Fund 300 - Capital Projects
Fund 300's adopted FY2026-27 budget lists $25,428,591 in total revenue and $27,215,900 in total expenditures, and $21,510,900 of the revenue is a Proceeds of Debt line [1] Budget line item detail.pdf, p. 36. By our calculation, two Contractual Services lines make up about 99% of those adopted expenditures [1] Budget line item detail.pdf, p. 36[2] Budget line item detail.pdf, p. 37. The Town's budget resolution says capital project funds are continuously appropriated until a project is complete [3] Resolution - Adopted Budget - FY26-27.pdf, p. 1. Airport capital projects are accounted for outside Fund 300 [4] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2[5] FY25-26 Final Budget.pdf, p. 34[6] Final Budget Adoption FY26-27.pdf, p. 36[7] Monthly Department Report.pdf, p. 2[8] Final Budget Adoption FY26-27.pdf, p. 30.
Updated
Findings
12 findings
-
1 Fund 300's adopted FY2026-27 budget lists $25,428,591 in revenue and $27,215,900 in expenditures, including $21,510,900 in Proceeds of Debt
Updated
The FY2026-27 budget line item detail filed with the June 17, 2026 meeting lists a Fund 300 adopted budget of $25,428,591 in total revenue and $27,215,900 in total expenditures [1] Budget line item detail.pdf, p. 36. The same table lists net revenue minus expenditures of $(1,787,309) [1] Budget line item detail.pdf, p. 36. Revenue is made up of three lines: CalTrans State Grants $3,730,000, Proceeds of Debt $21,510,900, and Interfund Transfers In $187,691 [1] Budget line item detail.pdf, p. 36.
The FY2025-26 line item detail filed with the June 18, 2025 meeting lists an adopted budget of $38,667,691 in total revenue and $44,773,449 in total expenditures [2] Budget - Line Item Detail.pdf, p. 34. That adopted FY2025-26 revenue includes $38,300,000 in Proceeds of Debt and $180,000 in CalTrans State Grants [2] Budget - Line Item Detail.pdf, p. 34. By our calculation, FY2026-27 adopted revenue is $13,239,100 lower than FY2025-26 (-34.2%) and adopted expenditures are $17,557,549 lower (-39.2%) [2] Budget - Line Item Detail.pdf, p. 34[1] Budget line item detail.pdf, p. 36. By our calculation, Proceeds of Debt is $16,789,100 lower (-43.8%) and CalTrans State Grants revenue is $3,550,000 higher [2] Budget - Line Item Detail.pdf, p. 34[1] Budget line item detail.pdf, p. 36.
The FY2026-27 document's own FY25-26 columns list total revenue of $367,691 (approved) and $5,577,691 (modified) [1] Budget line item detail.pdf, p. 36. These differ from the $38,667,691 adopted figure in the prior year's document, and the pages do not explain the difference [2] Budget - Line Item Detail.pdf, p. 34[1] Budget line item detail.pdf, p. 36. The Town Council resolution adopting the FY2026-27 budget says it is effective July 1, 2026 [3] Resolution - Adopted Budget - FY26-27.pdf, p. 1. According to the Budget line item detail, the adopted budget for Fund 300 Capital Projects for FY 2026-27 is $25,428,591 in total revenue and $27,215,900 in total expenditures, and the adopted budget for Fund 300 Capital Projects for FY 2026-27 includes $21,510,900 in Proceeds of Debt revenue [1] Budget line item detail.pdf, p. 36.
Why it matters
By our calculation, Proceeds of Debt is about 99.0% of Fund 300's adopted FY2025-26 revenue and about 84.6% of its adopted FY2026-27 revenue [2] Budget - Line Item Detail.pdf, p. 34[1] Budget line item detail.pdf, p. 36.
Sources
- Budget line item detail.pdf
- Budget - Line Item Detail.pdf
- Resolution - Adopted Budget - FY26-27.pdf
-
2 Two Contractual Services lines make up about 99% of Fund 300's adopted FY2026-27 expenditures, by our calculation
Updated
The FY2026-27 line item detail lists Dept 531 Capital Projects - Other, Contractual Services (300-531-43031) at $39,450,000 (approved budget 25-26), $40,260,000 (modified budget 25-26) and $22,253,788 (adopted budget 26-27) [1] Budget line item detail.pdf, p. 37. Total Dept 531 expenses are listed at $39,653,449 (approved 25-26), $40,463,449 (modified 25-26) and $22,490,900 (adopted 26-27) [1] Budget line item detail.pdf, p. 37.
Dept 530 Capital Projects - Streets lists Contractual Services (300-530-43031) at $4,700,096 in the adopted budget 26-27, within total Dept 530 expenses of $4,725,000 [2] Budget line item detail.pdf, p. 36. By our calculation, the two Contractual Services lines total $26,953,884, about 99.0% of the fund's $27,215,900 adopted expenditures [2] Budget line item detail.pdf, p. 36[1] Budget line item detail.pdf, p. 37. By our calculation, Dept 530 ($4,725,000) plus Dept 531 ($22,490,900) equals the $27,215,900 total [2] Budget line item detail.pdf, p. 36[1] Budget line item detail.pdf, p. 37.
Why it matters
Nearly all of Fund 300's adopted FY2026-27 expenditures sit in two Contractual Services account lines, by our calculation [2] Budget line item detail.pdf, p. 36[1] Budget line item detail.pdf, p. 37.
Sources
- Budget line item detail.pdf
- Budget line item detail.pdf
-
3 Town documents describe Fund 300 projects as funded without an annual General Fund source, with about $580,000 a year for roads
Updated
A 2017 staff report on the FY2017-18 tentative budget says the Capital Projects Fund (300) accounts for the majority of the Town's capital projects, most of which extend over multiple fiscal years [1] Staff Report, p. 13. The same report says the Town relies heavily on grant funds, state and federal allocations and other fund raising efforts [1] Staff Report, p. 13. The agenda action sheet for the April 27, 2022 preliminary FY22-23 CIP says the CIP is primarily funded with the planned use of reserves, the allocation of larger than budgeted TOT, and other revenues and grant funding [2] Preliminary Capital Improvement Program Projects and Budget for FY22-23.pdf, p. 1.
The 'Capital Projects Fund (300)' highlights for FY2024-25, in the December 4, 2024 agenda packet, say the Town has no annual General Fund source for CIP projects [3] Agenda (PDF), p. 190. The same page says work is pursued based on fund availability, which changes every year, and that the Town typically budgets approximately $580,000 each year to improve its roads and infrastructure [3] Agenda (PDF), p. 190. Initiative (245) at $3,250,000, AF3 60 Joaquin Affordable Housing Project at $2,700,000, and AF4 IIG Parcel Infrastructure at $11,000,000, all labeled 'Project Total' [3] Agenda (PDF), p. 190.
The FY25-26 budget assumptions list a continued allocation of $580,000 for road rehabilitation and related capital projects supported by reserves [4] FY25-26 Final Budget.pdf, p. 6. The FY26-27 budget assumptions list the same $580,000 allocation [5] Final Budget Adoption FY26-27.pdf, p. 1.1.
Why it matters
The records say Fund 300 project funding depends on what is available each year, and that road work gets a roughly $580,000 annual allocation supported by reserves [3] Agenda (PDF), p. 190[5] Final Budget Adoption FY26-27.pdf, p. 1.1.
Sources
- Staff Report
- Preliminary Capital Improvement Program Projects and Budget for FY22-23.pdf
- Agenda (PDF)
- FY25-26 Final Budget.pdf
- Final Budget Adoption FY26-27.pdf
-
4 The FY2026-27 budget resolution says Capital Project funds are continuously appropriated until the project is completed
Updated
The resolution adopting the FY2026-27 Annual Budget, dated June 17, 2026 in its text, says Capital Project revenues and expenditures may be distributed between individual project accounts within the Capital Project Fund [1] Resolution - Adopted Budget - FY26-27.pdf, p. 1. Under the resolution, this is done as recommended by the Public Works Director and approved by the Town Manager [1] Resolution - Adopted Budget - FY26-27.pdf, p. 1. It adds that Capital Project funds appropriated by the Town Council are continuously appropriated until the completion of the project [1] Resolution - Adopted Budget - FY26-27.pdf, p. 1[2] Resolution - Adopted Budget - FY26-27.pdf, p. 2.
The resolution also says the Town Manager is authorized to transfer funds within the budget and that the budget may be amended by Town Council action [1] Resolution - Adopted Budget - FY26-27.pdf, p. 1.
At 3:50:32 in the document filed with the May 4, 2022 meeting of the May 4, 2022 Town Council meeting, a speaker answering a Council question said 'in Fund 300, that is where all the capital project activity occurs' [3] Town Council — 2022-05-04 16:00:00, 3:45:26.
Why it matters
Money appropriated for a capital project stays available until the project is done, and shifts between project accounts within the fund require Public Works Director and Town Manager sign-off [1] Resolution - Adopted Budget - FY26-27.pdf, p. 1.
Sources
- Resolution - Adopted Budget - FY26-27.pdf
- Resolution - Adopted Budget - FY26-27.pdf
- Town Council — 2022-05-04 16:00:00
-
5 An April 1, 2026 budget transfer request lists four Fund 300 projects totaling $810,000, by our calculation
Updated
A budget transfer form with a stated date of request of 4/1/2026, filed with the April 1, 2026 meeting and requested by Rob Patterson, lists four Fund 300 capital projects [1] Attachment A - Budget Amendments.pdf, p. 1. They are: CRC Phase III Enhancement, $350,000; Shady Rest Restrooms, $300,000; Shady Rest Fence, $60,000; and Bike Park / Pump Track, $100,000 [1] Attachment A - Budget Amendments.pdf, p. 1.
For each project, the form shows the amount as a revenue credit to account 300-000-39999 and a matching expense amount in account 300-531-43031 [1] Attachment A - Budget Amendments.pdf, p. 1. By our calculation, the four amounts total $810,000 [1] Attachment A - Budget Amendments.pdf, p. 1. The page does not show an approval or the original source of the money [1] Attachment A - Budget Amendments.pdf, p. 1.
Why it matters
The form shows project-level amounts being set up inside Fund 300 on April 1, 2026, which the fund-level totals do not show [1] Attachment A - Budget Amendments.pdf, p. 1[2] Budget line item detail.pdf, p. 36.
Sources
- Attachment A - Budget Amendments.pdf
- Budget line item detail.pdf
-
6 The Main Street Landscaping Phase I construction contract is $528,263.10, within a project funded at $715,000
Updated
A staff report filed with the April 3, 2024 meeting says Town staff received two bids in February 2024: $517,905.00 from Gray's Grasshopper, Inc. and $1,091,000 from Alpine Landscape [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2. It says a bid review found no irregularities [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2. On March 20, 2024, the report says, the Town Council authorized $465,000 (FD 100 – General Fund) for the Main Street Landscaping capital project (Phase I and II) in the FY 2023-24 second quarter budget adjustment [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2. The report says the project is now fully funded with $715,000 allocated [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2.
The project will be accounted for in the Capital Improvement Department (531) of FD 300 – Capital Projects [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2.
Why it matters
The staff report ties one Fund 300 project to specific bids, a contract amount, contingency and remaining Phase II money [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2. The page does not say which bidder the contract narrative in the April 3, 2024 agreement was with or explain why the contract amount differs from the lowest bid [1] Authorize execution of contract for Main Street Landscaping project.pdf, p. 2.
Sources
- Authorize execution of contract for Main Street Landscaping project.pdf
-
7 The Town and Pacific West Communities were awarded a $20.6 million Infill Infrastructure Grant
Updated
The FY25-26 Final Budget says the Town and the Parcel Development Partner (Pacific West Communities) were awarded a $20.6 million Infill Infrastructure Grant (IIG) from the California Department of Housing and Community Development [1] FY25-26 Final Budget.pdf, p. 34[2] Agenda (PDF), p. 105. It says use of the funds will extend over several years as the Parcel is built out and will go to public and private infrastructure for the affordable housing project [1] FY25-26 Final Budget.pdf, p. 34. Build out is planned to include a minimum of 450 housing units [1] FY25-26 Final Budget.pdf, p. 34.
For Phase 1, the budget text says the funds covered the parking podiums of both buildings, underground infrastructure, the extension of Tavern Road, and integration of infrastructure on Laurel Mountain Road and Inyo Street [1] FY25-26 Final Budget.pdf, p. 34. It says the capital budget carries the grant funding over time and that actual use depends on construction schedules [1] FY25-26 Final Budget.pdf, p. 34. It lists 'Total Budget FY25-26 TBD with future phases of the Parcel' [1] FY25-26 Final Budget.pdf, p. 34. A December 4, 2024 agenda packet table lists AF4 IIG Parcel Infrastructure (Town Infrastructure) with a project total of $11,000,000 for FY24/25 [3] Agenda (PDF), p. 190.
Why it matters
The grant is described as paying out over several years, and the FY25-26 budget text gives no total for the parcel [1] FY25-26 Final Budget.pdf, p. 34.
Sources
- FY25-26 Final Budget.pdf
- Agenda (PDF)
- Agenda (PDF)
-
8 The McCoy Arts and Cultural Center is budgeted at $18,970,000 for FY26-27, up from $16,800,000 for FY25-26, with an early summer 2027 opening scheduled
Updated
The FY25-26 Final Budget lists the McCoy Arts and Cultural Center (MACC) (GF9) at 'Total Budget FY25-26 $16,800,000' [1] FY25-26 Final Budget.pdf, p. 34. It said the Town expected to break ground in late 2025 [1] FY25-26 Final Budget.pdf, p. 34. The FY26-27 Final Budget Adoption lists the Dave and Roma McCoy Mammoth Arts and Cultural Center (MACC) (GF9) at 'Total Budget FY26-27 $18,970,000' [2] Final Budget Adoption FY26-27.pdf, p. 36. By our calculation, that is $2,170,000 more [1] FY25-26 Final Budget.pdf, p. 34[2] Final Budget Adoption FY26-27.pdf, p. 36.
In both years the budget text lists funding sources for the new Performing Arts Auditorium as Measure U Capital funding reserves of $4.5 M, a $3M Mammoth Lakes Foundation contribution, Kern Community College District (local bond measure) funding of $7,500,000, and private donations [1] FY25-26 Final Budget.pdf, p. 34[2] Final Budget Adoption FY26-27.pdf, p. 36. The FY26-27 text says the Town Council authorized a purchase and sale agreement with the Mammoth Lakes Foundation on July 3, 2024, with minor amendments authorized May 7, 2025 [2] Final Budget Adoption FY26-27.pdf, p. 36. It says the Town broke ground in late 2025 and expects to open in summer 2027 [2] Final Budget Adoption FY26-27.pdf, p. 36.
A Monthly Department Report filed with the February 3, 2026 meeting says staff contracted with AMS Consulting to update the 2022 Operating Plan/Pro-forma [3] Monthly Department Report.pdf, p. 3. A Monthly Department Report filed with the August 4, 2026 meeting says concrete columns are complete, steel roof beams were scheduled for installation at the end of July or beginning of August, and the scheduled opening is early summer 2027 [4] Monthly Department Report.pdf, p. 2. The FY26-27 budget's staffing description says the Center is expected to open in late spring of 2027 [5] Final Budget Adoption FY26-27.pdf, p. 10.
Why it matters
The FY26-27 budget says its Measure U budget includes $180,000 in debt service for a portion of the land acquired from the Mammoth Lakes Foundation for MACC construction [6] Final Budget Adoption FY26-27.pdf, p. 1.1. The FY25-26 budget lists the same $180,000 [7] FY25-26 Final Budget.pdf, p. 6. The records give slightly different opening targets: late spring 2027, summer 2027 and early summer 2027 [5] Final Budget Adoption FY26-27.pdf, p. 10[2] Final Budget Adoption FY26-27.pdf, p. 36[4] Monthly Department Report.pdf, p. 2.
Sources
- FY25-26 Final Budget.pdf
- Final Budget Adoption FY26-27.pdf
- Monthly Department Report.pdf
- Monthly Department Report.pdf
- Final Budget Adoption FY26-27.pdf
- Final Budget Adoption FY26-27.pdf
- FY25-26 Final Budget.pdf
-
9 A consultant contract for the Community Bike Park/Pump Track requires services to be completed by December 31, 2026
Updated
A Monthly Department Report filed with the February 3, 2026 meeting says staff were evaluating survey results and continuing to determine the appropriate location(s) for the stated community bike park features [1] Monthly Department Report.pdf, p. 3. A Monthly Department Report filed with the August 4, 2026 meeting says the Town has contracted with the American Ramp Company for professional bike park consulting services [2] Monthly Department Report.pdf, p. 2. The scope lists kick-off and site review, preliminary concept, refined concept, final concept, and deliverables [2] Monthly Department Report.pdf, p. 2. The report says services shall be completed no later than December 31, 2026 [2] Monthly Department Report.pdf, p. 2.
The April 1, 2026 budget transfer form lists a Fund 300 'Capital Project - Bike Park / Pump Track' line of $100,000 [3] Attachment A - Budget Amendments.pdf, p. 1.
Why it matters
The records show the bike park moving from location evaluation in the February 2026 report to a consultant document filed with the February 3, 2026 meeting with a December 31, 2026 completion date in the August 2026 report [1] Monthly Department Report.pdf, p. 3[2] Monthly Department Report.pdf, p. 2.
Sources
- Monthly Department Report.pdf
- Monthly Department Report.pdf
- Attachment A - Budget Amendments.pdf
-
10 The FY2026-27 budget says airport capital projects are accounted for separately from Fund 300
Updated
The FY2026-27 Final Budget Adoption says the airport's capital projects are accounted for separately from standard capital improvement projects (Fund 300) due to restricted funding sources (FAA) [1] Final Budget Adoption FY26-27.pdf, p. 30. It says FAA funding for capital improvements is typically more than 91% of any approved project, with a required Town match to fund the remainder [1] Final Budget Adoption FY26-27.pdf, p. 30.
The Fund Balance FY23-24 document, filed with the November 20, 2024 meeting, says the Airport worked on six capital projects in FY23-24, with capital project expenditure of $454,450 [2] Fund Balance FY23-24.pdf, p. 17. It says these projects were funded using AIP Grant Revenue, restricted Passenger Facility Charge (PFC) revenue, and use of fund balance [2] Fund Balance FY23-24.pdf, p. 17. It lists the Airport's capital reserve at $1,735,415 and its overall fund balance at $2,329,415 [2] Fund Balance FY23-24.pdf, p. 17.
A staff report filed with the April 9, 2021 meeting lists 'Segmented Circle project competed Fall 2019' (as written) under an Airport Capital Improvement Program objective [3] Staff Report, p. 45.
Why it matters
Airport capital projects do not appear in Fund 300's totals, so Fund 300's adopted figures do not show airport project spending [1] Final Budget Adoption FY26-27.pdf, p. 30[4] Budget line item detail.pdf, p. 36.
Sources
- Final Budget Adoption FY26-27.pdf
- Fund Balance FY23-24.pdf
- Staff Report
- Budget line item detail.pdf
-
11 The airport multipurpose building was redesigned and split into phases; Phase 1 funding totals $2,234,630
Updated
A staff report filed with the April 9, 2025 meeting says the proposed multipurpose building for the airport's ARFF and snow removal equipment is an FAA required aviation safety structure and is listed as a top priority in the Airport Layout Plan and the Airport Capital Improvement Program [1] Staff Report.pdf, p. 7. A 2021 resolution gave a 'current estimate' for the ARFF/SCE Facility and associated site work (as written) of $4.2 million [2] Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf, p. 1.
The FY25-26 Final Budget lists the Multipurpose Building redesign (AP2a) at 'Total Budget FY25-26 Design: $350,000' [3] FY25-26 Final Budget.pdf, p. 34. It says the project was originally designed in 2023, that no bids were received on the structure, and that the FAA revised its eligibility, so the project is being redesigned [3] FY25-26 Final Budget.pdf, p. 34. For AP9 it says bids were opened in March 2024, a grant application was pending, and construction was planned for late summer 2025 [3] FY25-26 Final Budget.pdf, p. 34.
The FY26-27 Final Budget Adoption says the building is now being built in phases [4] Final Budget Adoption FY26-27.pdf, p. 36. Phase 1 has 4 usable units of work funded by AIP and AIG monies plus a 5% Town match, 'all totaling $2,234,630', and was to begin April 27, 2026 and be completed by July 10, 2026 [4] Final Budget Adoption FY26-27.pdf, p. 36. For Phase 2, it says the Town spent $79,000 to repackage plans into a smaller snow removal equipment storage building, expects to be awarded $1.5 million in Airport Resiliency funding, and planned to bid the project on May 29, 2026 [4] Final Budget Adoption FY26-27.pdf, p. 36.
Why it matters
The most recent record on the building is the FY26-27 budget text, which describes Phase 1 work scheduled for April to July 2026 and a Phase 2 bid planned for May 29, 2026 [4] Final Budget Adoption FY26-27.pdf, p. 36. The pages reviewed do not show whether those steps happened [4] Final Budget Adoption FY26-27.pdf, p. 36.
Sources
- Staff Report.pdf
- Resolution Certifying Environmental Impact Report and Agreement with Brandley Engineering for ARFF and Maintenance Facility.pdf
- FY25-26 Final Budget.pdf
- Final Budget Adoption FY26-27.pdf
-
12 A draft Whitmore agreement would let the Town build recreational amenities only with LADWP's written consent and plan approval
Updated
A staff report for the February 21, 2024 meeting recommended approving the Whitmore Recreation Area Joint Operations and Maintenance Agreement with Mono County, subject to final legal review and approval by Mono County [1] Whitmore Park Complex Agreement Between Town of Mammoth Lakes and Mono County.pdf, p. 1. It says the Town fully funds capital improvements at Whitmore Park with no reimbursement from the County, and that over the past couple of years this investment was approximately $595,700 [1] Whitmore Park Complex Agreement Between Town of Mammoth Lakes and Mono County.pdf, p. 1. It says the proposal eliminates the sharing of capital costs [2] Whitmore Park Complex Agreement Between Town of Mammoth Lakes and Mono County.pdf, p. 2.
The attached agreement text, marked 'DRAFT v3 – DH', says that upon LADWP's written consent and approval of construction plans, the Town may construct new recreational amenities and improve existing facilities at the Park Facilities [3] TOML and Mono County Whitmore Agreement 021224dh.pdf, p. 3. It says that unless the parties agree on a cooperatively funded project, the party initiating a project pays for its planning, design, development and construction [3] TOML and Mono County Whitmore Agreement 021224dh.pdf, p. 3. It also makes the Town solely responsible for arranging and paying for utility service and snow removal on the leased site for the Park Facilities, and for LADWP water use fees [3] TOML and Mono County Whitmore Agreement 021224dh.pdf, p. 3.
Why it matters
They do not show whether the agreement was finalized or which Town fund pays for the projects [1] Whitmore Park Complex Agreement Between Town of Mammoth Lakes and Mono County.pdf, p. 1[3] TOML and Mono County Whitmore Agreement 021224dh.pdf, p. 3.
Sources
- Whitmore Park Complex Agreement Between Town of Mammoth Lakes and Mono County.pdf
- Whitmore Park Complex Agreement Between Town of Mammoth Lakes and Mono County.pdf
- TOML and Mono County Whitmore Agreement 021224dh.pdf