Airport Admin & Ops (Dept 471)

The adopted FY2026-27 budget for Airport Admin & Ops (Dept 471) lists $1,625,054 in total expenses [1] Budget line item detail.pdf, p. 32. By our calculation that is $186,310 (+12.9%) above the FY2025-26 adopted budget of $1,438,744 [1] Budget line item detail.pdf, p. 32[2] Budget - Line Item Detail.pdf, p. 30. Earlier records trace the ARFF/snow removal equipment facility from 2021 cost estimates, through a redesign, to the phased Multipurpose Building [3] Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf, p. 1[4] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[5] Final Budget Adoption FY26-27.pdf, p. 36.

Updated

Findings

12 findings

  1. 1 Airport Admin & Ops (Dept 471) adopted expense budget for FY2026-27 is $1,625,054, up 12.9% from FY2025-26

    Updated

    The FY2026-27 adopted budget for Dept 471 total expenses is $1,625,054 [1] Budget line item detail.pdf, p. 32. The FY2025-26 adopted budget was $1,438,744, and the FY2026-27 line-item table shows the same amount in its 'APPROVED BUDGET 25-26' column [2] Budget - Line Item Detail.pdf, p. 30[1] Budget line item detail.pdf, p. 32. By our calculation the difference is +$186,310 (+12.9%) [2] Budget - Line Item Detail.pdf, p. 30[1] Budget line item detail.pdf, p. 32. The same table lists a modified FY2025-26 budget of $1,555,135 [1] Budget line item detail.pdf, p. 32. By our calculation the FY2026-27 adopted figure is $69,919 (+4.5%) above that modified figure [1] Budget line item detail.pdf, p. 32.

    Regular Salaries (account 220-471-40000) were $416,898 in the FY2025-26 adopted budget and $472,418 in the FY2026-27 adopted budget, a difference of +$55,520 (+13.3%) by our calculation [3] Budget - Line Item Detail.pdf, p. 29[1] Budget line item detail.pdf, p. 32. Health Ins Premiums (account 220-471-41002) were $141,027 in FY2025-26 and $224,147 in FY2026-27, a difference of +$83,120 (+58.9%) by our calculation [3] Budget - Line Item Detail.pdf, p. 29[1] Budget line item detail.pdf, p. 32.

    The FY26-27 final budget narrative for the Airport Operational Fund (220) says the airport budget has operating and capital project components [4] Final Budget Adoption FY26-27.pdf, p. 31. It also says FY26-27 included significant staff level modifications, including promotion of an Airport Manager, and that the General Fund contribution increased for FY26-27 [4] Final Budget Adoption FY26-27.pdf, p. 31[5] Final Budget Adoption FY26-27.pdf, p. 30.

    Why it matters

    They cover the airport operating department only; capital projects sit in the larger Fund 220 totals [1] Budget line item detail.pdf, p. 32[4] Final Budget Adoption FY26-27.pdf, p. 31.

    Sources

    1. Budget line item detail.pdf

      attachmentmeeting/filed datep. 32

    2. Budget - Line Item Detail.pdf

      attachmentmeeting/filed datep. 30

    3. Budget - Line Item Detail.pdf

      attachmentmeeting/filed datep. 29

    4. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 31

    5. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 30

  2. 2 Airport Operational Fund (220) adopted budget for FY2026-27 totals $4,248,684, above $3,866,744 in FY2025-26

    Updated

    The FY2026-27 adopted budget for Fund 220 lists Total Revenue of $4,248,684 and Total Expenditures of $4,248,684 [1] Budget line item detail.pdf, p. 31. The FY2025-26 adopted budget listed $3,866,744 for both totals [2] Budget - Line Item Detail.pdf, p. 29. By our calculation that is +$381,940 (+9.9%) [1] Budget line item detail.pdf, p. 31[2] Budget - Line Item Detail.pdf, p. 29.

    Interfund Transfers In (account 220-000-39999) is $1,350,406 in the FY2026-27 adopted budget [1] Budget line item detail.pdf, p. 31. It was $1,164,095 in the FY2025-26 adopted budget, a difference of +$186,311 (+16.0%) by our calculation [2] Budget - Line Item Detail.pdf, p. 29[1] Budget line item detail.pdf, p. 31. The FY2026-27 adopted budget also lists $2,013,030 for 'Phase 1 - Site Work FAA' [1] Budget line item detail.pdf, p. 31.

    The Final Budget Adoption FY26-27 says including them can make the annual budget fluctuate with the size and scope of projects [3] Final Budget Adoption FY26-27.pdf, p. 31. The actual expenditures for Fund 220 Airport in FY2016-17 were $2,482,810, and the actual revenue for Fund 220 Airport in FY2016-17 was $1,399,053 [4] Fund 220 - Airport Line Item Detail, p. 3.

    Why it matters

    The Fund 220 total includes airport capital projects, so it is much larger than the Dept 471 operating figure [3] Final Budget Adoption FY26-27.pdf, p. 31[5] Budget line item detail.pdf, p. 32.

    Sources

    1. Budget line item detail.pdf

      attachmentmeeting/filed datep. 31

    2. Budget - Line Item Detail.pdf

      attachmentmeeting/filed datep. 29

    3. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 31

    4. Fund 220 - Airport Line Item Detail

      attachmentmeeting/filed datep. 3

    5. Budget line item detail.pdf

      attachmentmeeting/filed datep. 32

  3. 3 The airport's Multipurpose Building was redesigned and split into phases; Phase 1 sitework ran April to July 2026

    Updated

    The FY24-25 budget book says the Multipurpose Building to Include ARFF and SRE was originally designed in 2023 [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. It says bids were not received on the structure portion and the FAA revised its eligibility for the facility based on operational changes at the airport, so the project was being redesigned [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. It also says an Airport Improvement Program (AIP) grant application was submitted to the FAA in April 2024 [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. An agenda packet filed with the December 4, 2024 meeting lists the action 'Redesign the Multipurpose Building into multiple phases and continue to work on receiving a competitive grant for building construction' [2] Agenda (PDF), p. 158.

    The FY25-26 final budget lists Total Budget FY25-26 Design of $350,000 for the redesign (AP2a) [3] FY25-26 Final Budget.pdf, p. 34. It describes a proposed 7-bay building and says the redesign was underway and the project would be ready to rebid in early 2025 [3] FY25-26 Final Budget.pdf, p. 34.

    The February 18, 2026 Public Works Engineering CIP Update lists the 'Airport Multipurpose Building Phase 1 - A3 Taxiway & Site Work' budget as $2.69M (Phase 1) [4] February 2026 Public Works Engineering CIP Update.pdf, p. 1. It says a pre-construction meeting would be held that month and construction was expected to start in April [4] February 2026 Public Works Engineering CIP Update.pdf, p. 1. The same update says staff planned a competitive discretionary grant request to the FAA for FFY 26 [4] February 2026 Public Works Engineering CIP Update.pdf, p. 1.

    The FY26-27 final budget document says Phase 1 began April 27, 2026 and would be completed by July 10, 2026 [5] Final Budget Adoption FY26-27.pdf, p. 36. The same document says that at the beginning of 2026 the FAA planning group flagged the airport for Airport Resiliency funding and the airport was 'on track to be awarded $1.5 million toward a building' [5] Final Budget Adoption FY26-27.pdf, p. 36. A September 2, 2026 staff report says the Phase I sitework was constructed in the summer of 2026 [6] Agenda (PDF), p. 43.

    Sources

    1. FY24-25 TOML BUDGET BOOK Web.pdf

      attachmentmeeting/filed datep. 165

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 158

    3. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    4. February 2026 Public Works Engineering CIP Update.pdf

      attachmentmeeting/filed datep. 1

    5. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    6. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 43

  4. 4 Staff recommended awarding the Multipurpose Building Phase II contract to Spiess Construction for $3,882,400

    Updated

    A September 2, 2026 Town Council staff report, prepared by Airport Manager Soibian Spring, recommends that Council award the contract to the lowest responsive bidder, Spiess Construction Co., Inc., in the amount of $3,882,400.00 [1] Agenda (PDF), p. 43. The Agenda (PDF) recommends authorizing the Airport Manager to approve minor revisions up to an additional 10% of the award amount [1] Agenda (PDF), p. 43.

    The report says this portion was separated to be eligible for special supplemental 'Airport Resilience' funding, and that the Multipurpose Building is otherwise not competitive for discretionary funds because of a lack of enplanements and commercial airline service [1] Agenda (PDF), p. 43. It says the Town currently stores snow removal equipment in a rented hangar and that the location, size, monthly cost and access to the runway create operational challenges [1] Agenda (PDF), p. 43.

    The September 2, 2026 agenda lists the award as item 10.1 [2] Agenda (HTML), p. 1. The excerpt provided does not show the vote on it [3] September 2, 2026 Minutes.pdf, p. 3.

    Of that, $1,681,560 is in the TOML GF Uncommitted column and $2,200,840 in the FAA column [4] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1. By our calculation those two amounts sum to $3,882,400 [4] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1.

    Why it matters

    The records provided do not explain the labeling [4] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1[1] Agenda (PDF), p. 43.

    Sources

    1. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 43

    2. Agenda (HTML)

      agenda_htmlmeeting/filed datep. 1

    3. September 2, 2026 Minutes.pdf

      attachmentmeeting/filed datep. 3

    4. Table 2 - CIP Budget Outlook for 26-27.pdf

      attachmentmeeting/filed datep. 1

  5. 5 In 2021 the Town estimated the ARFF/snow removal equipment facility and site work at $4.2 million

    Updated

    The August 15, 2021 engineering proposal letter put the estimated construction cost of the site work at $2,000,000 [1] 2021 Proposal - MMH ARFF-Maintenance - Site Work Engineering.pdf, p. 1. A separate August 15, 2021 proposal put the estimated construction cost of the ARFF/Maintenance Building at $2,100,000 [2] 2021 Proposal - MMH ARFF-Maintenance - Building Design-Build.pdf, p. 1.

    A staff report dated September 15, 2021 gave a 'current estimate for the ARFF/SCE Facility and associated site work' of $4.2 million [3] Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf, p. 1. It said the project was a high priority item in the Capital Improvement Program approved by Town Council on September 1, 2021 [3] Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf, p. 1. It described a facility footprint of approximately 8,400 SF plus a mezzanine of approximately 2,300 SF, 'for a total size of 10,000' [4] Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf, p. 2.

    A January 19, 2022 staff report said the airport leases a hangar from the Fixed Base Operator at $6,169.66 per month to house some of its equipment, and that the hangar cannot hold all of it [5] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1. It described the proposed ARFF/SRE Facility as an 8-bay, 8,100 sq. ft. building [5] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1. It said staff planned to request design funds in the 2022 grant cycle and construction funds in the 2023 grant cycle [5] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1.

    A planning commission staff report filed with the January 10, 2023 meeting said the ARFF/SRE facility was listed as the second highest priority project in the 2021-2030 Airport Capital Improvement Program (ACIP) [6] 1_PEDC Staff Report.pdf, p. 9. A staff report filed with the April 9, 2025 meeting said the proposed multipurpose building was listed as the #1 priority project in the 2023-2030 ACIP [7] Staff Report.pdf, p. 8. The 2023 Annual Planning Report says the ARFF/SRE project was renamed the Multipurpose Building to include ARFF and SRE [8] Agenda (PDF), p. 140.

    Why it matters

    These are 2021-2022 estimates and proposals [9] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[10] Final Budget Adoption FY26-27.pdf, p. 36. The project was later redesigned and phased, as described in the Multipurpose Building findings [9] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[10] Final Budget Adoption FY26-27.pdf, p. 36.

    Sources

    1. 2021 Proposal - MMH ARFF-Maintenance - Site Work Engineering.pdf

      attachmentmeeting/filed datep. 1

    2. 2021 Proposal - MMH ARFF-Maintenance - Building Design-Build.pdf

      attachmentmeeting/filed datep. 1

    3. Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf

      attachmentmeeting/filed date Document date (date stated in document) p. 1

    4. Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf

      attachmentmeeting/filed date Document date (date stated in document) p. 2

    5. Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf

      attachmentmeeting/filed datep. 1

    6. 1_PEDC Staff Report.pdf

      attachmentmeeting/filed datep. 9

    7. Staff Report.pdf

      attachmentmeeting/filed datep. 8

    8. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 140

    9. FY24-25 TOML BUDGET BOOK Web.pdf

      attachmentmeeting/filed datep. 165

    10. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

  6. 6 Town Council voted 4-0 on October 6, 2021 to certify the Terminal Area Development Project Final EIR and authorize Brandley Engineering

    Updated

    Minutes of the October 6, 2021 Town Council meeting record a motion by Councilmember John Wentworth, seconded by Mayor Pro Tem Lynda Salcido [1] Minutes (HTML), p. 1.1[2] Agenda (PDF), p. 35. The motion was to adopt the resolution also authorized the agreement with Brandley Engineering for Design Services for the proposed ARFF/Snow Removal Equipment Facility [1] Minutes (HTML), p. 1.1[2] Agenda (PDF), p. 35. The motion carried 4 to 0, with Councilmember Sarah Rea absent [1] Minutes (HTML), p. 1.1[2] Agenda (PDF), p. 35.

    The staff report said the EIR covers the ARFF/SRE facility and other projects in the ACIP [3] Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf, p. 1.

    An EIR addendum filed with the April 9, 2025 meeting says the Town concludes that the proposed ARFF modifications would not involve new or more severe environmental impacts compared to those identified in the certified EIR [4] Attachment C - 2022 Addendum MMH Terminal Area Development Project EIR.pdf, p. 3.

    Sources

    1. Minutes (HTML)

      minutes_htmlmeeting/filed datep. 1.1

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 35

    3. Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf

      attachmentmeeting/filed date Document date (date stated in document) p. 1

    4. Attachment C - 2022 Addendum MMH Terminal Area Development Project EIR.pdf

      attachmentmeeting/filed datep. 3

  7. 7 Airport budgets list FAA grant revenue, and CARES operating support ended in FY2025-26

    Updated

    The 2020-2021 Council Adopted Budget lists a Council Approved Budget 2020-21 of $638,781 for 'FAA Grant-Covid-19 Operations' revenue (account 220-000-34405) [1] 2020-2021 Council Adopted Budget, p. 67. It lists $1,935,648 for 'Airport Improvement Plan #33' revenue [1] 2020-2021 Council Adopted Budget, p. 67. The Final Budget Line Item Detail filed with the June 16, 2021 meeting lists a Council Approved Budget 21/22 of $600,000 for FAA Grant-Covid-19 Operations [2] Final Budget Line Item Detail.pdf, p. 26. By our calculation that is -$38,781 (-6.1%) from FY2020-21 [1] 2020-2021 Council Adopted Budget, p. 67[2] Final Budget Line Item Detail.pdf, p. 26. The Final Budget Line Item Detail filed with the June 15, 2022 meeting lists a Council Approved Budget FY22-23 of $400,000 for 'AIP-47 FAA Grant ACRGP' [3] Final Budget Line Item Detail.pdf, p. 27.

    An August 2021 staff report said the Town would receive more than $3.2M from the FAA to support continued operations [4] Staff Report.pdf, p. 10. It said this funded almost all of operations in FY20-21 and that the FY21-22 budget scaled back reliance on the funding [4] Staff Report.pdf, p. 10. The FY25-26 Final Budget says the Town no longer has FAA CARES grant funding to support operations, 'resulting in a loss of revenue of $285,000 from the prior year', and that the General Fund contribution increased for FY25-26 [5] FY25-26 Final Budget.pdf, p. 29[6] FY25-26 Final Budget.pdf, p. 27.

    A January 19, 2022 staff report said the FAA funds 90.66% of AIP Entitlement project costs and the Town pays a 9.34% local sponsor match [7] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1. It said that for AIP projects in 2020 and 2021 the FAA paid the sponsor portion through a CARES program and would likely not do so in 2022 [7] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1. An April 20, 2022 staff report said the airport was allocated $1,011,184 for FY 2022 and another $1,011,184 for FY 2023 under the Bipartisan Infrastructure Law as Airport Infrastructure Grant (AIG) Allocated funds [8] Mammoth Yosemite Airport Management Support Services.pdf, p. 1. The FY26-27 budget narrative says FAA funding for capital improvements is typically more than 91% of any approved project, with the Town funding the remainder [9] Final Budget Adoption FY26-27.pdf, p. 31.

    Why it matters

    The records show the Town's airport operations and capital work have relied on FAA funding, and that the CARES operating support listed in earlier budgets was gone by FY25-26 [4] Staff Report.pdf, p. 10[5] FY25-26 Final Budget.pdf, p. 29.

    Sources

    1. 2020-2021 Council Adopted Budget

      financialfiscal year from document title Document date (fiscal year from document title) p. 67

    2. Final Budget Line Item Detail.pdf

      attachmentmeeting/filed datep. 26

    3. Final Budget Line Item Detail.pdf

      attachmentmeeting/filed datep. 27

    4. Staff Report.pdf

      attachmentmeeting/filed datep. 10

    5. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 29

    6. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 27

    7. Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf

      attachmentmeeting/filed datep. 1

    8. Mammoth Yosemite Airport Management Support Services.pdf

      attachmentmeeting/filed datep. 1

    9. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 31

  8. 8 Parking lot reconstruction carries a $1,945,000 construction budget; staff recommended a $1,703,490 award

    Updated

    The FY24-25 budget book lists 'Total Budget FY24-25 Construction: $1,945,000' for 'Reconstruct General Aviation and Terminal Area Parking Lot - Construction' [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. The FY25-26 Final Budget lists 'Total Budget FY25-26 Construction: $1,945,000' for the same project (AP9) [2] FY25-26 Final Budget.pdf, p. 34.

    A July 17, 2024 Town Council staff report says the Town advertised the project from February 23 to March 20, 2024, and bids were opened on March 20, 2024, at 3:00 PM [3] Award Airport Parking Lot Reconstruction Project.pdf, p. 1. It recommended that Council award the contract to the lowest responsive bidder, Meyers Earthwork, Inc., in the amount of $1,703,490.00 [3] Award Airport Parking Lot Reconstruction Project.pdf, p. 1. The report says the pavements had not been reconstructed in over 20 years [3] Award Airport Parking Lot Reconstruction Project.pdf, p. 1.

    They say an Airport Infrastructure Grant (AIG) application was submitted to the FAA in April 2024 and was 'currently pending approval' [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[2] FY25-26 Final Budget.pdf, p. 34. The FY24-25 budget book says construction was planned for late summer of 2024, and the FY25-26 Final Budget says late summer of 2025 [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[2] FY25-26 Final Budget.pdf, p. 34.

    Why it matters

    The planned construction season moved from late summer 2024 to late summer 2025 between the two budget documents [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[2] FY25-26 Final Budget.pdf, p. 34. The records provided do not state why [1] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[2] FY25-26 Final Budget.pdf, p. 34.

    Sources

    1. FY24-25 TOML BUDGET BOOK Web.pdf

      attachmentmeeting/filed datep. 165

    2. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    3. Award Airport Parking Lot Reconstruction Project.pdf

      attachmentmeeting/filed datep. 1

  9. 9 Records show airport apron, fencing and layout plan work done in 2021-2023 and AWOS construction starting July 2023

    Updated

    A January 19, 2022 staff report said that during 2021 the Reconstruction of East General Aviation Apron was completed and the Security Gates and Terminal Area Fencing was substantially completed, with punchlist items remaining [1] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1. The 2022 Annual Planning Report, included in the April 12, 2023 agenda packet, says the Security Gates and Terminal Area Fencing project, which began in 2021, was completed during 2022 [2] Agenda (PDF), p. 27. It says the project included a new 8-foot-tall chain link fence along part of the north side of the airport, two single cantilever vehicle gates, one pedestrian gate and a new security camera system [2] Agenda (PDF), p. 27.

    The 2023 Annual Planning Report, included in the document filed with the May 7, 2025 meetings for May 7 and May 14, 2025, says the Airport Layout Plan was completed and accepted by the FAA on February 13, 2023 [3] Agenda (PDF), p. 140[4] Agenda (PDF), p. 28. The same report says construction of the Automated Weather Observation System (AWOS) Relocation and Upgrade project began in July 2023 and would be completed in spring of 2024 [4] Agenda (PDF), p. 28. The January 2022 staff report says the existing AWOS was installed in 1988 and that the ARFF/SRE facility location would make it a sheltered site [1] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1.

    The FY24-25 budget book says the AWOS project was bid and awarded in 2022 and construction began in 2023 after a winter suspension [5] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. It says that as of 2024 the majority of construction was complete but long lead times on specialty equipment delayed completion, and lists Total Budget FY24-25 Construction of $541,000 [5] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165.

    Sources

    1. Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf

      attachmentmeeting/filed datep. 1

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 27

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 140

    4. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 28

    5. FY24-25 TOML BUDGET BOOK Web.pdf

      attachmentmeeting/filed datep. 165

  10. 10 Aviation Insights airport management contract: renewal for a year ending April 30, 2026 was proposed at $50,000

    Updated

    A staff report for the April 20, 2022 Town Council meeting recommended that Council approve the professional service agreement for Aviation Insights, LLC to provide Airport Management Support Services to Mammoth Yosemite Airport [1] Mammoth Yosemite Airport Management Support Services.pdf, p. 1. It cited staffing and air service changes and said additional management support was recommended from a firm experienced in FAA processes [1] Mammoth Yosemite Airport Management Support Services.pdf, p. 1.

    The Aviation Insights Renewal says the initial term expired in April 2025 and the proposed renewal is for one year, ending April 30, 2026 [2] Aviation Insights Renewal.pdf, p. 1. Its recommended motion was to approve the amendment and authorize the Town Manager to execute it [2] Aviation Insights Renewal.pdf, p. 1.

    The amended compensation exhibit lists $400/hour for Dennis Roberts of Aviation Insights, LLC, with a retainer of 4 hours/month [3] Aviation Insights Contract Amendment 1.pdf, p. 4. It says retainers would start September 2025 [3] Aviation Insights Contract Amendment 1.pdf, p. 4. The same exhibit lists $400/hour rates for two other consultants [3] Aviation Insights Contract Amendment 1.pdf, p. 4.

    Why it matters

    The pages provided show the 2022 recommendation and the 2025 recommended renewal [1] Mammoth Yosemite Airport Management Support Services.pdf, p. 1[2] Aviation Insights Renewal.pdf, p. 1. They do not show Council's votes on either [1] Mammoth Yosemite Airport Management Support Services.pdf, p. 1[2] Aviation Insights Renewal.pdf, p. 1.

    Sources

    1. Mammoth Yosemite Airport Management Support Services.pdf

      attachmentmeeting/filed datep. 1

    2. Aviation Insights Renewal.pdf

      attachmentmeeting/filed datep. 1

    3. Aviation Insights Contract Amendment 1.pdf

      attachmentmeeting/filed datep. 4

  11. 11 Airport capital reserve reached $1,273,340 in FY22-23 after $565,801 in capital project expenditure

    Updated

    The Fund Balance FY22-23 says the projects were funded with AIP Grant Revenue, restricted Passenger Facility Charge (PFC) money and use of fund balance, and that the cumulative effect brought the capital reserve to $1,273,340 [1] Fund Balance FY22-23.pdf, p. 17. The Fund Balance FY22-23 says the balance contributed is $500,000 and remains available for winter and summer 23/24 air service [1] Fund Balance FY22-23.pdf, p. 17.

    A staff report filed with the August 18, 2021 meeting said that in the fourth quarter airport operations had additional revenue of $106,400 and additional expense of $97,000 [2] Staff Report.pdf, p. 10. It said this resulted in $9,400 in additional fund balance [2] Staff Report.pdf, p. 10.

    Why it matters

    The FY22-23 document shows how the Town reported the airport's capital reserve and air subsidy balance at that point [1] Fund Balance FY22-23.pdf, p. 17.

    Sources

    1. Fund Balance FY22-23.pdf

      attachmentmeeting/filed datep. 17

    2. Staff Report.pdf

      attachmentmeeting/filed datep. 10

  12. 12 FY2026-27 CIP outlook lists $4,892,075 for the Wildlife Security Fence and $235,500 for taxilane design

    Updated

    A January 19, 2022 staff report described the Wildlife Security Fence as a top priority for the Airport and FAA, to be an 8-foot chain link fence around the Airport [1] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1. It said the project had been on hold due to USFS environmental clearance questions [1] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1.

    For the taxilanes, the FY24-25 budget book lists Total Budget FY24-25 Design of $150,000 for Town Hangar Taxilane Reconstruction - Design [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. The FY25-26 Final Budget lists Total Budget FY25-26 Design of $229,000 for the same project (AP4a) [3] FY25-26 Final Budget.pdf, p. 34. The February 18, 2026 CIP update says the Airport Tee-Hangar Taxilane Rehabilitation design was on hold, with environmental monitoring plans being finalized, at $229K (design) [4] February 2026 Public Works Engineering CIP Update.pdf, p. 1.

    Why it matters

    The figures are a budget outlook, not spending [5] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1.

    Sources

    1. Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf

      attachmentmeeting/filed datep. 1

    2. FY24-25 TOML BUDGET BOOK Web.pdf

      attachmentmeeting/filed datep. 165

    3. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    4. February 2026 Public Works Engineering CIP Update.pdf

      attachmentmeeting/filed datep. 1

    5. Table 2 - CIP Budget Outlook for 26-27.pdf

      attachmentmeeting/filed datep. 1