Fund 220 - Airport Operations
Fund 220's adopted FY2026-27 budget lists total revenue and total expenditures of $4,248,684 each, up from $3,866,744 each in the adopted FY2025-26 budget [1] Budget line item detail.pdf, p. 31[2] Budget - Line Item Detail.pdf, p. 29. The FY2025-26 budget narrative says the Town no longer had FAA CARES grant funding to support airport operations, a loss of $285,000 in revenue from the prior year [3] Agenda (PDF), p. 100. Records filed in 2026 show Multipurpose Building Phase 1 work beginning April 27, 2026, and a repackaged Phase 2 building heading to bid [4] Final Budget Adoption FY26-27.pdf, p. 36.
Updated
What stands out: Fund 220’s adopted FY2026-27 budget lists $4,248,684 in total revenue and the same amount in total expenditures, including airport operations and capital projects. [1] Budget line item detail.pdf, p. 31[2] Final Budget Adoption FY26-27.pdf, p. 31 The FY2025-26 final budget said FAA CARES operating support had ended, reducing Airport Operations revenue by $285,000 from the prior year and increasing the General Fund contribution. [3] FY25-26 Final Budget.pdf, p. 27[4] FY25-26 Final Budget.pdf, p. 29 The Town’s September 2026 staff report says Multipurpose Building Phase I site work was constructed during summer 2026. [5] Award the contract for the Mammoth Yosemite Airport Multipurpose Building Phase II Project to Speiss .pdf, p. 1
Findings
-
1 Fund 220's adopted FY2026-27 budget is $4,248,684 in both revenue and expenditures, up from $3,866,744 in FY2025-26
Updated
The line-item detail filed with the June 17, 2026 meeting shows total revenue of $4,248,684 and total expenditures of $4,248,684 in the "Adopted Budget 26-27" column for Fund 220 accounts [1] Budget line item detail.pdf, p. 31. The line-item detail filed with the June 18, 2025 meeting shows total revenue and total expenditures of $3,866,744 each in the "Adopted BUDGET 25-26" column [2] Budget - Line Item Detail.pdf, p. 29. By our calculation, each total rises $381,940 (+9.9%) from FY2025-26 to FY2026-27 [2] Budget - Line Item Detail.pdf, p. 29[1] Budget line item detail.pdf, p. 31.
The FY2026-27 table lists Interfund Transfers In of $1,350,406 (adopted, FY2026-27), against $1,164,095 in the FY2025-26 approved budget column [1] Budget line item detail.pdf, p. 31. By our calculation, that is $186,311 higher [1] Budget line item detail.pdf, p. 31. The same table has a revenue line labeled "Phase 1 - Site Work FAA" with $2,013,030 in the FY2026-27 adopted column and no amount in the FY2025-26 columns [1] Budget line item detail.pdf, p. 31.
The FY26-27 final budget narrative says the Airport budget has two parts, operating budget and capital projects, and that both are represented in revenue and expenditure [3] Final Budget Adoption FY26-27.pdf, p. 31. It says FAA funding for capital improvements is typically more than 91% of any approved project, with a required Town match for the remainder [3] Final Budget Adoption FY26-27.pdf, p. 31. It also says the General Fund contribution increased for FY26-27 and mentions the promotion of an Airport Manager and other staff-level modifications [3] Final Budget Adoption FY26-27.pdf, p. 31.
Why it matters
The Town's narrative says the capital projects in this fund can cause the annual budget to fluctuate with the size and scope of the project [3] Final Budget Adoption FY26-27.pdf, p. 31. It also says the General Fund contribution increased for FY26-27 [3] Final Budget Adoption FY26-27.pdf, p. 31.
Sources
- Budget line item detail.pdf
- Budget - Line Item Detail.pdf
- Final Budget Adoption FY26-27.pdf
-
2 The Town no longer had FAA CARES grant funding for airport operations in FY25-26, a $285,000 revenue loss from the prior year
Updated
The FY25-26 final budget narrative says: "For FY25-26, the Town no longer has FAA CARES grant funding to support operations, resulting in a loss of revenue of $285,000 from the prior year" [1] FY25-26 Final Budget.pdf, p. 29[2] Agenda (PDF), p. 100. It adds that the General Fund contribution increased for FY25-26 and that one additional part-time employee was added to support administrative functions in the Deputy Airport Manager's office [2] Agenda (PDF), p. 100.
A staff report filed with the September 2, 2020 meeting says the FAA CARES Act $1.1M grant could be used for operational expenses starting January 20, 2020 until fully expended [3] Staff Report, p. 12. A staff report filed with the October 20, 2021 meeting says that in FY20-21 the operational support normally provided by the General Fund was covered by the FAA CARES Act grant funding [4] Staff Report(1).pdf, p. 15. It says some expenditures were not authorized under CARES, so an additional General Fund contribution was required [4] Staff Report(1).pdf, p. 15.
A document filed with the December 6, 2023 meeting says CARES Act funds supported the majority of Airport operations in FY22-23 [5] Agenda (PDF), p. 117. The FY23-24 fund balance document says the FAA "generously provided over $3.2M in operational funding for MMH" during the pandemic [6] Fund Balance FY23-24.pdf, p. 16. It says that in FY23-24 the operational support normally provided by the General Fund was covered in part by FAA grant funding [6] Fund Balance FY23-24.pdf, p. 16. A staff report filed with the November 19, 2025 meeting says the same for FY24-25 [7] Staff Report - FY 2025-26 Fund Balance Quarter 1 Update FINAL.pdf, p. 16.
Why it matters
The budget narrative ties the end of CARES funding to a $285,000 revenue loss and a higher General Fund contribution for FY25-26 [2] Agenda (PDF), p. 100.
Sources
- FY25-26 Final Budget.pdf
- Agenda (PDF)
- Staff Report
- Staff Report(1).pdf
- Agenda (PDF)
- Fund Balance FY23-24.pdf
- Staff Report - FY 2025-26 Fund Balance Quarter 1 Update FINAL.pdf
-
3 Multipurpose Building Phase 1 construction began April 27, 2026, with funding totaling $2,234,630
Updated
The FY26-27 final budget says Phase 1 of the Multi-Purpose Building has 4 "usable units of work" funded by Airport Improvement Program and Airport Infrastructure Grant monies plus a 5% Town sponsor match, "all totaling $2,234,630" [1] Final Budget Adoption FY26-27.pdf, p. 36. The same page says the project began on April 27, 2026, and will be completed by July 10, 2026 [1] Final Budget Adoption FY26-27.pdf, p. 36. It describes the work as a vehicle access road to the Corporate Hangar row, removal of a taxiway connector and installation of a new one 400 ft. to the west, and the purchase of two Lighted Xs for runway closures [1] Final Budget Adoption FY26-27.pdf, p. 36.
The February 18, 2026 Public Works Engineering CIP Update listed "Airport Multipurpose Building Phase 1 – A3 Taxiway & Site Work" with a budget of $2.69M (Phase 1) [2] Agenda (PDF), p. 60. It said a pre-construction meeting would be held that month and construction was expected to start in April [2] Agenda (PDF), p. 60. The CIP Budget Outlook for 26/27, filed with the September 2, 2026 meeting, lists "AP2b Multipurpose Building Phase 1 - Construction" at $3,882,400 in its Totals column [3] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1. Of that total, $2,200,840 is under FAA and $1,681,560 under TOML - GF Uncommitted [3] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1. The pages do not explain why these three Phase 1 figures differ [1] Final Budget Adoption FY26-27.pdf, p. 36[2] Agenda (PDF), p. 60[3] Table 2 - CIP Budget Outlook for 26-27.pdf, p. 1.
Why it matters
The FY26-27 budget document gives a construction start of April 27, 2026, which is the start the February 2026 update had projected for April [1] Final Budget Adoption FY26-27.pdf, p. 36[2] Agenda (PDF), p. 60.
Sources
- Final Budget Adoption FY26-27.pdf
- Agenda (PDF)
- Table 2 - CIP Budget Outlook for 26-27.pdf
-
4 The ARFF/snow removal facility planned in 2021 became a redesigned Multipurpose Building; Phase 2 was repackaged in 2026
Updated
In August 15, 2021 proposals, the Town proposed to construct a new 8 Bay ARFF/Snow Removal Maintenance Facility in 2022 [1] 2021 Proposal - MMH ARFF-Maintenance - Site Work Engineering.pdf, p. 1[2] 2021 Proposal - MMH ARFF-Maintenance - Building Design-Build.pdf, p. 1. The estimated construction cost was $2,000,000 for the site work and $2,100,000 for the ARFF/Maintenance Building [1] 2021 Proposal - MMH ARFF-Maintenance - Site Work Engineering.pdf, p. 1[2] 2021 Proposal - MMH ARFF-Maintenance - Building Design-Build.pdf, p. 1. A staff report filed with the January 10, 2023 meeting says the proposed ARFF/SRE facility was listed as the second highest priority project in the 2021-2030 Airport Capital Improvement Program [3] 1_PEDC Staff Report.pdf, p. 9. A staff report filed with the April 9, 2025 meeting says the proposed multipurpose building was listed as the #1 priority project in the 2023-2030 ACIP [4] Staff Report.pdf, p. 8.
The FY25-26 final budget says the project was originally designed in 2023 but bids were not received on the structure portion [5] FY25-26 Final Budget.pdf, p. 34. It also says the FAA revised its eligibility for the facility, so the project was being redesigned as a building with 7 bays [5] FY25-26 Final Budget.pdf, p. 34. That budget lists a Total Budget FY25-26 Design of $350,000 [5] FY25-26 Final Budget.pdf, p. 34. The February 18, 2026 update said the new design had been submitted for building permit review and that staff planned a competitive discretionary FAA grant request for FFY 26 [6] Agenda (PDF), p. 60.
The FY26-27 final budget says Phase 2 was intended as the total building, and that the FAA warned that without sufficient enplanements it could take years to build up enough discretionary funding [7] Final Budget Adoption FY26-27.pdf, p. 36. It says that at the beginning of 2026 the Town's FAA planning group made it aware of Airport Resiliency funding, and "We are on track to be awarded $1.5 million toward a building" [7] Final Budget Adoption FY26-27.pdf, p. 36. Because that is not enough for the entire project, the Town spent $79,000 to repackage the plans into a smaller Snow Removal Equipment storage building, which the budget says would go out to bid on May 29, 2026 [7] Final Budget Adoption FY26-27.pdf, p. 36.
Why it matters
The records show the project's size, FAA eligibility and funding changing between the 2021 proposals and the 2026 budget [1] 2021 Proposal - MMH ARFF-Maintenance - Site Work Engineering.pdf, p. 1[5] FY25-26 Final Budget.pdf, p. 34[7] Final Budget Adoption FY26-27.pdf, p. 36. The pages provided do not show whether the May 29, 2026 bid went out [7] Final Budget Adoption FY26-27.pdf, p. 36.
Sources
- 2021 Proposal - MMH ARFF-Maintenance - Site Work Engineering.pdf
- 2021 Proposal - MMH ARFF-Maintenance - Building Design-Build.pdf
- 1_PEDC Staff Report.pdf
- Staff Report.pdf
- FY25-26 Final Budget.pdf
- Agenda (PDF)
- Final Budget Adoption FY26-27.pdf
-
5 Airport parking lot reconstruction carries a $1,945,000 construction budget in both the FY24-25 and FY25-26 budget documents
Updated
The FY25-26 final budget lists a Total Budget FY25-26 Construction of $1,945,000 for "Reconstruct General Aviation and Terminal Area Parking Lot - Construction (AP9)" [1] FY25-26 Final Budget.pdf, p. 34. The FY24-25 budget book lists a Total Budget FY24-25 Construction of $1,945,000 for the same project [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. The FY24-25 book says construction was planned for late summer of 2024, and the FY25-26 budget says late summer of 2025 [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[1] FY25-26 Final Budget.pdf, p. 34. Both say bids were opened in March 2024, a successful bid was received within the budget, and an Airport Infrastructure Grant application submitted in April 2024 was pending approval [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[1] FY25-26 Final Budget.pdf, p. 34. The adopted FY25-26 revenue detail lists an "AIP-52 Terminal and GA Parking" line of $1,945,000 [3] Budget - Line Item Detail.pdf, p. 29.
A July 17, 2024 Town Council staff report, prepared by Deputy Airport Manager Sierra Waugh, recommended that Council award the contract to the lowest responsive bidder, Meyers Earthwork, Inc., in the amount of $1,703,490.00 [4] Award Airport Parking Lot Reconstruction Project.pdf, p. 1. Staff also recommended authorizing the Deputy Airport Manager to approve minor revisions up to an additional 10% of the award amount [4] Award Airport Parking Lot Reconstruction Project.pdf, p. 1. The page provided does not show the Council's vote [4] Award Airport Parking Lot Reconstruction Project.pdf, p. 1.
Why it matters
The documents show the same $1,945,000 project budget carried across two fiscal years while the planned construction season moved from 2024 to 2025 [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165[1] FY25-26 Final Budget.pdf, p. 34. The recommended award amount was lower, at $1,703,490.00 [4] Award Airport Parking Lot Reconstruction Project.pdf, p. 1.
Sources
- FY25-26 Final Budget.pdf
- FY24-25 TOML BUDGET BOOK Web.pdf
- Budget - Line Item Detail.pdf
- Award Airport Parking Lot Reconstruction Project.pdf
-
6 The AWOS relocation and upgrade was still under construction in 2024, with a $541,000 FY24-25 construction budget
Updated
The 2023 Annual Planning Activities Report, included in an agenda packet filed with the May 14, 2025 meeting, says construction on the Automated Weather Observation System (AWOS) Relocation and Upgrade project "began in July 2023 and will be completed in spring of 2024" [1] Agenda (PDF), p. 28. It says the scope included relocating the AWOS to a new location further west near the segmented circle and upgrading the equipment [1] Agenda (PDF), p. 28.
The FY24-25 budget book says the AWOS had to be relocated to build the Multipurpose Building because an AWOS needs an object free area around it [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. It says the project was bid and awarded in 2022 and construction began in 2023 after a winter suspension, with an FAA AIP grant received for construction in 2022 [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. It says that as of 2024 the majority of construction was complete but long lead times on specialty equipment had delayed completion, which was expected in 2024 [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. The listed Total Budget FY24-25 Construction is $541,000 [2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165.
Why it matters
The expected completion moved from spring 2024 in the 2023 report to later in 2024 in the budget book [1] Agenda (PDF), p. 28[2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165. The pages provided do not show a final completion date [1] Agenda (PDF), p. 28[2] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165.
Sources
- Agenda (PDF)
- FY24-25 TOML BUDGET BOOK Web.pdf
-
7 Aviation Insights' airport management contract was extended one year to April 30, 2026; staff later reported a new instrument approach
Updated
The FY2024-25 budget book says the Town contracted with Aviation Insights in 2022 to provide staff development and advanced knowledge of FAA operations [1] 2024-2025 Budget Book, p. 125. An April 20, 2022 staff report recommended that Council approve a professional service agreement with Aviation Insights, LLC for Airport Management Support Services [2] Mammoth Yosemite Airport Management Support Services.pdf, p. 1.
A Town Council Agenda Action Sheet for the May 7, 2025 meeting recommended approving an amendment for one additional year [3] Agenda (PDF), p. 221. It says the Town engaged Aviation Insights in April 2022, "The initial term of the agreement expired in April 2025," and the proposed renewal is for one year ending April 30, 2026 [3] Agenda (PDF), p. 221. The Agenda (PDF) says a key part of the initial contract was developing a new Instrument Approach Procedure, and that the extension is meant to support the FAA's review of those proposals [3] Agenda (PDF), p. 221.
Exhibit C (Amended) of Amendment 1, filed with the same meeting, lists hourly rates of $400/hour for Dennis Roberts of Aviation Insights, LLC, and also for Matt Barton of Flightpath Economics, LLC and Ronald Price of QED Airport & Aviation Consultants [4] Aviation Insights Contract Amendment 1.pdf, p. 4. It lists retainers of 4 hours/month each for Roberts and Barton, starting September 2025 [4] Aviation Insights Contract Amendment 1.pdf, p. 4. The pages provided do not show the Council's vote on the amendment [3] Agenda (PDF), p. 221[4] Aviation Insights Contract Amendment 1.pdf, p. 4.
At the February 4, 2026 Town Council meeting, an airport representative reporting to Council said the Town, working with Aviation Insights, QED and Flight Path Economics and the FAA, had implemented a new instrument approach procedure (at 0:15:02 in the recording) [5] Town Council — 2026-02-04 16:00:00, 12:12. The representative said the approach became available on January 22 and "took about two years" (at 0:16:00 in the recording) [5] Town Council — 2026-02-04 16:00:00, 12:12.
Why it matters
The records show the contract term, its $50,000 one-year value and the hourly rates in the 2025 amendment [3] Agenda (PDF), p. 221[4] Aviation Insights Contract Amendment 1.pdf, p. 4. They also show a 2026 staff report to Council crediting the consultants with a new approach procedure [5] Town Council — 2026-02-04 16:00:00, 12:12.
Sources
- 2024-2025 Budget Book
- Mammoth Yosemite Airport Management Support Services.pdf
- Agenda (PDF)
- Aviation Insights Contract Amendment 1.pdf
- Town Council — 2026-02-04 16:00:00
-
8 On October 6, 2021, Council voted 4-0 to certify the airport Terminal Area Development Project Final EIR
Updated
The document filed with the October 6, 2021 meeting record a motion by Councilmember John Wentworth, seconded by Mayor Pro Tem Lynda Salcido, to adopt a resolution certifying the Mammoth Yosemite Airport Terminal Area Development Project Final Environmental Impact Report [1] Minutes (HTML), p. 1.1. The motion also adopted the CEQA findings and Mitigation Monitoring and Reporting Program, and authorized an agreement with Brandley Engineering for Design Services for the proposed ARFF/Snow Removal Equipment Facility [1] Minutes (HTML), p. 1.1. It carried 4 to 0, with Councilmember Sarah Rea absent [1] Minutes (HTML), p. 1.1.
A document filed with the February 16, 2022 meeting (an amendment to Supplemental Services Agreement No. 25 with Brandley Engineering) says the EIR was certified at the October 6, 2021 Council meeting [2] Amend Supplemental Services Agreements No. 25 with Brandley Engineering, Inc. .pdf, p. 3. It says an Environmental Assessment was approved by the FAA on November 15, 2021 [2] Amend Supplemental Services Agreements No. 25 with Brandley Engineering, Inc. .pdf, p. 3.
Why it matters
The document filed with the October 6, 2021 meeting and the 2022 document agree on the October 6, 2021 certification date, and the 2022 document adds the FAA's November 15, 2021 approval of the Environmental Assessment [1] Minutes (HTML), p. 1.1[2] Amend Supplemental Services Agreements No. 25 with Brandley Engineering, Inc. .pdf, p. 3.
Sources
- Minutes (HTML)
- Amend Supplemental Services Agreements No. 25 with Brandley Engineering, Inc. .pdf
-
9 Fund 220 records show annual operating excesses set aside for capital, and a capital reserve of $1,383,227 after FY2019-20
Updated
A staff report filed with the November 4, 2020 meeting says that in FY2019-20, "we had an operating revenue excess of $101,080, which will be held in reserve for future capital" [1] Staff Report, p. 16. It says the airport worked on eight major capital projects in FY2019-20, with capital project expenditure and vehicle purchase of $1,122,341, and that the cumulative effect brought the capital reserve to $1,383,227 [1] Staff Report, p. 16. A staff report filed with the November 20, 2019 meeting says revenue, mainly from PFCs and limited capital project work, "brings the capital reserve to $1,481,976" [2] Staff Report, p. 10.
The FY23-24 fund balance document says all funds transferred to the Airport remain in the fund, designated for future capital projects [3] Fund Balance FY23-24.pdf, p. 16. It says that in FY23-24 contributions and operational performance provided $146,110 recommended for capital projects [3] Fund Balance FY23-24.pdf, p. 16.
Why it matters
These documents show that operating results and transfers in this fund are tracked as reserves for future capital projects [1] Staff Report, p. 16[3] Fund Balance FY23-24.pdf, p. 16.
Sources
- Staff Report
- Staff Report
- Fund Balance FY23-24.pdf
-
10 An airport representative told Council in February 2026 that grant awards for airport capital projects exceeded $5 million
Updated
In a department report at the February 4, 2026 Town Council meeting, an airport representative said recent improvements "include grant awards of over $5 million for capital improvement projects, including AWOS relocation, a new landside parking lot" (at 0:17:55 in the recording) [1] Town Council — 2026-02-04 16:00:00, 12:12. The representative also listed the multi-purpose building design and a vehicle access road to the east hangars "coming this spring" (at 0:18:21 in the recording) [1] Town Council — 2026-02-04 16:00:00, 12:12. This is a statement made in a report to Council, not a figure from a budget table [1] Town Council — 2026-02-04 16:00:00, 12:12.
An April 20, 2022 staff report says Mammoth Yosemite Airport was allocated $1,011,184 for FY 2022 and another $1,011,184 for FY 2023 under the Bipartisan Infrastructure Law, as Airport Infrastructure Grant allocated funds [2] Mammoth Yosemite Airport Management Support Services.pdf, p. 1. It says those funds may be used on any project typically eligible under the Airport Improvement Program [2] Mammoth Yosemite Airport Management Support Services.pdf, p. 1. An August 18, 2021 staff report says the airport has a threshold of 10,000 enplanements it must meet annually in order to receive $1,000,000 in FAA funds for capital improvement [3] Staff Report.pdf, p. 10.
Why it matters
The records show FAA capital funding tied to allocations and an enplanement threshold, and the $5 million figure rests on a staff statement to Council [2] Mammoth Yosemite Airport Management Support Services.pdf, p. 1[3] Staff Report.pdf, p. 10[1] Town Council — 2026-02-04 16:00:00, 12:12.
Sources
- Town Council — 2026-02-04 16:00:00
- Mammoth Yosemite Airport Management Support Services.pdf
- Staff Report.pdf
-
n1 Timeline of routine actions
Updated
January 19, 2022: Town records give different AIP match figures: a 2018 staff report listed 90.34% FAA funding and a 9.66% Town match, while a 2022 staff report listed 90.66% FAA funding and a 9.34% Town match. [1] Staff Report ACIP, p. 3[2] Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf, p. 1
November 20, 2024: A fund-balance report lists Fund 220’s capital reserve at $1,735,415 and its overall fund balance at $2,329,415 at the end of FY2023-24. [3] Fund Balance FY23-24.pdf, p. 17
December 4, 2024: The FY2024-25 budget book lists a $1,945,000 construction budget for reconstruction of the General Aviation and Terminal Area Parking Lot. [4] FY24-25 TOML BUDGET BOOK Web.pdf, p. 165
May 7, 2025: A Town Council agenda action sheet proposed a one-year Aviation Insights, LLC contract extension through April 30, 2026, for Airport Management Support Services at a total contract amount of $50,000; the provided record does not establish Council approval. [5] Agenda (PDF), p. 221
June 18, 2025: The FY2025-26 final budget says FAA CARES funding no longer supported airport operations, resulting in a $285,000 revenue loss from the prior year; it says the General Fund contribution increased. [6] FY25-26 Final Budget.pdf, p. 27[7] FY25-26 Final Budget.pdf, p. 29
November 19, 2025: A Town fund-balance staff report describes Fund 220 as a restricted-revenue fund that includes airport operations, air-subsidy commitments and airport capital projects, and says transferred airport funds remain designated for future capital projects. [8] Staff Report - FY 2025-26 Fund Balance Quarter 1 Update FINAL.pdf, p. 16
June 17, 2026: The adopted FY2026-27 Fund 220 budget lists $4,248,684 in total revenue and $4,248,684 in total expenditures; by our calculation, each is $381,940, or 9.9%, above the FY2025-26 adopted total of $3,866,744. [9] Budget line item detail.pdf, p. 31[10] Budget - Line Item Detail.pdf, p. 29
September 2, 2026: A Town Council staff report says Multipurpose Building Phase I site work was constructed during summer 2026; the FY2026-27 budget describes its four usable units of work as totaling $2,234,630, funded by AIP and AIG money plus a 5% Town sponsor match. [11] Award the contract for the Mammoth Yosemite Airport Multipurpose Building Phase II Project to Speiss .pdf, p. 1[12] Final Budget Adoption FY26-27.pdf, p. 36 Fund 220 is a Restricted Revenue Fund because the revenue comes from charges to external users for goods and services as well as support and ongoing commitment from the General Fund and FAA grant revenues [8] Staff Report - FY 2025-26 Fund Balance Quarter 1 Update FINAL.pdf, p. 16.
Sources
- Staff Report ACIP
- Receive Update on Draft ACIP for Years 2022-31 and Adopt Resolution.pdf
- Fund Balance FY23-24.pdf
- FY24-25 TOML BUDGET BOOK Web.pdf
- Agenda (PDF)
- FY25-26 Final Budget.pdf
- FY25-26 Final Budget.pdf
- Staff Report - FY 2025-26 Fund Balance Quarter 1 Update FINAL.pdf
- Budget line item detail.pdf
- Budget - Line Item Detail.pdf
- Award the contract for the Mammoth Yosemite Airport Multipurpose Building Phase II Project to Speiss .pdf
- Final Budget Adoption FY26-27.pdf