The Final Budget Adoption FY26-27 document lists a total budget of $100,000 for Park Signage (PR16), the same figure the FY25-26 Final Budget shows for FY25-26, and lists the TBID Kiosk (TBID1) total budget as TBD [1] Final Budget Adoption FY26-27.pdf, p. 36[2] FY25-26 Final Budget.pdf, p. 34[3] Final Budget Adoption FY26-27.pdf, p. 44. A 2026 operating plan says the Town will maintain regulatory, etiquette, interpretive and wayfinding signs on the trail network, and that new signage on public lands must be pre-approved by the U.S. Forest Service [4] 4.2.2 NonFundedCCS_OpPlan_2627.pdf, p. 7. A 2026 Strategic Priorities document says a comprehensive review and inventory of existing signage is being planned [5] 2026 Strategic Priorities .pdf, p. 5.

Updated

Findings

12 findings

  1. 1 Park Signage (PR16) shows a $100,000 total budget in both FY2025-26 and FY2026-27

    Updated

    The Final Budget Adoption FY26-27 document, filed with the June 17, 2026 meeting, describes Park Signage (PR16) as funding set aside to construct three new park monument signs consistent with the municipal signage and wayfinding program, with "Total Budget FY26-27 $100,000" [1] Final Budget Adoption FY26-27.pdf, p. 36. The signs are to be located at Mammoth Creek Park West, the Dog Park, and Shady Rest Park, and work will begin in summer 2026 [1] Final Budget Adoption FY26-27.pdf, p. 36. The page says the contract will be combined with the TBID signage and some informational signs at Mammoth Creek Park [1] Final Budget Adoption FY26-27.pdf, p. 36. The Tentative Budget FY26-27 and a June 3, 2026 agenda packet contain the same wording [2] Tentative Budget FY26-27.pdf, p. 17[3] Agenda (PDF), p. 111.

    The FY25-26 Final Budget, filed with the June 18, 2025 meeting, lists "Total Budget FY25-26 $100,000" for Park Signage (PR16), with the same three locations and the statement "Work will begin in summer 2025" [4] FY25-26 Final Budget.pdf, p. 34[5] FY25-26 Final Budget.pdf, p. 39. By our comparison, the total budget is $100,000 in each of the two fiscal years cited [4] FY25-26 Final Budget.pdf, p. 34[1] Final Budget Adoption FY26-27.pdf, p. 36.

    Why it matters

    The listed locations and start year differ between the earlier recommendation, the FY25-26 budget and the FY26-27 budget [6] 3rd Qtr FY22-23.pdf, p. 3[5] FY25-26 Final Budget.pdf, p. 39[1] Final Budget Adoption FY26-27.pdf, p. 36.

    Sources

    1. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 36

    2. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 111

    4. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 34

    5. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 39

    6. 3rd Qtr FY22-23.pdf

      attachmentmeeting/filed datep. 3

  2. 2 TBID Kiosk (TBID1) budget is listed as TBD in the FY25-26 and FY26-27 budget documents

    Updated

    The Tentative Budget FY26-27 and a June 3, 2026 agenda packet repeat this text [1] Tentative Budget FY26-27.pdf, p. 17.1[2] Agenda (PDF), p. 114.

    The FY25-26 Final Budget lists "Total Budget FY25-26: $TBD" for the same project and says "The scope and scale of the project are in development" [3] FY25-26 Final Budget.pdf, p. 44.

    Why it matters

    The kiosk project, which the budget text says was designed under the Municipal Signage and Wayfinding Project, carries no dollar figure in either year's budget document [4] Final Budget Adoption FY26-27.pdf, p. 44[3] FY25-26 Final Budget.pdf, p. 44.

    Sources

    1. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17.1

    2. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 114

    3. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 44

    4. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 44

  3. 3 SHARP Trailhead project: $1,015,000 estimated cost, $950,000 grant award, and signs included in the work

    Updated

    The May 15, 2024 agenda packet says there was "a gap in funding for the full construction and a need for contingency" [1] Agenda (PDF), p. 215. It says the total cost is estimated at $1,015,000 with a grant award of $950,000 [1] Agenda (PDF), p. 215.

    A March 6, 2024 Town Council staff report recommended that the Council award the base bid contract to the lowest responsive bidder, Spiess Construction Co., Inc., for $1,015,303.00 [2] Award contract for S.H.A.R.P. Trailhead Facilities.pdf, p. 1. The page shows the recommendation, not a Council vote [2] Award contract for S.H.A.R.P. Trailhead Facilities.pdf, p. 1.

    The report says the project was advertised on February 3, 2024 and includes interpretive signs and a wayfinding sign [2] Award contract for S.H.A.R.P. Trailhead Facilities.pdf, p. 1. It also says a design contract was awarded in late 2023 to address the parking lot condition, lack of amenities and "need for better signage" [2] Award contract for S.H.A.R.P. Trailhead Facilities.pdf, p. 1.

    Why it matters

    The records show the project's estimated cost, its grant, the additional local funds staff sought, and that interpretive and wayfinding signs are part of the advertised work [1] Agenda (PDF), p. 215[2] Award contract for S.H.A.R.P. Trailhead Facilities.pdf, p. 1.

    Sources

    1. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 215

    2. Award contract for S.H.A.R.P. Trailhead Facilities.pdf

      attachmentmeeting/filed datep. 1

  4. 4 MLT services agreements list signage and wayfinding as an example of Tourism Reserve capital investment

    Updated

    The MLT Services Agreement says the reserve may be used to fund extra work agreed to by the parties, including "capital investment (i.e. signage and wayfinding)" [1] Contract.pdf, p. 21. The same language continues on a page filed with the April 28, 2021 meeting [2] Services Agreement, p. 21.

    Draft versions of the MLT Services Agreement for FY 2023-24 to 2027-28, filed with the May 3 and May 17, 2023 meetings, repeat that wording [3] Agenda (PDF), p. 126[4] Draft MLT Contract 2023 - 2028.pdf, p. 20[5] Agenda (PDF), p. 218[6] Draft MLT Contract 2023 - 2028.pdf, p. 20. They add that use of the reserve requires Council approval through a resolution, appropriation of the funds and a budget amendment [6] Draft MLT Contract 2023 - 2028.pdf, p. 20. They also say the reserve is not to be used to supplant required services in the agreement [6] Draft MLT Contract 2023 - 2028.pdf, p. 20. These pages are labeled drafts, and the cited pages do not show the final adopted text [4] Draft MLT Contract 2023 - 2028.pdf, p. 20.

    The May 15, 2024 agenda packet, in its Tourism Reserve section, says staff recommended $115,000 be allocated to a project to professionally light 14 large trees on major routes in Town [7] Agenda (PDF), p. 215. The project includes lighting on the monument signs welcoming visitors to the Town on Highway 203 [7] Agenda (PDF), p. 215.

    Why it matters

    Successive MLT agreements name signage and wayfinding as an example of what the Tourism Reserve may fund, and a 2024 packet includes signage items in its Tourism Reserve section [1] Contract.pdf, p. 21[6] Draft MLT Contract 2023 - 2028.pdf, p. 20[7] Agenda (PDF), p. 215.

    Sources

    1. Contract.pdf

      attachmentmeeting/filed datep. 21

    2. Services Agreement

      attachmentmeeting/filed datep. 21

    3. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 126

    4. Draft MLT Contract 2023 - 2028.pdf

      attachmentmeeting/filed datep. 20

    5. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 218

    6. Draft MLT Contract 2023 - 2028.pdf

      attachmentmeeting/filed datep. 20

    7. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 215

  5. 5 MLT agreements list wayfinding among communication tools MLT develops

    Updated

    The scope page of the MLT Services Agreement for FY 2026-2027 to 2030-2031, filed with the June 17, 2026 meeting, lists under "Visitor and Local Communication" the example "Develop and maintain visitor-facing tools such as maps, guides, signage, and wayfinding" [1] MLT Services Agreement 2026-2031 - final.pdf, p. 16. The page says the examples are "not limited to" those listed [1] MLT Services Agreement 2026-2031 - final.pdf, p. 16.

    The July 2021 update's examples include banners and "Wayfinding" [2] Contract MLT Revised July 2021.pdf, p. 16.

    Why it matters

    Both agreements name wayfinding among the visitor communication tools MLT develops, and the 2026-2031 agreement adds signage and maintenance of such tools [2] Contract MLT Revised July 2021.pdf, p. 16[1] MLT Services Agreement 2026-2031 - final.pdf, p. 16.

    Sources

    1. MLT Services Agreement 2026-2031 - final.pdf

      attachmentmeeting/filed datep. 16

    2. Contract MLT Revised July 2021.pdf

      attachmentmeeting/filed datep. 16

  6. 6 A 2026 operating plan says the Town will maintain trail signs, and new signs on public lands need Forest Service pre-approval

    Updated

    A mutual interest agreement filed with the same meeting says the Town and U.S. Forest Service entered a Memorandum of Understanding in January 2020 to create an enhanced trails-based recreational experience using "integrated wayfinding and interpretation" [1] 4.2.1 26-CS-11050400-008-FS_Agreement.pdf, p. 3.

    Why it matters

    The operating plan assigns sign maintenance on the trail network to the Town and requires Forest Service pre-approval for new signage on public lands [2] 4.2.2 NonFundedCCS_OpPlan_2627.pdf, p. 7.

    Sources

    1. 4.2.1 26-CS-11050400-008-FS_Agreement.pdf

      attachmentmeeting/filed datep. 3

    2. 4.2.2 NonFundedCCS_OpPlan_2627.pdf

      attachmentmeeting/filed datep. 7

  7. 7 Trail signage history: a 2011 plan chapter and ARRA signage deliverables recorded in 2024 packet notes

    Updated

    The Item 5.3 TSMP analysis, filed with the April 11, 2024 meeting (its notes column says "last edit January 2021"), says deliverables were submitted to the Town for inclusion in the ARRA signage and wayfinding program "to be installed in the summer of 2011" [1] Item 5.3 - TSMP_Analysis.pdf, p. 4[2] Item 5.3 - TSMP_Analysis.pdf, p. 23. It also says the "Section in Standards Manual" was "complete and in use" [1] Item 5.3 - TSMP_Analysis.pdf, p. 4.

    Under the same item, the notes list "Complete messaging for 95 signs - 2/24/11" and "58 map files for ARRA signage - 2/24/11" [3] Item 5.3 - TSMP_Analysis.pdf, p. 11[4] Agenda (PDF), p. 93. They also list a "Complete QC (Quality Control) report delivered to TOML on 8/23/12: 12 discreet QC tasks for all 95 signs" [3] Item 5.3 - TSMP_Analysis.pdf, p. 11.

    Why it matters

    The notes do not show what was later installed [3] Item 5.3 - TSMP_Analysis.pdf, p. 11[1] Item 5.3 - TSMP_Analysis.pdf, p. 4.

    Sources

    1. Item 5.3 - TSMP_Analysis.pdf

      attachmentmeeting/filed datep. 4

    2. Item 5.3 - TSMP_Analysis.pdf

      attachmentmeeting/filed datep. 23

    3. Item 5.3 - TSMP_Analysis.pdf

      attachmentmeeting/filed datep. 11

    4. Agenda (PDF)

      agenda_pdfmeeting/filed datep. 93

  8. 8 A Town Loop pathway proposal lists sign types and paintwork at eight points near Eagle Lodge and Juniper Springs Resort

    Updated

    The MLTS Town Loop Pathway Signage and Wayfinding Update Proposal, filed with the February 11, 2021 meeting, is described as "Affecting Eagle Lodge and Juniper Springs Resort" [1] Item #5 - Waterford Signs - EagleJuniper Proposal, p. 1. Its key lists 4/6 signs at points 1, 3, 7 and 8, and a 6a sign at point 5 [1] Item #5 - Waterford Signs - EagleJuniper Proposal, p. 1. It lists a 6a sign plus paintwork (sharrow) at point 4, a 6a sign plus paintwork at point 6, and paintwork connecting the path across a parking lot at point 2 [1] Item #5 - Waterford Signs - EagleJuniper Proposal, p. 1. The proposal says the project "is projected to be implemented in Spring 2021 upon review and approval from Eagle Lodge and Juniper Springs Resort" [1] Item #5 - Waterford Signs - EagleJuniper Proposal, p. 1.

    Why it matters

    The proposal names the sign types, locations and approvals needed for a planned 2021 update of Town Loop wayfinding [1] Item #5 - Waterford Signs - EagleJuniper Proposal, p. 1.

    Sources

    1. Item #5 - Waterford Signs - EagleJuniper Proposal

      attachmentmeeting/filed datep. 1

  9. 9 Trails budget records show a $6,000 signage and wayfinding estimate in 2021 and an $11,000 line in the FY2223 proposed budget

    Updated

    A reply said "We did a big bump this year because we did a lot of new signage" [1] Mammoth Trails Committee — 2021-04-08, 17:49. That exchange follows a question about the design guidelines and standards manual line, and the recording does not tie the $2,000 to the signage and wayfinding line [1] Mammoth Trails Committee — 2021-04-08, 17:49.

    Attachment 4.1, filed with the May 3, 2022 meeting and titled "MLTS Proposed Budget for FY2223" (last updated 22.04.21), lists "Signage & Wayfinding" at 11,000.00 under Implementation, and "Standards Manual" at 1,000.00 under Design [2] Attachment 4.1 - Measure R and U Budget Requests.pdf, p. 8.

    Why it matters

    The trails program budget documents give a $6,000 estimate (fiscal year not stated) and a proposed $11,000 line for FY2223 for signage and wayfinding [1] Mammoth Trails Committee — 2021-04-08, 17:49[2] Attachment 4.1 - Measure R and U Budget Requests.pdf, p. 8.

    Sources

    1. Mammoth Trails Committee — 2021-04-08

      transcriptmeeting/filed date

    2. Attachment 4.1 - Measure R and U Budget Requests.pdf

      attachmentmeeting/filed datep. 8

  10. 10 The 2026 Strategic Priorities say a comprehensive review and inventory of existing signage is being planned

    Updated

    The 2026 Strategic Priorities document, filed with the December 17, 2025 meeting, lists under Community Connectivity: "Enhance wayfinding and mobility plans and upgrades" [1] 2026 Strategic Priorities .pdf, p. 5. The staff comment says there is still a desire to connect with partners like Mono County, creating a similar look and feel to their trails [1] 2026 Strategic Priorities .pdf, p. 5. It adds that "A comprehensive review and inventory of existing signage to evaluate effectiveness, seeking to reduce fatigue and overload is being planned" [1] 2026 Strategic Priorities .pdf, p. 5.

    Sources

    1. 2026 Strategic Priorities .pdf

      attachmentmeeting/filed datep. 5

  11. 11 The Municipal Wayfinding and Community Messaging Program appears in 2011 Planning Commission and Council records and in the 2021 Parcel Master Plan

    Updated

    In a recording of an October 5, 2011 meeting, a speaker summarized direction as "work with the Arts Commission on the Kabbalah sign and through this also merged with this Wayfinding Program" [1] Town Council — 2011-10-05, 3:28:10. The same speaker said "you're holding off on the concept of funding discussions" for the North Gateway [1] Town Council — 2011-10-05, 3:28:10.

    The 2021 Parcel Master Plan, filed with the May 11, 2022 meeting, requires that all directional and wayfinding signage within The Parcel development "shall be consistent with the Town of Mammoth Lakes Municipal Wayfinding and Community Messaging Program or Mammoth Lakes Trail System signage as appropriate" [2] Attachment C_The 2021 Parcel Master Plan.pdf, p. 25.

    Why it matters

    Records from 2011 and 2021 show the Municipal Wayfinding and Community Messaging Program moving through commission and Council review and later being referenced as a standard for signage on The Parcel [3] Minutes, p. 1[1] Town Council — 2011-10-05, 3:28:10[2] Attachment C_The 2021 Parcel Master Plan.pdf, p. 25.

    Sources

    1. Town Council — 2011-10-05

      transcriptmeeting/filed date

    2. Attachment C_The 2021 Parcel Master Plan.pdf

      attachmentmeeting/filed datep. 25

    3. Minutes

      minutes_htmlmeeting/filed datep. 1

  12. 12 Two other budget project descriptions include signage and wayfinding within larger projects

    Updated

    The Final Budget Adoption FY26-27 describes the Main Street South Side MUP (TR2) as including 1700LF of multi-use path along with "lighting, signage and wayfinding, and other supportive infrastructure" [1] Final Budget Adoption FY26-27.pdf, p. 42. That document lists "Total Budget FY26-27: $200,000", and says only the design phase has been funded [1] Final Budget Adoption FY26-27.pdf, p. 42. The Tentative Budget FY26-27 lists "Total Budget FY26-27: $250,000" for the same project, and the FY25-26 Final Budget lists $250,000 for FY25-26 [2] Tentative Budget FY26-27.pdf, p. 17[3] FY25-26 Final Budget.pdf, p. 41.

    Sources

    1. Final Budget Adoption FY26-27.pdf

      attachmentmeeting/filed datep. 42

    2. Tentative Budget FY26-27.pdf

      attachmentmeeting/filed datep. 17

    3. FY25-26 Final Budget.pdf

      attachmentmeeting/filed datep. 41

Updates

Added after this page was first published. The summary and findings above are unchanged.

: MLTS contractor's one-year extension for Fiscal Year 2627 includes MLTS wayfinding; Town commits minimum $44,783 for up to 450 hours; McCoy Update lists signage and wayfinding among its operational updates

An agenda packet filed with the October 26, 2026 meeting says the MLTS contractor, Mammoth Lakes Trails and Public Access, is working under a one-year contract extension for Fiscal Year 2627 [1]. The packet lists the projects as administration and operations implementation (website management for mammothtrails.org) and graphic, design, media and mapping services (MLTS wayfinding, handouts, promotional material) [1]. The same page says TOML has committed to minimum Base Compensation of $44,783, to be paid to MLTPA for up to 450 hours of work [1]. The Agenda (PDF) does not report actual spending [1].

The McCoy Update attachment filed with the November 2, 2026 meeting has an "Operational Updates" page [2]. Under Branding and Design, it lists a new website, a social presence (Facebook/Instagram), and signage and wayfinding [2]. The same page appears in the November 2, 2026 agenda packet [3]. The page states: "While the physical building is funded – the mission is not!" [2] It says a 3-year budget is being built, focusing on the ramp-up to full operational capabilities and economics, with a presentation to Commission and Council in December [2]. Other listed items include setting goals with Mammoth Lakes Performing Arts Foundation, defining audio, video, projection and lighting capabilities, hiring a Technical Operations Supervisor, and an RFP process for a new ticketing system [2]. The page gives no further detail on the signage and wayfinding item, such as scope, cost or schedule [2].

  1. Mammoth Trails Committee 2026-10-26: Agenda (PDF), p. 12
  2. Mammoth Lakes Recreation Board 2026-11-02: 5.1.1 The McCoy Update_MLR.Nov.2026.pdf, p. 10
  3. Mammoth Lakes Recreation Board 2026-11-02: Agenda (PDF), p. 65