting the driveway easement. We are not disputing any about that. So we are here to work with them and we are not saying, but we are very clear whether that's project going in which direction it is a shared driveway, no matter what it is.
18:35 Whether it's building build or not. And so 56 need to be understand and clear. This driveway is a shared driveway. So that's one I would like to make it clear because that land is owned by the 54 Monastery and they're granting that to the 56. And we're happy to work with them in whatever they have. Town has approved in 1990 in Town Council. There's a tract map and there's a lot of condition need to meet there. So and I can happy to work with them.
19:04 We don't have no issue with that. So this point right now, other than that, I don't have any other comment, but I'd like to open, keep my two, three minutes on the later on if they have any rebuttal. Thank you. Appreciate it. Thank you. Any questions for the applicant from the commission? With that, then I'd like to open it up to public comment. If anybody would like to make some public comment on the matter, now is your opportunity. I would ask staff,
19:36 to take note of any questions that may be asked that we can then address when public comment is closed. Yeah, this is if you would like to make public comment, this is the window. Our attorney has this lovely letter he'd like us to read just to help me stay on track, but I'm going to just stick to our two main concerns questions is we're trying to understand how you are
20:17 We're counting this easement towards net buildable acreage to approve this. Aren't easements and encumbered land typically removed from the net buildable space? You're calculating a quarter acre equaling six units. And to us, you remove the easement, whether it's shared or not, and that does not leave you with a quarter acre.
20:50 Trying to grapple with that and understand how you can squeeze this big project onto that very small space. And the other thing is how the recorded town map can say an exclusive easement and yet you've got it as shared. This conflict definitely affects us and surrounding neighbors. Right now I don't think either property is in any condition to even be sellable.
21:30 Yeah. So I guess we need those two major concerns answered and then refusing to accept responsibility to take care of our utilities that run under 54. That makes no sense in any building situation. So really I guess it's three now that we see that the developer is refusing responsibility to relocate and take care of our utilities that we've been using for the last.
22:02 25 years, under 54. So we definitely are asking the Commission today to pause approval until these issues are resolved. I guess the only thing I want to add to that is, you know, we purchased our property with this exclusive easement to have access to our property. And I don't understand if anyone in this room, if they purchased the same property with said exclusivity.
22:34 to their property. How would you accept that? I mean, that's what we purchase. That's what runs with us. The seller was the same seller for 54 is for us. He sold us an exclusive deed giving us access to our property. And it sounds like he sold 54 Mono Street, a promise that it's shared when public records that are recorded.
23:04 State that it is exclusive. This is a lot for us to grapple with and I don't think this is ready to be stamped approved. Hold on, please. So yeah, I just, it concerns me for our whole community that you can just interpret something that's recorded and legal to fit into one person's project. We're definitely all about workforce housing. We are not trying to
23:37 Put the kibosh on that. We just really want it done legally and not... We've made our argument of the numerous reasons why we don't want to share a driveway. It's not that we don't like sharing. We understand sharing is caring, not the problem. We just don't understand how we can not risk our safe access with the potentiality of all the chaos.
24:04 and cost that ensues and how it tarnishes our property for resale value. So we ask the commission to please pause this approval today until this is resolved. I'll spare you reading the lawyer's note. I can send that all out to you later after this meeting. That's it. Thank you, Kim. Would you mind sharing your lawyer's correspondence with the town staff just so it's included in the town packet? I would be happy to. Will it be included if I share it after the meeting today?
24:35 Yes, it will be. It'll be updated onto the record, so it's part of the record as public comments provided, and it'll be provided to the commission as well. Thank you. Thank you, Kim. Would anybody else care to make public comment? It might not be physically printed, but it will be shared out to everyone. We can print it if need be, but yeah. Any other public comment? Jamie, do we have any public comment via Zoom? No. Okay. Well, with that, I will close public comment.
25:18 And I will throw it back to staff. I believe Kim had three separate questions that perhaps you guys can address. Yeah, so I can address the questions on the density and the utility easement, and then Town Attorney Andy Morris will address the shared driveway and the legality of interpreting exclusive on the final map versus what was the conditions of approval.
25:45 Requiring the shared driveway. So our code defines density as the ratio of development intensity to gross lot area. And then it's to be based on the gross area prior to any required dedications. This means that we don't remove the IOD area or easements on the property because that property still remains as part of under the ownership of 54 Mono. So it's still the gross lot area there. We don't take that out when we're calculating density.
26:13 And then as far as the utility easement or utilities, currently the utilities for 54 Mono, one of the conditions of approval from the 1990 final map where that they were to be within a utility easement on that final map, that was not included on the final map, so there currently is no utility easement on there. And so technically there is a legal question as to whether the, you know,
26:40 And then Andy will respond to the
27:13 Exclusive easement on the final map versus the conditions of approval. Yeah, so the original subdivider made some mistakes in the process. They recorded a map that failed to reserve that utility easement and it inaccurately described the nature of the access easement, described as exclusive even though that's not the condition that was placed on by the town. And so you might think, well, okay, why do we care? They made a mistake, but here we are. But the thing is, the California law...
27:43 strongly discourages and tries to avoid the creation of lots that have no access to a road, what are sometimes called landlocked parcels. You can't have a landlocked parcel because the law recognizes that a parcel that can't get anywhere, that you can't get to from a road, that can't get from a parcel to a road, that doesn't do anyone any good. And so the law will
28:07 The courts have said over and over that if you have a parcel that appears to be landlocked, that has no record access to a road, they will find a way to give it access. And often that's through what's called an easement by necessity, where the court will say, well, we have this landlocked parcel, there has to be a way for it to get to a road, and so we're going to decide that it has an easement by necessity.
28:30 to get back to a road, even though it's not recorded anywhere, and even though it doesn't appear to exist, the court will say there is an easement. Implicitly, there's an easement. There's an ability for that parcel to get back to a road. And what they do is they do this really fact-specific analysis that you can boil down into saying they figure out who created the mess, and then whatever property was owned by the person who created the mess, that's where the easement goes. So in this case, it's a little bit unusual because we're not talking about trying to get 56 mono
28:59 Access over somebody else's property back to the road. We're talking about trying to give 56 Mono the ability to get to the road over its own property, which is a little bit unusual. But I think that if this were to get litigated, I think that a court would have no problem at all saying you just you can't read that easement as being exclusive because making that easement truly exclusive in favor of 56 Mono means that 54 has no way of getting out to Mono Street, which
29:28 As I said, courts will go to great lengths to try to avoid. So there is that one foot strip that was dedicated to the town. There's a no access easement along the property frontage. And then there's this maybe ambiguous easement in favor of 56 over 54. But I think that a court would say, yeah, we can't have a situation where 54 simply cannot get to the road. And I think the court would say that the exclusive
29:51 Easement is not really meant to be exclusive and that it just can't be as a matter of law because 54 has to have a way to get out to the street. So that's all I wanted to say about the shared driveway. I will add one thing to what Nolan said with the idea of you have to exclude easement areas from the lot size and calculating what can be built there. If you think about it, a lot of lots in Mammoth and in Truckee where I live and in other places too have all kinds of easements on them.
30:20 And in Mammoth especially, there are snow storage easements. A lot of the single family houses, a lot of the neighborhoods have snow storage easements in favor of the town across their frontages. There are also public utility easements all over the place. And the town has never deducted the area of those easements, snow storage or PUE or whatever it may be, from the area of the lot in calculating what can be built. The town just doesn't do that. And I'm not aware actually of any jurisdiction that does that.
30:47 And I'm not aware of anything in the law that requires the town to do that. So I understand this idea. I understand the position that Ms. Erickson has taken. I just, it's not consistent with how the town has ever done things. It's not consistent with how anyone does things, as far as I can tell. And I'm not aware of anything in the law that says that we have to do it that way. So just wanted to add that about the easement issue. Thank you, Andy. With that, I think I'll throw it back to the commission for any questions that...
31:17 It might have of staff or Andy's interpretation and clarification. I'll start maybe with my left. I guess my question, probably maybe Andy would have answered to it. I get, you know, if somebody, you know, did purchase a property and on their papers it said that it's, you know, this, you're buying A, B, C and D and then you find out the D was never actually part of the purchase, then how, like...
31:48 What would the 54 mono in this case, do they have any rights or what do you do? Do you go back into the cellar or what is the stipulation there? That's a really good question. There's a mechanism in the law for what's called a quiet title action. And a quiet title action is a specific form of lawsuit where the owner of property
32:16 might ask the court, can you please explain what our rights are? What are our rights? Do we have an easement? Do we not have an easement? Is our property burdened by an easement? Is it not burdened by an easement? Do we have an easement over somebody else's land or do we not? But any of those things can form the basis of a quiet title action where one or more property owners could go ask the court,
32:41 Can you please just tell us what the answer is? Can you please make a decision about what our rights are and what our rights are not? So I think that if the 54 and 56 mono property owners can't resolve things to their mutual satisfaction, I mean, I can't give anyone legal advice, of course, except the town, but that would be a path forward is somebody, somebody could go to court and ask a judge to decide what their rights are.
33:14 Further questions? Commissioner Ann? No? Commissioner Verruck? I just have a question regarding, you know, what our purview is versus what would be, I guess, litigated civilly. So, you know, with regard to utility easement, is that something that we are commenting on or taking into consideration? Or is that something that is dealt with?
33:44 between the two property owners. I think that the commission can think about that issue and I think that you could probably, if you wanted to approve this project, you could include a requirement that a utility easement be granted, which it sounds like the 54 Mono owner is willing to do. Certainly that was a requirement of the original map.
34:05 So having that condition now would be consistent with the original map requirements. And I think you could do that if you wanted to. And it doesn't sound like anyone would really object to that if the project is getting approved. Thank you. But to one further thought, though, I don't think that you can deny the project and then impose a condition that they dedicate a utility easement. You don't really have a mechanism to say no project, but give them an easement. That's not really within your purview.
34:35 Thank you. You're welcome. Commissioner Fleming, any questions? Thank you. All right, then I'll throw it back on the commission. Anybody want to express any opinions or thoughts or anybody care to make a motion? Well, I would just, I completely respect and understand where Erickson's and your neighbors are coming from with regard to this. And I'm really happy that some of us were able to meet out at your home and at your lot.
35:11 Last, whenever that was, a week or two ago. I think it was, it was really beneficial. I guess my, you know, just looking at the purview of what we're supposed to be deciding on today, I feel that the questions and concerns are things that are beyond what we as planning commissioners or I as a planning commissioner is required to address or vote on. So just in saying that,
35:41 I think that I'm not going to make a motion right now, but I just wanted to make that statement, that I appreciate both sides. I understand the frustration and I understand the concerns, but as far as what our purview is, I don't know that some of the concerns that you're bringing up are actually part of what the Planning Commission is supposed to be discussing or voting on. Thank you. Any other thoughts or opinions?
36:13 Comments that the Commission would like to make at this time? Then I think it's the appropriate time if someone would like to make a motion. I'll make a motion to adopt the Planning and Economic Development Commission resolution making the required CEQA and Municipal Code findings and approval use permit 24-003, major design review 24-006, and adjustment 25-005 with conditions as recommended by staff. One question.
36:55 We had included a slightly modified recommendation on the screen to, sorry, to include the, that's okay. And so if you want to clarify whether it is to include the slightly revised site plan that shifts it out of, shifts the building to the east to remove it out of that rear setback or not? Yes. And this would also, do we want to include the condition of approval for the utility easement? Yes.
37:24 So is that an official motion, Nolan? Jamie, is that an official motion? And I can clarify, and you can confirm that that was the intent, was to approve the project with the modification to, with the modified site plan, moving the building two feet to the east, and to include a condition of approval requiring a utility easement for 56 Mono Street be recorded. Is that correct? Is that your motion, Commissioner? Okay. And Jamie, that is,
37:55 Meet your requirements? Yes. Okay. So we have a motion in front of us. Do we have a second? We have a second. With that, do we have any further commission comments, opinions, thoughts that they'd like to express now? If not, I'd like to have a vote, please, Jamie. Commissioner Fleming? Yes. Commissioner Grand? Yes. Vice Chair Verruck? Yes. Chair Vanderhurst? Yes. Matter passes 4-0. Thank you very much for attending today, guys. Appreciate it.
38:27 Hopefully you guys can continue the conversation and find a compromise that is agreeable to both parties. You guys, I think, will be neighbors for a while, so hopefully this will work out to both of your benefits. Thank you very much. And with that, I'll move on to consent agenda. We have two packets of minutes, September 10th and September 23th from 2025.
38:58 Do we have any edits or would someone like to make a motion to approve the consent agenda? I'll make a motion to approve the consent agenda. Do we have a second? Second. Jamie, vote please. Commissioner Fleming? Yes. Commissioner Grand? Yes. Vice Chair Verruck? Yes. Chair Vanderhurst? Yes. Consent agenda passes. With that, we'll open it up to Commissioner Reports. I'll start on my right this time. Commissioner Fleming, do you have a report you'd like to submit? No. Commissioner Verruck?
39:32 No. Commissioner Grand. No. I don't as well. So with that, we'll move on to Nolan, Director's Report. Great. On the kind of the workforce housing side, so we'll start there. We are excited to announce that the 60 Joaquin Small Site Development Project, the interest list for the future sales of those units went live this past Monday. It is currently, it's a
40:00 Approximately 30 to 45 day period for anyone who is interested and is income eligible to submit through, we have a online application that we have flyers for, there's information in the sheet, information on our website and flyers around town. We can share that out with the commission as well so they can share it out with anyone who's interested. Those units are at a sales price of $505,000.
40:26 And the income eligibility is limited to households earning up to 150% AMI. So we're excited to see that project completed and moving forward. Also on the workforce housing side, for anyone who's driven through the parcel lately, over the past month they've gone from just foundations to now there's four buildings out there. So all the mods have mostly gone in and the buildings are largely starting to look like buildings, which is exciting to see that progress out there.
40:56 On the kind of non-workforce housing side, as at Mammoth Creek Inn yesterday, our kind of ongoing project that we're hoping to complete for their final sign-off, it's exciting to announce that water and engineering have signed off on the building permits for those new buildings out there.
41:16 For planning, I signed off on one of their building permits. Then for the remaining one, they're to provide a bond for their future landscaping work. So we're holding that CFO up until we get that bond to ensure they complete the landscaping work as required. And then building provided a punch list recently of just some items they needed to clean up and complete on the inside. So they'll re-inspect once they call out, but it is nearing completion, which is exciting.
41:44 The 540 commercial project, the developer continues to work on the variance plans. He has expressed that he is working on those and plans to submit soon. I wish I had more concrete dates on that, but we continue to push on that one. Then as far as some other significant projects for planning, that'll come before the commission at some point in the future. We don't have dates yet because they're still working through environmental review and design review on these projects.
42:12 But we are reviewing an application for the wood site for the two parcels there along Minaret for a 70-unit condo development project. It's currently going through a environmental review and design review. Once those items kind of get worked through and all the completeness items, we'll then look to schedule that for a future PEDC meeting. We also have an application for 474 Joaquin. So that's the three vacant parcels on the corner of Meridian and Joaquin.
42:41 It's proposed for a 39-unit condo development project on those three sites. It's also currently going through environmental review and design review. And also as a part of that project, they're working with the town to connect the drainage that comes into the site from above and below into the existing storm drain infrastructure. So that will then help with any future flooding and issues down drainage from that site.
43:11 And then the other project, we are currently working through a concept review application for the three corners up at the North Village area. So that's the northwest, the southwest, and the southeast corners there. The current, it's currently just a concept review, so it's not a full entitlement package yet. We have been meeting weekly with the applicant team as we review their project. And I know they're also looking to hopefully get a joint town council and commission meeting at some point in the future.
43:41 Just to get some input and answer any questions they might have on their project. So that project, it has a proposal for a branded hotel with a conference center, some restaurant and retail space, and then some branded residences. So the current proposals for those three sites. Some more to come on all three of those projects, but they're currently in the planning review phase.
44:06 And the first two you mentioned, Nolan, are probably going to be approaching design review earlier than the third one. Correct. The first two have an advisory design panel meeting scheduled for next Wednesday. So that's our body made up of the two design committee members as well as three design professionals from the community. We'll be reviewing those two projects here soon. Got it.
44:35 Thank you. Any updates from the Sierra Center Mall? Nothing yet, other than their building permit will expire at the end of 2025 if they have not made progress and called for an inspection. Got it. Okay. And then the last question I've got for you, Nolan, is I believe you're trying to touch base with Brianna, the Executive Director of the Chamber, about a possible subcommittee. Would you mind just...
45:03 Touching on that really quickly. Sure. So continue to get with Brianna so we can kind of discuss the details of what that body might look like. We hope to have something here. My goal would be at the December meeting to kind of daylight that committee and hopefully make some appointments to it and then begin meeting. Got it. Any questions for Nolan? No. I've heard that 80-50, is that 80-50 that brewery that's supposed to be opening across from Harmony? 50-50. 50-50.
45:33 They didn't get some permits and they won't hold? So they have a tenant improvement building permit submitted that's currently going through the planning review process. They were starting some of the demo work inside the tenant space prior to the permit being issued. They thought they could do that under their existing kind of outside.
45:57 It's not a tenant improvement, the outside renovation project. However, they did get a stop work order notice until their permit's been issued. I believe as of last Thursday, the only outstanding comments were from planning, and they addressed what they needed. So it might even be issued yet. I can follow up with that. But they are moving forward on their tenant improvements. Okay, thanks. Any other questions for Nolan or staff? No? Thank you, Nolan. Appreciate it.
46:28 And with that, I'll close the directive report and adjourn today's meeting into our next regularly scheduled meeting, which will be November 12, 2025, 9 a.m. in this building. Thank you, everyone. Appreciate it. Thanks, everybody.
47:32 That's because I didn't update. Oh, see? I mean, yeah, I don't think mine updated yet because I connected. I literally don't update and it stops working because I haven't updated and so on. I'm sure it's what IT wants to hear.